200 Gii1irigi:aiii Lane Sugai Laiid, T i c 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection Branch 61 1 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011 RE: Source Abandonment for Devon Energy Corporation: Coyote Flats Unit 14H-36-14-100 Dear Sir or Madam: This letter is to confirm the abandonment of irretrievable sources in a well in accordance with Part39, Section 39.77(d). Information for this abandonment is attached. If you have any questions or require additional information, please contact me at 281-285-7460. Sincerely, Thomas S. Wood Deputy Radiation Safety Officer Sc hIu m be rg er Technology Corporation
22

Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Jul 05, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711

December 30,2008

United States Nuclear Regulatory Commission Region IV- Materials Inspection Branch 61 1 Ryan Plaza Drive, Suite 400 Arlington, Texas 7601 1

RE: Source Abandonment for Devon Energy Corporation: Coyote Flats Unit 14H-36-14-100

Dear Sir or Madam:

This letter is to confirm the abandonment of irretrievable sources in a well in accordance with Part39, Section 39.77(d). Information for this abandonment is attached.

If you have any questions or require additional information, please contact me at 281 -285-7460.

Sincerely,

Thomas S. Wood Deputy Radiation Safety Off icer Sc h Iu m be rg er Techno logy Corporat ion

Page 2: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Date of Occurrence:

Source #1 Identification: M an uf a ctu rer: Model: Depth:

Source #2 I de ntif i c at ion: Manufacturer: Model: Depth:

Source #3 Identification: Manufacturer: Model: Depth:

Well Identification:

Seal Results:

Re cove ry Attempts:

Depth of Well:

Identification:

Reports:

Initial Telephone Contact:

Source Abandonment - Devon Energy Corporation Well: Coyote Flats Unit 14H-36-14-100

December 20,2008

592 GBq (16 Ci), Am241Be, Neutron Source, Serial # G2693 Monsanto Research Corporation

12,153' M D NSR-F

592 GBq (16 Ci), Arn241Be, Neutron Source, Serial # G5225 Gammatron, Inc.

12,167' MD NSR-F (AN-HP)

63GBq (1.7 Ci), Cs 137, Density Source, Serial#A5280 AEATechnology/ QSA Inc.

12,180'MD CDC.CY3 (GSR-J)

Company: Devon Energy Corporation Well: Coyote Flats Unit 14H-36-14-100 Field: Canyon Creek County: Swe etwa te r State: Wyoming API Number: 49-037-27747

310' of Class G, 17.5 ppg cement with Red Oxide Dye spotted in the annulus above the logging tool from 12,050'to 11,740'. A 600' kick off plug of Class G, 17.5 ppg cement was set from 10,950'to 10,350'. The casing liner set above the cement plug at the kick off point (KOP) will serve as the mechanical d ef I e cti on.

Multiple attempts from 12/10/08 to 12/20/2008

12,200'

Plaque as required by Part 39 ordered and will be attached to the well.

No other agency will receive a copy of this report,

Mr . Jack Whitten, NRC-Region IV on 12/16/08 @ 13:15 CST

Page 3: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

ABA EPORT a Offshore (OCS Waters) Land or State Lease Waters Date: 12/10/2008 Time: 1450

Company Name (Full Name): Devon Energy Corporation Well Name or (OCS-G No. or State Lease No.): Coyote Flats Unit 14H-36-14-100 Offshore State of: Wyoming Rig Name: Unit 112 API Number (If Available or CLSD): 49-037-27747 Field Name: Canyon Creek Lease Location (legal): 726' FSL 1189' FWL Sec 36 Township 14N Range IOOW County or Parish: Sweetwater State: Wyoming District: Rock Springs, WY Sales Engr: Trey Stearns TD: 12,200' Hole Size: 6.125" Deviation: Casing Depth: 10,548' Casing Size: 7.0" Depth of Fish (Top): 12,093' Bottom of Fish: 12,200' Source Type (1): NSR-F Source Type (2): GSR-J Source Activity (1): 592 GBq Source Activity (2): 63 GBq Serial No. (1 1: A2693/G5225 Serial No. (2): A5280 Isotope (1): AM241BE Isotope (2): CS-137 Depth (1): -12,153'/-12,167' Depth (2): -12,180' Leak Test Date (1): 10/06/2008 Leak Test Date (2): 10/06/2008 Leak Test Results (1): 5.1 19E-0006 uCi Tool String (Head to Bottom): LEH-QT; EDTC; ECC-A; ECS-A; AH-107; HGNS; HRCC; HRMS;

Date and Time Stuck: 12/10/2008 @ 1450 Date and Time Cement Pumped: 12/20/2008 @ 20:OO Hole Conditions: Hole was cased down to 10548 ft with 7in casing. Hole was drilled with 6.1 25in

Fishing Attempts: I st fishing attempt conducted with a 4.75in guide shoe and spiral grapple for the 3 5i8in section of tooi. ijnabie to engage grappie and after aiiempting to engage severai the weak point broke. 2nd attempt went in with washover pipe but it was not large enough to go over the 5in section of tool. 3rd attempt went back in with grapple and overshot. Comments (what happened to get stuck?, etc.,): Ran in hole with toolstring, tagged TD and we were unable to come off TD. Multiple fishing attempts were made but we were unable to retrieve fish.

