LBT Q1 2007 LBT Q1 2007 Engineering Review Engineering Review ETP ETP Elevation Track Elevation Track Protection Protection (oil contamination (oil contamination remediation) remediation)
Feb 04, 2016
LBT Q1 2007 Engineering LBT Q1 2007 Engineering ReviewReview
ETPETP
Elevation Track Protection Elevation Track Protection
(oil contamination (oil contamination remediation)remediation)
13-Apr-200713-Apr-2007 LBT Q1 2007 Engineering RevieLBT Q1 2007 Engineering Revieww
Highlights (Q1/2007)Highlights (Q1/2007)
Elevation Track Protection in large Elevation Track Protection in large measure a consequence of HBS measure a consequence of HBS capillary installation.capillary installation.
Plugging the air galleys and installing Plugging the air galleys and installing resistors at the pads reduces the oil resistors at the pads reduces the oil consumption by 50%, increases consumption by 50%, increases stiffness by ~12%.stiffness by ~12%.
13-Apr-200713-Apr-2007 LBT Q1 2007 Engineering RevieLBT Q1 2007 Engineering Revieww
13-Apr-200713-Apr-2007 LBT Q1 2007 Engineering RevieLBT Q1 2007 Engineering Revieww
13-Apr-200713-Apr-2007 LBT Q1 2007 Engineering RevieLBT Q1 2007 Engineering Revieww
Open IssuesOpen Issues
TechnicalTechnical Vacuum system yet to demonstrate it is a Vacuum system yet to demonstrate it is a
viable solutionviable solution ScheduleSchedule
NoneNone FinancialFinancial
Facility installation of a vacuum system will be Facility installation of a vacuum system will be expensive, ~$100kexpensive, ~$100k
ResourceResource Mountain support pacing operationMountain support pacing operation
13-Apr-200713-Apr-2007 LBT Q1 2007 Engineering RevieLBT Q1 2007 Engineering Revieww
Progress (Q1/2007)Progress (Q1/2007)
Delivered Hoover (vacuum Delivered Hoover (vacuum scavenger) to LBTO, 1scavenger) to LBTO, 1stst attempt at attempt at use stopped because of venting use stopped because of venting aerosolsaerosols
Installed coalescing filter and Installed coalescing filter and external vent line.external vent line.
13-Apr-200713-Apr-2007 LBT Q1 2007 Engineering RevieLBT Q1 2007 Engineering Revieww
Planning (Q2/2007)Planning (Q2/2007)
Run system during 2Run system during 2ndnd qtr. qtr. Identify problems, measure oil Identify problems, measure oil
extraction rate at 1 corner.extraction rate at 1 corner.