Page 1
JUMLAH
PROYEK NILAI INVESTASI NILAI INVESTASI
(JUTAAN RUPIAH) WNI WNA (JUTAAN RUPIAH) WNI WNA
1 SINTANG 31 916,874.70 247 - 1,225,261.74 394 1
2 SUNGAI TEBELIAN - - - - - - -
3 KELAM PERMAI 5 1,019,034.48 6,520 - 1,341,437.60 1,141.00 1.00
4 BINJAI HULU 7 1,435,556.93 27,111 20 211,681.00 172 3
5 TEMPUNAK 5 17,000.00 60 - 254,725.30 143.00 -
6 SEPAUK #BEZUG! #BEZUG! #BEZUG! ###### #BEZUG! #BEZUG! ####
7 KETUNGAU HILIR 10 3,562,243.26 10,512 - #WERT! 4,625.00 -
8 KETUNGAU TENGAH 29 646,355.09 650 11 1,098,932.40 1,408.00 14
9 KETUNGAU HULU 39 1,526,647.92 8,068 - 1,097,661.19 1,108.00 -
10 DEDAI 9 822,900.56 3,450 - 174,841.43 250 -
11 KAYAN HILIR 6 646,175.51 2,952 - 19,500.00 2,952 -
12 KAYAN HULU 16 1,273,253.00 1,350 - 65,926.17 85.00 -
13 SERAWAI 9 - - - - - -
14 AMBALAU 4 - - - - - -
#BEZUG! #BEZUG! #BEZUG! ###### #BEZUG! #BEZUG! ####JUMLAH
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL PMDN BERDASARKAN LOKASI PROYEK
Sampai dengan 30 September 2018
KABUPATEN SINTANG
PMDN
TENAGA KERJANO LOKASI KECAMATAN
PMDN
TENAGA KERJA
Page 2
JUMLAH
PROYEK NILAI INVESTASI NILAI INVESTASI
(JUTAAN RUPIAH) WNI WNA (JUTAAN RUPIAH) WNI WNA
I. Sektor Primer 141 10,633,774.45 65,175 119 5,862,119.63 13,025 4
1 Tanaman Pangan dan Perkebunan 39 10,633,774.45 65,175 23 5,862,119.63 13,025 4
2 Peternakan - - - - - - -
3 Kehutanan 6 - - - - - -
4 Perikanan - - - - - - -
5 Pertambangan 96 - - 96 - - -
II. Sektor Sekunder 22 3,546,692.47 23,456 - 1,164,956.97 1,341 1
1 Industri Makanan - - - - - - -
2 Industri Tekstil - - - - - - -
3 Industri Barang dari Kulit & Alas Kaki - - - - - - -
4 Industri Kayu - - - - - - -
5 Industri Kertas & Percetakan - - - - - - -
6 Industri Kimia & Farmasi - - - - - - -
7 Industri Karet & Plastik 3 201,622.65 20,138 - 182,159.55 159 -
8 Industri Mineral Non Logam - - - - - - -
9 Industri Logam, Mesin & Elektronika - - - - - - -
10 Industri Instrumen Kedokteran, Presisi, Optik dan Jam - - - - - - -
11 Industri Kendaraan bermotor & Alat transportasi lain - - - - - - -
12 Industri Lainnya 19 3,345,069.83 3,318 - 982,797.42 1,182.00 1.00
III. Sektor Tersier 35 26,376.34 144 - 335,497.00 30 -
1 Listrik, Gas dan Air - - - - - - -
2 Konstruksi 11 26,376.34 144 - - - -
3 Perdagangan & Reparasi 7 - - - - - -
4 Hotel & Restoran 5 - - - - - -
5 Transportasi, Gudang & Komunikasi - - - - - - -
6 Perumahan, Kawasan Industri & Perkantoran - - - - - - -
7 Jasa Lainnya 12 - - - 335,497.00 30 -
198 14,206,843.26 88,775 119 7,362,573.60 14,396 5
KEPALA DINAS PENANAMAN MODAL DAN PTSP
KABUPATEN SINTANG
SUDIYANTO, SH
Pembina Utama Muda
NIP. 19610610 199003 1 011
JUMLAH
KABUPATEN SINTANG
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL PMDN BERDASARKAN SEKTOR USAHA
Sampai dengan 30 September 2018
NO SEKTOR USAHA
REALISASI
TENAGA KERJA
RENCANA
TENAGA KERJA
Page 3
TANAMAN PANGAN DAN PERKEBUNAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT. Perkebunan Nusantara XIII Dedai 127/II/PMDN/2008 Tgl. 25/09/2008 Perkebunan Karet - 1 149,756.50 180 - 149,756.50 180 - Izin Berakhir
2 PT. Bonti Permai Jaya Raya Binjai Hulu, 129/III/PMDN/2003 Tgl. 27/7/2003 Perkebunan Kelapa Sawit 1 495,185.74 24,600 20 211,681.00 172 3 Izin Berakhir
Ketungau Hilir 23/III/PMDN/2005 Tgl. 16/3/2005 Izin Berakhir
011/61/IU/I/PMDN/Pertan/Ind/11 Tgl. 2/8/11 Izin Berakhir
3 PT. Permata Hijau Sarana Sepauk 485/I/PMDN/1993 Tgl. 13/12/1993 Perkebunan Kelapa Sawit - 48,720.00 5,000 3 295,007.66 194 - Izin Berakhir
2/61/PI/PMDN/2018 Tgl 30/01/2018 126,298.48 358
4 PT. Citra Kalbar Sarana Sepauk, Tempunak 008/61/I/IP/III/PMDN/2012 Tgl. 02/04/2012 Perkebunan Kelapa Sawit Izin Berakhir
106/I/PMDN/2006 Tgl. 16/08/2007 Izin Berakhir
8/6107/PI/PMDN/2018 Tgl. 21/06/2018 - 1 19.07.2018 388,500.00 1,900 - 233,427.00 390
5 PT. Megasawindo Perkasa Kayan Hilir 22/II/PMDN/2006 Tgl. 23/03/2006 Perkebunan Kelapa Sawit 1 545,357.75 2,842 - 19,500.00 2,952 - Izin Berakhir
6 PT. Bintara Tani Nusantara Kayan Hulu, Kayan Hilir 8/6107/IP/PMDN/2017 tgl 14/06/2017 Perkebunan Kelapa Sawit 1 1,273,253.00 1,350 - 65,926.17 85 -
7 PT. Jake Sarana Sepauk 009/61/IP/III/PMDN/2012 Tgl. 02-04-2012 Perkebunan Kelapa Sawit Izin Berakhir
109/I/PMDN/2006 Tgl. 16-8-06 Izin Berakhir
9/6107/PI/PMDN/2018 Tgl. 21/06/2018 - 1 19.07.2018 388,500.00 1,800 - 194,153.00 116 -
8 PT. Sintang Agro Mandiri Sintang, Tempunak, 1/61/IP-PB/PMDN/2014 Tgl. 17/06/2014 Perkebunan Kelapa Sawit - 1 05.07.2018 360,168.49 57 - 360,168.49 73 - Izin Berakhir
Sepauk, Binjai Hulu 1/6107/IU/PMDN/2016 Tgl. 24-11-2016
9 PT. Buana Hijau Abadi Ketungau Hilir, 1/61/IP/I/PMDN/2013 Tgl 10/07/2013 Perkebunan Kelapa Sawit - 1 19.07.2018 619,861.23 1,528 - 160,235.77 2,495 - Izin Berakhir
Tengah, Hulu 3/61/PPM/I/PMDN/2013 Tgl. 09-07-2013 Izin Berakhir
1/6107/IU/PMDN/2015 tgl 12-10-2015
10 PT. Bumi Sentosa Lestari Dedai, Kayan Hilir 005/61/IP/I/PMDN/2012 Tgl. 20/02/2012 Perkebunan Kelapa Sawit 1 524,969.50 3,000 - - - - Izin Berakhir
004/61/PPM/PMDN/2012 Tgl. 14/02/2012 - - - Izin Berakhir
11 PT. Makmur Agro Lestari Ketungau Hilir 149/I/PMDN/2008 Tgl. 11/08/2008 Perkebunan Kelapa Sawit 1 452,405.63 2,594 - 193,483.68 497 - Izin Berakhir
12 PT. Agro Sukses Lestari Kelam Permai, 1911/IP/I/PMDN/2010 Tgl. 24/03/2010 Perkebunan Kelapa Sawit - 1 17.05.2018 737,500.00 5,400 - 992,938.04 591 1 Izin Berakhir
Binjai Hulu 1/6107/PI/PMDN/2018 tgl 22/01/2018
13 PT. Duta Rendra Mulya Ket Hilir, Binjai Hulu, 018/61/IP/II/PMDN/2011 Tgl. 31/10/2011 Perkebunan Kelapa Sawit 1 - 10.10.2018 189,000.00 400 - 221,961.91 - - Izin Berakhir
Kelam Permai 118/II/PMDN/1989 Tgl. 08/08/1989 Izin Berakhir
14 PT. Kiara Sawit Abadi Ket Tengah, Hulu 3/61/IP/PMDN/2013 Tgl. 29-10-2013 Perkebunan Kelapa Sawit 1 - 16.10.2018 442,346.09 520 - 966,381.84 1,349 - Izin Berakhir
15 PT. Cahaya Unggul Prima Ket. Hilir, Ket. Tengah 2/6107/IP/PMDN/2016 Tgl. 22-3-2016 Perkebunan Kelapa Sawit 1 - 15.10.2018 850,000.00 2,480 - 252,944.81 1,022 -
16 PT. Perkasa Mas Langgeng Sepauk, Binjai, Tempunak Ket Hlr,Tgh 1/6107/IP/PMDN/2016 Tgl. 22-3-2016 Perkebunan Kelapa Sawit 1 - 15.10.2018 580,000.00 1,680 - 350,987.53 1,011 -
17 PT. Perdana Sawit Plantation Ket Hilir, Tengah 3/6107/IP/PMDN/2016 Tgl. 15-7-16 Perkebunan Kelapa Sawit 1 509,600.45 2,511 - 192 -
18 PT. Duta Sejahtera Utama Ketungau Hilir 6/6107/IP/PMDN/2016 Tgl. 20/12/2016 Perkebunan Kelapa Sawit 1 - 10.10.2018 595,000.00 265 - 8,474.36 332 -
19 PT. Duta Agro Prima Ketungau Hulu 20/6107/IP/PMDN/2017 tgl 04/10/2017 Perkebunan Kelapa Sawit 1 - 18.10.2018 146,079.91 1,800 - 218,407.25 320 -
20 PT. Sawit Emas Persada Ketungau Hulu 21/6107/IP/PMDN/2017 tgl 04/10/2017 Perkebunan Kelapa Sawit 1 - 18.10.2018 42,997.85 1,000 - 38,867.80 92 -
21 PT. Sawit Khatulistiwa Lestari Binjai Hulu, Ket Hilir, Ket Tengah 4/6107/IP/PMDN/2017 tgl 27/04/2017 Perkebunan Kelapa Sawit 1 509,600.45 2,511 - - - -