Leak Test Results (2): 2.940E-005 uCi

HRGD; AH-107; AIT-M

bit. Some washouts and minor bridges encountered on way in hole

NOTE: Regulatory agencies should be contacted ONLY by the Schlumberger Technology Corporation (STC) Radiation Safety Officer or, if unavailable, his designee.

Page 1 of 2 Rev 7/08

Page 4: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Notified: NRC or State of : NRC - Region IV

Name: Mr. Jack Whitten Name: Date: 12/16/2008 Date: Time: 13:15 CST Time:

ABANDONMENT The following is a summary of NRC and/or Agreement States regulations that mus tbe followed when abandoning an irretrievable well logging source(s). The specific regulations are found in 10 CFR 39.1 5 and equivalent regulations in Agreement States. An irretrievable well logging source means any licensed radioactive sealed source that becomes lodged in a well and cannot be retrieved after reasonable efforts have been made to recover the source(s).

If a well logging source is irretrievable, the following requirements must be implemented.

a) The source(s) must be immobilized and sealed in place with a cement plug. The cement has to be dyed red in Texas as a condition of the Texas Railroad Commission (others occasionally).

b) A mechanical deflection device must be set at some point in the well above the cement plug to prevent inadvertent intrusion on the source, unless the cement plug and sources(s) are not accessible to any subsequent drilling operations. The mechanical device can be devices such as a whipstock, old drill bit, etc. For LWO, drillpipe and/or collars left on top of the BHA usually are approved as a deflection device.

c) A permanent identification plaque, (supplied by the STC RSO) made of stainless steel (or brass, bronze and monel), must be mounted at the surface of the well unless the mounting of the plaque is not practical (Le. subsea completion).

The STC RSO (or his designee) wil l notify the NRC or Agreement State of the abandonment plan developed by/with the client. The NRC or Agreement State must approve the abandonment plan prior to implementation. The federal and/or state oil and gas well permitting agency must also approve the abandonment plan. The contact with the well permitting agency is the responsibility of the well owner/client but we should advise him/her of that fact as a courtesy.

If any changes must be made to the abandonment plan submitted to the NRC or Agreement State, the STC RSO must be informed so that he/she can get approval of the modification, as appropriate. The actual abandonment must not begin until any abandonment plan or modification to that plan is approved by the appropriate agency.

The STC Radiation Safety Officer must file a written report with the NRC or Agreement State after the abandonment. The facility management shall file a written report within 7 days to the STC Radiation Safety Officer. The facility report should cover the final abandonment details such as:

a) Actual date of abandonment.

b)

c)

d)

e)

Any changes in the data sent with the approved abandonment plan.

Detailed Well Schematic depicting location and depth of tool(s), source(s), drill pipe, plugs, deflection device etc.

Any information pertinent to the abandonment that the STC RSO may not have for his/her final report.

If all data sent to the STC RSO is still applicable for the final report, an e-mail or fax is to be sent to the STC RSO confirming that fact so that he/she can be ensured that the data sent to the appropriate agency is totally accurate. Most facilities send a completely new report since many these documents often are incomplete or are poor quality fax reproductions.

If there are any questions regarding these procedures, discuss them with your Operations Manager.

FACILITY MANAGEMENT MUST ENSURE THAT THE FINAL ABANDONMENT REPORT IS SUBMlllED TO THE STC RADIATION SAFETY OFFICER.

Page 2 of 2 Rev 7/08

Page 5: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Wellbore Diagram

Casing/ Hole Size

10,350’ Top of KO Plug

7” Css @. 10,548‘

10,600’ KOP

10,950’ Bottom of KO Plug

11,740’ Top of Cement Plu!

12,093’ Top of Tool

TD @ 12,200’ MD

Page 6: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection
Page 7: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Page 1 of 2

DATE: 12/20/2008 co FLATS

ONSHO ...... . ... . ..______ .. .. -- ..

