LAO PEOPLE’S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY ___________________________________________________________________________________________________________ ELECTRICITE DU LAO Champasack Province - SPRE II Environmental Management Plan (EMP) Sub-project : Soukhouma District, Champasack Province 2005 Table of Contents Environment Part BANFAI, NONGBONE ROAD, P.O. BOX 309, VIENTIANE, LAO PDR. TEL: (856-21) 451521, 31-171, 172, TLX: 4311 EDL VTE LS, FAX: (856-21) 415039 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
20
Embed
LAO PEOPLE’S DEMOCRATIC REPUBLIC · Mr. Sang Head of village Mr. Bounthanh Security Mr. Chanh Deputy head of village (Economic) Mr. Souan Village elderly Mrs. Douangpha Woman union
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
1. Objective of the EMP 2. Sub-Project 3. Mitigation 4. Monitoring 5. Institution Arrangement
a. Instutional Responsible and Capacity b. Environment Information Flow
6. Consultation with Local and Affected Groups 7. Schedule
Social Part
8. Property affected datasheet
1
1. Objective of the EMP
The objective of the EMP to assist Champasack EDL brand staff, responsible and carry out the mitigation and monitoring of the environmental impact associated with construction of transmission lines to the villages. 2. Sub-project Description This sub-project will be constructed along exsting road to proposed electify villages. Some area is decradation forest, paddy filed of villagers in each village. The line route selection was fully consulted with villagers in each village this is to minimise enviroenmntal impact and avoid distrub to villager’s properties. In case of can not avoid the impact and need to be removed tree from the line. Villager will full coorperate and will not request for any compensation. • Technical Description of the sub[project
Medium Voltage Low Voltage Village House
hold 22 kV
Line (m) Number of Concrete
Pole
Number of Transfor- mers
0.4 kV Line (m)
Number of Concrete
Pole Pakor 119 1 2,335 49 Bak 64 1 3,320 72 L95 Noneyang-Donekhok ngua
Because of the power line will be passed through the old line, so no need to build a new power line, avoid to damage an environment anymore.
Phase Issues Mitigation Measure Responsible
2
Cr
utting the trees out of the ight-of- way construction.
- Before construction will mark the line route and the trees exactly which one will be cut, for avoiding to damage the properties as least as posible.
EDL & Contractor
Noise pollution - Construction would only take place during daytime hours, and if construction during local holiday is required, the local affected people would first be consulted sufficiently far in advance.
Contractor
Dangerous from construction to the nearest population center
- Notice a sign for danger during the construction.
Contractor
Construction
Injuring and sickness of the workers
- Health and safety plan should be followed periodically, and should have medicine for the site.
Contractor
Ope
ration Clearing and cutting the trees
by the way of the construction - Pay attention for cutting the trees and
do not burn the trees under the power line.
EDL & local village
4. Monitoring Plan
Phase What
Parameter is to be monitored
Where Is the parameter to be monitored/type of monitoring equipment?
How Is the parameter to be monitored/type of monitoring equipment?
When Is the parameter to be monitored frequency of measurement or continuous?
Responsibility
Construction
Healt and safety of the workers
Right-of-way construction 22kV and 0,4 kV
− Review of healthy and safety of the contractor’s workers and population.
Monthly review of Contractor’s Health &Safety Plan before construction begins; monitor worker health and safety periodically
EdL; and Independent Third Party Monitor
Operation
Substation transformer insulating and cooling oils leaks to contaminate water courses or soils
Transformer − Daily inspection on leaking of the transformer, cleanout and disposal of any spilled insulating/ cooling oils
As per EdL substation systems inspection schedule
EDL and population report
3
5. Institutional Arrangement
5.1 Institutional Responsibility and Capacity
Environment unit is part of the planning division and under EDL branch and will
be report this organization. For the best activities will be cordinated with district and
village concerned in this sub-project.
5.2 Environmental Information Flow Environment unit will report directly to the head of planning Division, Director of EdL Branch ESU in Vientiane, EDL and reporting need to be send to the District also.