22 PT. Tri Persada Raya Tirta Karya Ketungau Tengah 19/6107/IP/PMDN/2017 tgl 03/10/2017 Perkebunan Kelapa Sawit 1 - 18.10.2018 23,009.48 1,000 - 2,851.96 3 -
23 PT. Kalimantan Sawit Plantation Sekubang Sepauk 22/6107/IP/PMDN/2017 tgl 13/12/2017 Perkebunan Kelapa Sawit - 1 761,962.38 757 - - - -
24 PT. Bukit Prima Plantindo Sintang Perkebunan Kelapa Sawit - 1 04.07.2018 - - - 214,873.63 102 - Belum PPM
25 PT. Satya Nusa Indah Perkasa Binjai Hulu, Ket Hilir Perkebunan Kelapa Sawit - 1 - - - - - - Belum PPM
26 PT. Bukit Hijau Lestari Sepauk, Tempunak Perkebunan Kelapa Sawit 1 - - - 131,766.19 70 - Belum PPM
27 PT. Inma Jaya Group Ketungau Hulu Perkebunan Kelapa Sawit - 1 - - - - - - Belum PPM
28 PT. Inma Makmur Lestari Ketungau Hulu Perkebunan Kelapa Sawit - 1 - - - - - - Belum PPM
29 PT. Indomal Sawit Jaya Ketungau Hulu, Ket Tengah Perkebunan Kelapa Sawit - 1 - - - - - - Belum PPM
30 PT. Sumatera Makmur Lestari Kayan Hilir Perkebunan Kelapa Sawit - 1 - - - - - - Belum PPM
31 PT. Prima Sawit Andalan Sepauk, Tempunak Perkebunan Kelapa Sawit 1 - - - 128,441.99 143 - Belum PPM
32 PT. Dharma Persada Sejahtera Sepauk Perkebunan Kelapa Sawit 1 - - - 68,859.27 143 - Belum PPM
33 PT. Agro Tani Mandiri Kelam Permai, Dedai Perkebunan Kelapa Sawit - 1 - - - - - - Belum PPM
34 PT. Bonti Permai Jayaraya II Binjai Hulu, Ket Hilir Perkebunan Kelapa Sawit - 1 - - - - - - Belum PPM
35 PT. Kencana Alam Permai Tempunak, Sepauk Perkebunan Kelapa Sawit 1 - - - 254,725.30 143 - Belum PPM
36 PT. Palmido Lestari Ketungau Hulu Perkebunan Kelapa Sawit - 1 - - - - - - Belum PPM
37 PT. Asia Bhakti Agro Sepauk, Tempunal Perkebunan Kelapa Sawit - 1 - - - - - - Belum PPM
38 PT. Palm Agro Katulistiwa Sepauk, Tempunak, Binjai Hulu Perkebunan Kelapa Sawit - 1 - - - - - - Belum PPM
39 PT. Puspa Kumala Sejahtera Ket. Hilir, Ket. Tengah Perkebunan Kelapa Sawit - 1 - - - - - - Belum PPM
40 PT. Palma Adinusa Jaya Sintang, Kel Per, Binjai Hl, Ket Hlr Perkebunan Kelapa Sawit - 1 - - - - - - Belum PPM
8 31 10,633,774.45 65,175 23 5,862,119.63 13,025 4
KET
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
Sampai dengan 30 September 2018
NO NAMA PERUSAHAAN
REALISASI
TK
KABUPATEN SINTANG
NOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
LAPORAN
KEGIATANBIDANG USAHALOKASI KECAMATAN
JUMLAH PERKEBUNAN
RENCANA
TK
Page 4
PETERNAKAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
KEHUTANAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT. Sari Bumi Kusuma Serawai 56/Menhut-II/2007 Tgl. 22-02-2007 Hasil Hutan Kayu 1 - - - - - - Izin Berakhir
2 PT. Batasan Serawai 416/Menhut-II/2004 Tgl. 19-10-2004 Hasil Hutan Kayu 1 - - - - - - Izin Berakhir
3 PT. Harapan Kita Utama Serawai 803/Kpts=VI/1999 Tgl. 30-09-1999 Hasil Hutan Kayu 1 - - - - - - Izin Berakhir
4 CV. Pangkar Begili Serawai 395/Menhut-II/2007 Tgl. 27-11-2007 Hasil Hutan Kayu 1 - - - - - - Izin Berakhir
5 PT. Borneo Karunia Mandiri Kayan Hulu 1002 Tahun 2001 Tgl. 31-12-2001 Hasil Hutan Kayu 1 - - - - - - Izin Berakhir
6 PT. Mitra Jaya Nusa Indah Serawai 306/Menhut-II/2010 Tgl. 17-05-2010 Hutan Tanaman Industri 1 - - - - - - Izin Berakhir
- 6 - - - - - -
PERIKANAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - - - - -
PERTAMBANGAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT. KARYA PUTERA MANDIRI Tempunak 1/6107/PI-PB/PMDN/2018 22/01/2018 ZIRKON 1 - - - - - -
17/6107/IP/PMDN/2017 29/08/2017
2 PT. AURUM PERSADA Sepauk 545/60/KEP-DPE/ TH 2013 ZIRKON 1 - - - - - -
3 PT. AURUM KHATULISTIWA Ket. Hulu 545/61/KEP-DPE/ TH 2013 EMAS 1 - - - - - -
4 PT. AMERTA ALAM SEMESTA Ket.hulu 543.5/59/KEP-DPE/ TH 2013 BATUBARA 1 - - - - - -
5 PT. ANUGRAH SEMESTA Sepauk 543.5/858/2012 ZIRKON 1 - - - - - - Izin Berakhir
6 PT. BANGUN ASIA MANDIRI Sepauk 1425 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
7 PT. BARITO RAYA ENERGI Ket. Hulu 1437 TH 2010 BATUBARA 1 - - - - - - Izin Berakhir
KET
KET
KET
KET
NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
LAPORAN
LOKASI KECAMATAN
BIDANG USAHA
REALISASI
TK
RENCANA
TK
JUMLAH KEHUTANAN
JUMLAH PERIKANAN
LOKASI KECAMATAN
Sampai dengan 30 September 2018
KEGIATAN
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
NO
REALISASI
TKNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
RENCANA
Sampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
LOKASI KECAMATAN
LAPORAN
KEGIATAN
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAANKABUPATEN SINTANG
RENCANA
KABUPATEN SINTANG
TK
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
LAPORAN
KEGIATANBIDANG USAHA
JUMLAH PETERNAKAN
NOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAANKABUPATEN SINTANG
Sampai dengan 30 September 2018
NO LOKASI KECAMATAN
RENCANA
TK
REALISASI
TKNAMA PERUSAHAAN
BIDANG USAHA TK
KABUPATEN SINTANG
Sampai dengan 30 September 2018
NO NAMA PERUSAHAAN
LAPORAN
KEGIATAN
REALISASI
TK
Page 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
8 PT. BUMI KELINGKANG MINING Ket.Tengah 1274 TH 2011 BATUBARA 1 - - - - - - Izin Berakhir
9 PT. BUMI KAYAN MINING Ket.Tengah 1275 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
10 PT. BUMI KETUNGAU MINING Ket.Tengah 1276 TH 2011 BATUBARA 1 - - - - - - Izin Berakhir
11 PT. BUMI MELAWI MINING Ket.Tengah 1277 TH 2011 BATUBARA 1 - - - - - - Izin Berakhir
12 PT. BUMI PERMATA JAYA Kayan Hulu 1172 TH 2011 BATUBARA 1 - - - - - - Izin Berakhir
13 PT. BUMI PERMATA JAYA Kayan Hulu 1171 TH 2011 BATUBARA 1 - - - - - - Izin Berakhir
14 PT. BUMI PERMATA JAYA Kayan Hulu 1170 TH 2011 BATUBARA 1 - - - - - - Izin Berakhir
15 PT. BUMI PERMATA JAYA Kayan Hulu 1169 TH 2011 BATUBARA 1 - - - - - - Izin Berakhir
16 PT. BUMI PERMATA JAYA Kayan Hulu 1168 TH 2011 BATUBARA 1 - - - - - - Izin Berakhir
17 PT. BUMI PERMATA JAYA Kayan Hulu 1167 TH 2011 BATUBARA 1 - - - - - - Izin Berakhir
18 PT. BUMI SARAN MINING Kayan Hulu 1164 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
19 PT. BUMI SINTANG MINING Ket.Hulu 542.1/904/ TH 2012 BATUBARA 1 - - - - - - Izin Berakhir
20 PT. JAKALINDO MINERALS Sepauk 802 TH 2009 ZIRKON 1 - - - - - - Izin Berakhir
21 PT. DINAMIKA AURUM Tempunak 545/62/KEP-DPE/ TH 2013 ZIRKON 1 - - - - - -
22 PT. DWI PRIMA PERSADA Ket.Tengah 1426 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
23 PT. FET MINING INDONESIA Ket.Tengah 545/987 TH 2012 BATUBARA 1 - - - - - - Izin Berakhir
24 PT. HAMPARAN HIJAU LESTARI Sintang 653 TH 2011 ZIRKON 1 - - - - - - Izin Berakhir
25 PT. HAMPARAN HJAU LESTARI Ket. Hilir 654 TH 2011 ZIRKON 1 - - - - - - Izin Berakhir
26 PT. HAMPARAN HIJAU LESTARI Binjai Hulu 655 TH 2011 ZIRKON 1 - - - - - - Izin Berakhir
27 PT. HIREMASA INDONESIA Ket. Hulu 1501 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
28 PT. HIREMASA INDONESIA Ket. Hulu 1502 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
29 PT. HIREMASA INDONESIA Ket. Hulu 1515 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
30 PT. KAYA SEMESTA Binjai, Kelam Permai dan Ketngau Hilir 1238 TH 2011 ZIRKON 1 - - - - - - Izin Berakhir