SPUD D A W 11/5/2008 MOUNTAIN TIGHTGROUP: RUBICON HORSE LOCATION: SEC 36-TI4N-RlOOW LAT-LONG: 41.137 N - 108.620 W FORMATION: BAXTER 3rd SILT PROJECT: GREEN RIVER KB ELEV 7,070.70 LITHOLOGY SOW SHALE I 10% SAND FIELD CANYON CREEK WI: 100.00000 DEPTH: 12,200 DSS: 45.00 FOOTAGE: COUNTY: SWEETWATER

PROP. #: 30517-010 AFE DRLG COS% 7,083,000 AFE COMP COST: 4,114.400 AFETOTAL COST 11,197,400 0 DAILY TOTAL COST 336,159 AUTH TVO: 11.880 IR) DAILY DRLG COST 336,158 DAILY COMP COST:

API: 49-037-27747 RIG NM I NDUNIT DRILLING I112 ....... ... ...

RIG PHX: 1-307-212-4164 ~.

STATE: WY AFE#r??27-_ . _.___ ............. __ ..... ...

. . 0 CUM TOTAL COST: 4,486.532

~

CUM DRLG COST 4486.532 CUM COMP COST: AUTH TMD: 15,072 (ft) .....

I_ -.

- - - - NO BIT DATA TODAY

-

MW 1270 011 VISC 85 10secGeI 13 PH 1000 10minGel 17 Chl 800 CA WL 650 Pm HTHP FC 1 5 0 Ex Lime PV 30 ElecStab YP 29 MBT 1600

_ _ ~- -~ --__

2806 AV(DC) 440 3

SLOW PUMP RATES __ -

LCM: LGS:

Dally Mud Losl to Hole: Cum Mud Lost to Hole:

~.

_____- ........

, - ~ I

3791.00 ' 3.00 ~ 3.151.84 4:236.00 2.00 ~ 3.596.21 4,680.00 ' 3.75 1 4,039.83 5.161.00 1 4.00 14.518.53 5i631.00 1 3.00 ~ 4.988.85 6.008.00 4.00 5364.94 6.873.00 3.00 j 6.028.69 6 961.00 2.00 6.316.41 7:171.00 1 2.00 j 6,526.29

5878 -L- -

bbls Daily I Cum Mud 2 841 0 bbl Conn Gas _- -__-

SURVEYS (Sideirack~OH) _ _ MD I Anale iTvD LDW vsect +N/-s ~- -

3854 8407 4744 10348 5765 12575 7258 15825 6571 16695 i ~ 8627 20906 11488 25056 12084 26312 1 1 12400 27045

0 22 0 22 0 39 0 05 0 21 0 27 0 15 0 35

I 768500 ' 400 ~ 7,65878 j 144 50 ~ 38 19 -21774 15531 005 6:05500 1 500 6,04757 14080 4370 -241 94 I 17400 027

Total BHA Length 889700 670 8,885 17 1 13220 ~ 6861 -30330 I 23368 023 8'99000' 670 687753 131 50 1 7247 -31054 241 76 009 Q30100 1 630 8'28653 I 12970 6571 -33346 I 26846 o 14 StnngWtUp Rolatlng Stnng Wt 9:65400 1 660 9:63735 151 80 1 9360 -36371 29287 070 ~ ( r ~ n g w ~ o _ w n BHAHrLEstlnsp - _ __

G p l h 10,548 FIT 15 00 Size 7 000 Wt 26 00 Grade P-110 Connecllon LTBC Nexl Casing 4 500 @ 15,072 00 La51 BOP Test Date 12/2/2008 Accidenl N Loss Control Inc 24 Hr Forecast TIH TO TOP OF PLUG SET OPEN PLUG

~ ~~~ __

- ____.. _______. . -~ - __ LAST CASING I BOP I NEXT CASING __ __ ________ - - ~ _ _ -

TOTAL PLAN v8 ACTUAL DAYS ~ _- __ __ CUM NORMAL vs NPT DAYS _________- - TODAY - -- - _____ -

43.10 (82.1OYr--- I PLANNED 58.0 I - 6 2 60(9052%)]

17.50 (72.92%) 7 NORMAL OPS 650(2708ng ] NPTOPS 9 40117 SO%)-- ACT (W/NPT)

-__- - NORMAL OPS NPT OPS _. __ _ -

0 hours 2400 0 davs 5250 I 0 davs 5800

From To IE 0500 0700 200 0700 0930 250 09 30 , 10 00 0 50

21 00 2230 150

2230 0500 650 I

- _ _ _ _ _ - COSTS SUMMARY Activity LasLZcHours 1 - _____ - - -

'ro-b?l- - _ _ _ _ - ~ - COSIS - - Code Oescnption . - --- . - __ NO RUN FMI AND SONICSCANNER

