Top Banner
Project Title: Drainage Improvement in Northern Hong Kong Island – Hong Kong West Drainage Tunnel : Environmental Permit No. : EP-272/2007/B : EP-272/2007/B Figure 2: Location of Eastern Portal 2 : (This figure was prepared based on Drawing No. 24133/B/E/D133 of EP Application (AEP-272/2007) ( (AEP-272/2007) 24133/B/E/D133 ) Main Drainage Tunnel Legend ( ): Temporary Works Area ( ) Alignment of main drainage Tunnel ( ) N Slope Stabilisation Works Stepped Chute
1

Legend ( ): N Temporary Works Area

Mar 27, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Legend ( ): N Temporary Works Area

Project Title: Drainage Improvement in Northern Hong Kong Island –

Hong Kong West Drainage Tunnel 工程項目名稱工程項目名稱工程項目名稱工程項目名稱 : 港島北部雨水排放糸統改善計劃港島北部雨水排放糸統改善計劃港島北部雨水排放糸統改善計劃港島北部雨水排放糸統改善計劃 – 港島西雨水排放隧道港島西雨水排放隧道港島西雨水排放隧道港島西雨水排放隧道

Environmental Permit No. : EP-272/2007/B 環境許可證編號環境許可證編號環境許可證編號環境許可證編號 : EP-272/2007/B

Figure 2: Location of Eastern Portal 圖圖圖圖 2 : 東東東東面入水面入水面入水面入水口位置口位置口位置口位置

(This figure was prepared based on Drawing No. 24133/B/E/D133 of EP Application (AEP-272/2007)

(本圖是根據申請環境許可証 (AEP-272/2007) 繒圖編號 24133/B/E/D133編制)

Main Drainage Tunnel 主排水隧道

Legend (圖例):

Temporary Works Area (臨時工地)

Alignment of main drainage Tunnel

(主排水隧道)

N

Slope Stabilisation Works

Stepped Chute