Oragvis-Gele RC Tank Construction (1,900m3) A part of Lanchkhuti City Water Supply System
35
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

Oragvis-Gele RC Tank Construction

(1,900m3)

A part of Lanchkhuti City Water Supply System

Page 2: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

MULTIPLE LEAKAGES RECORDED, PREVIOUS REPAIR ATTEMPTS BY PLASTERING OF SURFACE NOT SUCCESSFUL.

ORIGINALLY PLANNED REPAIRS OF EXISTING RC TANK BY CLEANING OF PLASTER AND IRONING OF WALLS & ROOF SLAB - NOT IMPLEMENTED DUE TO DETERIORATED CONDITION OF THE TANK.

Page 3: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

Existing RC Tank Status

During the original construction of existing Tank – concrete cover has not been provided for roof slab re-bars, instead – plaster was applied, which has falling off repeatedly. High moisture environment caused severe corrosion of steel reinforcement.

Page 4: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

Planned Construction Method

Existing Tank shell to be used for construction of new RC Tank; -Horizontal PVC Water Stop between wall kickers in base slab & wall segments; -- Vertical PVC Water Stop between 4nr Wall segments

Page 5: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

SOIL COVER (30CM) & REMAINING HYDRO-INSULATION REMOVAL

Page 6: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

TO ENABLE ENTRY FOR CONSTRUCTION OF NEW RC TANK

Page 7: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 8: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 9: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 10: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

EXISTING TANK BASE SLAB PREPARED FOR REINFORCEMENT

NEW RC TANK – BASE SLAB REINFORCING WORKS

Page 11: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

SURVEY CONTROL COLUMN PLINTHS FORMWORK, PVC WATER-STOP INSTALLATION

Page 12: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 13: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

HORIZONTAL PVC WATER STOP IN BASE SLAB’S WALL KICKER

Page 14: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 15: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 16: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

HORIZONTAL / VERTICAL WATER STOP FOR CONSTRUCTION JOINTS

Page 17: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

VISIBLE VERTICAL PVC WATER STOPS FOR WALL’S SEGMENTS JOINTS

VISIBLE VERTICAL PVC WATER STOPS FOR WALL’S SEGMENTS JOINTS

Page 18: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 19: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

VERTICAL PVC WATER STOP ON CONSTRUCTION JOINT

Page 20: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 21: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 22: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 23: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 24: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 25: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 26: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 27: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 28: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 29: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 30: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Page 31: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

ROOF SLAB’S REINFORCEMENT CONCRETE INSTALLATION

Page 32: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

CONCRETE POURING CONCRETE CURING

Page 33: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

CONCRETE CURING (7 DAYS) SEALING BETWEEN EXISTING RESERVOIR WALL AND NEW

RESERVOIR BASE SLAB BY SILICONE FOAM

Page 34: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

RESERVOIR’S INTERIOR’S REPAIRS, CLEANING RESERVOIR BACKFILLING AFTER APPLIED HYDRO-

INSULATION

Page 35: Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)

RC Tank’s Final Status