31 PT. KENDAWANGAN PUTRA Sepauk 607 TH 2011 EMAS 1 - - - - - - Izin Berakhir
32 PT. KETUNGAU NUSA RAYA Ket.Hulu 543.5/56/KEP-DPE/2013 BATUBARA 1 - - - - - -
33 PT. KETUNGAU NUSA RAYA Ket.Hulu 543.5/204/TH 2012 BATUBARA 1 - - - - - - Izin Berakhir
34 PT. MEGA SINAR PERSADA Ket.Hulu 1491 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
35 PT. MEGA SINAR PERSADA Ket. Tengah 1492 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
36 PT. MEGA SINAR PERSADA Ket. Tengah dan Ket. Hilir 1493 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
37 PT. MINERAL INDOSIN Sepauk dan Tempunak 1239 TH 2011 EMAS DMP 1 - - - - - - Izin Berakhir
38 PT. MITRA RAYA SHETINDO Sepauk 1086 Th 2011 EMAS DMP 1 - - - - - - Izin Berakhir
39 PT. PEMBANGUNAN SINTANG Ambalau 1172 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
40 PT. PUTRA ALAM LESTARI Serawai 606 TH 2011 EMAS 1 - - - - - - Izin Berakhir
41 PT. REZEKI ALAM PERMAI Sepauk danTempunak 1236 TH 2011 ZIRKON 1 - - - - - - Izin Berakhir
42 PT. REZEKI SEMESTA BUMI Serawai 1237 TH 2011 ZIRKON 1 - - - - - - Izin Berakhir
43 PT. SILANGKOP NUSA RAYA Ket.hulu 543.5/57/KEP-DPE/Thn 2013 BATUBARA 1 - - - - - -
44 PT. SILANGKOP NUSA RAYA Ket.Hulu 543.5/58/KEP-DPE/Thn 2013 BATUBARA 1 - - - - - -
45 PT. SILANGKOP NUSA RAYA Ket.Hulu 1147 TH 2011 BATUBARA 1 - - - - - - Izin Berakhir
46 PT. SINAR KAPUAS MINING Sepauk & tempunak 1273 TH 2011 ZIRKON 1 - - - - - - Izin Berakhir
47 PT. SINAR SEPAUK MINING Sepauk 1175 TH 2009 EMAS 1 - - - - - - Izin Berakhir
48 PT. SINAR TEMPUNAK MINING Tempunak 1177 TH 2009 EMAS 1 - - - - - - Izin Berakhir
49 PT. SUMBER ANDESIT RAYA Ambalau 1171 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
50 PT. TENAGA PERKASA Kayan Hulu 1178 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
51 PT. TENAGA PERKASA Kayan Hulu 1179 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
52 PT. TENAGA PERKASA Kayan Hulu 1180 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
53 PT. TENAGA PERKASA Kayan Hulu 1181 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
54 PT. TENAGA PERKASA Kayan Hulu 1182 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
55 PT. BARITO RAYA ENERGI Ket. Tengah 545/1066/ TH 2010 BATUBARA 1 - - - - - - Izin Berakhir
56 PT. THE GRAND LI FULLERTON Sepauk, Tempunak dan Sei. Tebelian 545/1026/ TH 2012 EMAS 1 - - - - - - Izin Berakhir
57 PT. USAHA MAJU MITRA Ket. Tengah 1139 TH 2011 BATUBARA 1 - - - - - - Izin Berakhir
58 PT. AUTO PARTS INDOMOTOR Kayan Hilir 1507 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
59 PT. AUTO PARTS INDOMOTOR Kayan Hilir dan Kayan Hulu 1508 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
60 PT. MEGAH BUMI Kayan Hulu 543.5/18/TH 2012 BATUBARA 1 - - - - - - Izin Berakhir
61 PT. TANJUNG MULIA PERSADA Serawai 1520 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
62 PT. TANJUNG MULIA PERSADA Ambalau 1521 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
63 PT. GUNUNG TIMANG ABADI Ambalau 1519 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
64 PT. EKA TANUR KENCANA Ket. Hulu 1518 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
65 CV. ARTHA ZIRKON Dedai 1235 TH 2011 ZIRKON 1 - - - - - - Izin Berakhir
66 PT. SINTANG SUMBER MINERAL Dedai 1240 TH 2011 ZIRKON 1 - - - - - - Izin Berakhir
67 PT. JAKALINDO MINERALS Sepauk 1312 TH 2011 ZIRKON 1 - - - - - - Izin Berakhir
68 PT. INDO PUTRA BERSAMA Sepauk 545/1154/KEP-PE/2013 ZIRKON 1 - - - - - -
Page 6
1 2 3 4 5 6 7 8 9 10 11 15
69 PT. INDO PUTRA BERSAMA Sepauk 545/1155/KEP-PE/2013 ZIRKON 1 - - - - - -
70 PT. SUNG PUTERA PERSADA Sepauk 1129 TH 2009 ZIRKON 1 - - - - - - Izin Berakhir
71 PT. SUNG PUTERA PERSADA Sepauk 543.5/875/TH 2012 ZIRKON 1 - - - - - - Izin Berakhir
72 PT. KARYA PUTRA MANDIRI Tempunak 17/6107/PMDN/2017 tgl 29/08/2017 ZIRKON 1 17,000.00 60.00 - - - -
73 PT. ANUGERAH BORNEO Ket. Hulu 1548 TH 2010 BATUBARA 1 - - - - - - Izin Berakhir
74 PT. PUTRA SUNGAI KAPUAS Serawai 720 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
75 PT. KALIMANTAN MINERAL Sepauk 0545/5/TH 2012 ZIRKON 1 - - - - - - Izin Berakhir
76 PT. MUARA UNGAI Kayan Hilir & Hulu 1396 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
77 PT. INTI KREASI ABADI Sepauk 722 TH 2009 EMAS 1 - - - - - - Izin Berakhir
78 PT. INSPIRA INDONESIA Ket. Tengah 693 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
79 PT. K. SAMAN Ket. Tengah 545/1065/TH 2012 BATUBARA 1 - - - - - - Izin Berakhir
80 PT. K. SAMAN Ket. Tengah 1522 Tahun 2009 BATUBARA 1 - - - - - - Izin Berakhir
81 PT. DIAMITRA AGUNG PERKASA Sintang dan Tempunak 1523 Tahun 2009 EMAS DMP 1 - - - - - - Izin Berakhir
82 PT. CAHAYA PRIMA Sintang 1522 Tahun 2009 EMAS DMP 1 - - - - - - Izin Berakhir
83 PT. DELIKA TIRTA KENCANA Ketungau Hulu 1525 Tahun 2009 BOUKSITE 1 - - - - - - Izin Berakhir
84 PT. DUTA SRAYA MANDIRI Ketungau Tengah dan Ketungau Hilir 1526 Tahun 2009 BOUKSITE 1 - - - - - - Izin Berakhir
85 PT. HIREMASA INDONESIA Ketungau Hulu 1524 TH 2009 BATUBARA 1 - - - - - - Izin Berakhir
- 85 17,000 60 - - - -
DAFTAR PEMEGANG SURAT IZIN PERTAMBANGAN DAERAH (SIPD)
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 H. WARNO MAWARDI, BE Dedai Mineral nonlogam&Batuan 1 - - - - - -
2 YAYA HITAYATI Dedai Mineral nonlogam&Batuan 1 - - - - - -
3 CV. YOVIN Dedai Mineral nonlogam&Batuan 1 - - - - - -
4 PT RELASI LESTARI Kelam Permai Mineral nonlogam&Batuan 1 - - - - - -
5 WAHYAN Sintang Mineral nonlogam&Batuan 1 - - - - - -
6 RAIHANAH Sintang Mineral nonlogam&Batuan 1 - - - - - -
7 BURHAN Sintang Mineral nonlogam&Batuan 1 - - - - - -
8 SOEPIYAN Sintang Mineral nonlogam&Batuan 1 - - - - - -
9 LIDANG Sepauk Mineral nonlogam&Batuan 1 - - - - - -
10 HIE SAN Sepauk Mineral nonlogam&Batuan 1 - - - - - -
11 WIDDIYANTO YANUAR Sintang Mineral nonlogam&Batuan 1 - - - - - -
- 11 - - - - - -
INDUSTRI MAKANAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - -
KET
KET
KABUPATEN SINTANG
NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
LOKASI KECAMATANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
JUMLAH PERTAMBANGAN
Sampai dengan 30 September 2018
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
REALISASI
NO LOKASI KECAMATAN
LAPORAN
KEGIATAN TKBIDANG USAHA
RENCANA
TK
JUMLAH INDUSTRI MAKANAN
JUMLAH PERTAMBANGAN
REALISASI
KEGIATAN TK
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
RENCANA
TKBIDANG USAHA
LAPORAN
KABUPATEN SINTANGSampai dengan 30 September 2018
NO NAMA PERUSAHAAN
Page 7
INDUSTRI TEKSTIL
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
INDUSTRI BARANG DARI KULIT DAN ALAS KAKI
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
INDUSTRI KAYU
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
INDUSTRI KERTAS DAN PERCETAKAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
INDUSTRI KIMIA DAN FARMASI
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
KET
KET
KET
KET
KET
KEGIATAN
