    KEGIATAN : PEMBANGUNAN JALAN

    PEKERJAAN : KONTRUKSI PEMBANGUNAN JALAN PENDUNG

    LOKASI : KECAMATAN AIR HANGAT

    PELAKSANA : CV. MAKBUL

    KONTRAK AWAL

    No URAIAN PEKERJAAN SATUAN VOLUMEHARGA SATUAN JUMLAH HARGA

    SATUAN V(Rp) (Rp)

    1 2 ! " # $

    1.2DIVISI 1. MOBILISASI

    Mobilisasi Ls 1.00 21,930,000 21,930,000.00 Ls

    J&'* H+, P+/0 DIVISI 1 ('& p Rp34&3 P+3+0 H+, P+/0) 215$%5%%%.%%

    2.1DIVISI 2. DRAINASE

    Galian Untu S!loan D"ainas! #an Salu"an Ai" M3 14$.2 41,119.05 $,011,$05.11 M3

    JUMLAH HARGA PEKERJAAN DIVISI 2 ('& p Rp34&3 P+3+0 H+, P+/0) #5%115#%".11

    5.1.1DIVISI ". PERKERASAN BERBUTIR

    La'is (on#asi A)"!)at *!las A M3 2&3.00 $53,23%.29 1&%,334,053.1& M3

    J&'* H+, P+/0 DIVISI " ('& p Rp34&3 P+3+0 H+, P+/0) 1675!5%".16

    DIVISI #. PERKERASAN ASPAL

    $.1 +1+a La'is !sa' (!n)iat - As'al ai" Lit!" 3,%50.00 11,%42.03 45,591,%15.50 Lit!"

    $.3 +5a Laston La'is Aus +A-/ +)"a#asi alus asa" on 492.52 554,$$3.0& 2&3,1%2,$55.24 on

    $.3.%.a As'al Mina on 2%.$9 12,19&,&05.00 349,952,15$.45 on

    $.3.10 Baan (!n)isi +ill!" abaan *) 10,094.&0 1,4%5.$2 14,99$,%%%.21 *)

  • 8/12/2019 Laporan Dan Backup Data

    2/199

    J&'* H+, P+/0 DIVISI # ('& p Rp34&3 P+3+0 H+, P+/0) #75625"1".!%

    &.9 (asan)an Batu *ali M 52.$ 67"5%6#.$7 41295049.14% M3

    3.3 ibunan ana Di#atan)an M 35.5% $"56".!% 339345$.&32 M3

    J&'* H+, P+/0 DIVISI ('& p Rp34&3 P+3+0 H+, P+/0)

    A J&'* H+, P+/0 (4+'& 839 &'&' 0 &04&0,0) 77$5$$75%2.27

    B P/ P+4'8*0 N33 (PP0) 1%; < (A) 775$$$57%.2

    C J&'* To4 P+/0 (A) = (B) $675$$7512."1

    D D38&40 $675$$75%%%.%%

    JUMLAH S'830 R4& T&/&* P&&* Dp0 J&4 S'830 R4& S'830 P&&* Dp0 R38& R&p3*

    S&0,3 P0&*5 27 M

    Dis!tu6ui Ol! Di!taui Ol! Di'!"ia O

    (!6abat (!buat *oit!n (!6abat (!lasana !nis *!)iatan i (!n!liti 8 (!!+((* Bi#an) i'ta *a"a (!ban)unan G!#un) *anto"

    Bi#an) i'ta *a"a 1. *

    2. S

    ASRIL5 ST.MT EDI WARMAN5 ST.MT 3. A;

    ;I(. 19&3011$ 199903 1 004 ;I(. 19&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    3/199

    SELISIH KONTRAK

    KETAAN TAMBAH PEKERJAAN KURANG

    JML. HARGA (Rp)VOLUME JML. HARGA (Rp)

    16 17 1$

    - - -

    - - -

    - &9.00 !!5#775!2!."!

    - - -

    !57215"#"."1 - -

    - -0.94 ($5725%%%.%%)

    - -

  • 8/12/2019 Laporan Dan Backup Data

    4/199

    %.%%

    5$56".$

    7521!5$!%.$% !57#"5!2!."!

    Dibuat Ol!

    *onsultan (!n)aIRWAN KOMAR RAHMAN5 SH

    Di"!tu"

  • 8/12/2019 Laporan Dan Backup Data

    5/199

    KEGIATAN : PEMBANGUNAN JAL

    PEKERJAAN : KONTRUKSI PEMBAN

    LOKASI : KECAMATAN AIR HA

    PELAKSANA : CV. MAKBUL

    KONTRAK AWAL

    No URAIAN PEKERJAAN SATUAN VOLUMEHARGA SATUAN

    (Rp)

    1 2 ! "

    1.2DIVISI 1. MOBILISASI

    Mobilisasi Ls 1.00 21,930,000

    J&'* H+, P+/0 DIVISI 1 ('& p Rp34&3 P+3+0 H+, P+/0)

    2.1DIVISI 2. DRAINASE

    Galian Untu S!loan D"ainas! #an Salu"an Ai" M3 14$.2 41,119.05

    JUMLAH HARGA PEKERJAAN DIVISI 2 ('& p Rp34&3 P+3+0 H+, P+/0)

    5.1.1DIVISI ". PERKERASAN BERBUTIR

    La'is (on#asi A)"!)at *!las A M3 2&3.00 $53,23%.29

    J&'* H+, P+/0 DIVISI " ('& p Rp34&3 P+3+0 H+, P+/0)

    DIVISI #. PERKERASAN ASPAL

    $.1 +1+a La'is !sa' (!n)iat - As'al ai" Lit!" 3,%50.00 11,%42.03

    $.3 +5a Laston La'is Aus +A-/ +)"a#asi alus asa" on 492.52 554,$$3.0&

    $.3.%.a As'al Mina on 2%.$9 12,19&,&05.00

    $.3.10 Baan (!n)isi +ill!" abaan *) 10,094.&0 1,4%5.$2

    J&'* H+, P+/0 DIVISI # ('& p Rp34&3 P+3+0 H+, P+/0)

    &.9 (asan)an Batu *ali M 67"5%6#.$7

    3.3 ibunan ana Di#atan)anM $"56".!%

    J&'* H+, P+/0 DIVISI ('& p Rp34&3 P+3+0 H+, P+/0)

    A J&'* H+, P+/0 (4+'& 839 &'&' 0 &04&0,0)

    B P/ P+4'8*0 N33 (PP0) 1%; < (A)

    C J&'* To4 P+/0 (A) = (B)

    D D38&40

    JUMLAH S'830 R4& T&/&* P&&* Dp0 J&4 S'830 R4& S'830 P&&* Dp0 R38&

    Dis!tu6ui Ol! Di!taui Ol!

    (!6abat (!buat *oit!n (!6abat (!lasana !nis *!)iatan

    +((* Bina Ma")a Bina Ma")a

    ASRIL5 ST.MT EDI WARMAN5 ST.MT

    ;I(. 19&3011$ 199903 1 004 ;I(. 19&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    6/199

    EMEN

    MANTAN

    AMANDEMEN KONTRAK SELISIH KONTRAK

    VOLUMEHARGA SATUAN JUMLAH HARGA PEKERJAAN TAMBAH PEKERJAAN K

    (Rp) (Rp) VOLUME JML. HARGA (Rp) VOLUME JM

    1% 11 12 1# 16

    1.00 21,930,000 21,930,000.00 - - -

    215$%5%%%.%%

    103.5$ 41,119.05 4,25%,2%%.%2 - - 42.$4

    !52"75277.72

    194.00 $53,23%.29 12$,&2%,22%.2$ - - &9.00 "

    12#56275227.2#

    3,9&2.50 11,%42.03 4&,042,4$4.1% 122.50 1,450,$4%.$% -

    512.$1 554,$$3.0& 2%4,323,0%&.40 20.09 1151!%5!2.16 -

    29.%$ 12,19&,&05.00 3$4,229,423.&% 1.1& 14,2&&,2$&.33

    10,50$.4& 1,4%5.$2 15,$0%,$1%.99 411.&& $11,&30.&%

    61152%5"$!."

    52.$0 67"5%6#.$7 41,295,049.15 52.$ !152$"5%!$.1"

    35.5%$"56".!%

    3,393,45$.&3 35.5%5$5!"#.6

    !!5#775"%".77

    $%757%75#16.1 6251#75"7!.7

    $%577%57#1.6

    $$$5#7$5!6$.%!

    $$$5#7$5%%%.%%

    S'830 R4& S'830 P&&* S'830 J&4 E0' R4& Dp0 P&&* S

    27 M+4 2%1

    ! 7

    "isa *ont"a Di"!si !nis *onsultan (!n)aIRWAN

  • 8/12/2019 Laporan Dan Backup Data

    7/199

    JADWAL PELAKSANAAN ( TIME SCH

    No. U R A I A N JUMLAH HARGABOBOT

    % Mgg I Mgg II

    Err:520 PEKERJAAN PENDAHULUAN 2,000,000.00 1.26 1.26

    Err:520 PEKERJAAN SUMUR BOR 126,975,000.00 79.81 15.96

    Err:520 PEKERJAAN WATER TRITMENT 19,930,000.00 12.53

    Err:520 PEKERJAAN DUDUKAN DAN RUMAH MESIN POMPA 10,186,658.5 6.0

    JUMLAH 159,091,658.54

    100.00PPN 10 15,909,165.85

    JUMLAH BOBOT 1!5,000,8"4.#9

    DIBULATKAN 1!5,000,000.00

    REN!ANA "ELA#$ANAAN 17.22 26.60

    REN!ANA #OMULATI 1!."" 4#.8"

    REALI$A$I "ELA#$ANAAN 5.81 61.36

    REALI$A$I #OMULATI 5.81 6!.18

    ' E ( I A $ I )11.1 23.35

    '*+-/* O: '*r*+4 O:

    K$%&'& D&* K$'&+& -& P$/&& #o+-4 "g44+

    "ro*+* J4* C. INTISARI TEKNIK PRATAMA

    H. SAIPUDIN,A.M/, SE SUHERMAN

    NI". 1960812 198501 1 001 #oor*4-or "g44+

    CV du

  • 8/12/2019 Laporan Dan Backup Data

    8/199

    E )

    $#ALA #ET.

