C E L L T O WE R DESIGN PUBLIC MEETING MAP D E S I GN P U B L I C M EET I NG M A P HOK E C OUNT Y D E S I GN P U B L I C M EET I NG M A P HOK E C OUNT Y P ROJ E C T 51078 . 1 . 1 / 46285 . 1 . 1 ( U - 5753 / U - 5858 ) PROJECT 51078.1.1/46285.1.1 (U-5753/U-5858) P ROJ E C T 51078 . 1 . 1 / 46285 . 1 . 1 ( U - 5753 / U - 5858 ) HOKE COUNTY L I ND S AY RD T O ROC K F I S H RD F ROM P L ANK RD A L ONG W AY S I D E RD / L I ND S AY RD T O ROC K F I S H RD F ROM P L ANK RD A L ONG W AY S I D E RD / LINDSAY RD TO ROCKFISH RD FROM PLANK RD ALONG WAYSIDE RD/ INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS TO CHANGE. THESE MAPS ARE FUNCTIONAL AND ARE SUBJECT OR ON OTHER DISPLAYS. THE DESIGNS SHOWN ON PROPOSED UTILITES ARE NOT SHOWN ON THESE MAPS TO PROVIDE GREATER VISUAL CLARITY, EXISTING AND UTILITY INFORMATION: DESIGN USING FINAL SURVEYS. LOCATIONS WILL ALSO BE DETERMINED DURING FINAL USING FINAL GROUND SURVEYS. FINAL DRIVEWAY ATTEMPT TO MINIMIZE IMPACTS WHERE FEASIBLE DURING THE FINAL DESIGN STAGE, DESIGNERS WILL FUNCTIONAL DESIGNS AND LIDAR GROUND SURVEYS. SHOWN ON THIS MEETING MAP ARE BASED OFF OF LIMITS OF CONSTRUCTION AND THEIR IMPACTS IMPACTS AND DRIVEWAY TIES: CONNECTIONS ALLOWED. GRADE-SEPERATED. NO PRIVATE DRIVEWAY RAMPS AT INTERCHANGES. ALL CROSS-STREETS ARE CONNECTION TO A FACILITY PROVIDED ONLY VIA FULL CONTROL OF ACCESS IS DEFINED AS A NOTES: 0 (HORIZONTAL) 100 200 50 100 ENGLISH LEGEND 0000 0000 TO BE RETAINED EXISTING STRUCTURES, ISLAND, CURB AND GUTTER PROPOSED STRUCTURES, ISLAND, CURB PROPOSED ROADWAY EXISTING ROADWAY TO BE RESURFACED EXISTING ROADWAY EXISTING ROADWAY PROPOSED RIGHT OF WAY EXISTING RIGHT OF WAY BUILDINGS TO BE REMOVED AND GUTTER LAKES, RIVER, STREAMS AND PONDS PRESENT ADT FUTURE ADT PROPERTY LINES EXISTING TRAFFIC SIGNAL PROPOSED TRAFFIC SIGNAL AND UTILITY) PROPOSED EASEMENTS (DRAINAGE, CONSTRUCTION, EXISTING UTILITY EASEMENT PROPOSED FULL CONTROL OF ACCESS DESIGN DATA -L- MAX SUPERELEV. = 6% DESIGN SPEED = VARIES 50-60 MPH FUNCTIONAL CLASS = COLLECTOR/ARTERIAL ORTHOPHOTO DATA INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 0 (HORIZONTAL) 100 200 50 100 ENGLISH DESIGN DATA -L- MAX SUPERELEV. = 6% DESIGN SPEED = VARIES 50-60 MPH FUNCTIONAL CLASS = COLLECTOR/ARTERIAL ORTHOPHOTO DATA S h ee t 1 o f 3 RE C OMM E ND E D OP T I ON S h ee t 1 o f 3 RE C OMM E ND E D OP T I ON NCONEMAP = 12-12-17 = 01-27-17 FLIGHT DATE = M-8091 FLIGHT MISSION M A T CHL I NE S HEET 2 - L - ( A 2 ) S T A . 3 0 + 0 0 . 