REALISASI
TKKEGIATAN
KABUPATEN SINTANGSampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
JUMLAH INDUSTRI KAYU
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
BIDANG USAHA
REALISASI
JUMLAH INDUSTRI BARANG DARI KULIT DAN ALAS KAKI
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANGSampai dengan 30 September 2018
JUMLAH INDUSTRI KERTAS DAN PERCETAKAN
BIDANG USAHALOKASI KECAMATAN
LAPORAN RENCANA
TK
KEGIATAN
REALISASI
TK
RENCANA
TK
TKNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
REALISASI
TK
TK
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
JUMLAH INDUSTRI TEKSTIL
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANGSampai dengan 30 September 2018
NO NAMA PERUSAHAAN LOKASI KECAMATAN
LAPORAN
KEGIATAN
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHALOKASI KECAMATAN
LAPORAN
TK TK
KABUPATEN SINTANGSampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
RENCANA
RENCANA
TK
KABUPATEN SINTANGSampai dengan 30 September 2018
LOKASI KECAMATAN
LAPORAN
LOKASI KECAMATAN
LAPORAN
KEGIATAN
JUMLAH INDUSTRI KIMIA DAN FARMASI
BIDANG USAHA
REALISASIRENCANA
Page 8
INDUSTRI KARET DAN PLASTIK
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT. Perkebunan Nusantara XIII Dedai 127/II/PMDN/2008 Tgl. 25/09/2008 Karet / SIR - 1 25,084.93 70 - 25,084.93 70 - Izin Berakhir
2 PT. Kirana Putera Karya Sintang 017/IUI/IX/2008 Tgl. 9-9-2008 Karet / SIR - 1 104,537.72 68 - 104,824.62 59 -
3 PT. Sumber Karet Sintang 102/I/PMDN/2016 Tgl. 11/09/2006 Latek 1 72,000.00 20,000 - 52,250.00 30 - Izin Berakhir
- 3 201,622.65 20,138 - 182,159.55 159 -
INDUSTRI MINERAL NON LOGAM
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
INDUSTRI LOGAM, MESIN DAN ELEKTRONIKA
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
INDUSTRI INSTRUMEN KEDOKTERAN, PRESISI, OPTIK DAN JAM
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
INDUSTRI KENDARAAN BERMOTOR DAN ALAT TRANSPORTASI LAINNYA
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
KET
KET
KET
KET
KET
REALISASI
NOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
REALISASI
LOKASI KECAMATAN
BIDANG USAHA
REALISASI
KABUPATEN SINTANGSampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHA TK
RENCANA
TK
LOKASI KECAMATAN
LAPORAN
KEGIATAN TK
JUMLAH INDUSTRI MINERAL NON LOGAM
Sampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHALOKASI KECAMATAN
LAPORAN
KEGIATAN
REALISASI
KABUPATEN SINTANG
TKLOKASI KECAMATAN
LAPORAN
KEGIATAN
RENCANA
TK
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
NO
JUMLAH INDUSTRI LOGAM, MESIN DAN ELEKTRONIKA
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
RENCANA
TK TK
LOKASI KECAMATAN
LAPORAN
KEGIATAN
REALISASI
LAPORAN
KEGIATAN
TK
KABUPATEN SINTANGSampai dengan 30 September 2018
NO NAMA PERUSAHAAN
KABUPATEN SINTANGSampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
JUMLAH INDUSTRI INSTRUMEN KEDOKTERAN, PRESISI, OPTIK DAN JAM
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
BIDANG USAHA
JUMLAH INDUSTRI KENDARAAN BERMOTOR DAN ALAT TRANSPORTASI LAINNYA
RENCANA
TK
RENCANA
KABUPATEN SINTANGSampai dengan 30 September 2018
NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
TK
JUMLAH INDUSTRI KARET DAN PLASTIK
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
Page 9
INDUSTRI LAINNYA
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT. Bonti Permai Jaya Raya Binjai Hulu, 129/III/PMDN/2003 Tgl. 27/7/2003 Industri CPO - 1 430,770.74 - - - - - Izin Berakhir
Ketungau Hilir 23/III/PMDN/2005 Tgl. 16/3/2005 Izin Berakhir
011/61/IU/I/PMDN/Pertan/Ind/11 Tgl. 2/8/11
2 PT. Permata Hijau Sarana Sepauk 485/I/PMDN/1993 Tgl. 13/12/1993 Industri CPO 1 25,500.00 - - 123,521.33 71 - Izin Berakhir
3 PT. Citra Kalbar Sarana Sepauk, Tempunak 008/61/I/IP/III/PMDN/2012 Tgl. 02/04/2012 Industri CPO - 1 19.07.2018 189,000.00 90 - - - - Izin Berakhir
106/I/PMDN/2006 Tgl. 16/08/2007 Izin Berakhir
4 PT. Megasawindo Perkasa Kayan Hilir 22/II/PMDN/2006 Tgl. 23/03/2006 Industri CPO 1 100,817.76 110 - - - - Izin Berakhir
5 PT. Bintara Tani Nusantara Kayan Hulu, Ky Hilir 8/6107/IP/PMDN/2017 tgl 14/06/2017 Industri CPO 1 - - - - - Izin Berakhir
6 PT. Jake Sarana Sepauk 009/61/IP/III/PMDN/2012 Tgl. 2-4-12 Industri CPO - 1 19.07.2018 189,000.00 200 - - 30 - Izin Berakhir
109/I/PMDN/2006 Tgl. 16-8-06 Izin Berakhir
7 PT. Sintang Agro Mandiri Sintang, Tempunak, 024/61/IP/I/PMDN/2011 Tgl. 23/11/2011 Industri CPO - 1 05.07.2018 360,168.49 122 - 209,898.00 82 - Izin Berakhir
Sepauk, Binjai Hulu 1/6107/IU/PMDN/2016 Tgl. 24-11-2016
8 PT. Buana Hijau Abadi Ketungau Hilir, 1/61/IP/I/PMDN/2013 Tgl 12/07/2013 Industri CPO - 1 19.07.2018 136,367.04 654 - 24,630.82 87 - Izin Berakhir
Tengah, Hulu 3/61/PPM/I/PMDN/2013 Tgl. 10-07-2013 Izin Berakhir
1/6107/IU/PMDN/2015 tgl 12-10-2015
9 PT. Bumi Sentosa Lestari Dedai, Kayan Hilir 005/61/IP/I/PMDN/2012 Tgl. 20/02/2012 Industri CPO 1 123,089.63 200 - - - - Izin Berakhir
004/61/PPM/PMDN/2012 Tgl. 14/02/2012 Izin Berakhir
10 PT. Makmur Agro Lestari Ketungau Hilir 149/I/PMDN/2008 Tgl. 11/08/2008 Industri CPO 1 131,008.91 80 - - - - Izin Berakhir
11 PT. Agro Sukses Lestari Kl Permai, Binjai Hulu 1/6107/PI/PMDN/2018 tgl 22/01/2018 Industri CPO 1 258,525.00 120 - 345,647.60 547 -
12 PT. Agro Gading Sejahtera Sintang, Tebelian, 006/61/IP/I/PMDN/2011 Tgl. 28/04/2011 Industri CPO 1 92,000.00 - - - 48 1 Izin Berakhir
Tempunak 02/61/PPM/PMDN/2010 Tgl. 10/11/2010 Izin Berakhir
13 PT. Duta Rendra Mulya Ket Hilir, Binjai Hulu, 018/61/IP/II/PMDN/2011 Tgl. 31/10/2011 Industri CPO 1 79,000.00 - - - - - Izin Berakhir
Kelam Permai 118/II/PMDN/1989 Tgl. 08/08/1989 Izin Berakhir
14 PT. Kiara Sawit Abadi Ket Tengah, Hulu 3/61/IP/PMDN/2013 Tgl. 30-10-2013 Industri CPO 1 - 16.10.2018 204,000.00 120 - 132,538.56 46 - Izin Berakhir
15 PT. Permata Subur Lestari Sungai Tebelian 1/6107/IP/PMDN/2015 Tgl. 10-7-2015 Industri CPO 1 - 09.10.2018 152,870.00 66 - 146,561.12 91 - Izin Berakhir
16 PT. Cahaya Unggul Prima Ket. Hilir, Ket. Tengah 2/6107/IP/PMDN/2016 Tgl. 22-3-2016 Industri CPO 1 277,000.00 620 - - - - Izin Berakhir
17 PT. Perkasa Mas Langgeng Sepauk, Binjai, Tempunak 1/6107/IP/PMDN/2016 Tgl. 22-3-2016 Industri CPO - 1 24.07.2018 189,000.00 420 - - - - Izin Berakhir
Ket Hilir, Tengah
18 PT. Perdana Sawit Plantation Ket Hilir, Tengah 3/6107/IP/PMDN/2016 Tgl. 15-7-16 Industri CPO 1 203,476.13 258 - - 180 -
19 PT. Sawit Khatulistiwa Lestari Binjai Hulu, Ket Hilir, Ket Tengah 4/6107/IP/PMDN/2017 tgl 27/04/2017 Industri CPO - 1 203,476 258 - - - -
2 17 3,345,069.83 3,318 - 982,797.42 1,182 1
LISTRIK, GAS DAN AIR
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
KET
KET
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
REALISASIRENCANA
TK
JUMLAH INDUSTRI LAINNYA
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANGSampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
REALISASI
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
TKLOKASI KECAMATAN