NO WD WIRE LINE TRUCK 206443 1 Tiooa Healer 500 00

500 00 21 800 00

NO RIG SERVICE NO P/U717'FEETOF23/8TUBlNGTIH WITH 11333FT35

DRILL PIPE TAGGED FISH AT 12093'PULL UP HOLE TO 12060' CIRCULATE BOTTOMS UP MA% GAS 5471 UNITS NO FLARE MIX AND PUMP 70 SKS 17 5 PPcl RED DYED CEMENT 11 7

NO NO

8eLs YIELD w BOTTOM OF PLUG AT izoeo' TOP OF ' PLUG AT 11740' DISPLACED WITH 84 BELS MUD NO POOH TO 1092O'COULD NOT CIRCULATE SURFACE

SAMPLE TAKEN AT 2030 HRS WOULD NOT POUR FROM CUP AT 2230 HRS POOH TO INSPECT 2 318 TUalNG YES

205103 DSA 206-103 Rotating Heed 208-103 Polnhle Water Camns 206-103 Trash Bin 206-103 centrifuge 208-103 T N Torque 208-103 While Water 'Water 206-103 /Camp House 208-103 Transformer 205103 EDR-Base System 205103 Whiie Watersewer 205103 Generator 206-103 Flare Slack 206-103 1 Man Lift 205-103 1 Forklift 206-103 'Hydraulic Choke 206-104 Smilh H E Jar 206-104

I -

FLOAT SUB 3 50" IF

Total Daily Cost I - F O i & 4 N BLACKWELL, SIONEYICAR- Cos1 to Dale

754.59 1,272.00 550.00 125.00 125.00 245.00

150.00 325.00 2oo.w 150.00 150.00 65.00

550.00 150.00 150.00 475.00 150.00 150.00 215.00 385.00

19.00

- . _.._____ 336,159

4,466,532

Page 8: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

~ ___ Code

206-104 206-104 206-203 206-257 206257 206289 206-281 206-302 206-307

. _- Description .~ ud Motor Iim Hole Equipment iRECTlONAL TOOLS ud Logger's 3G 6.125 HOLE upervision ommunications auling Water ig Fuel

_ ,la1 Daily Cost

Cumulative Cost to Dale

COS$ ____.__ -

3,839 00 1,734 50

810.00 297.934.67

2,650.00 235.00

-..-...___ 336,159

4.486.532

Page 9: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

11.5 In/ 12.5 Out 61 in/ 70 Out

BACK GROUND 5-30 Units CONNECTION

5459 Units

I

Midnight DEPTH: 12200 ft PREVIOUS DEPTH: 12200 ft TOTAL DEPTH: O f t

#-I

# 3 (7241') # 4 (9361') # 5 (1 0555) 6 118 Smith Mi516 (5116) # 6

## 2 (978)

#7

# 9 # 10 # -l1 # 12 13 14

ff 15 # 16

out of hole. easured while circulating.

3 3.7 %S

3'

90% Shale 10% Sandstone

Page 10: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Page 1 of 2

DATE: 12/21/2008 COYOTE -36-14-1OOH (0

DAILY DRLG REPORT . ~ .... ___ ___.~ - -

MOUNTAIN TIGHT GROUP RUBICON HORSE m T 60 SPUD DATE: 11/5/2008 LOCATION: SEC 36-Tl4N-RlOOW LAT-LONG: 41.137 N ~ 108.620 W FORMATION: EAXTERSKJ SILT PROJECT GREEN RIVER FIELD: CANYON CREEK WI: 100.00000 DEPTH: 12,200 DSS: 46.00 FOOTAGE: COUNTY: SWEETWATER

KE ELEV 7,070.70 LITHOLOGY 90% SHALE / l o % SAND

API: 49037-27747 RIG NM 1 NOUNIT DRILLING /11: RIG PH #: 1-307-212-4164

_-__ - .--- STATE: WY iAFE#:.144317_- PROP 30517010 i AFE DRLG COST: 7.LM3.000 --GE-COMF COST:-- ~ 4 ~ i ~ 4 , ~ 0 6 ~ ~ A F ~ L C O S T ~ ~ ~ ~ ~ ~ ~ l ~ O O - ~ ~ .-

0 DAILY TOTAL COST' 43,971 0 CUM TOTAL COST 4 530.503

AUTH TVD: 11,880 (R) j DAILY DRLG COST 43 971 DAILY COMP COST:

AUTH TMD: 15,072 (R) I CUM DRLG COST. 4.530 503 CUM COMP __ COST __ - - - - ___ BIT# SERIAL# TYPE SIZE I A O C ~ Y O T FEE 1 HRS ROP ~ JI 5 1 WOE RPM-' I F< G _ _ o 1 R _--L- -

