Land Development Update NAIOP/NVBIA Joint Meeting May, 12 2016
Feb 10, 2017
Land Development Update
NAIOP/NVBIA Joint MeetingMay, 12 2016
05/01/2023 2
Booster Shot Hiring
Agency Division Classification Status Comments1 CAP Engineer III S27 1 - Filled Street Light Focus 2 DPZ Zoning Administration Planner III S27 1 - Filled 3 DPZ Zoning Evaluation Planner III S27 1 - Filled 4 DPZ Zoning Evaluation Planner III S27 1 - Filled Filled as Planner III5 FCDOT Transportation Planner II S24 1 - Filled 6 FCDOT Transportation Planner II S24 1 - Filled 7 Fire Marshal Fire Inspector II S20 1 - Filled 8 Fire Marshal Fire Inspector II S20 1 - Filled 9 Fire Marshal Administrative Assistant II S13 1 - Filled
10 Fire Marshal Engineer III S27 1 - Filled
11Health Department Environmental Health Environmental Health Spec II S23 1 - Filled
12 LDS Building Plan Review & Inspections Code Specialist II S24 1 - Filled 13 LDS Director's Office Management Analyst I S21 1 - Filled 14 LDS Code Development & Compliance Engineer Tech II S18 1 - Filled 15 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 16 LDS Site Development & Inspections Senior Engineer III S28 1 - Filled 17 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 18 LDS Code Development & Compliance Engineer Tech III S21 1 - Filled 19 LDS IT Business Analyst III S27 1 - Filled 20 LDS Director's Office Planner IV S29 1 - Filled 21 LDS Building Plan Review & Inspections Engineer III S27 1 - Filled 22 LDS Site Development & Inspections Sr Engineer III S28 1 - Filled Reclassified; filled23 LDS Site Development & Inspections Senior Engineering Inspector S21 1 - Filled 24 LDS Director's Office Assistant Director S34 1 - Filled LDS Operations Director25 LDS HR Human Resources Generalist II S24 1 - Filled 26 LDS Building Plan Review & Inspections Engineer IV S29 1 - Filled Reclassified from Eng III to Eng IV27 Urban Forestry Urban Forester II S24 1 - Filled 28 Fire Marshal Engineer III S27 2 -Interviews re-advertised; interviews in progress
05/01/2023 3
Average Site Plan Timelines
Plan Types Target Feb - Apr
Last Perio
d (Nov-Jan)
Avg for 2015
Avg for 2014
Infill Lot Grading Plan (INF, Non-bonded Single Family)
21 25 29 26.0 25.9
Major Plan First Submission (SP, SD, PI)
60 62 59 58.5 66.8
Major (SP, SD, PI) Second DPE
14 / 28 31 27 22.2 33.1
Major (SP, SD, PI) Subsequent Non-DPE
45 49.5 58 62.1 68.6
05/01/2023 4
Average Review TimeResidential Building
05/01/2023 5
Average Review Time Commercial Building
05/01/2023 6
Average Review Time Commercial Building
05/01/2023 7
Gartner Update
05/01/2023 8
Gartner Update
05/01/2023 9
Gartner Update
05/01/2023 10
Next Steps
• Presentation of Visioning & Recommendations Document to Development Process Committee (Committee of the Whole Board)
• Discussions with Industry
• Road Mapping
05/01/2023 11
Fire Marshal’s Office
PLANS REVIEW INVENTORY
05/01/202312
Plan Type No. on Hand Oldest Date Work Day
LagSprinkler, Tenant plans without calculations 16 5-2-16 6Sprinkler, Tenant plans with calculations 5 4-25-16 11Sprinkler, Shell Bldgs., NFPA 13 systems 10 4-20-16 14Sprinkler, Shell Bldgs., NFPA 13-R & 13-D systems 15 4-6-16 24Town of Herndon Building Tenant 1 5-9-16 1Fire Alarm, Tenant plans 5 5-10-16 0Fire Alarm, Shell Bldgs. 2 5-10-16 0Door Lock / Security plans 3 5-9-16 1Range Hood/Tanks/Foam/Public Safety Plans /Misc. 18 4-26-16 10Site Plans/Rezoning 1 / 8 5-9-16 1High-Piled Storage Plans 0 -- 0Evacuation / Lockdown Plans 4 5-4-16 4
Burkholder Building Summary 88 4-6-16 XXXXXXXXX FM Architectural Review done at Herrity Building(Class 4 and Greater Building Plans)
8 5-2-16 6
FM Architectural Review (Fast Track Tenant Plans) 4 5-10-16 0FM Arch. Review (non-Fast Track Tenant Plans) 4 5-10-16 0
Herrity Building (B-2) Summary 16 5-2-16 XXXXXXXXX
05/01/2023 13
Planning & Zoning
05/01/2023 14
New NVBIA/NAIOP Webpage
http://www.fairfaxcounty.gov/dpwes/committees/nvbia-naiop-fairfax-committee.htm
05/01/2023 15
Thank you
Next Meeting: April 14, 2016