RENCANA
TK
JUMLAH LISTRIK, GAS DAN AIR
LAPORAN
KEGIATAN
TK
KABUPATEN SINTANGSampai dengan 30 September 2018
LOKASI KECAMATAN
LAPORAN
KEGIATAN
Page 10
KONSTRUKSI
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 CV NIKEN Tanjung Puri Sintang 2/6107/IP/PMDN/2017 tgl 17/04/2017 Jasa Konstruksi - 1 1,500.00 15 - - - -
2 CV TIRTA KAPUAS Tanjung Puri Sintang 3/6107/IP/PMDN/2017 tgl 27/04/2017 Jasa Konstruksi - 1 1,650.00 20 - - - -
3 PT RIYAN DASRI Tanjung Puri Sintang 6/6107/IP/PMDN/2017 tgl 09/06/2017 Jasa Konstruksi - 1 2,750.00 20 - - - -
4 PT DHEA KARYA PERDANA Tanjung Puri Sintang 7/6107/IP/PMDN/2017 tgl 14/06/2017 Jasa Konstruksi - 1 2,918.00 4 - - - -
5 PT PASAK BUMI SENENTANG Sintang 9/6107/IP/PMDN/2017 tgl 21/06/2017 Jasa Konstruksi - 1 9,183.34 23 - - - -
6 CV SEMAUNG JAYA Sintang 10/6107/IP/PMDN/2017 tgl 21/06/2017 Jasa Konstruksi - 1 1,800.00 9 - - - -
7 PT NUTRIMAS INDO Sintang 11/6107/IP/PMDN/2017 tgl 21/06/2017 Jasa Konstruksi - 1 1,900.00 6 - - - -
2/6107/PI-PB/PMDN/2018 23/03/2018
8 CV PERMATA DARUSSALAM Sintang 15/6107/IP/PMDN/2017 tgl 22/08/2017 Jasa Konstruksi - 1 1,175.00 11 - - - -
9 PT RAFI HASTA KARYA Sintang 16/6107/IP/PMDN/2017 tgl 16/08/2017 Jasa Konstruksi - 1 2,000.00 13 - - - -
10 PT DAUN KELAPA MAS Sintang 18/6107/IP/PMDN/2017 tgl 29/09/2017 Jasa Konstruksi - 1 500.00 8 - - - -
11 PT CIPTAJAYA SEMESTA KONSULTSintang 12/6107/IP/PMDN/2017 tgl 21/06/2017 Jasa Konsultan Perencana - 1 1,000.00 15 - - - -
- 11 26,376.34 144 - - - -
PERDAGANGAN DAN REPARASI
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT KETUNGAU LESTARI Ketungau Hilir 4/6107/IP/PMDN/2016 10/08/2016 Agen Premium dan Solar - 1 2,043.48 10 - - - -
2 PT KHAALISYA KHATULISTIWA JAYDedai 5/6107/IP/PMDN/2016 09/09/2016 Agen Premium Minyak Solar - 1 1,675.00 4 - - - -
3 PT PETRO SEKADAU LESTARI Ketungau Hilir 1/6107/IP/PMDN/2017 16/03/2017 Perdagangan SPBU - 1 1,540.00 7 - - - -
4 PT BINJAI PRIMA JAYA Binjai Hulu 5/6107/IP/PMDN/2017 27/04/2017 Perdagangan Eceran SPBU - 1 600.00 13 - - - -
5 PT MELAWI JAYA ABADI Kayan Hilir 14/6107/IP/PMDN/2017 22/08/2017 SPBU APMS - 1 3,250.00 15 - - - -
6 PT LINGGA PUTRA PERDANA Sintang 13/6107/IP/PMDN/2017 14/08/2017 Perdagangan Besar Logam - 1 1,000.00 15 - - - -
7 PT PT TANAH PINOH GEMILANG Pelimping Kelam Permai 2/6107/PI/PMDN/2018 23/03/2018 Perdagangan BBM AKR - 1 7,075.00 8 - - - -
8
9
10
11
12
13
14
15
- 7 - - -
KET
KETTK
JUMLAH PERDAGANGAN DAN REPARASI
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
LAPORAN
Sampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
REALISASIRENCANA
TK
KABUPATEN SINTANG
LOKASI KECAMATAN KEGIATAN
KABUPATEN SINTANGSampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
REALISASI
TK
JUMLAH KONSTRUKSI
KEGIATAN
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
RENCANA
TKLOKASI KECAMATAN
LAPORAN
Page 11
HOTEL DAN RESTORAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 Hotel Sakura Sintang Perhotelan - 1 - - -
2 Hotel Berlian Sintang Perhotelan - 1 - - -
3 Hotel Sartika Puri Sintang Perhotelan - 1 - - -
4 Hotel Setia Sintang Perhotelan - 1 - - -
5 Sintang Permai Hotel Sintang Perhotelan - 1 - - -
- 5 - - -
TRANSPORTASI, GUDANG DAN KOMUNIKASI
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
PERUMAHAN, KAWASAN INDUSTRI DAN PERKANTORAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - -
- - - - -
KET
KET
KET
JUMLAH PERUMAHAN, KAWASAN INDUSTRI DAN PERKANTORAN
KABUPATEN SINTANGSampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
REALISASI
TK
REALISASI
LOKASI KECAMATAN
LAPORAN
KEGIATAN
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
NO
KABUPATEN SINTANG
KABUPATEN SINTANGSampai dengan 30 September 2018
NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
RENCANA
TK
RENCANA
TK
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
TK
TK
JUMLAH HOTEL DAN RESTORAN
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
LOKASI KECAMATAN
LAPORAN
KEGIATAN
LOKASI KECAMATAN
LAPORAN
KEGIATAN
JUMLAH TRANSPORTASI, GUDANG DAN KOMUNIKASI
Sampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHA TK
REALISASIRENCANA
Page 12
JASA LAINNYA
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT BNI Cabang Sintang Sintang 140616500192 Jasa Perbankan - 1 335,497.00 30 -
2 PT BRI Cabang Sintang Sintang Jasa Perbankan - 1 - - -
3 PT BPD Kalbar Cabang Sintang Sintang Jasa Perbankan - 1 - - -
4 PT Panin Bank Sintang Jasa Perbankan - 1 - - -
5 PT Bank Muamalat Cab. Sintang Sintang Jasa Perbankan - 1 - - -
6 PT Bank Mandiri Cabang Sintang Sintang Jasa Perbankan - 1 - - -
7 PT Bank Syariah Mandiri Cab.SintangSintang Jasa Perbankan - 1 - - -
8 PT Bank Mega Cabang Sintang Sintang Jasa Perbankan - 1 - - -
9 PT Bank Panca Artha Cab. Sintang Sintang Jasa Perbankan - 1 - - -
10 PT Bank Danamon Cabang SintangSintang Jasa Perbankan - 1 - - -
11 PT Bank Central Asia Sintang Jasa Perbankan - 1 - - -
12 PT Bank BNI Syariah Sintang Jasa Perbankan - 1 - - -
- 12 335,497.00 30 -
KETTK
JUMLAH JASA LAINNYA
KABUPATEN SINTANGSampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN /
IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
REALISASIRENCANA
LOKASI KECAMATAN
LAPORAN
KEGIATAN TK
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL DALAM NEGERI BERDASARKAN NAMA PERUSAHAAN
Page 13
JUMLAH
PROYEK NILAI INVESTASI NILAI INVESTASI
(JUTAAN RUPIAH) WNI WNA (JUTAAN RUPIAH) WNI WNA
1 SINTANG - - - - - - -
2 SUNGAI TEBELIAN 3 605,351.60 5,419 35 630,630.76 155 3.00
3 KELAM PERMAI 1 404,012.60 493 - 630,630.76 155 3
4 BINJAI HULU - - - - - - -
5 TEMPUNAK - - - - - - -
6 SEPAUK 1 105,800.00 37 #WERT! 8,494.91 - -
7 KETUNGAU HILIR - - - - - - -
8 KETUNGAU TENGAH 3 1,501,120.01 1,213 2 92,470.91 614 3
9 KETUNGAU HULU 1 10,000.00 20 - 8,433.46 - -
10 DEDAI - - - - - - -
11 KAYAN HILIR - - - - - - -
12 KAYAN HULU - - - - - - -
13 SERAWAI 9 3,603,619.32 3,263 #WERT! 1,132,113.67 1,047 4.00
14 AMBALAU - - - - - - -
18 6,229,903.53 10,445 #WERT! 2,502,774.46 1,971 13 JUMLAH
PMA
TENAGA KERJA
PORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING (PMA) BERDASARKAN LOKASI PRO
KABUPATEN SINTANG
Sampai dengan 30 September 2018
NO LOKASI KECAMATAN
PMA
TENAGA KERJA
Page 14
JUMLAH
PROYEK NILAI INVESTASI NILAI INVESTASI
(JUTAAN RUPIAH) WNI WNA (JUTAAN RUPIAH) WNI WNA
I. Sektor Primer 17 6,614,339.66 10,562 37 2,595,210.31 2,077 16
1 Tanaman Pangan dan Perkebunan 11 5,014,263.65 9,410 37 2,497,242.51 1,508 15
2 Peternakan - - - - - - -
3 Kehutanan 2 1,471,120.01 1,000 - 63,231.90 561 1
4 Perikanan - - - - - - -
5 Pertambangan 4 128,956.00 152 - 34,735.89 8.00 -
II. Sektor Sekunder 12 2,364,120.97 4,153 - 65,178.22 563 3
1 Industri Makanan - - - - - - -
2 Industri Tekstil - - - - - - -
3 Industri Barang dari Kulit & Alas Kaki - - - - - - -
4 Industri Kayu 3 497,666.70 2,500 - 65,164.01 563.00 3.00
5 Industri Kertas & Percetakan - - - - - - -
6 Industri Kimia & Farmasi - - - - - - -