0 0 NCONEMAP = 12-12-17 = 01-27-17 FLIGHT DATE = M-8091 FLIGHT MISSION LEGEND 0000 0000 TO BE RETAINED EXISTING STRUCTURES, ISLAND, CURB AND GUTTER PROPOSED STRUCTURES, ISLAND, CURB PROPOSED ROADWAY EXISTING ROADWAY TO BE RESURFACED EXISTING ROADWAY EXISTING ROADWAY PROPOSED RIGHT OF WAY EXISTING RIGHT OF WAY BUILDINGS TO BE REMOVED AND GUTTER LAKES, RIVER, STREAMS AND PONDS PRESENT ADT FUTURE ADT PROPERTY LINES EXISTING TRAFFIC SIGNAL PROPOSED TRAFFIC SIGNAL AND UTILITY) PROPOSED EASEMENTS (DRAINAGE, CONSTRUCTION, EXISTING UTILITY EASEMENT PROPOSED FULL CONTROL OF ACCESS Sheet 1 of 3 RECOMMENDED CONCEPT 800' - 1000' 800' - 1000' U-TURN KNUCKLES NOT TO BE PLACED IN WETLANDS OR RIGHT OF WAY SENSITIVE AREAS POTENTIALLY TO BE USED AT ALL INTERSECTIONS WHERE POSSIBLE FULL CONTROL OF ACCESS WHERE POSSIBLE FULL CONTROL OF ACCESS * * * the amount of traffic and is subject to change The need for right turn lanes is dependent on C A C A C A C A DIRECTIONAL CROSSOVER WITH MEDIAN U-TURNS F F F F F F F F F F F C C C C C C C C C C C C C C C C C C C C C C C C C C C F F C C C C C C C C C C C C C C C C C C C C C F F F F F F F F F F F F F F F F F F F F F C C F F F F F F F F F F F F F F F F F 401 US 401 US TRAFFIC DATA US 401 US 401 2040 AADT 2019 AADT (SR 1418) LINDSAY RD TRAFFIC DATA 2040 AADT 2019 AADT 16,000 14,300 TRAFFIC DATA 2040 AADT 2019 AADT (SR 1305) WAYSIDE RD 14,500 13,200 PLANK RD PLANK RD 14,400 12,900 15,300 13,900 18,700 16,600 (SR 1305) WAYSIDE RD 16,200 14,400 15,100 13,000 36,600 30,100 27,800 23,000 VALUES ASSUME REVERSE SUPERSTREET BROCK RD (SR 1318) WAYSIDE RD (SR 1305) 600 1,100 4,600 2,600 10,300 7,500 4,100 3,300 1,400 950 5,500 4,300 7,700 7,100 6,800 6,100 15,400 10,400 PI STA 12+83.42 D D L = 376.15' T = 209.94' R = 340.00' DS = 35 MPH SE = .06 PI STA 12+52.49 D D L = 273.90' T = 139.85' R = 550.00' DS = 40 MPH SE = .06 -L2QC- WAYSIDE QUAD RD. -L2QA- LINDSAY QUAD RD. PI STA 16+04.85 D D L = 524.49' T = 265.70' R = 1,330.00' PI STA 26+54.30 D D L = 617.75' T = 314.55' R = 1,330.00' SE = .06 SE = .06 -L- (A2) SR 1305 (WAYSIDE RD) U-5753 CURVE DATA PI STA 18+39.32 D D L = 572.51' T = 291.28' R = 1,260.00' SE = .04 PI STA 27+86.11 D D L = 290.97' T = 145.68' R = 2,290.00' PI STA 42+82.31 D D L = 1,230.23' T = 660.08' R = 1,370.00' PI STA 53+88.82 D D L = 361.48' T = 182.73' R = 1,000.00' PI STA 71+50.72 D D L = 335.19' T = 168.30' R = 1,500.00' PI STA 79+35.72 D D L = 427.69' T = 217.73' R = 926.00' PI STA 89+78.77 D D L = 730.44' T = 374.69' R = 1,330.00' SE = .03 SE = .04 SE = .04 SE = .04 SE = .04 SE = .06 -L- (A2) SR 1418 (LINDSAY RD) U-5858 3 : 1 M AX 3 : 1 M AX 3 : 1 M AX 3 : 1 M AX 6 : 1 4 : 1 1 S B K B U S HTR HTR S S HTR H T R H T R H T R H T R 1 S B KD 1 S B KD 1 S B KD 1 SF D 1 S B KD 1 S B KD H T R H T R H T R H T R H T R 1 S B KD 1 S B K D 1 S B KD 1 SF D S H T R H T R S S S 1 S F D G 1 S B K D 1 S F D 1 SF B U S 1 S B KD 1 S B K D 1 SF D 1 SF D 1 SF D 1 SBLK BUS 2 - 1 SL' S 4 GAS PUMPS ATM 1SBLK BUS 8 G A S P U M PS 4-1SL'S S S C E N T U R Y L I NK S U B 2SFD 1SBKD 1SFD S 2SBKD 1 SBKD 2 SF D 2 SF D 2 SF D 1 SF D 1 SF D 1 SF D 1 S B KD 2 SF D 2 S F D 1 . 