    Mgg III Mgg I(

    100

    26.60 10.6 50

    12.53

    3.20 3.20 0

    2.33 13.8

    86.16 100.00 REN!ANA

    16.02 16.80

    8#."0 100.00 REALI$A$I

    )2.96 0.00

    '*r*+4 O:

    #o-r4-or "4+44

    C. DUA CANDI

    HARADI

    '*r-r

    M4+4 "4+444 30H4r* #4r

    20025

  • 8/12/2019 Laporan Dan Backup Data

    9/199

    LA

    #EGIATAN : $ARANA 'AN "RA$ARANA "ERI#ANAN

    "E#ERJAAN : "ENGA'AAN AIR BER$IH ;IN$TALA$I $UMUR BOR<

    LO#A$I : U"I #AB. MUARO JAMBI

    TAHUN ANGGARAN : 2013

    NO URAIAN PEKERJAAN OLUME SAT

    HAR2A

    SATUAN

    1 2 3 5

    I PEKERJAAN PENDAHULUAN

    1 Mobilisasi Peralatan dan personilPembersihan lokasi 1.00 Ls 2,000,000.00

    SUB JUMLAH

    II PEKERJAAN SUMUR BOR

    1 Pek. Pemboran sesuai spesifikasi teknis

    pemboran pilethole max dia 6" termasuk pengadaan

    air pelaksanaan simple field pemeabilt, dll.

    ! dari kedalaman 0 ! 100 m 100.00 M 1#5,000.00

    ! dari kedalaman 100 ! 150 m 50.00 M 165,000.00

    2 Pembesaran lubang bor reaming dari # ! 6"

    termasuk pengadaan air surfa$e, $asing, dll.

    ! dari kedalaman 0 ! 100 m 100.00 M 1#5,000.00

    ! dari kedalaman 100 ! 150 m 50.00 M 165,000.003 Pengadaan instalasi pipa dan saringan sesuai dengan

    spesifikasi teknis

    Pipa %ambang & pump house $asing

    ! 'enis pipa P() 6" *+ 100.00 M 15,000.00

    ! 'enis pipa P() #" *+ 50.00 M 125,500.00

    ! -op P() #" 1.00 h 250,000.00

    Pompa isap dan a$es$esories

    ! /ubmer sible 1.00 nit 2,500,000.00

    ! Pipa dorong 1 1&2" +ain 100.00 M 5,500.00

    ! *$$essories perpipaan 1.00 Ls 2,500,000.00

    5 Peker%aan pengadaan pemasangan

    3reel, penempurnaan sumur, grouting penemenan, dll 1.00 Ls #,500,000.006 Pen$u$ian 4deolopment, pembersihan lubang

    sumur sesuai dengan spesifikasi teknis 1.00 Ls ,50,000.00

    7 Panel listrik dan kelengkapanna 1.00 Ls ,000,000.00

    8 7ali sling untuk pegangan mesin pompa 100.00 M1 5,000.00

    9 Penelesaian sumur, pelaporan dan lain!lain 1.00 Ls 1,50,000.00

  • 8/12/2019 Laporan Dan Backup Data

    10/199

    SUB JUMLAH

    III PEKERJAAN WATER TRITMENT

    1 7abung 105# .00 nit ,600,000.00

    2 )atrede #.00 bh 120,000.00

    3 Mesin 1.00 nit 1,500,000.00

    Paiping 1.00 bh 1,200,000.00

    5 8abel 1.00 nit ,600,000.00

    6 7edmond 2000 Liter 1.00 nit 00,000.00

    7 /aluran untuk kabel pipa 1.00 Ls 500,000.00

    8 'asa 1.00 Ls 1,550,000.00

    SUB JUMLAH

    I PEKERJAAN DUDUKAN DAN RUMAH MESIN POMPA

    A P989:'**; 7*;*8*/@ ? 89)*M*7*; 8@7 89:M*;

    8*P*79; ? 89:@;)@

    No. Mataraian

    /

    Pe!a"a#a$

    a b

    DIVISI %. UMUM

    1.2 Mobilisasi

    DIVISI &. DRAINASE

    2.1 3alian untuk /elokan -rainase dan /aluran *ir

    DIVISI '. PEKERJAAN TANAH

    . Peniapan adan 'alan

    DIVISI . PERKERASAN BERBUTIR

    5.1.1 Lapis Pondasi *gregat 8elas )

    5.2,1 Lapis Pondasi *gregat 8elas *

    DIVISI . PERKERASAN ASPAL

    6.1 414a Lapis :esap Pengikat ! *spal )air

    6.45a Laston Lapis *us 4*)!+) 4gradasi halus&kasar

    6..A.a *spal Minak

    6..10 ahan Pengisi 4Ciller 7ambahan

    J*+a, Ha#-a Pee#/aa$ DIVISI % (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    J*+a, Ha#-a Pee#/aa$ DIVISI & (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    J*+a, Ha#-a Pee#/aa$ DIVISI ' (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    J*+a, Ha#-a Pee#/aa$ DIVISI (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

  • 8/12/2019 Laporan Dan Backup Data

    44/199

  • 8/12/2019 Laporan Dan Backup Data

    45/199

    'umlah

  • 8/12/2019 Laporan Dan Backup Data

    46/199

    01

  • 8/12/2019 Laporan Dan Backup Data

    47/199

    PER

    KEGIATAN : PEMBANGUNA

    PEKERJAAN : KONTRUKSI P

    LOKASI : KECAMATAN

    PELAKSANA : CV. MAKBUL

    KONTRAK AWAL

    No URAIAN PEKERJAAN SATUAN VOLUMEHARGA SAT

    (Rp)

    1 2 ! "

    1.2

    DIVISI 1. MOBILISASI

    Mobilisasi Ls 1.00 21,

    J&'* H+, P+/0 DIVISI 1 ('& p Rp34&3 P+3+0 H+, P+/0)

    2.1DIVISI 2. DRAINASE

    Galian Untu S!loan D"ainas! #an Salu"an Ai" M3 14$.2 41

    JUMLAH HARGA PEKERJAAN DIVISI 2 ('& p Rp34&3 P+3+0 H+, P+/0)

    5.1.1DIVISI ". PERKERASAN BERBUTIR

    La'is (on#asi A)"!)at *!las A M3 2&3.00 $53

    J&'* H+, P+/0 DIVISI " ('& p Rp34&3 P+3+0 H+, P+/0)

    DIVISI #. PERKERASAN ASPAL

    $.1 +1+a La'is !sa' (!n)iat - As'al ai" Lit!" 3,%50.00 1

    $.3 +5a Laston La'is Aus +A-/ +)"a#asi alus asa" on 492.52 554

    $.3.%.a As'al Mina on 2%.$9 12,19

    $.3.10 Baan (!n)isi +ill!" abaan *) 10,094.&0

    J&'* H+, P+/0 DIVISI # ('& p Rp34&3 P+3+0 H+, P+/0)

    &.9 (asan)an Batu *ali M 67"

    3.3 ibunan ana Di#atan)an M $"

    J&'* H+, P+/0 DIVISI ('& p Rp34&3 P+3+0 H+, P+/0)

    A J&'* H+, P+/0 (4+'& 839 &'&' 0 &04&0,0)

    B P/ P+4'8*0 N33 (PP0) 1%; < (A)

    C J&'* To4 P+/0 (A) = (B)

    D D38&40

    JUMLAH S'830 R4& T&/&* P&&* Dp0 J&4 S'830 R4& S'830 P&&* Dp0 R38& R&p

    DISU=UI OL@ 7 DI*A@UI OL@ 7

    (!6abat (!buat *oit!n +((* (!6abat (!lasana !nis *!)iatan PENGAWAS LAPANGAN

    *uasa (!n))una An))a"an +*(A (MBA;GU;A; =ALA; IREKSI TEKNIS NAMA

    Bina Ma")a DI;AS (*=AA; UMUM 1. JAMA

    2. SA@R

    ASRIL5 ST.MT EDI WARMAN5 ST.MT MASDIONO . NU>IR

    ;I(. 19&3011$ 199903 1 004 ;I(. 19&$020% 200&01 1 00$ 5%0 404 19%$11 1 001

  • 8/12/2019 Laporan Dan Backup Data

    48/199

    T ORDER

    KEMANTAN

    AMANDEMEN KONTRAK SELISIH KONTRAK

    VOLUMEHARGA SATUAN JUMLAH HARGA PEKERJAAN TAMBAH PEKERJAAN KURANG

    (Rp) (Rp) VOLUME JML. HARGA (Rp) VOLUME JML. HARGA

    1% 11 12 1# 16 17

    1.00 21,930,000 21,930,000.00 - - - -

    215$%5%%%.%%

    103.5$ 41,119.05 4,25%,2%%.%2 - - 42.$4 1,&53,31$.2

    !52"75277.72

    194.00 $53,23%.29 12$,&2%,22%.2$ - - &9.00 "15#%"572!.$

    12#56275227.2#

    3,9&2.50 11,%42.03 4&,042,4$4.1% 122.50 1,450,$4%.$% - -

    512.$1 554,$$3.0& 2%4,323,0%&.40 20.09 1151!%5!2.16 - -

    29.%$ 12,19&,&05.00 3$4,229,423.&% 1.1& 14,2&&,2$&.33

    10,50$.4& 1,4%5.$2 15,$0%,$1%.99 411.&& $11,&30.&% -

    61152%5"$!."