7 Industri Karet & Plastik - - - - - - -
8 Industri Mineral Non Logam - - - - - - -
9 Industri Logam, Mesin & Elektronika - - - - - - -
10 Industri Instrumen Kedokteran, Presisi, Optik dan Jam - - - - - - -
11 Industri Kendaraan bermotor & Alat transportasi lain - - - - - - -
12 Industri Lainnya 9 1,866,454.27 1,653 - 14.21 - -
III. Sektor Tersier 2 235,060 158 - 1,237 12 -
1 Listrik, Gas dan Air 2 235,060.00 158 - 1,236.97 12.00 -
2 Konstruksi - - - - - - -
3 Perdagangan & Reparasi - - - - - - -
4 Hotel & Restoran - - - - - - -
5 Transportasi, Gudang & Komunikasi - - - - - - -
6 Perumahan, Kawasan Industri & Perkantoran - - - - - - -
7 Jasa Lainnya - - - - - - -
31 9,213,521 14,873 37 2,661,625.49 2,652 19
KEPALA DINAS PENANAMAN MODAL DAN PTSP
KABUPATEN SINTANG
SUDIYANTO, SH
Pembina Utama Muda
NIP. 19610610 199003 1 011
JUMLAH
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING (PMA) BERDASARKAN SEKTOR USAHA
KABUPATEN SINTANG
Sampai dengan 30 September 2018
NO SEKTOR USAHA
REALISASIRENCANA
TENAGA KERJA TENAGA KERJA
Page 15
TANAMAN PANGAN DAN PERKEBUNAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT. Makmur Jaya Malindo Ketungau Tengah 70/V/PMA/2005 Tgl. 20-5-2005 Perkebunan Kelapa Sawit 1 30,000.00 213 2 29,239.01 53 2 Masa Izin telah berakhir
2 PT. Sinar Dinamika Kapuas Sungai Tebelian 274/V/PMA/2009 Tgl. 29/12/2009 Perkebunan Kelapa Sawit - 1 56,312.73 4,026 35 - - - Masa Izin telah berakhir
3 PT. Sumber Hasil Prima Serawai, Ambalau 19/I/IP/I/PMA/2012 Tgl. 18/01/2012 Perkebunan Kelapa Sawit 1 - 10.10.2018 402,227.00 850 - 797,810.09 673 4 Masa Izin telah berakhir
4 PT. Sinar Sawit Andalan Serawai, Ambalau 287/I/IP/I/PMA/2012 Tgl. 02/05/2012 Perkebunan Kelapa Sawit 1 - 10.10.2018 117,209.32 576 - 284,256.35 364 - Masa Izin telah berakhir
5 PT. Grand Mandiri Utama Kelam Permai, Dedai 895/1/IP/PMA/2014 Tgl. 20/04/2014 Perkebunan Kelapa Sawit 1 780,250.00 205 - 493,626.50 69 3 Masa Izin telah berakhir
446/1/IP-PB/PMA/2015 tgl.16/2/15
6 PT. Wahana Plantation & Product Sintang, S Tebelian, 2031/1/IP/PMA/2014 Tgl. 17/07/14 Perkebunan Kelapa Sawit 1 404,012.60 493 - 630,630.76 155 3 Masa Izin telah berakhir
Dedai
7 PT. Agro Bina Lestari Serawai 130/1/IP/PMA/2016 Tgl 20/1/16 Perkebunan Kelapa Sawit 1 - 10.10.2018 1,133,839.00 817 - 25,000.00 5 -
8 PT. Agro Surya Mandiri Serawai 96/1/IP/PMA/2016 Tgl 20/1/16 Perkebunan Kelapa Sawit 1 - 10.10.2018 739,666.00 500 - 25,000.00 5 -
9 PT. Palma Agro Lestari Jaya Ketungau Tengah 2960/1/IP/PMA/2015 Tgl. 11/11/2015 Perkebunan Kelapa Sawit 1 - 10.10.2018 583,247.00 1,200 - 99,806.23 134 - Masa Izin telah berakhir
10 PT. Agro Gading Sejahtera Sintang, Tebelian, 006/61/IP/I/PMDN/2011 Tgl. 28/04/2011 Perkebunan Kelapa Sawit 1 460,000.00 380 - 111,873.58 48 2 Masa Izin telah berakhir
Tempunak 2381/1/IP/PMA/2014 Tgl. 29/08/2014 Masa Izin telah berakhir
11 PT. Long Fortune Industri Dedai 43/23/1/IP/PMA/2017 Tgl 25/10/2017 Perkebunan Kelapa Sawit 1 307,500.00 150 - - 2 1
5 6 - 5,014,263.65 9,410 37 2,497,242.51 1,508 15
PETERNAKAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
KEHUTANAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT. Finantara Intiga Ketungau Tengah 70/II/PMA/2005 16/03/2005 Kehutanan - 1 1,471,120.01 1,000 - 63,231.90 561 1 Masa Izin telah berakhir
67/T/KEHUTANAN/INDUSTRI/2005
31.01.2005 - - - - - -
2 PT. Lahan Cakrawala Nanga Pinoh 11/V/PMA/2006 Tgl 19/01/2006 HTI 1 29,132.10 59 - - - - Masa Izin telah berakhir
- 2 - 1,500,252.11 1,059 - 63,231.90 561 1
Ket
Ket
Ket
JUMLAH PETERNAKAN
REALISASI
TK
JUMLAH KEHUTANAN
LOKASI KECAMATAN
LAPORAN
KEGIATAN
RENCANA
TKNO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANG
Sampai dengan 30 September 2018
REALISASI
TK
JUMLAH PERKEBUNAN
TK
RENCANA
TK
LOKASI KECAMATAN
LAPORAN
KEGIATAN
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
KEGIATAN
REALISASI
TK
RENCANA
KABUPATEN SINTANG
Sampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANG
Sampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHALOKASI KECAMATAN
LAPORAN
Page 16
PERIKANAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
PERTAMBANGAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT Silangkop Nusa Raya Ketungau Hulu 1147 Th 2011 Tgl 10/10/2011 Batu Bara - 1 10,000.00 20 - 8,433.46 - - Masa Izin telah berakhir
796/1/IP/I/PMA/2011 Tgl. 28/11/2011
2 PT. Segoro Global Mandiri Serawai 56/1/IP/I/PMA/2011 Tgl 28/1/2011 Emas - 1 5,800.00 17 ` 47.23 - - Masa Izin telah berakhir
3 PT. Fengquan Minning Investment 752/27.1BU.1/31.72.06.1003/-71.562/e/2007 1Jasa Pertambangan - 1 28,004.00 100 ` - - -
3185//1/IP/PMA/2015 1/12/2017
4 PT LHB Nusantara Resources Sintang 01335/1/PPM/PMA/2011 tgl 05/05/11 Jasa Pertambangan 1 85,152.00 15 ` 26,255.20 8 - Masa Izin telah berakhir
- 4 - 128,956.00 152 - 34,735.89 8 -
INDUSTRI MAKANAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
INDUSTRI TEKSTIL
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 151 - - - - - -
- - - - - - - - -
Ket
Ket
Ket
Ket
NOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHALOKASI KECAMATAN
REALISASI
TK
RENCANA
LOKASI KECAMATAN
KABUPATEN SINTANG
JUMLAH PERIKANAN
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
JUMLAH PERTAMBANGAN
Sampai dengan 30 September 2018
TK
JUMLAH INDUSTRI MAKANAN
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
BIDANG USAHANOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
KEGIATAN
JUMLAH INDUSTRI TEKSTIL
RENCANA
TK
LAPORAN
KEGIATAN
TK
Sampai dengan 30 September 2018
NO NAMA PERUSAHAAN
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANG
Sampai dengan 30 September 2018
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHALOKASI KECAMATAN
REALISASILAPORAN RENCANA
TK TK
KABUPATEN SINTANG
Sampai dengan 30 September 2018
TK
LAPORAN
KEGIATAN
KEGIATAN
REALISASI
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANG
REALISASI
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHALOKASI KECAMATAN
NO
RENCANA
TK
NAMA PERUSAHAAN
LAPORAN
Page 17
INDUSTRI BARANG DARI KULIT DAN ALAS KAKI
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
INDUSTRI KAYU
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT. Finantara Intiga Ketungau Tengah 70/II/PMA/2005 16/03/2005 Industri Kayu - 1 198,333.35 1,000 - 63,231.90 561 1 Masa Izin telah berakhir
67/T/KEHUTANAN/INDUSTRI/2005
31.01.2005 - - - - - -
2 PT. Landak Timber Product Teluk Kelansam Sintang 359/PI/PMA/2018 5/2/2018 Industri Penggergajian Kayu 1 - 15.10.2018 101,000.00 500 118.20 2
3 PT. Landak Timber Product Sepauk 414/1/IP/PMA/2015 23/02/2015 Industri Penggergajian
Kayu
1 198,333.35 1,000 - 1,813.90 - 2 Masa Izin telah berakhir
1 2 - 497,666.70 2,500 - 65,164.01 563 3
INDUSTRI KERTAS DAN PERCETAKAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
INDUSTRI KIMIA DAN FARMASI
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
Ket
Ket
Ket
Ket
Sampai dengan 30 September 2018
NO
JUMLAH INDUSTRI KIMIA DAN FARMASI
