LAKE KING FSL RL168.0 Primary spillway crest RL 168.3 Catchment area 0.56km 2 LAKE KING FSL RL168.0 Primary spillway crest RL 168.3 Catchment area 0.56km 2 LAKE KING FSL RL168.0 Primary spillway crest RL 168.3 Catchment area 0.56km 2 MURRAY STREET 13.11.2018 Scale 1 : 750 @ A1 1 : 1500 @ A3 0 5m 13068 Lake King, Rutherglen Landscape Master Plan Concept Design MP08 15m 50m 25m Existing path alignment in this area Alternative water flow alignment around island Local provenance shrubs and groundcovers providing habitat opportunities and improved amenity Existing path to be retained and surrounds revegetated with local provenance shrubs and groundcovers Existing dam wall to be removed Grassed spillway Concrete path over 40m wide spillway set at RL 168.30 Vegetated swale drain from Rutherglen golf course providing hydraulic connection to wetland Existing path south of lake to be retained Concrete pit with valve allowing wetland water level to be drawn down to RL 167.00 Low grassy mound providing elevated views across wetland and bowling green Re-aligned path over lowered dam wall enabling views from Murray street into wetland providing views across wetland and physical connection to Apex park Wetland peninsula directing flows around wetland Sandy beach Feature rock placement to help contain space and provide play opportunities for children Vegetated swale providing hydraulic connection to wetland RCP stormwater outlet providing low flow hydrulic connection from wetland to Murray street drainage infrastructure. Drainage pit & valve to enable wetland water levels to be drawn down