    52.$0 67"5%6#.$7 41,295,049.15 52.$ !152$"5%!$.1"

    35.5% $"56".!% 3,393,45$.&3 35.5% 5$5!"#.6

    !!5#775"%".77

    $%757%75#16.1 6251#75"7!.7 "5"$51!

    $%577%57#1.6

    $$$5#7$5!6$.%!

    $$$5#7$5%%%.%%

    S'830 R4& S'830 P&&* S'830 J&4 E0' R4& Dp0 P&&* S'83

    DIPERIKSA OLEH : SUNGAI PENUH5 KONSULTAN PENGAWAS DIBUA OL

    ERVISI ENGINEER UALIT ENGINEER INSPEKTOR *O;A*O (L

    CV. MAKBU

    RI KURNIAWAN5ST ASPIRI>AL5ST SANISMAL5 A' KOMAR RAHMA

    Di"!tu"

  • 8/12/2019 Laporan Dan Backup Data

    49/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN MIN22UAN

    DINAS PEKERJAAN UMUM MINGGU #E : $ATU

    PEMBAN2UNAN JALAN TANGGAL : 1>03>2013 $>' 20

    BULAN : 1

    LAPO

    KE2IATAN PEMBAN2UNAN JALAN

    PEKERJAAN JALAN LOLO KECIL SMP LEMPUR (LANJUTAN)

    KONTRAK NO. TAN22AL KONTRAK

    NILAI KONTRAK

    LOKASI KECAMATAN BUKIT KERMAN

    TAHUN AN22ARAN "014

    PERIODE

    KONTRAKTOR PELAKSANA C. ARESA TAMA

    KONSULTAN PEN2AWAS

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTRA#>A''

    (OLUME BOBOT %

    1 2 3 4 5

    1.2

    DIISI 1. UMUM

    Mo**+4+* L+ 1.00 2.57

    2.1DIISI ". DRAINASE

    G4*4 - $o4 'r4*4+ 4 $4r4 A*r M3 25.00 0.11

    3.3DIISI #. PEKERJAAN TANAH

    "?*44 B44 J44 M2 10000.00 2.3

    5.2,1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00 39.89

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    50/199

    BI'ANG : BINA MARGA

    #EGIATAN : "EMBANGUNAN JALAN

    03>2013 "E#ERJAAN : JALAN LOLO #E!IL ) $M" LEM"UR ;LANJUTANA AMA

    AN5ST SANISMAL5 A' SA@RIJAL

    30+ Ins'!to" (!lasana La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    51/199

    KET

    14

  • 8/12/2019 Laporan Dan Backup Data

    52/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN MIN2

    DINAS PEKERJAAN UMUM MINGGU #E

    PEMBAN2UNAN JALAN TANGGAL

    BULAN

    LAPO

    KE2IATAN PEMBAN2UNAN JALAN

    PEKERJAAN KONTRUKSI PEMBAN2UNAN JALAN P

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    TAN22AL KONTRAK 1# MARET "01#

    NILAI KONTRAK R%9!8,998,000

    LOKASI KECAMATAN AIR HAN2AT

    KONTRAKTOR PELAKSANA C. MAKBUL

    PERIODE "1 MARET "01# S3D "! MARET "01#

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTR

    (OLUME

    1 2 3 4

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    53/199

    UAN BI'ANG : BINA MARGA

    : 'UA #EGIATAN : "EMBANGUNAN JALAN

    : 21>03>2013 $>' 27>03>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTA

    : 1 LO#A$I : #E!AMATAN AIR HANGAT

    AN MIN22UAN

    ENDUN2 SEMURUP KEMANTAN

    #>A'' REALISASI

    S3D MIN22U LALU MIN22U INI S3D MIN22U INI

    BOBOT % (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    5 6 7 8 9 10 11

    2.57 0.20 0.51 0.20 0.51

    0.11 15.00 0.08 15 0.08

    39.89

    Err:509

    Err:509

    Err:509

    Err:509

    Err:509

    0.00

    Err:509 0.59 0.59

    DIPERIKSA OLEH :

    *O;SULA; (;GA/AS Dibu

    *ont"ato

    V. M

    DRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI

    S&p+33 E0,30+ Ins'!to" (!lasan

  • 8/12/2019 Laporan Dan Backup Data

    54/199

    N

    KET

    12

    t Ol! 7

    " (!lasana

    A*BUL

    ANDA5 A.M

    a La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    55/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN MIN2

    DINAS PEKERJAAN UMUM MINGGU #E

    PEMBAN2UNAN JALAN TANGGAL

    BULAN

    LAPO

    KE2IATAN PEMBAN2UNAN JALAN

    PEKERJAAN KONTRUKSI PEMBAN2UNAN JALAN P

    KONTRAK NO. KONTRAK.0183PANII3PU"01#TAN22AL KONTRAK 1# MARET "01#

    NILAI KONTRAK R%9!8,998,000

    LOKASI KECAMATAN AIR HAN2AT

    KONTRAKTOR PELAKSANA C. MAKBUL

    PERIODE "8 MARET "01# S3D 0# APRIL "01#

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTR

    (OLUME

    1 2 3 4

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    56/199

    UAN BI'ANG : BINA MARGA

    : #ETIGA #EGIATAN : "EMBANGUNAN JALAN

    : 28>03>2013 $>' 03>0>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTA

    : 1 LO#A$I : #E!AMATAN AIR HANGAT

    AN MIN22UAN

    ENDUN2 SEMURUP KEMANTAN

    #>A'' REALISASI

    S3D MIN22U LALU MIN22U INI S3D MIN22U INI

    BOBOT % (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    5 6 7 8 9 10 11

    2.57 0.20 0.51 0.20 0.51

    0.11 15.00 0.08 7.50 0.03 22.50 0.11

    39.89

    Err:509

    Err:509

    Err:509

    Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509

    0.00

    Err:509 0.59 Err:509 Err:509

    DIPERIKSA OLEH :

    *O;SULA; (;GA/AS Dibu

    *ont"ato

    V. M

    DRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI

    S&p+33 E0,30+ Ins'!to" (!lasan

  • 8/12/2019 Laporan Dan Backup Data

    57/199

    N

    KET

    12

    t Ol! 7

    " (!lasana

    A*BUL

    ANDA5 A.M

    a La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    58/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN MIN2

    DINAS PEKERJAAN UMUM MINGGU #E

    PEMBAN2UNAN JALAN TANGGAL

    BULAN

    LAPO

    KE2IATAN PEMBAN2UNAN JALAN

    PEKERJAAN KONTRUKSI PEMBAN2UNAN JALAN P

    KONTRAK NO. KONTRAK.0183PANII3PU"01#TAN22AL KONTRAK 1# MARET "01#

    NILAI KONTRAK R%9!8,998,000

    LOKASI KECAMATAN AIR HAN2AT

    KONTRAKTOR PELAKSANA C. MAKBUL

    PERIODE 04 APRIL "01# S3D 10 APRIL "01#

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTR

    (OLUME

    1 2 3 4

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    59/199

    UAN BI'ANG : BINA MARGA

    : EM"AT #EGIATAN : "EMBANGUNAN JALAN

    : 0>0>2013 $>' 10>0>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTA

    : 1 LO#A$I : #E!AMATAN AIR HANGAT

    AN MIN22UAN

    ENDUN2 SEMURUP KEMANTAN

    #>A'' REALISASI

    S3D MIN22U LALU MIN22U INI S3D MIN22U INI

    BOBOT % (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    5 6 7 8 9 10 11

    2.57 0.20 0.51 0.20 0.51

    0.11 22.50 0.11 22.50 0.11

    39.89

    Err:509

    Err:509

    Err:509

    Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

    0.00 0.00 &'I(>0@ 0.00 &'I(>0@

    Err:509 Err:509 Err:509 Err:509

    DIPERIKSA OLEH :

    *O;SULA; (;GA/AS Dibu

    *ont"ato

    V. M

    DRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI

    S&p+33 E0,30+ Ins'!to" (!lasan

  • 8/12/2019 Laporan Dan Backup Data

    60/199

    N

    KET

    12

    t Ol! 7

    " (!lasana

    A*BUL

    ANDA5 A.M

    a La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    61/199

  • 8/12/2019 Laporan Dan Backup Data

    62/199

    UAN BI'ANG : BINA MARGA

    : LIMA #EGIATAN : "EMBANGUNAN JALAN

    : 11>0>2013 $>' 17>0>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    : 2 LO#A$I : #E!AMATAN AIR HANGAT

    RAN MIN22UAN

    ENDUN2 SEMURUP KEMANTAN

    #>A'' REALISASI

    S3D MIN22U LALU MIN22U INI S3D MIN22U INI

    BOBOT % (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    5 6 7 8 9 10 11

    2.57 0.20 0.51 0.15 0.39 0.35 0.90

    0.11 22.50 0.11 22.50 0.11

    39.89 90 9.97 90.00 9.97

    Err:509

    Err:509

    Err:509

    Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509

    0.00 0.00 &'I(>0@ 0.00 &'I(>0@ 0.00 &'I(>0@

    Err:509 Err:509 &'I(>0@ Err:509

    DIPERIKSA OLEH :

    *O;SULA; (;GA/AS Dibuat

    *ont"ato"

