What’s New with LEED Existing Buildings: Operations + Maintenance v4 -- Metrics for Schools 06.23.15 Candice Groves, RA, LEED AP BD+C, O+M
20

LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

Aug 23, 2018

Download

Documents

ledien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

What’s New with LEED Existing Buildings: Operations + Maintenance v4

-- Metrics for Schools

06.23.15 Candice Groves, RA, LEED AP BD+C, O+M

Page 2: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

Consul'ng    

•  LEED  Gap  Analys is  Studies  •  LEED  Consul5ng   (EBO&M,  NC,  CI,  CS,  

ND,  and  Volume)  •  LEED  Recer5fica5on  •  PorGol io  Assessments  •  Corporate  Sustainabi l i ty  

Program  Management  •  LEED  GA,  AP  Exam  Prep  

Training  &  Con5nuing  Ed.  

www.sigearth.com  |  [email protected]  |  404.343.3835  

A t l a n t a ,   G A  

B o u l d e r ,   C O  

M i n n e a p o l i s ,   M N  

N e w   Y o r k ,   N Y  

Technical  Services    

•  Energy  Star  Benchmarking  &  PE  Sign-­‐Off  

•  ASHRAE  Level   I  &   I I  Energy  Audits  

•  Commissioning  (Cx)  &  Retro-­‐Commissioning  (RCx)  

•  IEQp1  Air  Calcs  &  Tes5ng  •  Local  Law  87  Compliance  •  SS  Credit  Documenta5on  

Copyright © 2015 Sustainable Investment Group (SIG)

Page 3: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

Introductions

Architect

LEED Accredited Professional / Green Building Consultant

Science Teacher

Facilities Managers? Educators? Architects? Engineers? Others?

LEED Project Experience? Credentials?

Page 4: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

This course is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.

" Attendees will learn about the major components of the LEED Operations + Maintenance (O+M) program.

" Attendees will be able to cite several specific credits of the LEED O+M program that apply to schools.

" Attendees will evaluate the benefits of monitoring performance with tools such as ENERGY STAR Portfolio Manager.

" Attendees will determine what aspects of the O+M program they can apply in their school facilities – even if not applying for LEED Certification.

Learning Objectives

Page 5: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

" Project teams may register projects for Certification for either LEED 2009 or LEED v4 until October 31, 2016

Image Credit: USGBC

Page 6: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

Image Credit: USGBC

* *

*

Page 7: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

Note: the credit numbering system has changed as well ~

Page 8: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

"

Building Design + Construction New Construction, Core & Shell, Schools, Retail, Healthcare, Hospitality, Data Centers, Warehouses & Distribution Centers Interior Design + Construction Commercial Interiors, Retail, Hospitality Building Operations and Maintenance Existing Buildings, Schools, Retail, Hospitality, Data Centers, and Warehouses & Distribution Centers Neighborhood Development

Homes Homes, Multifamily Low-rise, Multifamily High-rise

Neighborhood Scaled Projects

Page 9: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

WE Prerequisite Indoor Water Use Reduction WE Prerequisite Building-Level Water Metering

EA Prerequisite Minimum Energy Performance EA Prerequisite Building-Level Energy Metering

Page 10: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

WE Prereq - Indoor Water Use Reduction Flush and flow fixture requirements

– based on age of building as compared to baseline

WE Credit…. points earned for reduction based on calculated baseline (10% - 1 pt. 15% - 2 pts. 20 % - 3 pts. 25% - 4 pts. 30% - 5 pts.)

Page 11: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

WE Prereq - Indoor Water Use Reduction Schools also have a Process Water Purchasing Policy requirement

Page 12: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

WE Prereq – Building-Level Water Metering Water meter must be installed to measure total potable water use for building and associated grounds.

- Record meter data on monthly basis.

- Commit to sharing data with USGBC.

WE Credit – Indoor Water Use Reduction – points can be achieved through metering as well.

WE Credit – Building-Level Water Metering - points can be achieved through weekly subsystem metering of 2 or more types of water

“You can’t manage what you can’t measure”

Page 13: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

EA Prereq – Minimum Energy Performance OPTION 1: ENERGY STAR energy performance rating of at least 75 based on EPA’s Portfolio Manager – Benchmark against typical buildings OPTION 2: Show a 25% improvement in building energy consumption based on historical data when “typical building” national source energy data is not available.

Page 14: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

EA Credit – Optimize Energy Performance 3 – 20 points available for increased ENERGY STAR performance ratings based on a benchmark against typical buildings. 2 – 14 points available for improvement in building energy consumption based on historical data when “typical building” national source energy data is not available.

Page 15: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

EA Prereq – Building-Level Energy Metering Energy meter must be installed to measure total building energy consumption.

- Record meter data on monthly basis.

- Commit to sharing data with USGBC.

EA Credit – Advanced Energy Metering - points can be achieved through metering of major end uses that represent 20% or greater of total annual energy consumption (excluding plug loads)

- specific interval and storage requirements must be met as well

“You can’t manage what you can’t measure”

Page 16: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

SS Credit – Joint Use of Facilities Schools Credit

OPTION 1: Make at least 3 building spaces open to the general public. (auditorium, gymnasium, playing fields, parking, etc.)

OPTION 2: Contract with specific organizations to share at least 2 building spaces.

OPTION 3: Use shared space owned by other organizations. (Example – park adjacent to the school)

Page 17: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

MR Credit – Solid Waste Management - Ongoing Schools – Additional Requirements

Divert 50% of ongoing consumable solid waste from landfill

Schools requirements…

…if documenting that composting does not exist or is not economically feasible, it can be excluded from calculation

…incorporate an education component such as signage, staff training, and extracurricular student activities that promote environmental benefits of composting

Divert 75% of durable goods from landfill

Page 18: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

IN – Innovation in Operations Schools – Innovative Credit Opportunity

Public Education. Provide educational program on environmental and human health benefits of green building practices + how occupants can improve green performance.

- signage

- case study

- guided tour

- educational outreach program

- website / electronic newsletter

Page 19: LEED EB OM v4 - Metrics for Schools - Home - … · Operations + Maintenance v4 -- Metrics for Schools ... LEED 2009 or LEED v4 until October 31, ... Building Design + Construction

Resources for LEED v4

" http://www.usgbc.org/v4

" http://www.usgbc.org/resources/list

" http://www.usgbc.org/resources/green-schools-teach-whole-school-sustainability