Top Banner
Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1
29

Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

Mar 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

Leachate System Clogging -The Springfield Experience

Nathan HammJuly 17, 2017

1

Page 2: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Presentation Overview

2

• Facility Background

• Challenges

• Technical Approach

• Findings

• Remedial Approach

• Design Recommendations

Page 3: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Facility Background

3

• MSW Landfill• 120 Acres Pre-Subtitle D

• 22.2 Acres Subtitle D

• Historically Trucked Leachate to WWTP• Up to 15 MGY

• Leachate Pumping System and Forcemain• Constructed in 2010

• Duplex Pump Station from Existing Storage Lagoon

• 9 Mile, 4-Inch SDR 9 and SDR 17 HDPE Forcemain

• Design Pump Flow 100 - 110 GPM (2.6 ft/sec)

• >74M Gallons Pumped Since Commencement

Page 4: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

4

Pump Station

Page 5: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

5

Pumping System

Page 6: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

6

Forcemain Construction

Page 7: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Challenges

7

• July 2016 Leachate System Stops Operating• Pumps Ramp Up and Shut Down (High Pressure

Limits)

• City Attempts to Restore Service• Perform Pump Maintenance

• Lagoon Intake Screen Dislodged

• Turtles and Deer Bones

• Attempts to Video / Camera Forcemain

• Jetting Contractor Cleaned Select Section

• Additional Clogs

Page 8: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Technical Approach

8

• Determine Extent of Problem• Forcemain Pressure Analysis

• Camera / Video Select Forcemain Sections

• Assess Scale / Sludge Formation Mechanisms• Leachate Sampling and Analysis

• Sludge Sampling and Analysis (Lagoons & Forcemain)

• Develop Remedial Alternatives/Recommendations

• Implement Selected Remedial Solutions

Page 9: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Findings - Forcemain Pressure Test

9

0

15

30

45

60

75

90

105

120

135

150

165

180

195

210

0

15

30

45

60

75

90

105

120

135

150

165

180

195

210

14:25 14:35 14:45 14:55 15:05 15:15 15:25 15:35

Pre

ssu

re,

PS

I

Time, Minutes

Forcemain Pressure Test Using Pump House Pumps

Pump

'AR-2"

"AR-4'

"AR-5"

"AR-6"

"AR-8"

"AR-10"

Page 10: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Findings - Forcemain Camera

10

Page 11: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Findings - Leachate Analysis

11

• High TDS and Dissolved Metals• TDS 3,000 mg/L

• Calcium, Iron, Magnesium, Sodium

• Moderate to High Organics Concentrations

• Scale Index Analysis and Precipitate Modeling• High Scaling Potential (Calcite-CaCO3 and Siderite-FeCO3)

0

200

400

600

800

1000

1200

1400

Oct-01Oct-03Oct-05Oct-07Oct-09Oct-11Oct-13Oct-15

CO

D,

mg

/l

Chemical Oxygen Demand

0

50

100

150

200

250

300

Oct-01Oct-03Oct-05Oct-07Oct-09Oct-11Oct-13Oct-15

Am

mo

nia

as

N,

mg

/l

Ammonia as N

Page 12: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Leachate Lagoon Sludge

12

Page 13: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Pumping System Strainer Basket Sludge

13

Page 14: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Forcemain Sludge

14

Page 15: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Forcemain Sludge

15

Page 16: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Findings - Sludge Sampling and Analysis

– EMSL Analytical

16

Sample ID: 1 2Description: Lagoon Sludge Forcemain SludgeGrouping Analyte Contribution Contribution

Liquid Phase: Water 45 – 55% 35 - 45%Solid Phase: Plant Matter 1 - 3% 1 - 2%

DecomposedOrganic Matter

1 - 3% 1 - 2%

Quartz 5 - 10% <1%Calcium Carbonate 30 - 40% 5 - 10%Mica <1%Iron Oxide 2 - 5% 40 - 50%UnidentifiedInorganics

1 – 2% 10 - 20%

BiologicalOrganisms:

Bacteria Trace Trace

Page 17: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Findings - Summary

17

• Sludge / Sediment Buildup Throughout Forcemain• Loose Sludge with “Chips” vs. Hard Cementation

• Heaviest Buildup in Middle Sections

• Observed Scaling on Pipe Walls in Section Closest to Pumps

• Significant Sludge Buildup in Lagoon (>18-Inches)• Sucked into Pumping System

• Sludge Chemical Composition Different Between Lagoon and Forcemain

• Leachate Conducive to Precipitate Scale Formation

Page 18: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Remedial Approach

18

• Modify Lagoon Intake Structure

• Phased Cleaning Approach• High Rate Flushing and Suction• High Pressure Jetting• Chemical Cleaning (Acid Treatment)

• Camera the Pipes After Cleaning to Observe Effectiveness

• Develop a Long-Term Routine Maintenance Program• Pigging• Lagoon Aeration• Routine Flushing or Jetting• Chemical Scale Inhibitors• Biocides

Page 19: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

High Rate FlushingFlushing Line North of AR-5 - Collecting with a Vac Truck

Location Station Valve AdjustmentDist to End,

Feet

Max Pressure,

psiFlow Rate,

gpmGallons for one flush

# of Flushes

Flush Time (min)

Gallons Required

Set Up Break Down, Hrs RT Haul, mi Load Rate

Cycle Time, Hrs

Pump Distance

AR-3 to AR-5 26+00

Open AR-5 NorthClose AR-5 SouthClose AR-3 NorthOpen AR-7 SouthVac Truck at AR-5

Pump Truck at AR-3 8500 150 150 5548 1.5 55 8323 1.5 16 300 1.66 372

AR-3 to AR-1(accounting for

6" pipe) 26+00

Open AR-5 SouthClose AR-3 SouthOpen AR-3 NorthClose AR-1 NorthVac Truck at AR-3 2234 150 150 2384 1.5 24 3575 1.5 16 300 0.83 372

Pump House to AR-1 26+00

Open AR-3 SouthClose AR-1 SouthOpen AR-1 North

Pump at AR-1Vac Truck or Hose at PH 2600 200 150 1697 1.5 17 2546 1.5 5 100 0.99 200

Pump House to Leachate Pond

Open AR-1 SouthPump Truck at PH

Open Suction Line ValvePump to Leachate Pond 200 100 200 522 3 8 1567 1.5 5 100 0.99 20

Monitor Pressure at injection point Subtotal

104 min 16010 gal 6 hr 4 hr 12 hr

Frac Tank Locations Totals10 hr 107911 gal 19 hr 24 hr 53 hr

19

Page 20: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Forcemain Pigging

20

Foam Swabs and Scouring Pigs

Page 21: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Forcemain Pigging

21

Remote Tracking System

Page 22: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Pigging - Launcher

22

Page 23: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Pigging – Catcher System

23

Page 24: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Pigging – Before and After Swabs

24

Page 25: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Pigging – Before & After

25

Page 26: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Lesson Learned – HDPE Restrictions

26

Page 27: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Chemical Treatment

27

• Acid Blends

• Large Volume Requirements

• Safety Concerns

• Disposal

• Cost

Page 28: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Overall Conclusions

28

• Analyze Leachate for Scaling Potential During Design

• Design Forcemain Systems for Sediment Resuspension• > 3.5 ft/sec for loose scale removal and resuspension

• < 8 ft/sec to avoid excess head and water hammer

• Forcemain Pipe ≥ 4-inch Diameter to Facilitate Maintenance

• Design for Maintenance• Cleanouts Spaced 400-500 ft Maximum

• Pig Launchers and Catchers

• Chemical Treatment Equipment

• Develop and Follow a Routine Maintenance Plan

Page 29: Leachate System Clogging - The Springfield Experience conference/Leachate Pipe Clogging...Leachate System Clogging - The Springfield Experience Nathan Hamm July 17, 2017 1. MWCC 2017

MWCC 2017

Questions

Nathan Hamm, P.E.

SCS Engineers, Inc.

7311 W. 130th Street, Suite 100

Overland Park, KS 66213

[email protected]

(913) 749-0705 Direct Office Line

29