    V. M

    DRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI>

    S&p+33 E0,30+ Ins'!to" (!lasana

  • 8/12/2019 Laporan Dan Backup Data

    63/199

    KET

    12

    Ol! 7

    (!lasana

    *BUL

    NDA5 A.M

    La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    64/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN MIN2

    DINAS PEKERJAAN UMUM MINGGU #E

    PEMBAN2UNAN JALAN TANGGAL

    BULAN

    LAPO

    KE2IATAN PEMBAN2UNAN JALAN

    PEKERJAAN KONTRUKSI PEMBAN2UNAN JALAN P

    KONTRAK NO. KONTRAK.0183PANII3PU"01#TAN22AL KONTRAK 1# MARET "01#

    NILAI KONTRAK R%9!8,998,000

    LOKASI KECAMATAN AIR HAN2AT

    KONTRAKTOR PELAKSANA C. MAKBUL

    PERIODE 18 APRIL "01# S3D "4 APRIL "01#

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTR

    (OLUME

    1 2 3 4

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    65/199

    UAN BI'ANG : BINA MARGA

    : ENAM #EGIATAN : "EMBANGUNAN JALAN

    : 18>0>2013 $>' 2>0>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTA

    : 2 LO#A$I : #E!AMATAN AIR HANGAT

    AN MIN22UAN

    ENDUN2 SEMURUP KEMANTAN

    #>A'' REALISASI

    S3D MIN22U LALU MIN22U INI S3D MIN22U INI

    BOBOT % (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    5 6 7 8 9 10 11

    2.57 0.35 0.90 0.35 0.90

    0.11 22.50 0.11 22.50 0.11

    39.89 90.00 9.97 270 29.92 360.00 39.89

    Err:509

    Err:509

    Err:509

    Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509

    0.00 0.00 &'I(>0@ 0.00 &'I(>0@

    Err:509 Err:509 29.92 Err:509

    DIPERIKSA OLEH :

    *O;SULA; (;GA/AS Dibu

    *ont"ato

    V. M

    DRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI

    S&p+33 E0,30+ Ins'!to" (!lasan

  • 8/12/2019 Laporan Dan Backup Data

    66/199

    N

    KET

    12

    t Ol! 7

    " (!lasana

    A*BUL

    ANDA5 A.M

    a La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    67/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN MIN2

    DINAS PEKERJAAN UMUM MINGGU #E

    PEMBAN2UNAN JALAN TANGGAL

    BULAN

    LAPO

    KE2IATAN PEMBAN2UNAN JALAN

    PEKERJAAN KONTRUKSI PEMBAN2UNAN JALAN P

    KONTRAK NO. KONTRAK.0183PANII3PU"01#TAN22AL KONTRAK 1# MARET "01#

    NILAI KONTRAK R%9!8,998,000

    LOKASI KECAMATAN AIR HAN2AT

    KONTRAKTOR PELAKSANA C. MAKBUL

    PERIODE "5 APRIL "01# S3D 01 MEI "01#

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTR

    (OLUME

    1 2 3 4

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    68/199

    UAN BI'ANG : BINA MARGA

    : TUJUH #EGIATAN : "EMBANGUNAN JALAN

    : 25>0>2013 $>' 01>05>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTA

    : 2 LO#A$I : #E!AMATAN AIR HANGAT

    AN MIN22UAN

    ENDUN2 SEMURUP KEMANTAN

    #>A'' REALISASI

    S3D MIN22U LALU MIN22U INI S3D MIN22U INI

    BOBOT % (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    5 6 7 8 9 10 11

    2.57 0.35 0.90 0.35 0.90

    0.11 22.50 0.11 22.50 0.11

    39.89 360.00 39.89 360.00 39.89

    Err:509

    Err:509

    Err:509

    Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509

    0.00 0.00 &'I(>0@ 0.00 &'I(>0@

    Err:509 Err:509 ) Err:509

    DIPERIKSA OLEH :

    *O;SULA; (;GA/AS Dibu

    *ont"ato

    V. M

    DRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI

    S&p+33 E0,30+ Ins'!to" (!lasan

  • 8/12/2019 Laporan Dan Backup Data

    69/199

    N

    KET

    12

    t Ol! 7

    " (!lasana

    A*BUL

    ANDA5 A.M

    a La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    70/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN MIN2

    DINAS PEKERJAAN UMUM MINGGU #E

    PEMBAN2UNAN JALAN TANGGAL

    BULAN

    LAPO

    KE2IATAN PEMBAN2UNAN JALAN

    PEKERJAAN KONTRUKSI PEMBAN2UNAN JALAN P

    KONTRAK NO. KONTRAK.0183PANII3PU"01#TAN22AL KONTRAK 1# MARET "01#

    NILAI KONTRAK R%9!8,998,000

    LOKASI KECAMATAN AIR HAN2AT

    KONTRAKTOR PELAKSANA C. MAKBUL

    PERIODE 0" MEI "01# S3D 08 MEI "01#

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTR

    (OLUME

    1 2 3 4

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    71/199

    UAN BI'ANG : BINA MARGA

    : 'ELA"AN #EGIATAN : "EMBANGUNAN JALAN

    : 02>05>2013 $>' 08>05>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTA

    : 2 LO#A$I : #E!AMATAN AIR HANGAT

    AN MIN22UAN

    ENDUN2 SEMURUP KEMANTAN

    #>A'' REALISASI

    S3D MIN22U LALU MIN22U INI S3D MIN22U INI

    BOBOT % (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    5 6 7 8 9 10 11

    2.57 0.35 0.90 0.35 0.90

    0.11 22.50 0.11 22.50 0.11

    39.89 360.00 39.89 360.00 39.89

    Err:509

    Err:509

    Err:509

    Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509

    0.00 0.00 &'I(>0@ 0.00 &'I(>0@

    Err:509 Err:509 Err:509

    DIPERIKSA OLEH :

    *O;SULA; (;GA/AS Dibu

    *ont"ato

    V. M

    DRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI

    S&p+33 E0,30+ Ins'!to" (!lasan

  • 8/12/2019 Laporan Dan Backup Data

    72/199

    N

    KET

    12

    t Ol! 7

    " (!lasana

    A*BUL

    ANDA5 A.M

    a La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    73/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN MIN2

    DINAS PEKERJAAN UMUM MINGGU #E

    PEMBAN2UNAN JALAN TANGGAL

    BULAN

    LAPO

    KE2IATAN PEMBAN2UNAN JALAN

    PEKERJAAN KONTRUKSI PEMBAN2UNAN JALAN P

    KONTRAK NO. KONTRAK.0183PANII3PU"01#TAN22AL KONTRAK 1# MARET "01#

    NILAI KONTRAK R%9!8,998,000

    LOKASI KECAMATAN AIR HAN2AT

    KONTRAKTOR PELAKSANA C. MAKBUL

    PERIODE 09 MEI "01# S3D15 MEI "01#

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTR

    (OLUME

    1 2 3 4

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    74/199

    UAN BI'ANG : BINA MARGA

    : $EMBILAN #EGIATAN : "EMBANGUNAN JALAN

    : 09>05>2013 $>' 15>05>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTA

    : 3 LO#A$I : #E!AMATAN AIR HANGAT

    AN MIN22UAN

    ENDUN2 SEMURUP KEMANTAN

    #>A'' REALISASI

    S3D MIN22U LALU MIN22U INI S3D MIN22U INI

    BOBOT % (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    5 6 7 8 9 10 11

    2.57 0.35 0.90 0.35 0.90

    0.11 22.50 0.11 22.50 0.11

    39.89 360.00 39.89 360.00 39.89

    Err:509

    Err:509

    Err:509

    Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509

    0.00 0.00 &'I(>0@ 0.00 &'I(>0@

    Err:509 Err:509 Err:509

    DIPERIKSA OLEH :

    *O;SULA; (;GA/AS Dibu

    *ont"ato

    V. M

    DRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI

    S&p+33 E0,30+ Ins'!to" (!lasan

  • 8/12/2019 Laporan Dan Backup Data

    75/199

    N

    KET

    12

    t Ol! 7

    " (!lasana

    A*BUL

    ANDA5 A.M

    a La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    76/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN MIN2

    DINAS PEKERJAAN UMUM MINGGU #E

    PEMBAN2UNAN JALAN TANGGAL

    BULAN

    LAPO

    KE2IATAN PEMBAN2UNAN JALAN

    PEKERJAAN KONTRUKSI PEMBAN2UNAN JALAN P

    KONTRAK NO. KONTRAK.0183PANII3PU"01#TAN22AL KONTRAK 1# MARET "01#

    NILAI KONTRAK R%9!8,998,000

    LOKASI KECAMATAN AIR HAN2AT

    KONTRAKTOR PELAKSANA C. MAKBUL

    PERIODE 16 MEI "01# S3D "" MEI "01#

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTR

    (OLUME

    1 2 3 4

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    77/199

    UAN BI'ANG : BINA MARGA

    : $E"ULUH #EGIATAN : "EMBANGUNAN JALAN

    : 16>05>2013 $>' 22>05>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTA

    : 3 LO#A$I : #E!AMATAN AIR HANGAT

    AN MIN22UAN

    ENDUN2 SEMURUP KEMANTAN

    #>A'' REALISASI

    S3D MIN22U LALU MIN22U INI S3D MIN22U INI

    BOBOT % (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    5 6 7 8 9 10 11

    2.57 0.35 0.90 0.65 1.67 1.00 2.57

    0.11 22.50 0.11 22.50 0.11

    39.89 360.00 39.89 360.00 39.89

    Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509

    0.00 0.00 &'I(>0@ 0.00 &'I(>0@

    Err:509 Err:509 Err:509 Err:509

    DIPERIKSA OLEH :

