Top Banner
OVERVIEW: - LAMA IDICO Is A JOINT STOCK COMPANY with a head office building and a factory in 60.000 m2 workshop. -TURNOVER: 2013: 160 bill VND 2014: 182 bill VND - CAPACITY of Factory: 500 T/Month for steel structure. 300 T/Month for others steel products.
22

LAMA IDICO SHORT PRESENTATION 2014

Jan 22, 2018

Download

Documents

Rickey Nguyen
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: LAMA IDICO SHORT PRESENTATION 2014

OVERVIEW:

- LAMA IDICO Is A JOINT STOCK COMPANY with a head office building and a factory in 60.000 m2 workshop. -TURNOVER: 2013: 160 bill VND 2014: 182 bill VND - CAPACITY of Factory: 500 T/Month for steel structure. 300 T/Month for others steel products.

Page 2: LAMA IDICO SHORT PRESENTATION 2014

TOTI INDUSTRY CO., Ltd TOAN TIEN INDUSTRY TRADING AND SERVICE LIMITED COMPANY Add. Street no. 12, Linh Trung ward, Thu Duc District, Ho Chi Minh City

PARNER SHIP:

Page 3: LAMA IDICO SHORT PRESENTATION 2014

Strategic Location: ~ 30 km to Ho Chi Minh Ports: Cat Lai, Long Phuoc… ~ 30 km to Phu My Port. ~ 30 km to Dong Nai Port. ~ 10 km to Nhon Trach Port

Page 4: LAMA IDICO SHORT PRESENTATION 2014

QUALIFICATION: - ISO 9001-2008

- CANDIDATE FOR ASME

HOLDER: U, R, S

Page 5: LAMA IDICO SHORT PRESENTATION 2014

MISSION: Supply domestic service and export: products: - Fabricating steel tanks & vessel - Fabricating steel structures, ducts, piping spools. - Installation and maintenance for industrial plants: Steel, cement, chemical, food… plants;

Hydropower, thermal power plants. GOAL: - To be one of biggest export supplier of steel products with high quality. - To be an expert in installing industrial plants, power plants.

Page 6: LAMA IDICO SHORT PRESENTATION 2014

HUMAN RESOURSE: - Management: 9 people.

- Technical engineers: 8 people. - Sale department: 4 people. - QA-QC: 8 people.

- Production engineer: 10 people. - Manufacturing team: 8 teams of

total 320 people.

Page 7: LAMA IDICO SHORT PRESENTATION 2014

FABRICATING & MACHINING WORKSHOP: ~ 20.000 m2

Page 8: LAMA IDICO SHORT PRESENTATION 2014

FABRICATING & ASSEMBLY YARD: ~ 30.000 m2

Page 9: LAMA IDICO SHORT PRESENTATION 2014

BLASTING – PAINTING WORKSHOP: ~ 3.000 m2

Page 10: LAMA IDICO SHORT PRESENTATION 2014

PACKING AND LOADING YARD: ~ 4.000 m2

Page 11: LAMA IDICO SHORT PRESENTATION 2014

FACILITY: - OVERHEAD CRANE 10-TON:

- MOBILE CRANE: 120-TON

- YARD CRANE: 10-10-50-TON

- TRUCK CRANE: 5-TON

Page 12: LAMA IDICO SHORT PRESENTATION 2014

FACILITY: - MACHINING MACHINE: - CUTTING CNC OXY GAS + PLASMA: - HYDRAULIC MACHINE: BENDING,

CUTTING, ROLLING… - ~ 80 WELDING MACHINE FOR SMAW,

FCAW/MIG, TIG, SAW. - MANY TOOLS & EQUIPMENTS TO

INSTALL A COMPLETE INDUSTRIAL PLANT, POWER PLANT.

Page 13: LAMA IDICO SHORT PRESENTATION 2014

OUR MAIN CLIENTS:

Page 14: LAMA IDICO SHORT PRESENTATION 2014

OUR RECENT MAIN PROJECTS EXPORTED:

CLIENT : DANIELI PROJECT : Combustion air ducts (COA Ducts) for steel plant COUNTRY : Thailand SCOPE : Supply painted ducts and supports as EN standard.

Page 15: LAMA IDICO SHORT PRESENTATION 2014

OUR MAIN PROJECTS EXPORTED IN 2014:

CLIENT : DANIELI PROJECT : Mould and mobile sector ready strand for steel plant COUNTRY : Thailand SCOPE : Supply painted-machined structure as EN standard.

Page 16: LAMA IDICO SHORT PRESENTATION 2014

OUR MAIN PROJECTS EXPORTED IN 2014:

CLIENT : DANIELI PROJECT : Discharge ducts for steel plant COUNTRY : Argentina SCOPE : Supply CORTEN ducts and supports as EN standard.

Page 17: LAMA IDICO SHORT PRESENTATION 2014

OUR MAIN PROJECTS EXPORTED IN 2014:

CLIENT : DANIELI PROJECT : Quenching tower for steel plant COUNTRY : Argentina SCOPE : Supply CORTEN ducts and supports as EN standard.

Page 18: LAMA IDICO SHORT PRESENTATION 2014

OUR MAIN PROJECTS EXPORTED IN 2014:

CLIENT : DANIELI PROJECT : BAG HOUSE for steel plant COUNTRY : Argentina SCOPE : Supply CORTEN casing-dampers-hopper-bag plate as EN standard.

Page 19: LAMA IDICO SHORT PRESENTATION 2014

OUR MAIN PROJECTS EXPORTED IN 2014:

CLIENT : DANIELI PROJECT : Structure of Furnace for steel plant COUNTRY : IRAQ SCOPE : Supply painted structural wall and roof as EN standard.

Page 20: LAMA IDICO SHORT PRESENTATION 2014

OUR MAIN PROJECTS EXPORTED IN 2014:

CLIENT : DANIELI PROJECT : Waste gas duct and stack of Furnace for steel plant COUNTRY : IRAQ SCOPE : Supply painted ducts and stack as EN standard.

Page 21: LAMA IDICO SHORT PRESENTATION 2014

OUR MAIN PROJECTS EXPORTED IN 2014:

CLIENT : DANIELI PROJECT : Steel plant COUNTRY : Argentina SCOPE : Sand-filter tank 40m3 and Emergency tank 110m3.

Page 22: LAMA IDICO SHORT PRESENTATION 2014

THANK YOU FOR REVIEWING

AND WELCOME TO YOU TO OUR COMPANY TO SEE FULL PROFILE

If any requires, Please don’t hesitate to contact me anytime via mobile phone or email as below: Mr. Rickey Nguyen – Export sale manager. Mobile : (+84) 914 209 045 Email : [email protected] or [email protected]