Project Finance Dr Anisur Rahman
55

Lecture 5 - Project Finance and Risk Management

Jul 07, 2016

Download

Documents

Lewis

Construction Project Management - Project finance and risk management
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Lecture 5 - Project Finance and Risk Management

Project Finance

Dr Anisur Rahman

Page 2: Lecture 5 - Project Finance and Risk Management

Project Finance

Financial Vs Technical Financing projects

loans, bonds, etc.

?? Project needs finance or

funding Significant projects have some features that relate to

financing. project is very large - exceeds capacity of single organization cross national boundaries technically complex capital intensive

Page 3: Lecture 5 - Project Finance and Risk Management

What is Project Finance?

Project finance is the raising of fund on a Limited Recourse basis, for the purposes of developing a large capital- intensive infrastructure project, where the repayment of the financing by the borrower will be dependent on the internally generated cashflows of the project

Page 4: Lecture 5 - Project Finance and Risk Management

Project Finance

Project can be financed Privately Publicly or Hybrid

Page 5: Lecture 5 - Project Finance and Risk Management

In any construction project rate of expenditure changes dramatically throughout the project lifecycle

Page 6: Lecture 5 - Project Finance and Risk Management

Project Finance strategies

Characteristics of a financing strategy Enough finance Commitment The total cost of finance may be substantial

When should we start financial planning?

Page 7: Lecture 5 - Project Finance and Risk Management

Funding Sources

AVAILABILITYTERMSEVALUATIONSTRUCTURINGACCEPTANCE

FINANCIAL PACKAGEto raise $ when needed andto raise $ when needed and

to minimize risk and coststo minimize risk and costs

Workable

Page 8: Lecture 5 - Project Finance and Risk Management

Three Types of Finances

Equity

Debt

Aids

Page 9: Lecture 5 - Project Finance and Risk Management

Equity

Funds subscribed by shareholders from their own resources.

Called Risk capital - High risk with no guarantee of return. Equity investors have the last claim if the project goes into

liquidation.

Equity sources from•Corporate Cashflow•Individual Investors•Joint ventures•Government•Multi-lateral Investors

Page 10: Lecture 5 - Project Finance and Risk Management

Debt

An obligation on the borrower to repay principal and interest to pre-arranged schedule.

Commercial Banks (against security) Multilateral lenders (World Bank) Suppliers

The lender has a priority claim if the project goes into liquidation.

Page 11: Lecture 5 - Project Finance and Risk Management

Aid

To meet social and community objectives:

Government to another Government tied (some obligations)

Agencies like World Bank

Page 12: Lecture 5 - Project Finance and Risk Management

Non-Traditional Sources

Subordinated Debt In the case of default, creditors with subordinated

debt wouldn't get paid out until after the senior debt holders were paid in full.

Counter-trade The seller accepts goods in lieu of cash payments

Build, own, and transfer (BOT) The supplier finance, build & operate the facility to

recover the costs and profits over an agreed period of time.

Page 13: Lecture 5 - Project Finance and Risk Management

Standby loan Contingent-capital mechanism under which a lender gives written

commitment to advance a specified amount of money at specified terms on demand or on a specified future date.

The loan facility will not be used unless circumstances warrant, Borrower can cancel it at anytime. Used typically

to ensure availability of critical funds following a catastrophe, or

to obtain construction financing at a lower interest rate on the assurance that permanent financing will be available when a project is complete and is generating income.

Non-Traditional Sources

Page 14: Lecture 5 - Project Finance and Risk Management

Term Loan Finance large infrastructure project where very high

funding required Normally a group of financer provide the fund instead of

single financer. Cost of raising fund includes

Management fee Commitment fee Agency fee Underwriting fee Success fee Guarantee fee

Example: Channel tunnel project (UK, France) - The project cost £4.65 billion Financial structure involved 210 lending organisations – lead

financer were Japanese banks (30%), NatWest bank etc

Page 15: Lecture 5 - Project Finance and Risk Management

Other Loans

Export credits Pure form of loan provided by the exporter of the

product/equipment, Bank, or Government agencies of the exporting country to promote export

Euro-currency loans Loans provided by the banks from the unregulated and informal

market for bank deposits and bank loans denominated in a currency other than that of the country where the bank is located

