Lannavaara Iron Project An Opportunity For Port – Rail – Pipeline 19 September 2014 Alta, Norway
SCANDINAVIANRESOURCES AB
Ownership Structure
2
Hannans Reward Ltd Est. 2002
Listed on the Australian Securities Exchange Based in Perth, Australiawww.hannansreward.com
Scandinavian Resources AB Org No. 556737-6263
Est. 2008Based in Malå, Sweden
100%
SCANDINAVIANRESOURCES AB
Introduction to the Concept
• Potential to be a large, long-life (+25 year) project.
• High iron content product (+69% Fe) in low sovereign risk jurisdictions.
• The Project comprises exploiting a large magnetite iron resource at Lannavaara,
converting the ore into a high quality iron product, transporting the product 170km
to an ice-free, deep-water port and shipping the product to market.
• The Project is at the Conceptual Stage: social, environmental, infrastructure,
marketing, processing, mining and exploration related investigations are at early
stages.
3
SCANDINAVIANRESOURCES AB
Lannavaara Iron Project - A Lengthy Process
4
Explore for Iron DepositsExplore for Iron Deposits
Mine Rock and Extract OreMine Rock and Extract Ore
Process Ore into Iron ProductProcess Ore into Iron Product
Transport Iron Product on New Rail with Finnish Gauge or Pipeline
Transport Iron Product on New Rail with Finnish Gauge or Pipeline
De-Ice, Unload & Store Product in the Mountain
De-Ice, Unload & Store Product in the Mountain
Reload the Ship at the Quay Reload the Ship at the Quay
Transport to MarketTransport to Market
SwedenSweden
FinlandFinland
NorwayNorway
Social & Cultural
Environmental
Stakeholders
Shareholders
SCANDINAVIANRESOURCES AB
Rail / Pipeline – Unloading & Storage
7
Underground (in-the-mountain) de-icing, unloading facility (or dewatering) and storage facility which limits dust, noise and impact on the nature
Rail or pipeline
Note: This image is for illustration purposes only and has not been the subject of analysis by SRAB
SCANDINAVIANRESOURCES AB
Quay & Shiploader
9
Note: The shiploader is for illustration purposes only and is not the property of SRAB.
SCANDINAVIANRESOURCES AB
Rail Logistics Assumptions
10
Assumptions
Locomotives Diesel / LNGPort Capacity 8Mt pa (with options for expansion)Vessel Capacity 250,000DWTRail Gauge Finnish standard (25 tonne axle-load and 8 t/m)Wagons 100t total weight, loading 80t of product, 12.5m long and 46
wagons in totalTonnes of Ore Per Train 3,680t of oreStandard Train Length 675m (including locomotives)Trains Per Day 7 (planning caters for 8)Train Cycle 12 hoursMarshalling & Train Movements in the Port
Before entering the mountain
Ore Handling In the mountainQuay & Shiploader The center of the ship loader is the only real quay, the vessel
is moored and resting at 5 strong mooring points with fender system, adapted to tidal waters.
Power Requirements 3,700 kWRock Excavation 335,000m3
SCANDINAVIANRESOURCES AB
Energy in Lapland – Supply, Demand & Security
Lannavaara Iron Project may present catalyst for new business opportunities in Lapland (e.g. supply of LNG / NG)
What is the demand for LNG / NG in Lappland?• Industry
– Norrbotten & Finnish Lapland• Power Generation
– Sweden & Finland
Skibotn could provide LNG:• Storage & Bunkering
LNG can be transported by:• Truck and Rail
NG could be transported by:• Pipeline
11
SCANDINAVIANRESOURCES AB
Stakeholder Briefings
12
Muonio Kommun
Tunturi-Lapin Kehitys Tapani Haapasaari
Kolari Kommun
County of Troms
City of Tromsø
Port of Tromsø
Troms Chamber of Commerce
Confederation of Norwegian Enterprise
Storfjord Kommun
Enontekiö Kommun
Kiruna Kommun
Luleå University of Technology
Regional Council of Lapland
Reindeer Herders' Association, Finland
Käsivarsi cooperative
Lapland Chamber of Commerce
Lannavaara and Övre SoperoCommunities
Norwegian Public Roads Administration
Joint Barents Transport Working Group
Finnish Transport Agency
SCANDINAVIANRESOURCES AB
Next Steps
Communications
• Stakeholders – Introductory Meetings completed
Scoping Study
• Unloading, Storage & Reloading – completed
• Concentrate & Gas Pipeline – initiated
• Rail – tender process completed
• Social & Environment – tender process initiated
• Legal & Permitting – tender process initiated
• Completion Date – December 2015
13
SCANDINAVIANRESOURCES AB
Contact
14
For more information please contact:
Damian Hicks Managing Director Scandinavian Resources AB +46 703 220 226 (M)[email protected] (E)
Amanda ScottExploration DirectorScandinavian Resources AB +46 703 221 497 (M)[email protected] (E)