Top Banner
Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee March 27, 2012 Prepared by: Public Works - Design/Construction Division
29

Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Apr 20, 2018

Download

Documents

lethuan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Leesville Road From I-540 Northward to New Leesville Boulevard

1

Public Works Committee March 27, 2012 Prepared by: Public Works - Design/Construction Division

Page 2: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Leesville Road From I-540 Northward to New Leesville Boulevard

Project Limits

Page 3: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Leesville Road From I-540 Northward to New Leesville Boulevard Proposed Typical Section

Raised Median with Turn Lanes Median Width Varies from 28 feet to 16 feet

(4) 11-foot Lanes (2 Northbound, 2 Southbound) (2) 5-foot Bicycle Lanes 5-foot wide Sidewalks on a 10-foot wide Berm Proposed Right-of-Way varies from 97 feet to 109 feet

3

Page 4: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Public Hearing Issues of Concern (March 6, 2012) Cemetery Property – Graves to be relocated Ward Property – Stone wall, landscaping, drainage

impacts, & assessments Ms. Armstrong – Safety concerns & assessments Barlow/Christopher Property (Gas Station) – Well

impact & assessments

Leesville Road From I-540 Northward to New Leesville Boulevard

4

Page 5: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 1 – Cemetery Impacts

Leesville Road From I-540 Northward to New Leesville Boulevard

Page 6: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Roadway Alignment Alternatives 3 Alternate Alignments Considered at the

Intersection of Leesville Road with Crestmont and Renfield Alt 1: Widen closer to the Cemetary (North Side) Alt 2: Widen closer to the Housing Development (South

Side) Alt 3: Widen both sides approximately equally

Alternate 3 was selected to minimize impacts to properties on both sides of Leesville Road

Leesville Road From I-540 Northward to New Leesville Boulevard

6

Page 7: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 1 - Cemetery Impacts (cont’d) Current plan requires 5 graves to be relocated City staff and consultant investigated additional

alternatives to decrease impacts to cemetery Staff proposes to shift sidewalk to back of curb and install

a 3’+/- retaining wall (modular block) just outside R/W Fence would be relocated directly behind wall Contractor would need to use shoring or other approved

means/methods to construct wall without impacting grave sites

Staff has met with NCDOT and received verbal approval on the revised design

Leesville Road From I-540 Northward to New Leesville Boulevard

7

Page 8: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Leesville Road From I-540 Northward to New Leesville Boulevard

8

Revised Design (Alternative 3A)

Page 9: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Leesville Road From I-540 Northward to New Leesville Boulevard

9

Revised Design (Alternative 3A)

Page 10: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Leesville Road From I-540 Northward to New Leesville Boulevard Item 2 – Ward Property Impacts

Ward

Driveway

Page 11: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 2 – Ward Property Concerns (cont’d) Property impacts

Increasing driveway slope Impacts to existing stone wall Impacts to drainage system and landscaping

Street lighting glare Land acquisition Assessments

Leesville Road From I-540 Northward to New Leesville Boulevard

11

Page 12: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 2 - Ward Driveway (cont’d)

Leesville Road From I-540 Northward to New Leesville Boulevard

12

Page 13: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 2A - Ward Driveway Impacts (cont’d) Several preliminary alternatives were considered

Leesville Road From I-540 Northward to New Leesville Boulevard

13

PLAN VIEW PROFILE VIEW

Page 14: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 2A – Revised Driveway Design (Alt. 5)

Leesville Road From I-540 Northward to New Leesville Boulevard

14

Page 15: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 2B – Street Lighting Current plan includes 4 light poles on Ward property City and NCDOT have lighting policies on major

thoroughfare roadways Progress Energy can install a back plate to reduce

glare onto adjacent properties

Leesville Road From I-540 Northward to New Leesville Boulevard

15

GLARE SHIELD

Page 16: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 2C – Land Acquisition Impacts

Leesville Road From I-540 Northward to New Leesville Boulevard

16

Page 17: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 2D – Assessments Property owner does not agree with Assessments Staff recommends assessments in accordance with

standard City policy Property is outside city limits Assessments not due until property is annexed Assessments may be paid under the City’s 10 year

financing option at that time

Leesville Road From I-540 Northward to New Leesville Boulevard

17

Page 18: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Leesville Road From I-540 Northward to New Leesville Boulevard Item 3 – Ms. Armstrong

Ms. Armstrong’s Area of Concern

Page 19: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 3 – Ms. Armstrong (cont’d)

Assessments

Safety concerns at Crestmont/Renfield intersection Children having to cross Leesville Road to/from school bus Leesville Road and Crestmont/Renfield is unsignalized

intersection (No signal proposed as it does not meet signal warrants)

Leesville Road From I-540 Northward to New Leesville Boulevard

19

Page 20: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 3A – Assessments Property owner does not agree with Assessments Staff recommends assessments in accordance with

standard City policy Property is outside city limits Assessments not due until property is annexed Assessments may be paid under the City’s 10 year

financing option at that time

Leesville Road From I-540 Northward to New Leesville Boulevard

20

Page 21: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 3B – Safety Concerns

Bus Stop concerns Leesville will become a median divided corridor Vehicles on opposite side of median do not have to stop

for a stopped school bus WCPSS will need to revise the bus routes to pick up/drop

off children on each side of the road

Safety concerns of route to Sycamore Elementary School Safe route along Leesville Road from Crestmont Drive to the

School Entrance School Entrance is signalized with pedestrian heads

Leesville Road From I-540 Northward to New Leesville Boulevard

21

Page 22: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Leesville Road From I-540 Northward to New Leesville Boulevard Item 3B – Safety concerns to School

School Entrance at Farless Road (Signalized with Pedestrian Heads)

Unsignalized intersection at Leesville/Crestmont

Page 23: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Leesville Road From I-540 Northward to New Leesville Boulevard Item 4 – Barlow/Christopher Property (Citgo Gas Station)

Barlow Property

Page 24: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 4 – Barlow/Christopher Property Concern of roadway impact to existing well Assessments

Leesville Road From I-540 Northward to New Leesville Boulevard

24

Page 25: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 4A – Roadway impact to existing well (cont’d) Existing well is located inside the existing R/W Staff received site plans from NCDOT showing that well

and store sign were to be constructed on store property outside R/W

Staff has directed changes in an effort to eliminate any impacts to existing well (7 feet outside proposed fill slope)

Staff met with NCDOT Received verbal approval for the design change DOT offered to meet with City and/or owner to further discuss

City will take all precautions to prevent impacts to well, however, property owners are ultimately responsible due to well location being inside the existing R/W

Leesville Road From I-540 Northward to New Leesville Boulevard

25

Page 26: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 4A – Roadway impact to Existing Well

Leesville Road From I-540 Northward to New Leesville Boulevard

26

Well located 7 feet off proposed fill slope

Page 27: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Item 4B – Assessments Property owner does not agree with Assessments Staff recommends assessments in accordance with

standard City policy Property is outside city limits Assessments not due until property is annexed Assessments may be paid under the City’s 10 year

financing option at that time

Leesville Road From I-540 Northward to New Leesville Boulevard

27

Page 28: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Questions/Comments

Leesville Road From I-540 Northward to New Leesville Boulevard

28

Page 29: Leesville Road Widening - 3/27/2012 Public Works Committee ... · Leesville Road From I-540 Northward to New Leesville Boulevard 1 Public Works Committee . March 27, 2012. Prepared

Project Funding Total Project Cost: $7,569,000 Right of way/construction funding available July 1, 2012

based on Draft 2012-2013 Transportation CIP

Project Schedule Complete Right of way acquisition – early Fall 2012 Bid/Award Construction Contract – late Fall 2012 Begin Construction – Winter 2012-2013 Complete Construction – Summer 2014

Leesville Road From I-540 Northward to New Leesville Boulevard

29