Debentures Similar to term loan but the loan is divided into securities and

sold through stock exchange (stock market) Usually in the form of bonds,

Page 16: Lecture 5 - Project Finance and Risk Management

Financing Problems Debt Service

cash flow problems

Fees payable to banks (providers) stand-by fees

Insufficient funds miscalculation, under-estimating

Currency Inflation and exchange rate

Political and economic risks

Page 17: Lecture 5 - Project Finance and Risk Management

Financial Risks

Construction finance risks must be identified earlier

Risks in a construction finance can be either within control of at least one party not within any party’s control but can be insurable not within any party’s control and can not be

insurable

Page 18: Lecture 5 - Project Finance and Risk Management

Financial Risk Analysis

A typical financial risk analysis should include Financial market analysis

Cost analysisMarket analysisFinancial analysis

Page 19: Lecture 5 - Project Finance and Risk Management

Inflation and Contracting

Fixed price contract most of the financial risks of the construction process

is assumed by the contractor. Clients favour this contract over others.

Cost - Plus contract based on negotiation and the owner bears most of the

financial risk. (overheads/profit as %age)

Page 20: Lecture 5 - Project Finance and Risk Management

Impacts on Project Management

No project without finance. Long lead time (government bureaucracies). Lenders dictate conditions that are often tied to

production schedules. Status of borrower, location, debt/equity ratio. Therefore, understand lenders concerns

debts will be repaid on time. adequate security and recourse. for shareholders, dividends will be paid.

Page 21: Lecture 5 - Project Finance and Risk Management

Decision Maker’s Preferences

Attitude toward Risk Risk averse (avoid risk) Risk neutral Risk prone (seeking)

What sort of company is yours?

Page 22: Lecture 5 - Project Finance and Risk Management

Risk Management in Construction Project

Dr Anisur Rahman

G09 [email protected]

Page 23: Lecture 5 - Project Finance and Risk Management

Risk Analysis and Management

All projects are subject to change (risk and uncertainty).

Risks can not be removed all the time but the impact of risks can be reduced through risk management

Risk management How sources of risks in project are identified How they are assessed/measured in terms of its

likelihood, impact and consequences. How these can be dealt appropriately in a project

environment

Page 24: Lecture 5 - Project Finance and Risk Management

Risk & Uncertainty Concept

Risk is when a decision is made based upon past experience or data

Known risks (material cost) Known Unknown risks (exist, but not sure about

possibility)- it could or will but don’t know when or what degree.

Unknown Unknown risks (unforeseen)

Page 25: Lecture 5 - Project Finance and Risk Management

Risk Analysis & Management

IDENTIFY AVOID ACCEPT

TRANSFER SHARE ABSORB

Page 26: Lecture 5 - Project Finance and Risk Management

Construction Risk Management Exercise (1)

For a demolition construction project in a very congested urban area (e.g. Southport), identify the major risks and suggest how they can be minimized.

Page 27: Lecture 5 - Project Finance and Risk Management

A joint-venture construction corporation is tendering for a BOT contract from a provincial government in China Mainland for building a bridge with a 25-year concession period. The company will charge a toll for vehicles using the bridge in order to make income. The government imposes a maximum construction duration of 4 years, beyond which a damage rate will be charged per week over-run. Discuss major risks in the contract, and propose strategies of responding the risks.

Construction Risk Management Exercise (2)

Page 28: Lecture 5 - Project Finance and Risk Management

Risk Management Steps

Assess Analyse MonitorManageIdentify

Page 29: Lecture 5 - Project Finance and Risk Management

Risk Identification

The first and perhaps the most important step in attempting to deal with exposure to risks is to identify them.

Risk identification involves detailed examination of the project strategy, through which potential risks may be uncovered and possible responses are framed.

Risk identification focuses the attention of project management on the strategies for controlling and allocation of risk, for example through the choice of a contract strategy.

It highlights those areas where further design, development work, or clarification is needed

Should include all risks whether or not under the control of the PM, parent organisation or any stakeholder.

Page 30: Lecture 5 - Project Finance and Risk Management

Sources of Risks Any factor with a probability of occurrence which

can influence the project outcome is the source of risk.