____ ~- _ _ -- ~ __-_____.

- -____

PUMP #1 PUMP #2 PUMP #3 ___ __ MW 1240 Oil VISC 56 10secGeI 7 11 000 11 000 11 000 3H 950 10mlnGel 13 2hl 950 CA NL 680 Pm rlTHP 'C 150 ExLlme =V 24 ElecStab VP 23 MET 1650 .CM 3aily Mud Lost to Hole

~ ~ _ _ -

2606 AV(DC) 440 3

SLOW PUMP RATES__ - HP/ln2

____ PSI @ spr PSI @ y r __---____ -_

bbls Dally I Cum Mud Cost $5 896 / 267,909 3um Mud Lost to Hc -- - -

_ _ _ 3,791 00 300 4,23600 200 468000 375 5,16100 ~ 400 5631 00 , 3 00 6.00800 I 400 6,67300 , 300 8.861 00 I 200 7.17100 200

766500 400 805500 500 889700 670 899000 670 9,30100 630 965400 660 -

___ - 2,641 0 bbl Conn Gas Trip Gas Ekgrd Gas

SURVEYS (Sidstrack_::H) ___ BHA #; -

~ ____.._ - __ - - - TVD Dlr VSeu +N/-S +EI-W Oescnplion _ 1 OD-Lenslh - ______ __

3,151 64 3654 I 8407 3.596 21 4744 10348 I 4.51853 1 4.988 65 5 384 94 96 27 6:028 69 1 11488 25056 6 316 41 12064 I 26312 ' 6.526 29 12400 27045

765878 14450 38 19 ~ -21774 15531 804757 14060 4370 -241 94 17400 027 it

4,03963 1 5765 12575 ~

I i I

8,885 17 13220 6861 1 -30330 23368 0 23 897753 131 50 7247 3 1 0 5 4 241 78 0 0 0 .. .. 926653 12970 8571 -33346 26648 0 14 Slnng WtUp 963735 151 80 9360 -36371 29297 070 s~n,g_wt~own _. ._ ___

LAST CASING I BOP I NEX~CGSING

Tolat BHA Length Rotating Slrlng Wt BHA Hr Last lnsp

leplh 10.548 FIT 1500 Size 7000 Wt 2600 Grade P-110 connection LTBC Next Casing 4 500 I@ 15.072 00 ast BOP Test Dale 12/2/2008 Accident N Loss Control Inc 24 Hr Forecasl PIU DIRECTIONAL TOOLS WAIT ON CEMENT

roday (HRS) 1 00 - RIG DOWN TIME __ Cumm-(HRS) ____ 3000 ___ __ _

- NETLNALYSAS TO DATE - - -_ - ___ ___ __ I-- - CUM NORMAL vs NPT DAYS TOTAL PLAN vs ACTUAL DAYS

,PLANNED r--- - - - - _. - - __ TODAY

___ ____-_____- - 58.0 1- ~ORMAL OPS I 12.00 (50.00%) -

.IPT OPS 1 7 2 00 ($a.oo%) s 90 (18 50%) ACT (WINPT) 53 5F(92.24%3 -- 1- 0 hours 2400 0 days 5350 0 days 5800 1

%om/ To H r s Prob'll ActivityLast24 Hours - 05 00 08 30 I 3 50 I YES I POOH WITH 3 5 DRILL PIPE AND UD 2 318 TUBING FOUND ' 1 PERF JT PLUGGEDATTOPPERFERATION WITH WIPPER

1 1 PLUG 38 30 12 30 4 00 i YES WAIT ON 2 318 TUBING 1230 1830 600 ' NO P/U728FEETOF23/6TUElNGTRlPINHOLETO11162'

TRIED CIRCULATE, KELLY HOSE FROZEN

WAITTING ON CEMENT REPORT 19 30 1 00 YES WORKING WITH STEAM TRING TO UNPLUG KELLY HOSE

UP IN CASING KNOCK KELLY HOSE LOSE DRIVE BLOWING STEAM UP HOSE AN0 STAND

2300 01 30 250 NO TIHHOLETAGCEMENTAT11770'EOTTOMOFPLUGAT

11 30 1 02 30 1 00 NO POOH TO 10950' I2 30 1 03 00 13 00 I 05 00

12080' 290 FEET OF CEMENT

CIRCULATE BOTTOMS UP MAX GAS 2900 UNITS NO FLARE 0 50 2 00

NO NO I WU HALLIEURTON TEST LINE TO 5000 PSI PUMP 10

'EELS WATER 22 EELS CEMENT, 1 25 ELLS WATER AND DISPLACE WITH 74 EELS MUD. 10950'EOTrOM OF PLUG. j '

