Supervision of Water Supply Systems Rehabilitation Works in 17 (21) Towns of Georgia under WIMP (Rehabilitation of Lanchkhuti Water Supply System EIB/WIMP/W/ICB/07)

Extension of Distribution Network: 24,250m of PE100 Pipe (OD200, OD160, OD110, OD90, OD63 & OD32), 450m

of Steel Pipe (d159/4mm, d108/3mm & d76/3.5mm), associated 1,151nr House Connections & 10,300m of PE100 Pipe (OD20).

Sectoring of City Network with 10nr Valves. Installation of 1,950m of Transmission Main Steel Pipe (d109/4mm & d272/6mm), from Lashis Gele Reservoir to

the City Network.

Lashis Gele Outfall - Construction of new Reinforced Concrete Reservoir (500m3), with associated Valve Chamber & installation of associated inlet & outlet pipes and valves, rehabilitation of Headwork Capitation Area (new stone filter layers and perforated collection pipes), construction of new Chlorine Building & Gas Storage Structure and installation of Chlorine Gas Dosing System at Reservoir Area, Installation of SCADA System including Flow Measurement, Residual Chlorine Monitoring and Flow Control.

Oragvis Gele Outfall - Construction of new Reinforced Concrete Reservoir (1,900m3) , with associated Valve Chamber & installation of associated inlet & outlet pipes and valves, rehabilitation at the existing Chlorination Building and installation of Salt Based Disinfection System at the second Reservoir Area. Installation of SCADA System including Flow Measurement, Residual Chlorine Monitoring and Flow Control.

Contract value 2,700,000GEL (€1,125,000) FIDIC Red Book MDB 2006

Page 3: Lanchkhuti WS Project Overview
Page 4: Lanchkhuti WS Project Overview

PIPE TRENCH EXCAVATION

Page 5: Lanchkhuti WS Project Overview

24,250M OF PE100 PIPE (OD200, OD160, OD110, OD90, OD63 & OD32) INSTALLED UNDER THE PROJECT

Page 6: Lanchkhuti WS Project Overview
Page 7: Lanchkhuti WS Project Overview

PE PIPE WELDING

Page 8: Lanchkhuti WS Project Overview
Page 9: Lanchkhuti WS Project Overview

BRANCH CONNECTIONS UNDERGROUND FIRE HYDRANT AND ISOLATING VALVE

Page 10: Lanchkhuti WS Project Overview
Page 11: Lanchkhuti WS Project Overview

55NR OF PREFABRICATED CONCRETE MANHOLES INSTALLED IN CITY NETWORK

Page 12: Lanchkhuti WS Project Overview
Page 13: Lanchkhuti WS Project Overview
Page 14: Lanchkhuti WS Project Overview

1,151NR HOUSE CONNECTIONS & 10,300M OF PE100 PIPE (OD20)

Page 15: Lanchkhuti WS Project Overview

PE EF PIPE SADDLE FOR HOUSE CONNECTIONS PN16 WATER METER PVC BOX

Page 16: Lanchkhuti WS Project Overview

CORRUGATED PVC PIPES AS BOXES FOR 1ST VALVE WM BOX AND 1ST VALVE CORRUGATED BOX

Page 17: Lanchkhuti WS Project Overview

DEWATERING OF TRENCH – LANCHKHUTI CITY HAS HIGH LEVEL OF UNDERGROUND WATER

Page 18: Lanchkhuti WS Project Overview

PIPE CROSSING OVER THE EXISTING STORM WATER CHANNELS & CREEKS

Page 19: Lanchkhuti WS Project Overview

BRIDGE CROSSING

Page 20: Lanchkhuti WS Project Overview

PRESSURE TESTING AS PER “SNIP” CONSTRUCTION NORMS AND REGULATIONS 3.05.04-85*

Page 21: Lanchkhuti WS Project Overview

DISINFECTION BY CHLORINATION FLUSHING POINT

Page 22: Lanchkhuti WS Project Overview

Lashis Gele Transmission Main Reservoir – City Network

Installation of 1,950m of Transmission Main Steel Pipe (d109/4mm & d272/6mm), from Lashis Gele Reservoir to the City Network.