Construction risk drivers: Financial risks Legal risk Political Social Environmental Communication Geographical Geotechnical Construction Technological Demand/product risks

Page 31: Lecture 5 - Project Finance and Risk Management

Examples: Internal and External risks

Internal risks External risksPoor project definitionUnreliable task estimateDecision making processAvailability of resourcesPoor tracking capabilityLack of reporting proceduresCommunication bottle neckUnchecked scope creepManagerial incompetence

Market-driven changeChanging technologyPolitical upheavalEnvironmental factorsEconomic cyclesGlobal competitionSocial changesLegislative constraint

Page 32: Lecture 5 - Project Finance and Risk Management

How Do You Identify Risks?

Review current and past projects: Requires a close examination of all previous, existing projects and their potential sources of risks to reduce the impact on the project.

Project simulation: if you don’t have access to a previous project data, a project simulation will offer some assistance. It is possible to review a project schedule from a risk perspective using a number of project simulations to see different ‘what if’ scenarios across the Project.

Continue

Page 33: Lecture 5 - Project Finance and Risk Management

Some of the obvious scenarios are: Can the schedule absorbs any delay? Type of risks could cause

delays? Confident of the scope? Type of risks could change scope? Available resources? Type of risks could impact on resources? What if the specifications was compromised due to poor

mgt/scope changed? What if reworking is essential? What if budget was reduced? What if client shortened the timeline? What if important approval or other significant milestones failed

to realise?

How Do You Identify Risks?

Continue

Page 34: Lecture 5 - Project Finance and Risk Management

How do you identify risks? Project checklists: development of simple checklists

that are useful in recording all the potential and actual risks.

Feasibility studies: time consuming and costly but still effective.

Commercial database: Mostly secondary data; most of them already collected by some other parties for some other specific reasons. To avoid reinventing “risk” wheel.

Project team knowledge: the project team are the people who are planning and implementing. Ask them for opinions, idea and feedback by actively involve them

Interview: all the relevant stakeholders. Deliverable descriptions or product descriptions:

which defines the product in its technical details together with the information on the associated risks in dealing with the product.

Page 35: Lecture 5 - Project Finance and Risk Management

Risk Assessment

Asses both the likelihood and consequences of the identified risks;

The objective is to separate the minor (acceptable) risks to major risks and to help develop a process of determining appropriate responses.

The information required will include: Likelihood of the risk; Impact of the risk; Person responsible for the risk

Page 36: Lecture 5 - Project Finance and Risk Management

Probability of Risk Occurrences

An attempt to try to estimate the chances of something to happen;

When working with probability it is common to use either numerical values on an appropriate scale or use descriptive terms such as ‘high’, ‘medium’ or ‘low’.

Probability category  Explanation

Score Rating1 Rare 1 in a 100 chance of occurring

2 Unlikely Slight possibility

3 Moderate Reasonable to consider it could happen

4 Likely Most probable that it could occur

5 Certain 100% chance that it could occur

Page 37: Lecture 5 - Project Finance and Risk Management

Profiling the Consequence Rating

Consequence category  Explanation

Score Rating

1 Insignificant Impact would be inconsequential2 Minor Noticeable but not serious impact3 Moderate Manageable scale of impact4 Major Large scale impact

5Catastrophi

cExtreme scale (possibly widespread0 of impact

Page 38: Lecture 5 - Project Finance and Risk Management

Probability and Consequence MatrixProbability and Consequence Matrix

Page 39: Lecture 5 - Project Finance and Risk Management

Risk Assessment Matrix

Risk event Likelihood Consequences Responsibility

Bad weather Likely

Catastrophic- substantial schedule delay Team member

Poor team skill Moderate

Major- poor quality and motivation, project drift PM

Scope changes Certain

Major- variation in time, budget and quality All Stakeholder

Budget reduction Rare

Major- downgrade of resources, quality and completion estimates PM

Page 40: Lecture 5 - Project Finance and Risk Management

Risk Analysis and Evaluation

To analyse the risks and evaluating its potential impact across the project.