JUMLAH INDUSTRI KAYU
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
NAMA PERUSAHAAN
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHALOKASI KECAMATAN TK
LAPORAN
KEGIATAN
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHALOKASI KECAMATAN KEGIATAN
RENCANA
TK
RENCANA
TK
KABUPATEN SINTANG
REALISASI
TK
NOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
LAPORAN
Sampai dengan 30 September 2018
NOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHALOKASI KECAMATAN
REALISASI
TK
LAPORAN
KEGIATAN
RENCANA
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
JUMLAH INDUSTRI KERTAS DAN PERCETAKAN
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAANKABUPATEN SINTANG
JUMLAH INDUSTRI BARANG DARI KULIT DAN ALAS KAKI
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANG
NAMA PERUSAHAANNO TK
Sampai dengan 30 September 2018
LOKASI KECAMATAN
REALISASI
TK
KABUPATEN SINTANG
Sampai dengan 30 September 2018
LAPORAN
KEGIATAN
REALISASI
TK
RENCANA
Page 18
INDUSTRI KARET DAN PLASTIK
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
INDUSTRI MINERAL NON LOGAM
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
INDUSTRI LOGAM, MESIN DAN ELEKTRONIKA
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
INDUSTRI INSTRUMEN KEDOKTERAN, PRESISI, OPTIK DAN JAM
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
INDUSTRI KENDARAAN BERMOTOR DAN ALAT TRANSPORTASI LAINNYA
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
Ket
Ket
Ket
Ket
Ket
TK
LAPORAN
KEGIATANNAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHANO
JUMLAH INDUSTRI KENDARAAN BERMOTOR DAN ALAT TRANSPORTASI LAINNYA
LAPORAN
KEGIATAN
KABUPATEN SINTANG
Sampai dengan 30 September 2018
LOKASI KECAMATAN
REALISASI
LAPORAN
KEGIATAN
RENCANA
TK
Sampai dengan 30 September 2018
RENCANA
TKBIDANG USAHALOKASI KECAMATAN
NO
REALISASI
JUMLAH INDUSTRI LOGAM, MESIN DAN ELEKTRONIKA
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANG
NAMA PERUSAHAAN LOKASI KECAMATAN
REALISASI
TK
NOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
LAPORAN
KEGIATAN
RENCANA
TK
RENCANA
TK
Sampai dengan 30 September 2018
NOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
JUMLAH INDUSTRI KARET DAN PLASTIK
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANG
Sampai dengan 30 September 2018
NO NAMA PERUSAHAAN
LAPORAN
KEGIATAN
LOKASI KECAMATAN
TK
REALISASI
TK
RENCANA
TK
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
NAMA PERUSAHAAN LOKASI KECAMATAN
REALISASI
NO
KABUPATEN SINTANG
Sampai dengan 30 September 2018
KABUPATEN SINTANG
JUMLAH INDUSTRI MINERAL NON LOGAM
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
JUMLAH INDUSTRI INSTRUMEN KEDOKTERAN, PRESISI, OPTIK DAN JAM
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
TK
NOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
Page 19
INDUSTRI LAINNYA
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT. Makmur Jaya Malindo Ketungau Tengah 70/V/PMA/2005 Tgl. 20-5-2005 Minyak Makan (CPO) - 1 - - - - - - Masa Izin telah berakhir
2 PT. Sinar Dinamika Kapuas Sungai Tebelian 274/V/PMA/2009 Tgl. 29/12/2009 Minyak Makan (CPO) - 1 145,026.27 900 - - - - Masa Izin telah berakhir
3 PT. Sumber Hasil Prima Serawai, Ambalau 19/I/IP/I/PMA/2012 Tgl. 18/01/2012 Minyak Makan (CPO) 1 - 10.10.2018 230,000.00 100 - - - - Masa Izin telah berakhir
4 PT. Sinar Sawit Andalan Serawai, Ambalau 287/I/IP/I/PMA/2012 Tgl. 02/05/2012 Minyak Makan (CPO) 1 - 10.10.2018 175,000.00 250 - - - - Masa Izin telah berakhir
5 PT. Emas Hijau Sejahtera Kapuas Sepauk 3245/I/IP/PMA/2014 Tgl. 14/11/2014 Minyak Makan (CPO) 1 90,000.00 - - 14.21 - - Masa Izin telah berakhir
6 PT. Agro Bina Lestari Serawai 130/1/I/IP/PMA/2016 Tgl 20/1/16 Minyak Makan (CPO) 1 - 10.10.2018 430,000.00 80 - - - -
7 PT. Agro Surya Mandiri Serawai 96/1/IP/PMA/2016 Tgl 20/1/16 Minyak Makan (CPO) 1 - 10.10.2018 369,878.00 73 - - - -
8 PT. Palma Agro Lestari Jaya Ketungau Tengah 2960/1/IP/PMA/2015 Tgl. 11/11/2015 Minyak Makan (CPO) 1 - 10.10.2018 136,000.00 100 - - - Masa Izin telah berakhir
9 PT. Grand Mandiri Utama Kelam Permai, Dedai 895/1/IP/PMA/2014 Tgl. 20/04/2014 Minyak Makan (CPO) 1 290,550.00 150 - - - - Masa Izin telah berakhir
446/1/IP-PB/PMA/2015 tgl.16/2/15 Masa Izin telah berakhir
10 PT. Wahana Plantation & Product Sintang, S Tebelian, 2031/1/IP/PMA/2014 Tgl. 17/07/14 Minyak Makan (CPO) 1 404,012.60 493 - - - - Masa Izin telah berakhir
Dedai
11 PT. Agro Gading Sejahtera Sintang, Tebelian, 006/61/IP/I/PMDN/2011 Tgl. 28/04/2011 Minyak Makan (CPO) 1 175,000.00 121 - - - 1 Masa Izin telah berakhir
Tempunak 2381/1/IP/PMA/2014 Tgl. 29/08/2014 Masa Izin telah berakhir
11 PT. Long Fortune Industri Dedai 43/23/1/IP/PMA/2017 Tgl 25/10/2017 Perkebunan Kelapa Sawit 1 116,000.00 93 - - 1 1
5 4 - 1,866,454.27 1,653 - 14.21 - -
LISTRIK, GAS DAN AIR
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 PT. Shanxi Cheng Xie Power IndonesiaSintang 1600/I/IP/PMA/2014 Instalasi Tenaga Listrik - 1 35,060.00 8 - - - - Masa Izin telah berakhir
2 PT. Intika Accord Power Sintang 396/1/IP/PMA/2017 Tgl 1 Feb 2017 Pembangkitan Tenaga Listrik 1 - 08.10.2018 200,000.00 150 - 1,236.97 12 -
1 1 - 235,060.00 158 - 1,236.97 12 -
KONSTRUKSI
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
Ket
Ket
Ket
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
TK
REALISASI
TK
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
RENCANA
Sampai dengan 30 September 2018
KEGIATAN
TK
KABUPATEN SINTANG
REALISASI
TK
NOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
LAPORAN
LOKASI KECAMATAN
RENCANA
TK
Sampai dengan 30 September 2018
KABUPATEN SINTANG
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
RENCANA
JUMLAH INDUSTRI LAINNYA
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
NAMA PERUSAHAAN LOKASI KECAMATAN
REALISASI
TK
JUMLAH LISTRIK, GAS DAN AIR
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANG
Sampai dengan 30 September 2018
NO
LAPORAN
KEGIATAN
JUMLAH KONSTRUKSI
LAPORAN
KEGIATAN
BIDANG USAHALOKASI KECAMATAN
Page 20
PERDAGANGAN DAN REPARASI
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - -
2 - - - -
- - - - - - - - -
HOTEL DAN RESTORAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
TRANSPORTASI, GUDANG DAN KOMUNIKASI
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
PERUMAHAN, KAWASAN INDUSTRI DAN PERKANTORAN
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
Ket
Ket
Ket
Ket
REALISASI
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANG
Sampai dengan 30 September 2018
JUMLAH PERDAGANGAN DAN REPARASI
KEGIATAN
JUMLAH PERUMAHAN, KAWASAN INDUSTRI DAN PERKANTORAN
LOKASI KECAMATAN
RENCANA
BIDANG USAHA TK
TK
TK
JUMLAH TRANSPORTASI, GUDANG DAN KOMUNIKASI
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
LAPORAN
KEGIATAN
LOKASI KECAMATAN
LAPORAN
KEGIATAN
LOKASI KECAMATAN
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
REALISASI
LAPORAN
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