5 S B K D 1 S B K D 1 S B KD 1 S B KD 1 SF D 1 S B K D 1 SF D 1 SF D 2 S B K F D 2 S B KD 1 SF D 1 S B K F D 1 S B K D 2 S B KD 2 S B KD 2 S B K D 1 S B K D 1 S B K D 2 S B KD 1 S B K D 1 SF D BUS 1 SF U / M TL C A N U/ MTL CAN S S S S S HTR HTR HTR HTR HTR 1 SBK BUS 1 S B K D 1 SF D H T R S 2 SF D 1 S M T L B U S 1 S M TL B U S 1 SFD 1 SBKD S S S S S 1 SBLK BUS C A N B U S 1 S M T L C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A - Y 1 - - Y 1 - -QRDC1- - Q R D C - - Q R DA - - Y 2 - 15 30 15 15 15 20 25 15 10 15 35 4 0 45 50 20 25 30 P C S T A 45 + 23 . 49 P T S T A 5 2 + 32 . 36 P O T S T A 10 + 00 . 00 P C S T A 10 + 73 . 48 P T S T A 14 + 49 . 6 3 P O T S T A 1 9 + 03 . 54 PO T S T A 10 +0 0 . 00 P C S T A 13 + 39 . 16 P T S T A 18 + 63 . 6 4 PC S T A 23 +39 . 75 PT S T A 2 9 +5 7 . 50 P O T S T A 1 0 + 00 . 00 P C S T A 11 + 12 . 64 PT S T A 13 +86 . 53 PO T S T A 18 +22 . 70 30 35 40 55 60 65 50 45 15 20 2 5 PO T S T A 1 0 +00 . 00 PC S T A 1 5 +48 . 04 PT S T A 2 1 +2 0 . 55 - Y 1 B - PC S T A 26 +40 . 42 PT S T A 29 +31 . 40 PC S T A 36 +22 . 23 PT S T A 4 8 +5 2 . 46 PC S T A 52 +06 . 0 9 PT S T A 5 5 +67 . 5 7 PC S T A 6 9 +8 2 . 42 PT S T A 73 +17 . 61 PC S T A 77 +17 . 9 9 PT S T A 81 +4 5 . 6 8 PC S T A 8 6 +0 4 . 08 PT S T A 93 +34 . 5 3 PO T S T A 9 6 +41 . 35 30 35 4 0 45 50 55 60 65 70 75 80 85 90 95 - Y 1 A - - L - ( A 2 ) - L - ( A 2 ) 120 ' 30 ' 24 ' 24 ' 30 ' 24 ' 24 ' 2 3 ' 24 ' 24 ' 3 0 ' 3 0 ' 2 4 ' 3 6 ' 23 ' 24 ' 2 4 ' 23 ' 24 ' 24 ' 1 2 0 ' 2 3 ' 24 ' 2 4 ' BEGIN TIP PROJECT U-5753 BEGIN TIP PROJECT U-5858 END TIP PROJECT U-5753 T O R A E F O R D T O F AY ETTE V I LLE T O F A Y ETTE V I LLE S R 13 18 BR O C K R D S R 1418 ( L I ND S AY R D ) P L A NK R D S W EET B R I A R L N SP R UC E P I N E DR DA RB Y DR DA L M A T I O N DR S R 1305 W AY S I D E R D I N DE P E N DE N C E DR W OODL AND DR T I M B E R I DG E D R O L D P A R K E R F A R M R D HO LL O W L N DR E W S T QUA L R I DG E DR N E S T I NG L N OL D OAK R D F O R E S T C K DR CLAN CAMPBELL RD EASEMENT CELL TOWER T O R A E F O R D PROPOSED TYPICAL SECTION -L- (A2) BEGIN PROJECT TO ADCOX RD PROPOSED TYPICAL SECTION -L- (A1) BEGIN PROJECT TO ADCOX RD 120' MIN. RIGHT OF WAY 120' MIN. RIGHT OF WAY BEGIN TIP PROJECT U-5753 23'-30' 12' 12' 2' 14' W/GRL 8' 12' 12' 2' 14' W/GRL 8' 23'-30' 12' 12' 4' 12' W/GRL 9' 12' 12' 4' 12' 11' W/GRL 8' 6' N.T.S. N.T.S. 10' ROCKFISH CHURCH SELF STORAGE