L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004
6

L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004

Jan 06, 2016

Download

Documents

Valiant

L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004. L2TS Pulsar Board (Phase I). TS broadcast L2A/L2R to all front-end crates. Send L2 trigger decision to trigger supervisor. Receive L2 trigger decision from PC. b0xft00. On L2A, receive TL2D bank. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004

L2TS and Plan for Integration

Cheng-Ju LinFermilab

Pulsar Meeting06/11/2004

Page 2: L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004

L2TS Pulsar Board (Phase I)

TSReceive L2 triggerdecision from PC

Send L2 triggerdecision to triggersupervisor

TS broadcastL2A/L2R toall front-endcrates

b0xft00

b0cot00

b0fcal05

On L2A, receiveTL2D bank

Send TL2D to theDAQ stream upon L2A

• Firmware for Phase I summer commissioning has been written (Sakari)• First round of testing shows the firmware is working well• In the process of integrating with the PCs

Page 3: L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004

PCL2TSTS Test Setup

• We have setup a mini-DAQ system in the test-stand room.

L2 Trigger

Decisio

n

+ TL2D Bank (Phase

I)

L1 Trigger Data

TS L1A

L2TS Pulsar

Pulsar TX

(SLINK fiber)

PC

(SLINK fiber)

TS handshaking(sending L2A/R,

ROL, Buffer #)

Running algorithm

Random L1A

preFRED/FRED

Page 4: L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004

Mini-DAQ (supports 8 test-stand crates)RXPT TXPT TS Pulsar (L2TS) FRED (GL1)

preFRED

Greg F., Andrew M. , Michael S. and Bill B. did a tremendous job gettingthe different boards to live happily under one roof.

Page 5: L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004

“Loop” Status

• We have achieved the first milestone with the closing of the “TSPCL2TSTS” loop: - Still need to test the loop with high rate and larger data size to look for low level problems

- Still need to test the TL2D DAQ path

• The next major milestone is to bring Daniel’s control/monitoring node into the “loop” closing THE loop.

• With “THE” loop fully tested in the test-stand, we’ll be ready for the trigger room.

Page 6: L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004

Summer Integration Plans

(1) While we are still testing “THE” loop in the test-stand, we’ll start replicating in the setup in the trigger room (L2TS and Slink TXs in lower alpha crate, PCs on the 3rd floor).

(2) Repeating the same set of test-stand room tests in the trigger room using the real sparky and TS. Can be done in between stores.

(3) When the upstream system is ready, we’ll swap the SLINK fiber and send real data into the PC. Proof of principle: use the L2 Pulsar setup for L2 torture and cosmic data runs in between stores.

(4) Parasitically running L2 Pulsar in beam (compare alpha TL2D with Pulsar TL2D). In this configuration, L2TS output cable to the TS is dangling.

(5) The final step is to plug the L2TS output cable to the trigger room TS in beam run.