Launch InVesta Green Gas 2.0/Milena Biomass Gasification Europe Alkmaar, 2 October 2014 Britta van Boven
5

Launch InVesta - Britta van Boven

Jul 02, 2015

Download

EBAconference

Presentation given Biomass Gasification Europe 2014 at the Conference of the European Biogas Association 2014.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Launch InVesta - Britta van Boven

Launch InVesta Green Gas 2.0/Milena

Biomass Gasification Europe

Alkmaar, 2 October 2014

Britta van Boven

Page 2: Launch InVesta - Britta van Boven
Page 3: Launch InVesta - Britta van Boven

BioSNG will be an important cornerstone of a renewable energy mix

Source: Routekaart Hernieuwbaar Gas, June 2014

Renewable gas -  Heating and electricity

production -  Backup for renewable

electricity -  Feedstock for industry -  As a transport fuel: CNG and

LBG

-  Expected demand for renewable gas supersedes local biomass potential for anaerobic digestion

-  Future import of sustainable biomass

-  BioSNG and gasification as the most energy and cost efficient solution

Page 4: Launch InVesta - Britta van Boven

Green Gas 2.0 (Milena) project

Present

R&D Refinements

Operation (Alkmaar)

Build demo 4MW plant

Final plan and FID decision

Consortium building and commercial negotiations

Successful R&D and lab scale test, small

demo*

Near Future Future steps Past

Selling licences

Launching customer

50- 100MW plant

Analyses & review, build-up of consortium

GG 2.0

2015 2017 2014 20xx 20xx 20xx 2011 2012 2014 2014

Assignment of TKI and SDE+

subsidies

*Gasification and cleaning on small demo scale, gas upgrading on lab scale

Installation Alkmaar, Green Gas 2.0

-  4 MW Milena gasifier -  Capex: ca. EUR 23 mln -  Location: Alkmaar, NL -  Input material: sustainable woodchips -  Output: ca. 2,8 MW biomethane for injection in local grid -  Partners: Gasunie, Dahlman, Taqa, ECN, (PDENH), (HVC)

Enabling competitive large-scale biomethane production

Page 5: Launch InVesta - Britta van Boven

4MW MILENA gasifier for Alkmaar

Gasification Methanation and gas

upgrading

Cleaning (tar removal)

MILENA OLGA SNG

CH4

§  4 MW installation to be build in NL for GG 2.0

§  Possibly to be tested with OLGA in Portugal for project in Alkmaar

§  4MW installation is in place in Portugal

§  Existing installation available for test

§  New OLGA installation to be build in Alkmaar for GG 2.0 project

§  4 MW added in Alkmaar as part of GG 2.0 project

Lab scale installation in Petten

0,8 MW installation in Petten

4 MW installation in Portugal