    *O;SULA; (;GA/AS Dibu

    *ont"ato

    V. M

    DRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI

    S&p+33 E0,30+ Ins'!to" (!lasan

  • 8/12/2019 Laporan Dan Backup Data

    78/199

    N

    KET

    12

    t Ol! 7

    " (!lasana

    A*BUL

    ANDA5 A.M

    a La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    79/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN MIN2

    DINAS PEKERJAAN UMUM MINGGU #E

    PEMBAN2UNAN JALAN TANGGAL

    BULAN

    LAPO

    KE2IATAN PEMBAN2UNAN JALAN

    PEKERJAAN KONTRUKSI PEMBAN2UNAN JALAN P

    KONTRAK NO. KONTRAK.0183PANII3PU"01#TAN22AL KONTRAK 1# MARET "01#

    NILAI KONTRAK R%9!8,998,000

    LOKASI KECAMATAN AIR HAN2AT

    KONTRAKTOR PELAKSANA C. MAKBUL

    PERIODE "# MEI "01# S3D "9 MEI "01#

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTR

    (OLUME

    1 2 3 4

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    80/199

    UAN BI'ANG : BINA MARGA

    : $EBELA$ #EGIATAN : "EMBANGUNAN JALAN

    : 23>05>2013 $>' 29>05>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTA

    : 3 LO#A$I : #E!AMATAN AIR HANGAT

    AN MIN22UAN

    ENDUN2 SEMURUP KEMANTAN

    MIN22U KE 11

    #>A'' REALISASI

    S3D MIN22U LALU MIN22U INI S3D MIN22U INI

    BOBOT % (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    5 6 7 8 9 10 11

    2.57 1.00 2.57 1.00 2.57

    0.11 22.50 0.11 22.50 0.11

    39.89 19.00 39.89 19.00 39.89

    Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 52.60 .5 52.60 .5

    0.00 35.58 0.37 35.58 0.37

    E509 E509 E509 E509

    DIPERIKSA OLEH :

    *O;SULA; (;GA/AS Dibu

    *ont"ato

    V. M

    DRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI

    S&p+33 E0,30+ Ins'!to" (!lasan

  • 8/12/2019 Laporan Dan Backup Data

    81/199

    N

    (SEBELAS)

    KET

    12

    t Ol! 7

    " (!lasana

    A*BUL

    ANDA5 A.M

    a La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    82/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN MIN2

    DINAS PEKERJAAN UMUM MINGGU #E

    PEMBAN2UNAN JALAN TANGGAL

    BULAN

    LAPO

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTR

    (OLUME

    1 2 3 4

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    83/199

    UAN BI'ANG : BINA MARGA

    : $EBELA$ #EGIATAN : "EMBANGUNAN JALAN

    : 23>05>2013 $>' 29>05>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTA

    : 3 LO#A$I : #E!AMATAN AIR HANGAT

    AN MIN22UAN

    #>A'' REALISASI

    S3D MIN22U LALU MIN22U INI S3D MIN22U INI

    BOBOT % (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    5 6 7 8 9 10 11

    2.57 1.00 2.57 1.00 2.57

    0.11 22.50 0.11 22.50 0.11

    39.89 19.00 39.89 19.00 39.89

    Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509

    0.00 0.00 &'I(>0@ ) &'I(>0@

    E509 E509 E509 E509

    DIPERIKSA OLEH :

    *O;SULA; (;GA/AS Dibu

    *ont"ato

    V. M

    DRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI

    S&p+33 E0,30+ Ins'!to" (!lasan

  • 8/12/2019 Laporan Dan Backup Data

    84/199

    N

    KET

    12

    t Ol! 7

    " (!lasana

    A*BUL

    ANDA5 A.M

    a La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    85/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN MIN2

    DINAS PEKERJAAN UMUM MINGGU #E

    PEMBAN2UNAN JALAN TANGGAL

    BULAN

    LAPO

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTR

    (OLUME

    1 2 3 4

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    86/199

    UAN BI'ANG : BINA MARGA

    : $EBELA$ #EGIATAN : "EMBANGUNAN JALAN

    : 23>05>2013 $>' 29>05>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTA

    : 3 LO#A$I : #E!AMATAN AIR HANGAT

    RAN MIN22UAN

    #>A'' REALISASI

    S3D MIN22U LALU MIN22U INI S3D MIN22U INI

    BOBOT % (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    5 6 7 8 9 10 11

    2.57 1.00 2.57 1.00 2.57

    0.11 22.50 0.11 22.50 0.11

    39.89 19.00 39.89 19.00 39.89

    Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509 Err:509

    0.00 0.00 &'I(>0@ ) &'I(>0@

    E509 E509 E509 E509

    DIPERIKSA OLEH :

    *O;SULA; (;GA/AS Dibu

    *ont"ato

    V. M

    DRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI

    S&p+33 E0,30+ Ins'!to" (!lasan

  • 8/12/2019 Laporan Dan Backup Data

    87/199

    KET

    12

    t Ol! 7

    " (!lasana

    A*BUL

    ANDA5 A.M

    a La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    88/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN BULA

    DINAS PEKERJAAN UMUM BULAN #E : "ERTAMA

    PEMBAN2UNAN JALAN TANGGAL : 1>03>2013 $>' 1

    LAPORAN BULANAN

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    TAN22AL KONTRAK 1# MARET "01#

    NILAI KONTRAK R%9!8,998,000

    NILAI AMANDEMEN KONTRAK R%999,689,000KONTRAKTOR PELAKSANA C. MAKBUL

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTRA#>A''

    S3D BUL

    (OLUME BOBOT % (OLUME

    1 2 3 4 5 6

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00 2.57

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00 0.11

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00 39.89

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    89/199

    AN BI'ANG : BINA MARGA

    #EGIATAN : "EMBANGUNAN JALAN

    >0>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    LO#A$I : #E!AMATAN AIR HANGAT

    BULAN KE 1 (SATU)

    REALISASI

    N LALU BULAN INI S3D BULAN INIKET

    BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    7 8 9 10 11 12

    0.20 0.51 0.20 0.51

    ) )

    ) )

    22.50 0.11 22.50 0.11

    ) )

    ) )

    ) ) ) )

    ) )

    ) )

    ) ) ) )

    ) ) ) )

    ) ) ) )

    ) ) ) )

    ) )

    Err:509 Err:509 Err:509 Err:509

    ) &'I(>0@ ) &'I(>0@

    0.00 E509 E509

    H : D38&4 O* : ENGAWAS *ont"ato" (!lasana

    I+-or V. MA*BUL

    SANISMAL5 A' MAI>ON RI>ANDA5 A.M

    (!lasana La'an)an

    D34&/&3 O* :

    (!6abat (!lasana !nis *!)iatan

    (MBA;GU;A; =ALA;

    DI;AS (*=AA; UMUM *AB. *I;I

    EDI WARMAN5 ST.MT

    ;I(. 19&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    90/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN BULA

    DINAS PEKERJAAN UMUM BULAN #E : 'UA

    PEMBAN2UNAN JALAN TANGGAL : 11>0>2013 $>' 0

    LAPORAN BULANAN

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    TAN22AL KONTRAK 1# MARET "01#

    NILAI KONTRAK R%9!8,998,000

    NILAI AMANDEMEN KONTRAK R%999,689,000KONTRAKTOR PELAKSANA C. MAKBUL

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTRA#>A''

    S3D BUL

    (OLUME BOBOT % (OLUME

    1 2 3 4 5 6

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00 2.57 0.20

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00 0.11 22.50

    5.1.1

    DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00 39.89 )

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    91/199

    AN BI'ANG : BINA MARGA

    #EGIATAN : "EMBANGUNAN JALAN

    >05>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    LO#A$I : #E!AMATAN AIR HANGAT

    BULAN KE " (DUA)

    REALISASI

    N LALU BULAN INI S3D BULAN INIKET

    BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    7 8 9 10 11 12

    0.51 0.15 0.39 0.35 0.90

    ) )

    ) )

    0.11 22.50 0.11

    ) )

    ) )

    360.00 39.89 360.00 39.89

    ) )

    ) )

    ) ) ) )

    ) ) ) )

    ) ) ) )

    ) ) ) )

    ) )

    Err:509 Err:509 Err:509

    &'I(>0@ ) &'I(>0@ ) &'I(>0@

    E509 DI30: E509

    H : D38&4 O* : GA=A$ *ont"ato" (!lasana

    I+-or V. MA*BUL

    SANISMAL5 A' MAI>ON RI>ANDA5 A.M(!lasana La'an)an

    D34&/&3 O* :

    (!6abat (!lasana !nis *!)iatan

    (MBA;GU;A; =ALA;

    DI;AS (*=AA; UMUM *AB. *I;I

    EDI WARMAN5 ST.MT

    ;I(. 19&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    92/199

    PEMERINTAH KABUPATEN KERINCI LAPORAN BULANAN

    DINAS PEKERJAAN UMUM BULAN #E : #ETIGA

    PEMBAN2UNAN JALAN TANGGAL : 09>05>2013 $>' 29>05>2013

    LAPORAN BULANAN

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    TAN22AL KONTRAK 1# MARET "01#

    NILAI KONTRAK R%9!8,998,000

    NILAI AMANDEMEN KONTRAK R%999,689,000KONTRAKTOR PELAKSANA C. MAKBUL

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    N7. DIISI URAIAN PEKERJAAN SATUAN

    #ONTRA#>A''

