Corporate Presentation November 2012 Les aimants permanents au néodyme, le futur de l’ énergie verte TSX.V: GMA
Corporate Presentation November 2012
Les aimants permanents au néodyme, le futur de l’énergie verte
TSX.V: GMA
Our presentation contains «forward-looking statements» not based on historical facts. Forward-looking statements express, as of the date of this presentation, our estimates, forecasts, projections, expectations and opinions as to future events or results. The forward looking statements that are contained in this presentation are based on various assumptions and estimates by the Corporation and involve a number of risks and uncertainties. As a consequence, actual results may differ materially from results forecast or suggested in these forward-looking statements and readers should not place undue reliance on forward-looking statements. We caution you that such forward-looking statements involve known and unknown risks and uncertainties, as discussed in the Corporation’s filings with Canadian Securities Administrators. Various factors may prevent or delay our plans, including but not limited to, contractor availability and performance, weather, access, mineral prices, success and failure of the exploration and development carried out at various stages of the program, and general business, economic, competitive, political and social conditions. The Corporation expressly disclaims any obligation to update any forward-looking statements, except as required by applicable securities laws.”
Forward Looking Statements
2
3
Projects Portfolio
GéoMégA Team
4
Board, Management and Consultants have demonstrated success in resource discovery, project development, finance & corporate governance.
5
Share Capital, Shareholders and History
Low share count providing significant upside potential.
Insiders and close hands hold a strong position of issued shares.
6
MONTVIEL – Rare Earths/Niobium (100% interest)
7
Montviel - Proximity to Labour and Infrastructure
Supported by Stakeholders
HWY 113 Signing of a Pre-Development Agreement on October 20, 2011
8
● 45 km from Montviel; ● Current population of 1,800; ● Supports Montviel sustainable development; ● New 25 kV Substation in 2015.
● 60 minutes from Montviel; ● Current population of 2,800; ● Supports Montviel sustainable development; ● Rail road and airport facilities.
9
MONTVIEL – Preliminary Economic Assessment
Expected in February 2013
10
All infrastructures required for mining and processing located on site.
Project energy provided by a 45 km long power line connected to the Hydro-Québec distribution network.
Production in 2016
MONTVIEL – Preliminary Economic Assessment
MONTVIEL – Core Zone Surface Plan (-50m)
11 Updated NI 43-101 resource calculation expected in December 2012
MONTVIEL – Heavies Zone (HRE-S)
12 Additional drilling required to define full extend of HRE-S zone
13
14
15
16
MONTVIEL = Fast Tracked Development
17
Phase 1 Drilling 10,000 meters
Initial 43-101
-183.9 Mt Indicated @ 1.45% TREO - 66.7Mt Inferred @ 1.46% TREO
SGS Géostat
Mineralogy QEMSCAN
Rep
ort
- Fluoro-Carbonates - Coarse grains SGS Lakefield
Phase 2 Drilling 24,000 meters
Final 43-101
> 40 Mt Measured @ ~ 2% TREO Elzéar Belzile
Metallurgy
Preliminary Economic Assessment
Flow
Sh
eet
- G MINING: Mining, Economic Model, Report - GOLDER Ass.: Geotechnical, Hydrogeology, Geochemical
- ROCHE: Environment/Permitting
Rep
ort
Pre-feasibility/Feasibility G MINING, GOLDER, ROCHE
Baseline Study Géodéfor
Initial
Rep
ort
1. Baseline Study – Final 2. Environmental and Social Impact Assessment
ROCHE
Pilot plant moved 5 months
from original Pilot plant
- Rare Earth oxides (Neodymium)
- Niobium concentrate SGS Lakefield, G MINING,
Gary Pearse
Cut-off grade: critical REO + Niobium
Cut-off grade @ 1.00% OTRT
Permitting process
Geomega Resources Inc.
475 av. Victoria
St-Lambert, QC J4P 2J1
T: (450) 465-0099
F: (450) 465-0012
W: www.ressourcesgeomega.ca
TSX.V : GMA
18