Top Banner
1 A Project and Knowledge Management System 3M Case Study
20

Labcore Insight Project And Knowledge Management

Nov 18, 2014

Download

Technology

msf4566

The slideshow illustrates the needs for project and knowledge management at 3M Film and Media Division and how Labcore\'s InSight product addressed the needs
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Labcore Insight Project And Knowledge Management

1

A Project and Knowledge Management System

3M Case Study

Page 2: Labcore Insight Project And Knowledge Management

2

Background

• 2004—major customer complaint• 2006—major manufacturing issue• Local technical resources added ~2005

– Analytical lab, statistical consulting, manufacturing technology

• Lots of capabilities, and lots of work—needed tool to help drive… – Project management– Collaboration– Knowledge retention

• But not just a lab system….drive for total integration

Page 3: Labcore Insight Project And Knowledge Management

3

What were our options?

• Lotus Notes (DB, Team Room, EC Tools…)– No searching, rigid, hidden, minimal standards

• LIMS, i.e. GALIMS—3M solution– Lab projects only

• Knowledge management– Managing help desks

• Project management– Too rigid, management focused, hour counting

• Collaboration tools– Too loose, less structure

• Develop it ourselves?• Chose P-Wave’s LabCore product

– Good mix of collaboration tools and content management– Extendable to our needs

Page 4: Labcore Insight Project And Knowledge Management

4

Guiding Design Principles

Project Worker-Focused Toolsets

Project PackageCollaboration

CustomizedWorkflows

and Content

Standard lookand feel

My Projects Status and Rollup Knowledge Archive

Page 5: Labcore Insight Project And Knowledge Management

5

Insight Project Management System

High level view• My projects• My Tasks• My Templates• All Projects• Admin• Search• Settings

Individual project view• Details• Tasks• Discussion• Files• Reports

Page 6: Labcore Insight Project And Knowledge Management

6

Going from Pain to Solutions

Pain

• Scattered Information

Solutions

• One-stop shop

Page 7: Labcore Insight Project And Knowledge Management

7

Scattered Information

TasksCharterDiscussion

Files

LN E-mails*

Integrated Tables*

Reports

Hourly Charges*

Informal Info

Meeting NotesStatusQuestionNotebook

User pain: Pieces of the project are scattered in many places Solution: One -stop shop

Project Package

Page 8: Labcore Insight Project And Knowledge Management

8

Going from Pain to Solutions

Pain

• Scattered Information

• Tedious inclusion of project info

Solutions

• One-stop shop

• Multiple entry routes, even hosting the editor

Page 9: Labcore Insight Project And Knowledge Management

9

Tedious inclusion of project info

User pain: It’s just not convenient to add information to a project siteSolution: Multiple ways to add information

Files attached within the system

Files attached using normal “share drive” function

Integrated MSWord-like Report writer

Simple informal info entry points

Send E-mail and attachments to a project*

Integrated MSExcel-like tables*

Project Manager

Page 10: Labcore Insight Project And Knowledge Management

10

Going from Pain to Solutions

Pain

• Scattered Information

• Tedious inclusion of project info

• Unclear “to do” lists

Solutions

• One-stop shop

• Multiple entry routes, even hosting editor

• “My Lists”, reporting, and prioritization

Page 11: Labcore Insight Project And Knowledge Management

11

Unclear “to do” lists

User pain: People’s to-do lists and priorities not easily viewableSolution: “My Lists”, reporting, and prioritization

• User customizable grouping, filtering*, and order

• Visual indicators for timing

• Export to Excel

• Prioritization tool

• Break a project up into its pieces, assign people and timing

• Each task has its own mini-workspace

• Gantt display option*

• Group and filter* by user-defined scenarios

• Customizable reports*

P f Importance,Timing, Feasibility,Scope

Page 12: Labcore Insight Project And Knowledge Management

12

Going from Pain to Solutions

Pain

• Scattered Information

• Tedious inclusion of project info

• Unclear “to do” lists

• Manual status roll-ups

Solutions

• One-stop shop

• Multiple entry routes, even hosting editor

• “My Lists”, reporting, and prioritization

• Built-in contents, automated roll-ups

Page 13: Labcore Insight Project And Knowledge Management

13

Manual status roll-ups

User pain: It’s manual work to get and communicate project statusSolution: Add it to the project foundation,and then roll it up

Hopper *Ideas* and Submitted Projects

My Dashboard *Select fields, groups* for display

i.e. timing, status, percent complete, $ value…

“Mega Dashboard” *

Higher level look across business

Launch by business* or project lead

Auto Roll-up*

Prompting Mechanism*

Page 14: Labcore Insight Project And Knowledge Management

14

Going from Pain to Solutions

Pain

• Scattered Information

• Tedious inclusion of project info

• Unclear “to do” lists

• Manual status roll-ups

• Multiple documentation methods and standards

Solutions

• One-stop shop

• Multiple entry routes, even hosting editor

• “My Lists”, reporting, and prioritization

• Built-in contents, automated roll-ups

• Customized project templates, but standard foundation

Page 15: Labcore Insight Project And Knowledge Management

15

Multiple documentation methods and standards

User pain: Each project type has its own “MO”Solution: Customized project templates, but standard foundation

• Ready to populate

•Content and Layout* that fits the need

• Still uses common look, feel, fields

• Customized report templates will be available as well*

Page 16: Labcore Insight Project And Knowledge Management

16

Going from Pain to Solutions

Pain

• Scattered Information

• Tedious inclusion of project info

• Unclear “to do” lists

• Manual status roll-ups

• Multiple documentation methods and standards

• Multiple project repositories without hierarchies and relationships

Solutions

• One-stop shop

• Multiple entry routes, even hosting editor

• “My Lists”, reporting, and prioritization

• Built-in contents, automated roll-ups

• Customized project templates, but standard foundation

• Project-within-a-project and project linking

Page 17: Labcore Insight Project And Knowledge Management

17

Multiple project repositories without hierarchies

User pain: A single project might have its pieces in several placesSolution: Create project-within-a-project and project linking

• Support multiple levels of project hierarchy*

• Projects can be related—find one, find many

Page 18: Labcore Insight Project And Knowledge Management

18

Going from Pain to Solutions

Pain

• Scattered Information

• Tedious inclusion of project info

• Unclear “to do” lists

• Manual status roll-ups

• Multiple documentation methods and standards

• Multiple project repositories without hierarchies and relationships

• Lost project knowledge, reinvention

Solutions

• One-stop shop

• Multiple entry routes, even hosting editor

• “My Lists”, reporting, and prioritization

• Built-in contents, automated roll-ups

• Customized project templates, but standard foundation

• Project-within-a-project and project linking

• Drive for tools that users like, searchability

Page 19: Labcore Insight Project And Knowledge Management

19

Lost project knowledge, reinvention

User pain: Work was done before, but no traces remain reinvent itSolution: Drive for tools that users embrace, searchability

• Google-like, fully indexed

• New search story currently in development: input fields, output fields, reporting, saved searches.

• Validate user stories

• Feedback sessions

• 442 tickets entered –mostly user difficulties. PWave very responsive to fix them

Page 20: Labcore Insight Project And Knowledge Management

20

Overall Results

• ~250 lab projects in 1st 7 months!

• Not being done 2 years ago

• Positive user feedback on system

• Real productivity and performance benefits

• Utilizing archived knowledge

• Expanding usage to other project types