    S3D BULAN LAL

    (OLUME BOBOT % (OLUME BOB

    1 2 3 4 5 6

    1.2'I(I$I 1. MOBILI$A$I

    Mo**+4+* L+ 1.00 2.57 0.35

    ".1DIISI ". DRAINASE

    G4*4 U- $o4 'r4*4+ 4 $4r4 A*r M3 25.00 0.11 22.50

    5.1.1DIISI 5. PERKERASAN BERBUTIR

    L4*+ "o4+* Agrg4- #4+ A M3 360.00 39.89 360.00

    DIISI 6. PERKERASAN ASPAL

    6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    93/199

    BI'ANG : BINA MARGA

    #EGIATAN : "EMBANGUNAN JALAN

    "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    LO#A$I : #E!AMATAN AIR HANGAT

    BULAN KE # (TI2A)

    REALISASI

    BULAN INI S3D BULAN INIKET

    (OLUME BOBOT % (OLUME BOBOT %

    8 9 10 11 12

    0.65 1.67 1.00 2.57

    22.50 0.11

    360.00 39.89

    Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509

    ) &'I(>0@

    E509 E509

    D38&4 O* :

    *ont"ato" (!lasana

    I+-or V. MA*BUL

    ANISMAL5 A' MAI>ON RI>ANDA5 A.M(!lasana La'an)an

    D34&/&3 O* :

    !lasana !nis *!)iatan

    BA;GU;A; =ALA;

    =AA; UMUM *AB. *I;I

    I WARMAN5 ST.MT 9&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    94/199

  • 8/12/2019 Laporan Dan Backup Data

    95/199

    RAN KEMAJUAN ISIK BI'ANG : BINA MARGA

    TERAKHIR #EGIATAN : "EMBANGUNAN JALAN

    : 1>03>2013 $>' 29>05>2013 "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    LO#A$I : #E!AMATAN AIR HANGAT

    REALISASI

    JUMLAH BULAN LALU JUMLAH BULAN INI JUMLAH S3D BULAN INIKET

    (OLUME BOBOT % (OLUME BOBOT % (OLUME BOBOT %

    0.35 0.90 0.65 1.67 1.00 2.57

    22.50 0.11 ) ) 22.50 0.11

    360.00 39.89 ) ) 360.00 39.89

    ) ) Err:509 Err:509 Err:509 Err:509

    ) ) Err:509 Err:509 Err:509 Err:509

    ) ) Err:509 Err:509 Err:509 Err:509

    ) ) Err:509 Err:509 Err:509 Err:509

    Err:509 Err:509 ) ) Err:509 Err:509

    ) &'I(>0@ ) ) ) &'I(>0@

    E509 E509 E509 E509

    RIKSA OLEH : D38&4 O* :KONSULTAN PENGAWAS *ont"ato" (!lasana

    I+-or V. MA*BUL

    SANISMAL5 A' MAI>ON RI>ANDA5 A.M(!lasana La'an)an

    D34&/&3 O* :

    (!6abat (!lasana !nis *!)iatan

    (MBA;GU;A; =ALA;

    DI;AS (*=AA; UMUM *AB. *I;I

    EDI WARMAN5 ST.MT

    ;I(. 19&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    96/199

    JADWAL PELAKSANAAN REALISASIPEMERINTAH KABUPATEN KERINCI

    DINAS PEKERJAAN UMUM BULAN #E)1

    #ONTRA#TOR "ELA#$ANAPEMBAN2UNAN JALAN

    C. MAKBUL

    N7. DIISI URAIAN PEKERJAAN BOBOT % BULAN KE1 BULAN KE"

    1 2 3 5 6 7

    'I(I$I 1. MOBILI$A$I2.1

    0.60 0.60 0.60 0.60

    DIISI ". DRAINASE0.7 0.16 0.16 0.16

    DIISI 5. PERKERASAN BERBUTIR 13.9

    DIISI 6. PERKERASAN ASPAL 78.26

    "4+4g4 B4- #4*.5

    T*4 T44 '*4-4g40.37

    JUMLAH 100.00

    RENCANAMIN22UAN 0.60 0.60 0.60 0.60 0.16 0.16 0.16

    KOMULATI 0.60 1.21 1.81 2.1 2.57 2.73 2.88

    REALISASIMIN22UAN 0.59 Err:509 Err:509

    KOMULATI 0.59 Err:509 Err:509

    D*$+;+ O'$ DIPERIK

    "/44- "4+44 T*+ #g*4-4 EN2AWAS LAPAN2AN

    "EMBANGUNAN JALAN DI*SI *;IS

    'INA$ "E#ERJAAN UMUM #AB. #ERIN!I

    E'I =ARMAN, $T.MT MASDIONO

    NI". 19760208 200701 1 006 NIP. %$"7% !%! 1$7#11 1 %%1

  • 8/12/2019 Laporan Dan Backup Data

    97/199

    : BINA MARGA

    : "EMBANGUNAN JALAN

    : JALAN "EN'UNG $EMURU" ) #EMANTAN

    : #E!AMATAN AIR HANGAT

    . KONTRAK.0183PANII3PU"01#

    NTRAK 1# MARET "01#

    K R%. 9!8.998.000

    WAKTU PELAKSANAAN

    KE# BULAN KE4 BULAN KE5 BULAN KE6 BULAN KE!

    11 12 13 1 15 16 17 18 19 20 13 1 15 16 17 18 19

    2.32 2.32 2.32 2.32 2.32 2.32

    7.83 7.83 7.83 7.83 7.83 7.83 7.83 7.83 7.83

    1.1

    0.19 0.19

    1.32 0.19 2.32 2.32 2.32 2.32 2.32 2.32 7.83 7.83 7.83 7.83 7.83 7.83 7.83 7.83 7.83

    7.61 7.80 10.12 12.5 1.77 17.10 19.2 21.7 29.57 37.39 5.22 53.05 60.87 68.70 76.52 8.35 92.17

    Dibuat Ol! 7

    NGAWAS *ont"ato" (!las

    S&p+33 E0,30+ Ins'!to" V. MA*BUL

    ANDRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI>ANDA

    (!lasana La'an

    DIKETAHUI OLEH

    4g B*4 M4rg4>#4+4 "gg4 Agg4r4 ;#"A#4+4 "gg4 Agg4r4 ;#"ALM9 /*7

    1 /7* 0 F 51# /&- 0F550 P E 5.0 M 8@:@

    LE 0.0 F 0.# L E 0.5 M

    2 7 E 1.15 M 1.15

    5.00 G 0.5 G 1.15 1#.0AA

    2 /7* 0F550 /&- 0F600 P E 50.0 M 8@:@

    LE 0.0 F 0.# L E 0.5 M

    2

    7 E 0.5 M 0.5

    50.00 G 0.5 G 0.5 1.125

    /7* 0F600 /&- 0F650 P E #. M 8@:@

    LE 0.0 F 0.# L E 0.5 M2

    7 E 0.60 M 0.60

    #.0 G 0.5 G 0.60 10.06

    /7* 0F650 /&- 0F00 P E 50.0 M 8@:@

    LE 0.0 F 0.# L E 0.5 M

    2

    7 E 0.50 M 0.50

    50.00 G 0.5 G 0.50 A.5

    /7* 0F00 /&- 0F50 P E 2.5 M 8@:@

    LE 0.0 F 0.# L E 0.5 M

    2

    7 E 0.50 M 0.50

    2.50 G 0.5 G 0.50 5.6

    /7* 0F60 /&- 0F650 P E 1A.0 M 8*;*;

  • 8/12/2019 Laporan Dan Backup Data

    141/199

    'ML*< 7>7*L 5.15 M

    DISETUJUI OLEH : -@P9:@8/* >L9< ?

    6abat (!lasana !nis *!)iatan PENGAWAS LAPANGAN KONSULTAN PENGAWAS

    (MBA;GU;A; =ALA; DI*SI *;IS

    DI;AS (*=AA; UMUM Su'!"isi n)in!!" @nspektor

    EDI WARMAN5 ST.MT MASDIONO ANDRI KURNIAWAN5ST SANISMAL5 A

    ;I(. 19&$020% 200&01 1 00$ ;I(. 095%0 404 19%$11 1 001

  • 8/12/2019 Laporan Dan Backup Data

    142/199

  • 8/12/2019 Laporan Dan Backup Data

    143/199

    .M

    an

  • 8/12/2019 Laporan Dan Backup Data

    144/199

    PEMERINTAH KABUPATEN KERINCI BI'ANG : BINA MARGA

    DINAS PEKERJAAN UMUM #EGIATAN : "EMBANGUNAN JALAN

    PEMBAN2UNAN JALAN "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    LO#A$I : #E!AMATAN AIR HANGAT

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    REKAPITULASI

    ;O. DIVISI UAIA; (*=AA; SAUA; VO

    &.9 (asan)an Batu *ali M3 53

    M3 53.15

    DIPERIKSA OLEH : '*4- OPENGAWAS LAPANGAN KONSULTAN PENGAWAS CV. MAK

    DI*SI *;IS S&p+33 E0,30+ I+-or "4+44 L4

    MASDIONO ANDRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI>AN

    ;I(. 095%0 404 19%$11 1 001

  • 8/12/2019 Laporan Dan Backup Data

    145/199

    DIKETAHUI OLEH : DISETUJUI OLEH :

    (!6abat (!buat *oit!n +((* (!6abat (!lasana !nis *!)iatan

    *uasa (!n))una An))a"an +*(A (MBA;GU;A; =ALA;

    Bina Ma")a DI;AS (*=AA; UMUM

    ASRIL5 ST.MT EDI WARMAN5 ST.MT

    ;I(. 19&3011$ 199903 1 004 ;I(. 19&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    146/199