JUMLAH HOTEL DAN RESTORAN
NO
NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHALOKASI KECAMATAN TK
REALISASI
KEGIATAN
Sampai dengan 30 September 2018
NO
RENCANA
TK
Sampai dengan 30 September 2018
KABUPATEN SINTANG
RENCANA
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANG
Sampai dengan 30 September 2018
NOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
BIDANG USAHA
NO NAMA PERUSAHAANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
TK
LAPORAN
KABUPATEN SINTANG
REALISASI
TK
TK
RENCANA
NAMA PERUSAHAAN
Page 21
JASA LAINNYA
INVESTASI INVESTASI
ADA TDK TGL (JUTAAN RP) WNI WNA (JUTAAN RP) WNI WNA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 - - - - - -
- - - - - - - - -
Ket
RENCANA
JUMLAH JASA LAINNYA
REALISASI
TKNAMA PERUSAHAAN BIDANG USAHANO KEGIATANNOMOR & TANGGAL PENDAFTARAN
/ IZIN PRINSIP / IZIN USAHA
LAPORAN
TK
LAPORAN PERKEMBANGAN REALISASI PENANAMAN MODAL ASING BERDASARKAN NAMA PERUSAHAAN
KABUPATEN SINTANG
LOKASI KECAMATAN
Sampai dengan 30 September 2018
Page 22
JUMLAH
PROYEK NILAI INVESTASI NILAI INVESTASI
(JUTAAN RUPIAH) WNI WNA (JUTAAN RUPIAH) WNI WNA
I. Sektor Primer 158 17,248,114.11 75,737 156 8,457,329.94 15,102 20
1 Tanaman Pangan dan Perkebunan 50 15,648,038.10 74,585 60 8,359,362.14 14,533 19
2 Peternakan - - - - - - -
3 Kehutanan 8 1,471,120.01 1,000 - 63,231.90 561 1
4 Perikanan - - - - - - -
5 Pertambangan 100 128,956.00 152 96 34,735.89 8 -
II. Sektor Sekunder 34 5,910,813.44 27,609 - 1,230,135.18 1,904 4
1 Industri Makanan - - - - - - -
2 Industri Tekstil - - - - - - -
3 Industri Barang dari Kulit & Alas Kaki - - - - - - -
4 Industri Kayu 3 497,666.70 2,500 - 65,164.01 563 3
5 Industri Kertas & Percetakan - - - - - - -
6 Industri Kimia & Farmasi - - - - - - -
7 Industri Karet & Plastik 3 201,622.65 20,138 - 182,159.55 159 -
8 Industri Mineral Non Logam - - - - - - -
9 Industri Logam, Mesin & Elektronika - - - - - - -
10 Industri Instrumen Kedokteran, Presisi, Optik dan Jam - - - - - - -
11 Industri Kendaraan bermotor & Alat transportasi lain - - - - - - -
12 Industri Lainnya 28 5,211,524.10 4,971 - 982,811.63 1,182 1
III. Sektor Tersier 37 261,436 302 - 336,734 42 -
1 Listrik, Gas dan Air 2 235,060.00 158 - 1,236.97 12 -
2 Konstruksi 11 26,376.34 144 - - - -
3 Perdagangan & Reparasi 7 - - - - - -
4 Hotel & Restoran 5 - - - - - -
5 Transportasi, Gudang & Komunikasi - - - - - - -
6 Perumahan, Kawasan Industri & Perkantoran - - - - - - -
7 Jasa Lainnya 12 - - - 335,497.00 30 -
229 23,420,364 103,648 156 10,024,199.09 17,048 24
KEPALA DINAS PENANAMAN MODAL DAN PTSP
KABUPATEN SINTANG
SUDIYANTO, SH
Pembina Utama Muda
NIP. 19610610 199003 1 011
JUMLAH
REKPITULASI RENCANA DAN REALISASI PENANAMAN MODAL
KABUPATEN SINTANG
Sampai dengan 30 September 2018
NO SEKTOR USAHA
RENCANA REALISASI
TENAGA KERJA TENAGA KERJA
Page 23
JLH JLH JLH JLH
PRY INVESTASI INVESTASI PRY INVESTASI INVESTASI PRY INVESTASI INVESTASI PRY INVESTASI
Rp.000.000 WNI WNA Rp.000.000 WNI WNA Rp.000.000 WNI WNA Rp.000.000 WNI WNA Rp.000.000 WNI WNA Rp.000.000 WNI WNA Rp.000.000 WNI WNA
I. Sektor Primer 158 17,248,114.11 75,737 156 8,457,329.94 15,102 20 158 16,352,881.24 74,980 60 ########## 13,265 15 167 13,812,204.76 ##### 60 7,262,755.04 14,158 33 151 7,849,574.09 58,990 156
1 Tanaman Pangan dan Perkebunan 50 15,648,038.10 74,585 60 8,359,362.14 14,533 19 50 14,735,805.23 73,828 60 ########## 12,696 14 49 12,325,284.75 ##### 60 7,191,042.45 13,588 22 46 7,692,406.85 57,970 60
2 Peternakan - - - - - - - - - - - - - - - - - - - - - - - - -
3 Kehutanan 8 1,471,120.01 1,000 - 63,231.90 561 1 8 1,471,120.01 1,000 - 63,231.90 561 1 7 1,471,120.01 1,000 - 63,231.90 561 1 7 147,120.01 1,000 -
4 Perikanan - - - - - - - - - - - - - - - - - - - - - - - - -
5 Pertambangan 100 128,956.00 152 96 34,735.89 8 - 100 145,956.00 152 - 34,735.89 8 - 111 15,800.00 37 - 8,480.69 9 10 98 10,047.23 20 96
II. Sektor Sekunder 34 5,910,813.44 27,609 - 1,230,135.18 1,904 4 32 5,613,313.45 7,109 - 926,625.14 1,851 3 31 5,259,566.83 6,851 - 801,294.55 1,712 1 23 3,165,431.35 4,154 -
1 Industri Makanan - - - - - - - - - - - - - - - - - - - - - - - - -
2 Industri Tekstil - - - - - - - - - - - - - - - - - - - - - - - - -
3 Industri Barang dari Kulit & Alas Kaki - - - - - - - - - - - - - - - - - - - - - - - - -
4 Industri Kayu 3 497,666.70 2,500 - 65,164.01 563 3 2 396,666.70 2,000 - 65,045.80 561 3 2 396,666.70 2,000 - 63,969.37 561 1 1 198,333.35 1,000 -
5 Industri Kertas & Percetakan - - - - - - - - - - - - - - - - - - - - - - - - -
6 Industri Kimia & Farmasi - - - - - - - - - - - - - - - - - - - - - - - - -
7 Industri Karet & Plastik 3 201,622.65 20,138 - 182,159.55 159 - 2 129,622.65 138 - 129,909.55 129 - 2 129,622.65 138 - 129,909.55 129 - 2 129,622.65 138 -
8 Industri Mineral Non Logam - - - - - - - - - - - - - - - - - - - - - - - - -
9 Industri Logam, Mesin & Elektronika - - - - - - - - - - - - - - - - - - - - - - - - -
10 Industri Instrumen Kedokteran, Presisi,
Optik dan Jam
- - - - - - - - - - - - - - - - - - - - - - - - -
11 Industri Kendaraan bermotor & Alat
transportasi lain
- - - - - - - - - - - - - - - - - - - - - - - - -
12 Industri Lainnya 28 5,211,524.10 4,971 - 982,811.63 1,182 1 28 5,087,024.10 4,971 - 731,669.79 1,161 - 27 4,733,277.48 4,713 - 607,415.63 1,022 - 20 2,837,475.35 3,016 -
III. Sektor Tersier 37 261,436.34 302 - 336,734 42 - 36 261,436.33 302 - 336,619.90 42 - 18 14,400.00 8 - 335,497.00 30 - 18 14,400.00 8 -
1 Listrik, Gas dan Air 2 235,060.00 158 - 1,236.97 12 - 2 235,060.00 158 - 1,122.90 12 - 1 14,400.00 8 - - - - 1 14,400.00 8 -
2 Konstruksi 11 26,376.34 144 - - - - 11 26,376.33 144 - - - - - - - - - - - - - - -
3 Perdagangan & Reparasi 7 - - - - - - 6 - - - - - - - - - - - - - - - - -
4 Hotel & Restoran 5 - - - - - - 5 - - - - - - 5 - - - - - - 5 - - -
5 Transportasi, Gudang & Komunikasi - - - - - - - - - - - - - - - - - - - - - - - - -
6 Perumahan, Kawasan Industri &
Perkantoran
- - - - - - - - - - - - - - - - - - - - - - - - -
7 Jasa Lainnya 12 - - - 335,497.00 30 - 12 - - - 335,497.00 30 - 12 - - - 335,497.00 30 - 12 - - -
229 23,420,364 103,648 156 ########### 17,048 24 226 22,227,631 82,391 60 ########## 15,158 18 216 19,086,172 ##### 60 8,399,546.59 15,900 34 192 11,029,405 63,152 156
RENCANA REALISASI
TENAGA KERJA TENAGA KERJA
RENCANA DAN REALISASI PENANAMAN MODAL DI KABUPATEN SINTANG
TENAGA KERJA TENAGA KERJANO SEKTOR USAHA
2015RENCANA
TENAGA KERJATENAGA KERJA TENAGA KERJA
TAHUNRENCANA REALISASI
2016
JUMLAH
2018 2017RENCANA REALISASI
Page 24
INVESTASI
Rp.000.000 WNI WNA
5,344,747.60 12,005 16
5,273,035.01 11,444 15
- - -
63,231.90 561 1
- - -
8,480.69 - -
542,277.52 1,093 1
- - -
- - -
- - -
63,231.90 561 1
- - -
- - -
129,622.65 138 -
- - -
- - -
- - -
- - -
349,422.98 394 -
335,497.00 30 -
- - -
- - -
- - -
- - -
- - -
- - -
335,497.00 30 -
6,222,522.13 13,128 17
2015REALISASI
TENAGA KERJA