COSTS SUNI_AR Description _ _ ___ Code __

206-103 EDR-Ease System 206-103 ,Man Lift

206103 Generalor 206104 SmiVl H E Jar

- - 1- - __ Total Dally C % r FOREMAN CARLILE RONNIE Cumulative Cost Io Dale

- costs __

21,600 00 500.00 500.00

5.896.03 550.00

125.00 125.00 245.00 ?%.E 325.00 200.00 150.00 150.00 65.00

550.00 150.00 476.00 150.00 215.00 150.00 150.00 385.00

10.00 3.839.00

43,971 4,530,503

Page 11: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Page 2 of 2

DATE:

COSTS SUMMAR

14-36-1 4-1 OOH ( IG DRLG REPORT - _ _ _____ __ __ - _ _ _ -

Code Descnptlon ___ __ 206-104 Mud Motor 206-203 2 3 1 TUBING 206-257 Mud LOggefS 206-269 Supervision 206-281 'Communications

206-302 Hauling Water 206-302 /POTABLE

206-302 RIG WATER 206-307 Rtg Fuel

Cumulative Cost to Date:

12/21/2008

costs

860.00 810.00

2.650.00 235.00 692.00

2,260.00

43.971 4,530,503

Page 12: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

DEPTH: 12200 KELLY BUSHING: 7125 ft 12.3 In/ 12.2 Out Midnight DEPTH: 12200 ft 53 in/ 60 Out PREVIOUS DEPTH: 12200 ft

CONNECTION PEAK 2363 Units TRIP SHORT TRIP

# 2 (978') 8 7/8 Smith Mi516 (5146) # 3 (7241') # 4 (9361') # 5 (1 0555) # 6 #7

I SHOW I GAS BOP

9664 100

3798' # 10 # 'II Jie 12

3 lit 13 # 14 # 15 # 16

Units of gas measured while circulating.

3885 3.7 as

3'

90% Shale 10% Sandstone

Page 13: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

dd 2 - 3 sx of mil-min alr~le circulating ptk and hole to get v~scos~ty back down to 45 to cementing. Add more Dnii-Thin as needed to get the VIS. down to 45 - 50 sec/qt

Page 14: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Operator Devon I Company Rep Ronny I Contractor Unit Drilling Co. I Contractor ~ e p CIayne Coleman FieldlLease Hiawatha 1 Blk/Co/Parish Sweetvrater i Loc 536 T14N RlOOW I Ctrv/State United States Wvomino I lo Unit 112

,

I I I I I I

Entered Trucking charges for DT: 49206,49207, 19503, and 49504. TIH, circulated bottoms up for 1 1/2 hours. Held Safety meetmg with cem2nten and cemented. Th2 stinger plugged off with cement before first cement fob was done alter pumping plug. TOOH to lay down entin Stinger string. Waited on nevi 2 3/8 in. stringer to show up on location. Currently, picking up new M n g of pipe stinger. Wlll then n H to cement

I I I I I I I 1 I n Storage I Surface to Bit min/stks Total System

ONS: Add 1 sx of Dnil-Thin to get the viscosity down to the 45- 50 sedqt range vrhlle to cement job. Add 2 sx of Sodium fflwrbonate while circulating prior to cement job. Don't add

da to the mud system unti l the PH is back down to 9.5, then maintain the PH in the 9 5 - 10.0 e with the addition of caustic soda.

Page 15: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Product Active Ending Reserve Endlng

Units Start Transferred I n Received Returned Lost Daily Use Final Unit Price USD Daily Cost USD Concentrations Concentrations PP9 PP9

Bulk BULK TANK COMPRFSSOR i ea 1 2 1 2

MIL-BAR BULK lOOlb 11562 1567 BULK TANKS I ea I 2 I 2

60.00 120.00 45.00 90.00 6.88 2.50

MIL-LUBE ]55USgall 32 I I I I I I 32 1 967.53 1 I

Page 16: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Page 1 of2

Tom Wood

From: Jack Whitten [[email protected]] Sent: Tuesday, December 16,2008 4:19 PM

To: wood t@sugar-land. oil field. slb. com Cc: Michael Vasquez Subject: RES: Schlumberger Source Abandonment

Tom//

If required, source abandonment procedure described in your December 16, 2008, e-mail is approved as requested. Source abandonment should be conducted in accordance with the e-mail. Any _____._. variations __ . _. .... to the approved abandonment procedure must be approved by the NRC before source abandonment can occur.

Please let me know when the abandonment of the well logging sealed sources is completed. Additionally, we will review your 30-day report when received. If we have any questions we will contact you.

