E. Michael Saleski PPS and BCS [email protected]. edu April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski PPS and BCS Systems Manager
Dec 30, 2015
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
LCLSPersonnel Protection System and Beam
Containment System
E. Michael Saleski
PPS and BCS Systems Manager
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
PPS and BCS Overview
Roles of Personnel
Systems Scope
Present Status
Path forward for design, review, and approval
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
Personnel RolesManagement Responsibilities for
System Development through Operations
System Development and Commissioning Operations
Sa
fety
A
ssu
ran
ce
Sa
fety
A
ssu
ran
ce
De
sig
n,
Imp
lem
en
tatio
n,
Ma
inte
na
nce
, T
est
ing
De
sig
n,
Imp
lem
en
tatio
n,
Ma
inte
na
nce
, T
est
ing
Op
era
tion
al
Ove
rsig
ht
Op
era
tion
al
Ove
rsig
ht
Ove
rall
Re
spo
nsi
bili
ty,
Re
sou
rce
A
lloca
tion
Ove
rall
Re
spo
nsi
bili
ty,
Re
sou
rce
A
lloca
tion
LCLS Controls Manager
CPE Controls Manager
LCLS PPS Systems Manager
CPE Safety Systems
Review Officer
PPS Group Leader
Accelerator Systems Division
Safety Officer
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
PPS Scope
Mixture of: New PPS Systems
Existing PPS Systems with minor modifications
Hutch Protection Systems (HPS)
Plan to utilize PLC architectureNew at SLAC, increases review burden
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
PPS Scope
LINAC
20-21
26-27
24-25
28-29
22-23
Muon Shield
Undulator Hall
Sector 30+ BSY
Shield Wall
Injector
LTUElectronDump
Enclosure
LTU to BSYEmergency
exit
Equipment Access & Emergency Exit
D2 Dump
BAS IIDump
Backward Beam
Stopper
Barrier Gate at BSY/RY Boundary
FEEShieldWall
ShieldWall
NearHall
X-RayTransport
FarHall
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
LCLS Injector Vault PPS Layout
Up
Backward Beam
StopperEO
EO
EO
EO
Pr
Down
EO
SR
Laser Room
Laser Light Barrier
EO
Pr
SR
Emergency Off Button
Search Preset Button
Search Reset Button
Keybank
BSOIC
BCS PIC
Annunciator
PPS Equipment Door
Entry Module
DL1 Bend BX01/02
Dump
Linac Injector Spectrometer
Penetration
W
WVideo Camera
Equipment Drop with Removable Decking
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
PPS Status for Nov 2006 Injector Commissioning
Injector Software development complete
Hardware drawings, wiring diagrams are complete
LCLS Injector PPS FDR is next week (4-27)
Installation is set to begin in June
Begin detailed design of downstream systems in Summer 2006
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
PPS Review Path
PPS Global SCR: Nov 18, 2005
Injector (linac+BSY) Informal PDR: Feb ’06
Injector (linac+BSY) FDR: April 27th
RSC subcommittee: Functional Requirements Review: March 29th
RSC subcommittee: Safety Lifecycle Review: April 14th
RSC subcommittee: Technical Review: May
RSC full committee: June
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
BCS Scope
Prevents radiation from ‘escaping’ the shielding enclosure
Direct measurements of radiation or beam loss
Protection of safety-critical collimators and stoppers
Entirely new LCLS BCS neededNew gun = new shut-off mechanisms
Support two simultaneous programs (LCLS & PEP) = new set of shut-off paths
Reduce mutual interference of programs as much as possible = targeted shut-offs
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
BCS Modes
CID
NDR
SDR
PRL
LE Bypass
HE Bypass
LCLSInj
NARC
SARC
A-Line
BTH
HENIT
LESIT
D2
CID
NDR
SDR
PRL
LE Bypass
HE Bypass
LCLSInj
BAS II
NARC
SARC
A-Line
BTH
HENIT
LESIT
Accelerator in LCLS Mode
Accelerator in Linac Mode
Beamlines that shut-off CID
Beamlines that shut-off LCLS
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
BCS System ArchitectureNIT/SIT BCS Summary and
Bypass Chassis
LCLS BCS Summary and
Bypass Chassis
ESA BCS Summary and
Bypass Chassis
LINAC
Zone 3
BCS Summary
and Shut-Off Chassis
LCLSZone
BCS Summary, Shut-Off,
and Local Mode
Chassis
LCLS/LINAC Switching Logic
To LCLS Shut-Off
Mechanisms
LINAC
Zone 2
BCS Summary
and Shut-Off Chassis
LINAC
Zone 1
BCS Summary
and Shut-Off Chassis
To CID Shut-Off
MechanismsBSY PICs BCS Summary and
Bypass Chassis
119B PICs
119D PICs
119C PICs
PIC CrateST950ST960
ST950 &ST960
Flow Switches
Sector 29 and E+ BCS Inputs
Sector 4,Sector 10,
Damping Rings,And CID
BCS Inputs
LCLS LocalBCS Inputs
CIDLocal Mode
Chassis
PEP ACMs (5113)
BSY ACMs (5112, 5150)
MCC Meter Relays
DC Detect
BCS Trigger Timing Watchdog
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
BCS Status
System Concept Review completed (2-24)System design and PDR series are progressing towards a June FDRNew LCLS BCS device requirements for Injector-through-BSY operation is determinedNew BCS device compliment for downstream systems is currently being specifiedBCS Engineering Specifications Document is currently being generated (95% complete for commissioning-relevant content)
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
BCS Review Path
System Concept Review: Feb 24th
PDR series is underway (April-June)
FDR is on track for June
RSC System Review is needed; not scheduled
RSC Review of BCS device compliment for Injector through BSY operations is needed; not scheduled:
E. Michael Saleski
PPS and BCS [email protected]
April 20, 2006
Summary
PPS: heavy review schedule, but expect readiness for Fall Commissioning
BCS: Conceptual design of hybrid CID/LCLS BCS is complete, including new shut-off mechanisms2-month PDR process is initiated; FDR in JulyExpect readiness for Inj-to-BSY operation in November