    5 A.M

  • 8/12/2019 Laporan Dan Backup Data

    147/199

  • 8/12/2019 Laporan Dan Backup Data

    148/199

    PEMERINTAH KABUPATEN KERINCI BACK UP DATADINAS PEKERJAAN UMUM I'ANG : BINA MARGA

    PEMBAN2UNAN JALAN EGIATAN : "EMBANGUNAN JALAN

    TAHUN AN22ARAN "01# #ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    KONTRAKTOR PELAKSANA "E#ERJAAN : GALIAN UNTU# $ELO#AN 'RAINA$E 'AN

    C. MAKBUL LO#A$I : #E!AMATAN AIR HANGAT

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    Ite Pee#/aa$ 6 Ga+8a$ U$t* Se+oa$ D#a8$a7e 9a$ Sa+*#a$ A8#

    ;o raian Peker%aan (>LM9 /*7 /897 & 3

    8@:@

    1 /7* 0 F 51# /&- 0F550 P E 6.0 M

    LE 0.5 F 0.5 L E 0.5 M 0.5

    2 7 E 0.5 M

    6.00 G 0.5 G 0.5 2.#0

    2 /7* 0F550 /&- 0F600 P E 50.0 M 8@:@

    LE 0.A5 F 0.A5 L E 0.A5 M

    2 0.0

    7 E 0.0 M

    50.00 G 0.A5 G 0.0 2.50

    8@:@

    1 /7* 0F600 /&- 0F650 P E 50.0 M

    LE 0.0 F 0.0 L E 0.0 M

    2 7 E 0.50 M 0.50

    50.00 G 0.0 G 0.50 22.500

    8@:@

    1 /7* 0F650 /&- 0F00 P E 50.0 M

    LE 0.5 F 0.5 L E 0.5 M

    2 7 E 0.5 M 0.5

    50.00 G 0.5 G 0.5 16.625

    8*;*;

    1 /7* 0F60 /&- 0F6#A P E 1A.0 M

    LE 0.50 F 0.50 L E 0.50 M

    2 7 E 0.50 M 0.50

    1A.00 G 0.50 G 0.50 #.500 0.50

  • 8/12/2019 Laporan Dan Backup Data

    149/199

    'ML*< 7>7*L 105.A M

    DISETUJUI OLEH : DI(I*SA OL@ 7

    (!6abat (!lasana !nis *!)iatan PENGAWAS LAPANGAN KONSULTAN PENGAWAS(MBA;GU;A; =ALA; DI*SI *;IS

    DI;AS (*=AA; UMUM Su'!"isi n)in!!" Ins'!to"

    EDI WARMAN5 ST.MT MASDIONO ANDRI KURNIAWAN5ST SANISMAL5 A'

    ;I(. 19&$020% 200&01 1 00$ ;I(. 095%0 404 19%$11 1 001

  • 8/12/2019 Laporan Dan Backup Data

    150/199

    RAN AIR

    :

    Ba#an 6alan

    Ba#an 6alan

    Ba#an 6alan

    Ba#an 6alan

  • 8/12/2019 Laporan Dan Backup Data

    151/199

    ibuat Ol! 7

    V. MAKBUL

    RI>ANDA5 A.M

    sana La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    152/199

    PEMERINTAH KABUPATEN KERINCI BI'ANG : BINA MARGA

    DINAS PEKERJAAN UMUM #EGIATAN : "EMBANGUNAN JALAN

    PEMBAN2UNAN JALAN "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    LO#A$I : #E!AMATAN AIR HANGAT

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    REKAPITULASI

    ;O. DIVISI UAIA; (*=AA; SAUA; VO

    DIVISI 2. DRAINASE

    2.1 Galian S!loan D"ainas! #an Salu"an Ai" M3 1

    JUMLAH 1%".7#

    DIPERIKSA OLEH : '*4- OPENGAWAS LAPANGAN KONSULTAN PENGAWAS CV. MAK

    DI*SI *;IS S&p+33 E0,30+ I+-or "4+44 L4

    MASDIONO ANDRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI>AN

    ;I(. 095%0 404 19%$11 1 001

  • 8/12/2019 Laporan Dan Backup Data

    153/199

    DIKETAHUI OLEH : DISETUJUI OLEH :

    (!6abat (!buat *oit!n +((* (!6abat (!lasana !nis *!)iatan

    *uasa (!n))una An))a"an +*(A (MBA;GU;A; =ALA;

    Bina Ma")a DI;AS (*=AA; UMUM

    ASRIL5 ST.MT EDI WARMAN5 ST.MT

    ;I(. 19&3011$ 199903 1 004 ;I(. 19&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    154/199

    &

    5 A.M

  • 8/12/2019 Laporan Dan Backup Data

    155/199

  • 8/12/2019 Laporan Dan Backup Data

    156/199

    PEMERINTAH KABUPATEN KERINCI BACK UP DATADINAS PEKERJAAN UMUM I'ANG : BINA MARGA

    PEMBAN2UNAN JALAN EGIATAN : "EMBANGUNAN JALAN

    TAHUN AN22ARAN "01# #ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    KONTRAKTOR PELAKSANA " E#ERJAAN : GALIAN UNTU# $ELO#AN 'RAINA$E 'A

    C. MAKBUL LO#A$I : #E!AMATAN AIR HANGAT

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    Ite Pee#/aa$ 6 T8!*$a$ Ta$a, D89ata$-a$

    ;o raian Peker%aan ( /*7 /897 & 3

    8@:@ 0.5

    1 8@:@ 0F600 /&- 0F650 P E 50.0 M

    L E 0.5 M 0.

    7 E 0.0 M

    50.00 G 0.5 G 0.0 11.25 M

    8@:@ 8@:@ 1.00

    2 /7* 0F650 /&- 0F00 P E 50.0 M

    L E 1.00 M 0.0

    7 E 0.0 M

    50.00 G 1.00 G 0.0 15.00 M

    8@:@ 8@:@ 0.A5

    /7* 0F00 /&- 0F50 P E 50.0 M

    L E 0.A5 M 0.20

    7 E 0.20 M

    50.00 G 0.A5 G 0.20 A.50 M

    8*;*; 8*;*; 1.00

    # /7* 0F650 /&- 0F00 P E 1A.0 M

    L E 1.00 M

    7 E 0.0 M

    1A.00 G 1.00 G 0.0 5.#0 M

  • 8/12/2019 Laporan Dan Backup Data

    157/199

    'ML*< 7>7*L #0.15 M

    DISETUJUI OLEH : DI(I*SA OL@ 7(!6abat (!lasana !nis *!)iatan PENGAWAS LAPANGAN KONSULTAN PENGAWA

    (MBA;GU;A; =ALA; DI*SI *;IS Su'!"isi n)in!!"

    DI;AS (*=AA; UMUM

    EDI WARMAN5 ST.MT MASDIONO ANDRI KURNIAWAN5ST

    ;I(. 19&$020% 200&01 1 00$ ;I(. 095%0 404 19%$11 1 001

  • 8/12/2019 Laporan Dan Backup Data

    158/199

    RAN AIR

    :

    0.

  • 8/12/2019 Laporan Dan Backup Data

    159/199

    Dibuat Ol! 7

    CV. MAKBUL

    MAI>ON RI>ANDA5 A.M

    (!lasana La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    160/199

    PEMERINTAH KABUPATEN KERINCI BI'ANG : BINA MARGA

    DINAS PEKERJAAN UMUM #EGIATAN : "EMBANGUNAN JALAN

    PEMBAN2UNAN JALAN "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    LO#A$I : #E!AMATAN AIR HANGAT

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    REKAPITULASI

    ;O. DIVISI UAIA; (*=AA; SAUA; VO

    3.3 ibunan ana Di#atan)an M3 4

    M3 40.1

    DIPERIKSA OLEH : '*4- OPENGAWAS LAPANGAN KONSULTAN PENGAWAS CV. MAK

    DI*SI *;IS S&p+33 E0,30+ I+-or "4+44 L

    MASDIONO ANDRI KURNIAWAN5ST SANISMAL5 A' MAI>ON RI>A

    ;I(. 095%0 404 19%$11 1 001

  • 8/12/2019 Laporan Dan Backup Data

    161/199

    DIKETAHUI OLEH : DISETUJUI OLEH :

    (!6abat (!buat *oit!n +((* (!6abat (!lasana !nis *!)iatan

    *uasa (!n))una An))a"an +*(A (MBA;GU;A; =ALA;

    Bina Ma")a DI;AS (*=AA; UMUM

    ASRIL5 ST.MT EDI WARMAN5 ST.MT

    ;I(. 19&3011$ 199903 1 004 ;I(. 19&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    162/199

    5 A.M

  • 8/12/2019 Laporan Dan Backup Data

    163/199

  • 8/12/2019 Laporan Dan Backup Data

    164/199

    "EMERINTAH #ABU"ATEN #ERIN!I

    'INA$ "E#ERJAAN UMUM

    PEMBAN2UNAN3 PENIN2KATAN INRASTRUKTUR PEDESAAN

    J. "ro. 'r.$r* $* M4+C $o*4 $H ) $g4* "

    TAHUN AN22ARAN "01#

    'I(I$I : 'I(I$I 6. "E#ERJAAN A$"AL

    "E#ERJAAN : L4*+4 R+4 "g*4- ) A+4 !4*r, L4+-o L4*+ A-4r4 ;A!)=!< ;Gr44+* H4+>#4+4r< A+4 M*?4, B44 "g*+* ;*r< T444

    NO. ITEM : 6.1 ;1

  • 8/12/2019 Laporan Dan Backup Data

    165/199

    : BINA MARGA

    : "ENING#ATAN JALAN #ABU"ATEN

    : JALAN "EN'UNG $EMURU" ) #EMANTAN

    : $"M#.018>"AN)II>"U>2013

    : #E!ATAMAN AIR HANGAT TIMUR

    : !(. MA#BUL

    : #ONTRA#.018>"AN)II>"U)2013

    RA# 7 *O;A* ADD.1-01%(A;-II(U-2013

    AR

    A! ) =!