Each project and/or task should have a detailed analysis undertaken to investigate further the risk events likely to impact on it

Page 41: Lecture 5 - Project Finance and Risk Management

Risk Analysis Techniques

A wide range of techniques is available, including: Sensitivity analysis - a quantitative technique which

allows the effect of economic changes in a project to be explored. Non-probabilistic approach

Probability analysis using Monte Carlo simulation Decision trees Utility functions Expert judgment Stakeholder meeting

Page 42: Lecture 5 - Project Finance and Risk Management

Sensitivity Diagram for Major Risks in a Construction Project

Page 43: Lecture 5 - Project Finance and Risk Management

Risk Response

Possible risk response strategies in project management:

Risk transfer Risk avoidance Risk control Risk acceptance

Page 44: Lecture 5 - Project Finance and Risk Management

Risk Response - Transfer

Risk transfer may be accomplished either contractually by allocating risk through contract conditions or by insurance.

Parties to whom risk has been transferred generally responded by including an appropriate risk allowance in the cost estimate or charging a premium.

Page 45: Lecture 5 - Project Finance and Risk Management

Abrahamson’s Principles

not be

Page 46: Lecture 5 - Project Finance and Risk Management

Consideration of Risk Sharing

Contractor assuming risk The owner will be paying contingency costs that might

be more they are really worth. If the uncertain events do not occur, windfall profit. A contractor who accepts a risky fixed price contract is

at a disadvantage against a larger contractor. In the long term, the gambling contractor goes

bankrupt.

Page 47: Lecture 5 - Project Finance and Risk Management

Consideration of Risk Sharing

Owner assuming risk The owner will incur additional administrative costs. the contractor must have incentive to manage and

control the cost entailed in the risk. the contractor may be in better position to negotiate

with subcontractor and suppliers. The owner must be prepared to make extra payments

as the uncertain events occur.

Page 48: Lecture 5 - Project Finance and Risk Management

Risk Sharing

The owner is the initiating party of the contract

The owner is capable of loading all construction risk to the contractor

Risks over which the contractor has no control should be assumed by the owner

Page 49: Lecture 5 - Project Finance and Risk Management

Risk Response

When risk cannot be transferred for whatever reason, management action is required to either reduce (or to retain) or avoid or accept it.

Page 50: Lecture 5 - Project Finance and Risk Management

Risk Response: Risk avoidance

Where the level of risk is deemed unacceptable to retain, the best method of dealing with the risk is to avoid the activity with which the risk is associated.

Page 51: Lecture 5 - Project Finance and Risk Management

Risk Response: Risk control

If risk cannot be fully avoided, its impact could be reduced, for example:

- by re-assessing strategy - by developing alternative solutions - by re-designing the project

Page 52: Lecture 5 - Project Finance and Risk Management

Risk Response: Risk Acceptance:

Risk Acceptance: While risk avoidance and risk minimization can help to reduce the overall level of risk, some residual risk will always remain.

The decision maker needs to determine how best to control it.

The most common approach to controlling residual risk is through a contingency allowance.

Page 53: Lecture 5 - Project Finance and Risk Management

Risk Response – Risk Acceptance

Contingency allowance may be expressed in the form of a single figure or as a percentage of cost, time or any other variable and added to the base estimate.

It may also be broken up into a series of smaller contingencies, which are added to the base estimate at specific time intervals.

Page 54: Lecture 5 - Project Finance and Risk Management

Risk Monitoring Risk management is continuous process- Why?

Risk- is a moving target

Probability of occurrences –is a moving target

Consequence responsibility –is a moving target

Management strategies: changing nature of risk and risk sources, probability, consequences and the assignment of responsibility urge for the need to a range of monitoring and controlling strategies encompassing various degree of acceptance, mitigation and rejection

Risk monitoring describe how risks will continually be tracked to ensure that effective risk management is performed throughout the life of the project, such as use of methods and techniques like risk checklists and watch lists.

Page 55: Lecture 5 - Project Finance and Risk Management

Key Points to Remember Risk is a constant companion since project involve on going changes. Every effort should be made by the relevant stakeholders to identify and

manage risk since no projects comes with crystal ball. Risk management is structured process that seeks to deliver suitable

risk management strategies for the project The scope, magnitude and impacts are dynamic – they will change

throughout the project Risk assessment is not just done at the beginning of the project – it is

performed regularly throughout the project lifecycle The management of the risk must be assigned to the authorised

stakeholders if it is to be managed effectively Attempt should be made to remove the subjectivity from both probability

and consequence estimate Do not forget to update your risk management strategies All project stakeholders should be acknowledged project risks and sign

off on the agreed control strategies at each stage of the project lifecycle Remember risks has both negative and positive impacts