Top Banner
21

Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Dec 19, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.
Page 2: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Laura Hemming – Project Manager

Jan Dodd – Project Engineer

Ty Gremaux – Report Editor/CAD Tech.

Cory Howell – Project Engineer

Page 3: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Project Location13th and Hulman Streets

Terre Haute, IN

Page 4: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

History of Property

• Opened in 1916 as Indiana Coke and Gas Company

• Closed in 1988• Known contaminants

include: benzene, toluene, ethylbenzene, xylene, and polyaromatic hydrocarbons

January 1940

Page 5: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Design Requirements

• Brownfield considerations

• Environmental remediation

• Commercial and industrial use

• Hulman and 13th Street improvements

• Railroad access to site

• Location of detention pond

Page 6: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Site Map

13th Street

Hulman Street

Canadian Pacific Railroad

North Plat

Middle Plat

South Plat

Hulman M ini Speedway

Time Warner Cable Relay Sation L ease

ProposedDetention

Pond

N

Page 7: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Project Approach

Site Assessment Phase II Review &GIS Mapping

Remediation Plans

Development Scenarios

Page 8: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Progress to Date

• Development Envelope

• Topographic Survey

• Low Impact Development (LID)

• Codes and Regulations

• Subsurface Conditions

• Begin Phase II Review

Int. of 13th Street and Lockport Road

September 2004

Page 9: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Development Envelope

• Availability and location of utilities

• Floodplains, wetlands and underground mines

• Right-of-way

• Zoning restrictions

• Soil contamination

Holey Moley 800-382-5544

Page 10: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Topographic Survey

• Rough topographic survey completed

• Obtained complete survey performed by American Consulting Inc.

• Compared two surveys to ensure accuracy

Page 11: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Topographic Survey

Page 12: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Low Impact Development

• Bioretention considerations

• Vegetated swales

• Pervious pavements

• Cisterns

• Cost analysis

Page 13: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Codes & Regulations

• Risk Integrated System of Closure (RISC) document

• Federal contamination guidelines for ground water

• Design Standards and Specifications Terre Haute and Indiana Department of Transportation

Page 14: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Subsurface Conditions

• Preliminary geological investigation

• Compared with soil borings from Trinity Environmental Group and ATC investigations

• Limitations for development

Intersection of 13th and Hulman Streets

September 2004

Page 15: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Future Direction

• Finish Phase II review & GIS mapping

• IDEM response letter & proposed additional testing

• Remediation plans

• Potential development scenarios

Page 16: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Phase II Review & GIS Mapping

• Soil borings and analytical testing

• Location of contaminants

• Contamination density mapping (GIS)

• Brownfield research

• Federal, state, and local development requirements

• Grant availability

Page 17: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

IDEM Response Letter & Proposed Additional Testing

• Inadequacies of initial testing• What tests need to be conducted again?

• What tests have never completed that are needed?

• How much extra will this cost?

Page 18: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Remediation Plans

• Specific areas or entire site

• Closure levels

• Worst-case scenario

• Plan based on current contaminant knowledge

• Cost analysis of two options

Page 19: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

13th Street

Hulman Street

Canadian Pacific Railroad

North Plat

Middle Plat

South Plat

Hulman M ini Speedway

Time Warner Cable Relay Sation L ease

ProposedDetention

Pond

N

Potential Development Scenarios

• Site layout

• Phasing of project

• Roadway design

Phase I

Phase II

Phase III

Phase IV

Page 20: Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.

Timeline

TASKSEPTEMBE

ROCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL

Site Assessment        

                                                       

Phase II Review & GIS Mapping

       

                                                       

Remediation Plans        

                                                       

Potential Development

Scenarios       

                                                       

Cost Estimation        

                                                       