6. Consultation with Local People and Project Affected Groups
4
Consultation • Date/venue of consultation meeting Date: 22.02.04 Venue: Pa kor village
Participants Name Responsibility Mr. Bounmy Head of village Mr. Sitha Deputy head of village Mr. South Deputy head of village Mr. Chanesy Village elderly Mrs. Thoumma Woman union Mr. Thong Youth
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Bounmy Village head EdL staff
5
Consultation • Date/venue of consultation meeting Date: 23.02.04 Venue: Bak village
Participants Name Responsibility Mr. Thone Head of village Mr. Bountheng Deputy head of village (Economic) Mr. Phanh Village elderly Mr. Thom Village elderly Ms. Boua Woman union Mr. Phim Youth
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Thone Village head EdL staff
6
Consulatation • Date/venue of consultation meeting Date: 22.02.04 Venue: Nonephachao village
Participants Name Responsibility Mr. Chanhsay Head of village Mr. Dy Security Mr. Say Deputy head of village(Economic) Mr. That Village elderly Mr. Vieng Forest Ms. Ngyien Woman union Mr. Som ath Youth
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Say Deuty village head EdL staff
7
Consulatation • Date/venue of consultation meeting Date: 20.02.04 Venue: Phone village
Participants Name Responsibility Mr. Sang Head of village Mr. Bounthanh Security Mr. Chanh Deputy head of village (Economic) Mr. Souan Village elderly Mrs. Douangpha Woman union Mr. Chanh Forest Mr. My Youth
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Bounchanh Village head EdL staff
8
Consultation • Date/venue of consultation meeting Date: 20.02.04 Venue: Kouttaboun village
Participants Name Responsibility Mr. Chanhsom Head of village Mr. Thavone Security Mr. May Deputy head of village (Economic) Mr. Phavone Village elderly Mrs. Phanh Woman union Mr. Phanh Security Mr. Keo Security Mr. Pha Youth
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Thavone Keomany Village head EdL staff
9
Consultation • Date/venue of consultation meeting Date: 19.02.04 Venue: Khok nongbua village
Participants Name Responsibility Mr. Bounlouan Head of village Mr. Phanh Security Mr. Bounlom Deputy head of village (Economic) Mr. Pheng Village elderly Ms. Chanh Woman union Mr. Pok Youth
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Bounlouan Village head EdL staff
10
Consultation • Date/venue of consultation meeting Date: 19.02.04 Venue: Thadane village
Participants Name Responsibility Mr. Chanhtho Head of village Mr.Vone Deputy head of village (Economic) Mr. Keo Security Mr. My Village elderly Ms. Nith Woman union Mr. La Forest Mr. Vanh Youth
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Keo Deputy village head EdL staff
11
Consultation • Date/venue of consultation meeting Date: 21.02.04 Venue: Kok village
Participants Name Responsibility Mr. Veng Head of village Mr. Thong Security Mr. That Deputy head of village(Economic) Mr. Bounthat Village elderly Mr. Nyvone Woman union Mr. Lien Forest Mr. Somchit Youth
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Bounthong Village head EdL staff
12
Consultation
• Date/venue of consultation meeting Date: 21.02.04 Venue: village
Participants Name Responsibility Mr. Ki Deputy head of village (Economic) Mr. Sing Deputy head of village (Education& Health) Mr. Suthat Deputy head of village Mr.Vanh Village elderly Ms. Phet Woman union Mr. Noukham Forest Mr. Kong Youth Mr. Noukham
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Khasing Bounyadeth Village head EdL staff
13
Consultation • Date/venue of consultation meeting Date: 20.02.04 Venue: Mak mi village
Participants Name Responsibility Mr. Lien Secretary of politic unit Mr. Done Deputy Secretary of politic unit Mr. Nom Village elderly Mr. Liem Village elderly Ms. Deng Woman union Mr. Nak Security Mr. Ome Security
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Lien Village head EdL staff
14
Consultation • Date/venue of consultation meeting Date: 20.02.04 Venue: Huadonesay village
Participants Name Responsibility Mr. Pone Head of village Mr. Leuang Deputy of secretary politic unit Mr. Deng Deputy Head of village Mr. Bounsyphanh Village elderly Mrs. Keo Woman union Mr. Nouan Youth
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Pone Village head EdL staff
15
Consultation • Date/venue of consultation meeting Date: 21.02.04 Venue: Toum noy village
Participants Name Responsibility Mr. Thou Secretary of politic unit Mr. Meuy Deputy head of village (Economic) Mr. Chanhphoune Village elderly Mr. Vanh Village elderly Mrs. Khamphanh Woman union Mr. Chanthone Youth
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Meuy Veosy Village head EdL staff
16
Consultation • Date/venue of consultation meeting Date: 21.02.04 Venue: Toum yai village
Participants Name Responsibility Mr. Bounhieng Head of village Mr. Syboun Security Mr. Mr. Keo Deputy head of village (Economic) Mr. Phoumy Village elderly Mrs. Boualone Woman union Mr. Inpanh Security Mr. Kanha Security
Agenda: 1. Discussion about construction of 22 kV and 0,4 kV transmission line in the village.
How to minimum the impact to environment village proerty. Summary minute of meeting, comment, question and response by presenter. 1. All villagers agreed for survey and happy if village will have electricity soon. For the
trees which have to cut for construction of the line, they agreed to cut and no need to get any compensation, during the construction they will provide labour and give the place for construction team to live.
Sealed and signed Signed Bounhieng Village head EdL staff
17
7. Schedule
Sub-project Soukhouma Dist.
Champasack Prov.
Construction (day)
Operation
22kV 0,4kV 22kV 0,4kV Transformer Pole
election
Line stringing
Pole election
Line stringing
Pakor 4 31 2 times/ 2 times/ year year
Bak 6 8
L95 Noneyang-Donekhok ngua
7 10
Nonephachao 3 6 3 16
Phone 2 5 2 9
Koutaboune 2 5 3 15
Khoknongbua 3 8
Thadane 2 5 3 10
L99 Thahea-Bankok-Omdonesay
7 12
Kok 5 26
That 13 36
Makmi 3 12
Huadonesay 5 24
Toum noy 5 10
Toum yai 5 10
Based on those above schedule for the mitigation and monitoring could be: