Laying a new pipeline A pictorial story
11

Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

Apr 01, 2015

Download

Documents

Amaya Catterall
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

Laying a new pipeline

A pictorial story

Page 2: Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

Where it begins: a proving slot

The proving slots are small trenches dug at regular intervals sothat it can be “proved” as to what pipes and other services are actually in the ground and exactly where these items are.

Page 3: Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

Safety Equipment

Safety vests and appropriate protective equipment are suppliedto local labour on the project

Page 4: Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

Trenching begins

Solid rock bringsout the Jackhammer

Excess material is removed asquickly as possible to designated holding sites

Heavy machineryis available asneeded

Page 5: Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

Road crossings

Cutting the strip

Road closure for safety’s sake

And the dust fliesas the cuts are made

Page 6: Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

Laid pipe showing householderconnection

3 way join with tee valves in place

Pipe laying in progress

Trench also contains other services

Pipe laying

Page 7: Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

Pipes and the consumer

Barricading open trenchesFor safety purposes Waiting to be

connected

To consumersmeter

Preparing trenches tocarry connection toconsumers

Page 8: Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

Reinstatement

Closing the trench

Temporary road reinstatement

Consumers driveway being reinstated

Page 9: Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

Reinstating a road

Traffic Control

Preparations forreinstatement

Applying a primingagent

The Bitumenarrives

Spreading theasphalt

And lastly compaction

Page 10: Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

And soon to be as good as new!

Page 11: Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.

And finally when all is donePressure Testing takes place to

check for leaks

Water is pumped into the system under pressure and the whole system checked for leaks. Only after this will the new system “take over” from the old