Page 23: Lanchkhuti WS Project Overview

STEEL PIPE MATERIAL (D109/4MM & D272/6MM),

Page 24: Lanchkhuti WS Project Overview

Lashis Gele Intake Filter

Rehabilitation of Headwork Capitation Area (new stone filter layers and perforated collection pipes)

Page 25: Lanchkhuti WS Project Overview

ORIGINAL STATUS OF CLOGGED FILTER AREA EXCAVATION & REMOVAL OF EXISTING FILTER MATERIAL

Page 26: Lanchkhuti WS Project Overview

PERFORATED COLLECTION PIPES

Page 27: Lanchkhuti WS Project Overview

APPLICATION OF NEW FILTER MATERIAL

Page 28: Lanchkhuti WS Project Overview

INSTALLATION OF GEO-TEXTILE ON SIDES OF FILTER AREA COLLECTION PIPES, VENTILATION PIPE

Page 29: Lanchkhuti WS Project Overview

PERFORATED COLLECTION PIPES

Page 30: Lanchkhuti WS Project Overview

FILTER MATERIAL

Page 31: Lanchkhuti WS Project Overview
Page 32: Lanchkhuti WS Project Overview

FINAL STATUS

Page 33: Lanchkhuti WS Project Overview

REGULATION OF NEW 500M3 RESERVOIR INFLOW VALVE CLOSED – WATER FROM FILTER DISCHARGED INTO THE RIVER

Page 34: Lanchkhuti WS Project Overview
Page 35: Lanchkhuti WS Project Overview

Lashis Gele Reservoir / Chlorinator Building

Page 36: Lanchkhuti WS Project Overview

EXISTING RESERVOIR HAD TO BE DEMOLISHED DUE TO MULTIPLE LEAKAGES, DETERIORATED CONCRETE

WALLS & BASE SLAB OF OLD RESERVOIR USED AS SHELL FOR NEW RESERVOIR

Page 37: Lanchkhuti WS Project Overview

NEW BASE SLAB, WALLS & COLUMNS NEW RESERVOIR ROOF SLAB REINFORCEMENT

Page 38: Lanchkhuti WS Project Overview

RESERVOIR INTERIOR

Page 39: Lanchkhuti WS Project Overview

BITUMEN PROTECTION FINAL STATUS AFTER BACKFILLING (INSTALLED ULTRA SONIC WATER LEVEL METER, AUTOMATIC VALVE ON INLET SHAFT, VENTILATION PIPES, LAMP-POSTS AND ACCESS MANHOLES)

Page 40: Lanchkhuti WS Project Overview

Lashis Gele Reservoir Chlorinating Building

Double “Bunker type” Chlorinator with 2nr Chlorine Gas submersible chambers in case of emergency, Chlorine Gas automatic dosing system, SCADA System

Page 41: Lanchkhuti WS Project Overview

ORIGINAL CHLORINATOR BUILDING NEW CHLORINATOR BUILDING

Page 42: Lanchkhuti WS Project Overview

RESERVOIR OUTLET PIPING RESERVOIR VALVE (SHUTTER) CHAMBER, UL.SONIC FLOW METER SHAFT, RESIDUAL CHLORINE ANALYSER SHAFT INTEGRATED IN SCADA SYSTEM

Page 43: Lanchkhuti WS Project Overview

Oragvis Gele Outfall

New 1,900m3 Reservoir & reconstructed Salt based Chlorinator Building

Page 44: Lanchkhuti WS Project Overview

DUE TO DETERIORATED CONDITION OF EXISTING CONCRETE, MULTIPLE LEAKAGES, EXISTING RESERVOIR WAS PARTIALLY DEMOLISHED

Page 45: Lanchkhuti WS Project Overview

EXISTING BASE SLAB & PARTIAL WALLS –USED AS SHELL FOR NEW RC RESERVOIR

NEW BASE SLAB, WALLS, COLUMNS

Page 46: Lanchkhuti WS Project Overview

NEW RESERVOIR ROOF SLAB REINFORCEMENT ROOF SLAB CONCRETE. (ASSOCIATED VALVE CHAMBER & ASSOCIATED INLET & OUTLET PIPES AND VALVES INCLUDED)

Page 47: Lanchkhuti WS Project Overview

NEW 1,900M3 RESERVOIR INTERIOR FINAL STATUS – AFTER BACKFILLING, INSTALLATION OF UL.SONIC WATER LEVEL METER

Page 48: Lanchkhuti WS Project Overview

Oragvis Gele Outfall Chlorinating Building

Rehabilitation at the existing Chlorination Building and installation of Salt Based Disinfection System at the Oragvis Gele Reservoir Inlet Area. Installation of SCADA System including Flow Measurement, Residual Chlorine Monitoring and Flow Control.

Page 49: Lanchkhuti WS Project Overview

ORIGINAL CHLORINATING BUILDING REHABILITATED CHLORINATING BUILDING

Page 50: Lanchkhuti WS Project Overview

ORIGINAL STATUS OF CHLORINATING BUILDING MIXING BASIN

REHABILITATED INTERIOR, CEILING, WINDOWS, MIXING BASIN