STOP Roop Nagar Roop Nagar Kamla Nagar Kamla Nagar Transformer Transformer Towards Maurice Nagar Towards Maurice Nagar Towards Shakti Nagar Chowk Towards Shakti Nagar Chowk 3.6M 2M 6.7M 1.1M 7.8M 1.8M 2M Footpath Footpath Shoulder Shoulder Carriageway Carriageway Median 3.6M 2.4M 7M 1M 7M 0.6M Variable Median Carriageway Carriageway Buffer Footpath Footpath Existing Cross Section (GG') - Satyawati Road Proposed Cross Section (GG') - Satyawati Road FOOTPATH BUFFER SPACE TABLE TOP / RAMPS MEDIAN AND ISLANDS BUS STOPS TOILET BLOCKS IPT PICK-DROP VENDOR UTILITIES PARALLEL CAR PARKING 0 2m 5m 10m 0 5m 10m 15m TITLE: REVISION DHRUPAD CONSULTANTS PVT. LTD. 7E, POCKET B, SIDDHARTH EXTENSION, NEW DELHI-14 CONTACT: 011-49270513, 9958056935 EMAIL: [email protected],[email protected] WEB : www.dhrupadconsultants.com Delhi Development Authority DATE DRAWN BY SNEHA CHKD. BY ROHIT This drawing is a property of Dhrupad Consultants Pvt. Ltd and must not be copied or reproduced in any form Sl.No. CLIENTS: CONSULTANTS: DWG No. DCPL/DDA/UTTIPEC/TP/ BCP/01 PROJECT: 15.102.2021 Walkability Plan Part - H Preparation of Walkability plans for various sites/ stretches in Delhi. Name of the Area: Kamla Nagar Existing - Satyawati Marg Proposed - Satyawati Marg To Nangia Park Chowk To Daulat Ram College To Nangia Park Chowk To Daulat Ram College Bus stop Bus stop Transformer to be shifted Relocation of toilet block in buffer space Carriageway (7M) Buffer space (0.6M) Footpath (3.5M) G' G G' G Part H Legend Key Map Note: All the design consideration are as per IRC 35 : 2015 (guidelines for road marking), IRC 67 : 2012 (guidelines for signages) and IRC 103 : 2012 (Guidelines for pedestrian facilities). SCALE: (For Plans) All Dimensions are in meters unless mentioned otherwise. (For Sections)