T hx// J ac k W

From: Tom Wood [mailto:[email protected]] Sent: Tuesday, December 16, 2008 1:38 PM To: Jack Whitten Subject: Schlumberger Source Abandonment

Jack, As per our phone conversation, information regarding the abandonment of three radioactive sources for Devon Energy Corporation in Sweetwater County, Wyoming is as follows:

Company Name: Devon Energy Corporation Well: Coyote Flats Unit 14-H-36-14-100 API Number: 49-037-27747

TD: 12,200' Hole Size: 7.875" Top of Tool: 12,093'

The abandonment plan is as follows: r)-++rrm #.& TAAi. 1 c) 1 E A ' U U L L U l I I UI I uu1. I L, I J-t

A 200' cement plug with red oxide dye to be spotted on top of the tool string from -12,093 to -1 1,893'. A second 400' cement plug, to be used as a kickoff plug will be set from -1 1,000' to -10,600. The casing liner to be set at the kickoff point will serve as the mechanical deflection device

Sources and Source Depth

12,107' 592 GBq, Am241 Be, Neutron Source 12,122' 592 GBq, Am241 Be, Neutron Source

12,134' 63 GBq, Cs 137, Density Source, Serial # A51 76

12/16/2008

Page 17: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Page 2 of 2

Written report will be filed with your office as per Part 39,§39.77(d).

Please don't hesitate to contact me should you have any questions regarding this abandonment.

Thanks and regards, Tom Wood

T h o m a s S. Wood D e p i i t y R a d i a t i o n S a f e l \ / O f f i c e r S c i i l u m b e i g e r T e c h n o l o g y C o r p o r a t i o i i 200 G iIlincJIiaii-i ILaiie, Mn-7 S i i y a r L a i J c l , T e x a s 77478

P h o n e : 4 - 1 ( 2 8 1 ) 285-7460 F a x : -1-1 ( 7 8 1 ) 285-8526 C e l l : i ~ 1 ( 2 8 1 ) 725-0802

12/16/2008

Page 18: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

cert Page 1 of 1

Mon i tori ng Services - . * .

P.O. BOX 266677. HOUSTON, TEXAS 77207 .AREA CODE 713/478-5820. FAX 281/532-0929

SEALED SOURCE LEAK TEST CERTIFICATE

RSO SCHLUMBERGER WELL SVCS 2071 2901 YELLOWSTONE RD.

ROCK SPRINGS WY

Customer#: 2603

Source #: 36358

82901 Account #: 2071 RADIONUCLIDE: CS-137

ACTIVITY: l.J CI SERIALNO: 5280 WIPE DATE: 70/06/2008 EFFICENCY: 0.95 NET CPM: 62

SOURCE CODE: GSRJ

GROSS CPM: &I BKGCPM: 19. NET CPM

EFF X 222x1 0*6 DPMlu CI =MICROCURIE ----

THE ABOVE SOURCE WIPE TEST HAS BEEN ASSAYED IN ACCORDANCE WITH OUR RADIOACTIVE MATERIAL LICENSE AND THE APPROPRIATE REGULATORY REQUIREMENTS. THE REGULATIONS DEFINE A LEAKING SOURCE AS ONE FROM

MORE OF ACTIVITY. WHICH AN APPROPRIATE WIPE TEST HAS REMOVED 0.005 (5.0~10E-3) MICROCUIRE OR

MICROCURIE THE REMOVABLE ACTIVITY 2.940E-oo5 WAS:

1.088E+000 Bq ASSAY NO: 10/10/2008 61 DATE: 1011 0/2008

ASSAYED BY:

http://www.wipetest.codcert.aspx?source=363 5 8&adate= 10/6/2008 12/16/2008

Page 19: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

cert Page 1 of 1

Mo n ito r i ng Services . * , . . .

P.O. BOX z~ff i77. HOUSTON. TEXAS 77207 .AREA CODE 7 i m a 6 a z o . FAX zaimz-0929

SEALED SOURCE LEAK TEST CERTIFICATE I , , ,

RSO SCHLUMBERGER WELL SVCS 2071 2901 YELLOWSTONE RD.