    Agrg4- A! ) =! A+4 M*?4 *r L4*+ R+4 "

    #oo+*+*(o ;ToON RI>A

    ;I(. 095%0 404 19%$11 1 001

  • 8/12/2019 Laporan Dan Backup Data

    183/199

    DIKETAHUI OLEH : DISETUJUI OLEH :

    (!6abat (!buat *oit!n +((* (!6abat (!lasana !nis *!)iatan

    *uasa (!n))una An))a"an +*(A (MBA;GU;A; =ALA;

    Bina Ma")a DI;AS (*=AA; UMUM

    ASRIL5 ST.MT EDI WARMAN5 ST.MT

    ;I(. 19&3011$ 199903 1 004 ;I(. 19&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    184/199

    5 A.M

  • 8/12/2019 Laporan Dan Backup Data

    185/199

  • 8/12/2019 Laporan Dan Backup Data

    186/199

    PEMERINTAH KABUPATEN KERINCI

    BI'ANG : BINA MARGA

    #EGIATAN : "EMBANGUNAN JALAN

    DINAS PEKERJAAN UMUM"E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    JENI$ "E#ERJAAN : GALIAN UNTU# $ELO#AN 'RAINA$E 'AN $ALUR

    PEMBAN2UNAN JALANLO#A$I : #E!AMATAN AIR HANGAT

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    BACK UP DATA @INAL UANTITSKETSA GAMBAR

    (*=AA; 7 Baan (!n)isi +ill!" abaan *O;A*O 7 V. MA*BUL

    ;O. IM 7 $.3.10

    ;O. SAIO;A - /

    (S;AS VOLUM +*G *M3 O;

    1 0C000 - 0C050 24.3$ 1.90H 0.4$

    2 0C050 - 0C100 24.3$ 1.90H 0.4$

    3 0C100 - 0C150 24.3$ 1.90H 0.4$

    4 0C150 - 0C200 24.3$ 1.90H 0.4$

    5 0C200 - 0C250 24.3$ 1.90H 0.4$

    $ 0C250 - 0C300 24.3$ 1.90H 0.4$

    & 0C300 - 0C350 24.3$ 1.90H 0.4$

    % 0C350 - 0C400 24.3$ 1.90H 0.4$

    9 0C400 - 0C450 24.3$ 1.90H 0.4$

    10 0C450 - 0C500 24.3$ 1.90H 0.4$

    11 0C500 - 0C550 24.3$ 1.90H 0.4$

    12 0C550 - 0C$00 24.3$ 1.90H 0.4$

    13 0C$00 - 0C$50 24.3$ 1.90H 0.4$14 0C$50 - 0C&00 24.3$ 1.90H 0.4$

    15 0C&00 - 0C&50 24.3$ 1.90H 0.4$

    15 0C&50 - 0C%00 24.3$ 1.90H 0.4$

    1$ 0C&50 - 0C%50 24.3$ 1.90H 0.4$

    1& 0C%50 - 0C900 24.3$ 1.90H 0.4$

    1% 0C900 - 0C950 24.3$ 1.90H 0.4$

    19 0C950 - 1C000 24.3$ 1.90H 0.4$

    20 1C000 - 1C050 24.3$ 1.90H 0.4$

    21 1C050 - 1C100 24.3$ 1.90H 0.4$

    22 1C100 - 1C13& 1%.03 1.90H 0.34

    JUMLAH 1%."2"

    D3 P+3 O* :PENGAWAS LAPANGAN KONSULTAN PENGAWAS

    DI*SI *;IS Su'!"isi n)in!!" Ins'!to"

    SSA 0C000

  • 8/12/2019 Laporan Dan Backup Data

    187/199

    MASDIONO ANDRI KURNIAWAN5ST SANISMAL5 A' MAI>

    ;I(. 095%0 404 19%$11 1 001 (!l

    DISETUJUI OLEH :

    (!6abat (!lasana !nis *!)iatan

    (MBA;GU;A; =ALA;

    DI;AS (*=AA; UMUM

    EDI WARMAN5 ST.MT

    ;I(. 19&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    188/199

    N AIR

    A;GA;

    Dibuat Ol! 7

    V. MA*BUL

    A 1C13&

  • 8/12/2019 Laporan Dan Backup Data

    189/199

    N RI>ANDA5 A.M

    sana La'an)an

  • 8/12/2019 Laporan Dan Backup Data

    190/199

    PEMERINTAH KABUPATEN KERINCI BI'ANG : BINA MARGA

    DINAS PEKERJAAN UMUM #EGIATAN : "EMBANGUNAN JALAN

    PEMBAN2UNAN JALAN "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    LO#A$I : #E!AMATAN AIR HANGAT

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    REKAPITULASI

    ;O. DIVISI UAIA; (*=AA; SAUA;

    DIVISI #. PERKERASAN ASPAL

    $.3.10 Baan (!n)isi +ill!" abaan *)

    JUMLAH K,

    DIPERIKSA OLEH : '

    PENGAWAS LAPANGAN KONSULTAN PENGAWAS CV

    DI*SI *;IS S&p+33 E0,30+ I+-or "4

    MASDIONO ANDRI KURNIAWAN5ST SANISMAL5 A' MAI>ON

    ;I(. 095%0 404 19%$11 1 001

  • 8/12/2019 Laporan Dan Backup Data

    191/199

    DIKETAHUI OLEH : DISETUJUI OLEH :

    (!6abat (!buat *oit!n +((* (!6abat (!lasana !nis *!)iata

    *uasa (!n))una An))a"an +*(A (MBA;GU;A; =ALA;

    Bina Ma")a DI;AS (*=AA; UMUM

    ASRIL5 ST.MT EDI WARMAN5 ST.MT

    ;I(. 19&3011$ 199903 1 004 ;I(. 19&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    192/199

    5 A.M

  • 8/12/2019 Laporan Dan Backup Data

    193/199

  • 8/12/2019 Laporan Dan Backup Data

    194/199

    PEMERINTAH KABUPATEN KERINCI BI'ANG : BINA MARGA

    DINAS PEKERJAAN UMUM #EGIATAN : "EMBANGUNAN JALAN

    PEMBAN2UNAN JALAN "E#ERJAAN : JALAN "EN'UNG $EMURU" ) #EMANTAN

    LO#A$I : #E!AMATAN AIR HANGAT

    KONTRAK NO. KONTRAK.0183PANII3PU"01#

    REKAPITULASI BACK-UP DATA

    ;O. DIVISI UAIA; (*=AA; SA VOLUM VOLUM *

    *O;A* ADD. 1 ALISASI (*. AMB

    1 2 3 4 5 $ &

    DIVISI 1. UMUM

    1.2 MOBILISASI LS 1.00 1.00 1.00

    DIVISI 2. DRAINASE

    2.1 Galian S!loan D"ainas! #an Salu"an Ai" M3 14$.20 103.5$ 105.%&

    DIVISI ". PERKERASAN BERBUTIR

    5.1.1 La'is (on#asi A)"!)at *!las A M3 2&3.00 194.00 195.&0

    DIVISI #. PERKERASAN ASPAL

    $.1 +1+a La'is !sa' (!n)iat - As'al ai" Lit!" 3,%50.00 3,9&2.50 3,990.00

    $.3 +5a on 492.52 512.$1 514.%$

    $.3.%.a As'al Mina on 2%.$9 29.%$ 29.99

    $.3.10 Baan (!n)isi +ill!" abaan *) 10,094.&0 10,50$.4& 10,552.%

    &.9 (asan)an Batu *ali M3 - 52.$0 53.15

    3.3 ibunan ana Di#atan)an M3 - 35.5% 40.15

    DIPERIKSA OLEH :PENGAWAS LAPANGAN KONSULTAN PENGAWAS

    DI*SI *;IS SU(VISI ;GI; I;S(*U

    MASDIONO ANDRI KURNIAWAN5ST SANISMAL5 A' K

    ;I(. 095%0 404 19%$11 1 001

    DIKETAHUI OLEH : DISETUJUI OLEPPK B-&> B& M&>&3K+&*& P$>>+& A>>&& "EJABAT "ELA#$ANA #

    DINAS PEKERJAAN UMUM KAB. KERINCI "EMBANGUNAN JA

    'INA$ "E#ERJAAN U

    Laston La'is Aus +A-/ +)"a#asi alusasa"

  • 8/12/2019 Laporan Dan Backup Data

    195/199

    ASRIL,ST,MT

    NIP. 19!#011619990#1004

  • 8/12/2019 Laporan Dan Backup Data

    196/199

    A;GA;

    (*. *UA;G

    %

    '*4- O :

    -r4-or "4+44

    !(. MA#BUL

    AR RAHMAN, SH

    '*r-r

    IATAN

    N

    UM

  • 8/12/2019 Laporan Dan Backup Data

    197/199

    T

    006

  • 8/12/2019 Laporan Dan Backup Data

    198/199

    (!6abat (!lasana !nis *!)iatan

    BIDA;G BI;A MAGA

    DI;AS (*=AA; UMUM

    DI MAMA;, S, M

    ;I(. 19&$020% 200&01 1 00$

  • 8/12/2019 Laporan Dan Backup Data

    199/199

    Di'!"isa ol! 7 Ol!

    *onsultan (!n)a