1 Beyond LED Technology | 1939 Parker Ct, Stone Mountain, GA, 30087 Due to continuous product improvement, information in this document is subject to change. LED Center Basket Troffers ZAT Series LED CENTER BASKET TROFFERS • Up to 130 Lumens per watt • Durable steel construction • White polyester powder-coat finish • Precision engineered polystyrene diffuse • Pre-installed driver ZAT Series • Installs into conventional grid ceiling • 0-10V dimming capabilities • Built-in Standard earthquake clips • Universal 100-277Vac 50-60Hz • DLC premium Beyond LED ZAT Series Basket troffers offer uniform illumination and excellent energy savings when you replace traditional T5, T8, or T12 fluorescent troffers. Our ZAT Series troffers deliver soft, glare-free, ambient lighting in a popular center-basket design. The slim profile and energy-saving LED technology make ZAT the ideal choice for renovation or new construction.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1 Beyond LED Technology | 1939 Parker Ct, Stone Mountain, GA, 30087Due to continuous product improvement, information in this document is subject to change.
LED Center Basket TroffersZAT Series
LE
D C
EN
TE
R B
AS
KE
T T
RO
FF
ER
S
• Up to 130 Lumens per watt• Durable steel construction• White polyester powder-coat finish• Precision engineered polystyrene diffuse• Pre-installed driver
ZAT Series
• Installs into conventional grid ceiling• 0-10V dimming capabilities • Built-in Standard earthquake clips• Universal 100-277Vac 50-60Hz• DLC premium
Beyond LED ZAT Series Basket troffers offer uniform illumination and excellent energy savings when you replace traditional T5, T8, or T12 fluorescent troffers. Our ZAT Series troffers deliver soft, glare-free, ambient lighting in a popular center-basket design. The slim profile and energy-saving LED technology make ZAT the ideal choice for renovation or new construction.
2(866) 786-1117 • www.BeyondLEDTechnology.comDue to continuous product improvement, information in this document is subject to change.
LED Center Basket TroffersZAT Series
LE
D C
EN
TE
R B
AS
KE
T T
RO
FF
ER
S
CORRELATED COLOR TEMPERATURE (CCT)
Specifications
PRODUCT DESCRIPTION
ORDER INFORMATIONEXAMPLE:TF22-DM-40P
Product category Size Dimming Fixture wattage CCT
TF= Troffer fixtureD=0-10v
Dimming22=2'X2' 40=4000k
50=5000k
PROJECT NAME
CATALOG NUMBER
NOTES
FIXTURE TYPE
Version
P=Premium
2'X2' CCT TunableLED Troffer Fixture
PERFORMANCE SUMMARY
Efficacy: 125LPW
Delivered Light Output: 4375lm
Input Power: 35Watts
CRI: Ra>80
Tunable CCT: 3000K/4000K/5000K with a selector switch
Input Voltage: 100-277 VAC
Input current: 0.30A
THD:<20%(at 277V)
Standard Warranty: 5 Years
Standard Lifetime: Designed to L70 minimum 50,000 hours
Mounting: Recessed
Dimensions: L 23.7” x W 23.8” x H 2.8”
Fixture measurement and weight are round up,pls contact your OKT representative for
3 Beyond LED Technology | 1939 Parker Ct, Stone Mountain, GA, 30087Due to continuous product improvement, information in this document is subject to change.
Dimensions
Drawing
Due to continuous product improvement, information in this document is subject to change.Revision Date: 01/17/20191939 Parker Ct Suite C Stone Mountain, GA 30087 | Phone: (866) 786-1117 | www.beyondledtechnology.com
Notice For User• Please turn off power before install or change assembly parts.• The input voltage and lamps should be matched, after connecting the power line,
Please make sure the wiring section is insulated• Licensed Electrician Installation ONLY.
PackageLamps Net Weight Qty/Carton Size Weight/Carton
5 Beyond LED Technology | 1939 Parker Ct, Stone Mountain, GA, 30087Due to continuous product improvement, information in this document is subject to change.
Installation
LED-(WHITE)
WHITE
WIRING DIAGRAM
LED Driver
Troffer Housing
LED Board
Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.
Electric Shock Attention
Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.
Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.
Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.
Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)
AC-N
AC-L
GREEN
LED-LED+DIM-DIM+
PC Cover
CCT adjustmentPower regulation
Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.
LED-(WHITE)
WHITE
WIRING DIAGRAM
LED Driver
Troffer Housing
LED Board
Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.
Electric Shock Attention
Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.
Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.
Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.
Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)
AC-N
AC-L
GREEN
LED-LED+DIM-DIM+
PC Cover
CCT adjustmentPower regulation
Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.
Warning
LED-(WHITE)
WHITE
WIRING DIAGRAM
LED Driver
Troffer Housing
LED Board
Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.
Electric Shock Attention
Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.
Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.
Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.
Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)
AC-N
AC-L
GREEN
LED-LED+DIM-DIM+
PC Cover
CCT adjustmentPower regulation
Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.
LED Center Basket TroffersZAT Series
LE
D C
EN
TE
R B
AS
KE
T T
RO
FF
ER
S
6(866) 786-1117 • www.BeyondLEDTechnology.comDue to continuous product improvement, information in this document is subject to change.
Installation
LED-(WHITE)
WHITE
WIRING DIAGRAM
LED Driver
Troffer Housing
LED Board
Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.
Electric Shock Attention
Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.
Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.
Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.
Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)
AC-N
AC-L
GREEN
LED-LED+DIM-DIM+
PC Cover
CCT adjustmentPower regulation
Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.
LED-(WHITE)
WHITE
WIRING DIAGRAM
LED Driver
Troffer Housing
LED Board
Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.
Electric Shock Attention
Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.
Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.
Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.
Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)
AC-N
AC-L
GREEN
LED-LED+DIM-DIM+
PC Cover
CCT adjustmentPower regulation
Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.
Warning
LED-(WHITE)
WHITE
WIRING DIAGRAM
LED Driver
Troffer Housing
LED Board
Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.
Electric Shock Attention
Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.
Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.
Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.
Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)
AC-N
AC-L
GREEN
LED-LED+DIM-DIM+
PC Cover
CCT adjustmentPower regulation
Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.
LED Center Basket TroffersZAT Series
LE
D C
EN
TE
R B
AS
KE
T T
RO
FF
ER
S
7 Beyond LED Technology | 1939 Parker Ct, Stone Mountain, GA, 30087Due to continuous product improvement, information in this document is subject to change.
Wiring
LED-(WHITE)
WHITE
WIRING DIAGRAM
LED Driver
Troffer Housing
LED Board
Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.
Electric Shock Attention
Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.
Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.
Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.
Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)
AC-N
AC-L
GREEN
LED-LED+DIM-DIM+
PC Cover
CCT adjustmentPower regulation
Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.
LED-(WHITE)
WHITE
WIRING DIAGRAM
LED Driver
Troffer Housing
LED Board
Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.
Electric Shock Attention
Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.
Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.
Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.
Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)
AC-N
AC-L
GREEN
LED-LED+DIM-DIM+
PC Cover
CCT adjustmentPower regulation
Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.
LED Center Basket TroffersZAT Series
LE
D C
EN
TE
R B
AS
KE
T T
RO
FF
ER
S
8(866) 786-1117 • www.BeyondLEDTechnology.comDue to continuous product improvement, information in this document is subject to change.