Customer##: 2803

Source #: 38614 ROCK SPRINGS WY

82901 Account #: 2071 RADIONUCLIDE: AM241 BE

ACTIVITY: E CI SERIAL NO: G5225 SOURCE CODE: NSRF WIPE DATE: 10/06/2008

EFFICENCY: 1.32 NET CPM: - 15 GROSS CPM: 34 BKGCPM: 19

NET CPM

EFF X 2 .22~10~6 DPMlu CI =MICROCURIE -

THE ABOVE SOURCE WIPE TEST HAS BEEN ASSAYED IN ACCORDANCE WITH OUR RADIOACTIVE MATERIAL LICENSE AND THE APPROPRIATE REGULATORY REQUIREMENTS. THE REGULATIONS DEFINE A LEAKING SOURCE AS ONE FROM

MORE OF ACTIVITY. WHICH AN APPROPRIATE WIPE TEST HAS REMOVED 0.005 (5.0~10E-3) MICROCUIRE OR

MICROCURIE THE REMOVABLE ACTIVITY 5,1 ,9E-006 WAS:

1.894E-001 Bq ASSAY NO: 1011012008 59 DATE: 10/1 Ol2008

http://www.wipetest.com/cert.aspx?source=3 86 14&adate= 10/6/2008 12/16/2008

Page 20: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Schlurnberger Technology Corporation Radiation Safety & Compliance

200 Gillingham Lane, MD 7 Sugar Land, Texas 77478 Tel 281 -285-7460 Fax 281-285-8526

To Ernie J i lek

From Tom W o o d

Subject Abandonment Plaque

Date: December 30,2008

Fax : 985-727-2165

Tel: 281 -285-7460 Fax: 281 -285-8526

Pages 2 (including cover)

Ernie,

Request fo r abandonment plaque for Devon Energy Corporation, we l l information follows.

Regards,

This transmission is intended only for the use of the individual or entity to which it is addressed and may contain information that is privileged and confidential. If you are not the intended recipient, you are hereby notified that any disclosure, distribution or copying of this information is strictly prohibited. If you have received this transmission in error, please notify us immediately by telephone and return the original documents t o us a t the address above via the United States Postal Services.

Page 21: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

Schlumberger Technology Corporation Radiation Safety & Compliance

200 Gillingham Lane, MD 7 Sugar Land, Texas 77478 Tel 281-285-7460 Fax 281-285-8526

December 30,2008

Graphics N' Meta l 1200 Clause1 Street Mandenvil le, LA. 70448

(985) 727-21 65 (Fax) (504) 669-6082

Attn: Ernie Jilek,

Please construct the standard abandonment plaque w i th the fol lowing information:

Company: Devon Energy Corporation We l l Name: Coyote Flats Unit 141-1-36-14-100 Field: Canyon Creek County: Sweetwater State: Wyoming

Date of Abandonment: 12/20/2008 We l l Depth: 12,200' Plug Back Depth: 11,740' Top of Fish: 12,093' Sources Abandoned: 592 GBq (16 Ci), Am-241, Neutron Source @ 12,153'

592 GBq (16 Ci), Am-241, Neutron Source @ 12,167' 63 GBq (1.7 Ci), Cs-137, Density Source @ 12,180'

API#: 49-037-27747

Special Instructions: DO NOT RE-ENTER THIS WELL BEFORE CONTACTING REGION IV OFTHE NUCLEAR REGULATORY COMMISSION OR SCHLUMBERGER TECHNOLOGY CORPORATION

Please fo rward to me the completed plaque and invoice.

Thomas S. W o o d '

Page 22: Lane Laiid, Tic 774711 · 2012-12-01 · 200 Gii1irigi:aiii Lane Sugai Laiid, Tic 774711 December 30,2008 United States Nuclear Regulatory Commission Region IV- Materials Inspection

MEMORY TRANSMISSION REPORT

FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS

: 866 : 12.30 10:33 : B 919857272165 : 2 : 12.30 10:35 : 12.30 10:36 : 2 : OK

Schlumberger Technoloigy COrpOrillion Radierlon Satew & COmpllBnce

200 Gillinghsm Lone. MD 7 s u g a r Land. +exas ??a78 Tel 28?-286-?480 Far 287 -286-8626

Fax ro Ernie Jllek

From Tom Wood

TIME : 12-30-'08 10:36 FAX N0.1 : 281-285-8526 NAME : Schlumberger

h h h SUCCESSFUL TX NOTICE

Date: December 30, 2008

Fax : 985-727-21 85

Tel: 281-285-7460 Fax: 281 -285-8526

S u bje ct Abandonment Pla q u e Pages 2 (including cover)

Ernie.

Request for abandonment plaque for Devon Energy Corporation. well information follows.

Regards,

This transmission is intended only for the use of the individual or ontit-# to which it is addressed end may contain inlormation that is privileged and sonfidontial. If you are not the intended recipient. you are hereby notified that eny disclonure, distritlullon or copying 01 lhis information is strictly prohibited. I f you have received this lransrnisslon in error, please notifv us immediately by felenhane and rerurn The oriolnal documents to us at the address above via the United Srates Postal ServiGss.