ALL-AMERICAN DOLLAR GENERAL PUPPY CREEK PARK SHELL ROBIN'S WALK QUAIL HOLLOW EAST QUAIL HOLLOW WEST COBBLE RIDGE TIMBER RIDGE LINDSAY FARMS AUTOMOTIVE PURE PERFORMANCE BP 2 3 4 1 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 198 200 199 201 103 106 107 104 105 108 109 110 111 112 113 104 114 115 116 117 118 119 FORT BRAGG MILITARY RESERVATION PUPPY CREEK PARK, LLC WENDELL WOOLFORD FUEL ZONE, LLC CHARLES WAGNER JR DOUG L A SH E A T H SCOTT STOCKDALE JEFFREY TAYLOR BRUCE HABLE BRETT ROTHER LEO FLUITT TIMOTHY SIEBELINK RENAEE ALLEN INDIA RIVES FREDRICK BASS E D W A R D T H O M A S MILDRED BRATCHER JOHN BREACH ANTHONY MOUZON SHARON COX CLIFFORD WINKLEMAN JERRY JACKSON JERRY JACKSON JESSE HORSLEY LAKENYA KYLES NORMA JEAN PAULLEY JAMES JACKSON JESSE HORSLEY RICHARD JERNIGAN JR RICHARD WARD SHANNA BURNS CAROL GONZALEZ BUDDY STONEBRAKER WILLIAM JACKSON JOYCE MCFADYEN LACY MCFADYEN MAC CROWLEY MAC CROWLEY P A R3 D E V EL O P M E N T G R OU P , LL C STEVE SAPP HA C K E T T P R O P E R T I E SI N C ROBERT DYER RICKEY ROYALS MARCUS WAGNER JEHAD MUSA PAULETTE SELLMAN JOSE RODRIQUEZ JEROME SEWERT CALVIN JONES ROSLYN MCKINNIE WILLIAM JOLLEY JR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 FREDERICK SLOAN TIMOTHY REIL BLAKE GAYNOR KEITH SHRADER HARRY ERVIN LEIGH ANNE WADE JENNIFER BAYNE JACKIE WOODARD ENNIS BREWER B ET H M C M AHON CLARA ST JOHN MICHAEL SULICK A R T HU RB ON I LL A CLIFTON PLANK M I C HA EL B ANND I T I N I LARRY CHAVIS JAMES GILLIAM SOFIA CABELL DANIEL KOSTURA JR HAZEL GONZALEZ JOSEPH CERVAY CORBIN HAHN STEVEN FOWLER TRACY HODO CLIFTON GROCE M I C HA E L S W E E N E Y D A RR Y L W A S H I NG T ON E M C M O R T GA G EC O R P 70 71 72 73 74 75 76 77 78 79 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 C H R I S T O P H E RW E E K S A U D R E Y J . T R OX EL L 198 199 200 201 V E GA P E C U N I A - F R A N C I S C O MOZELLA HARVEY FREDDY TAVERAS CB MM P R O P E R T I E SLL C ANTHONY WILLIAMS BARBARA MCHONE ANITA GROVE RONNIE HOLLIDAY STEVEN GAMBLE LUCILLE ROBINSON JESUS TIRADO LAND DEVELOPMENT & MANAGEMENT CARLSTON GOULD CAROLINA TELEPHONE HAROLD KIDD WILLIAM LINDSAY T R I NA R I DD LET R U S T W I LL I A M L I ND S AY CATHERINE FAIRCLOTH CAROL POWELL AAMIR QURESHI MYRL CLINARD HAROLD KIDD RAEFORD CHRISTIAN FELLOWSHIP JESUS TIRADO 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 MYRL CLINARD ELEANOR THOMAS JAMES SANDERS JAMES SANDERS VINCENT WEST JAMES SANDERS WAYMAN MCCORQUODALE JAMES SANDERS KATHY SETTLE WILLIAM SCOTT SEAVY HALES JANET HEDGPETH SEAVY HALES WARREN SLOTTERBACK WILLIAM WRIGHT JAMES WRIGHT 103 104 105 106 107 108 109 110 111 113 114 115 116 117 118 119 112 AMERICAN TOWER (EASEMENT) C D A B