L1271-C1, Old Tower Generator Replacement, LoganL1271-C1, Old Tower Generator Replacement, LoganInternational Airport, East Boston, MAInternational Airport, East Boston, MA
Category: Airport Project ID #: 1004122894Street Address: 1 Harborside Dr. Boston MA 02128 Confirmed Value $4,288,000.00County: Suffolk Stage: Biddate SetBid Date: 9/7/2016 , 11:00AMArchitect:Documents Available: Plans, Specs available in Insight Plans available from Massachusetts Port AuthorityLast Update: 8/5/2016 Plans,Specs were Added/Updated
NotesNotes
Details [Division 2]: Building Demolition, Clearing, Dewatering, Shoring, Earthwork, Slope Protection & ErosionControl, Paving & Surfacing, Water Systems, Wells, Landscaping. [Division 4]: Clay Unit Masonry,Concrete Unit Masonry, Marble. [Division 5]: Structural Steel, Metal Fabrications, Metal Stairs.[Division 7]: Waterproofing, Fireproofing. [Division 8]: Metal Doors, Hardware. [Division 9]: CeilingSuspension Systems, Tile, Acoustical Ceilings, Painting. [Division 10]: Interior Signs. [Division 11]:Vehicle Service Equipment. [Division 12]: Multiple Seating. [Division 14]: Elevators, Material HandlingSystems, Hoists & Cranes. [Division 15]: Heat Pumps, Air Handling, Ductwork. [Division 16]:Service/Distribution, Standby Power Generator Systems, Alarm & Detection Systems.
Additional DetailsAdditional DetailsListed On: 7/30/2016 Floor Area:Contract Type: Work Type: AlterationStage Comments 1: Floors Below Grade:Stage Comments 2: Owner Type: FederalBid Date: 9/7/2016 Mandatory Pre Bid Conference:Invitation #: BD-14-1411-CAPPR-LOC1-
HistoryHistoryUserUser ViewedViewed First Viewed DateFirst Viewed Date Currently Tracked?Currently Tracked? Date TrackedDate TrackedAdam Sweet True 8/5/2016 False
MARK LOCATION ARRANGEMENT GAL. UL DESIGN OF EQUIPMENT REMARKS
MT-1OUTSIDEUNDERGROUND
4000 GALLON MAIN FUEL OIL STORAGE TANK 4000 58 XERES FRP DESIGN 0
GENERAL NOTES
PLUMBING WORK IS INDICATED DIAGRAMMATICALLY. EXACT LOCATIONS OF ALL COMPONENTS ARE TO BE DETERMINED IN THE FIELD AND BY THE ACTUAL BUILDING CONDITIONS. DUCTS, PIPING OR EQUIPMENT INTERFERING WITH OTHER INSTALLATIONS SHALL BE RELOCATED AS REQUIRED AT NO ADDITIONAL COST TO THE OWNER. EXACT LOCATIONS MUST HAVE THE APPROVAL OF THE ARCHITECT.
ALL WORK SHALL BE COORDINATED WITH ALL OTHER TRADES BEFORE ANY INSTALLATION IS MADE.
ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH STATE CODES, MANUFACTURER'S APPROVED PUBLISHED LITERATURE, AND AUTHORITIES HAVING JURISDICTION.
INSTALLATION OF EQUIPMENT SHALL PERMIT ACCESSIBILITY FOR SERVICE AND/OR REPLACEMENT.
ALL MISCELLANEOUS STRUCTURAL SUPPORTS REQUIRED FOR PLUMBING EQUIPMENT INSTALLATION SHALL BE PROVIDED BY PLUMBING SUBCONTRACTOR.
ALL EQUIPMENT, PIPING, ETC. MUST BE INSTALLED ACCORDING TO THE LATEST SEISMIC REQUIREMENT.
EQUIPMENT TAG SYMBOLS & ABBREVIATIONS
TAGNO NO
AGEQUIPMENTREQUIRINGELECTRICSERVICE
EQUIPMENTNOT
REQUIRINGELECTRICSERVICE
SEE SCHEDULE FOR PERFORMANCE REQUIREMENTS
ACCU-1 TO 5 AC-1 TO 5 FOP-1 & 2
AIR COOLED CONDENSING UNITS AIR COOLED UNITS FUEL OIL PUMPS
ABBREVIATIONS
AC AIR COOLED UNIT
BTU BRITISH THERMAL UNITBTUH BTU PER HOUR
CFM CUBIC FEET PER MINUTE
DIA DIAMETER
DDC DIRECT DIGITAL CONTROL
DN DOWNDT DAY TANK
FPM FEET PER MINUTEFOP FUEL OIL PUMPFLA FULL LOADED AMPS
FT FEETPLUMBING HEATING, VENTILATING AND AIR CONDITIONINGHZ HERTZIN INCHES
MBH THOUSANDS OF BTU'S PER HOUR
NTS NOT TO SCALE
OPD OVERCURRENT PROTECTION DEVICES
PSI POUNDS PER SQUARE INCH (GAUGE)
RA RETURN AIR
SA SUPPLY AIR
SC SPEED CONTROL
V VOLTS
WSA WIRE SIZING AMPS
« M m *MIQtMNCM.
#1455
REV.NO DATE DESCRIPTION
MADEBY
CHK.BY
APPD.BY
MASSACHUSETTS PORT AUTHORITYBOSTON, MASSACHUSETT!
LOGAN INTERNATIONAL AIRPORT EAST BOSTON, MASSACHUSETTS
OLD TOWER GENERATOR REPLACEMENT
LEGENDS, NOTES & SCHEDULESMECHANICAL
JACOBS ENGINEERING GROUP INC.BOSTON, MASSACHUSETTS
DES. BY: DWN. BY: IP
SCALE: NO SCAI2
CHKD. BY: CM
APPROVED:
SHEET 77 OF 90
LOC. CODE:
DATE:08/2016
MPA PROJECT NO. L1271-C1
DWG. NO.:
P1Q0Jacobs - P:\2016.17.00 Massport Generator Design\MEP Desrgn\Ptumbing\Sheets\PLUMBING,DWG July 29, 2016
ITEM QTY. DESCRIPTION
1 1 PREFERRED UTILITIES STAINLESS STEEL MODEL 2 SPILL CONTAINER
OR MODEL 3-3-X IN-GROUND SPILL CONTAINER
2 1 KAMVALOK DRY DISCONNECT FITTING
3 3 PREFERRED UTILITIES FIRE SAFETY VALVE WITH POSITION SWITCH
4 1 PREFERRED UTILITIES MODEL 61- F STOP OR TYPE 71 OVERFILL PREVENTION VALVE
5 1 PREFERRED UTILITIES TANK LEVEL PROBE - MODEL TG-EL-WF
6 2 PREFERRED UTILITIES VENT LEAK SWITCH - MODEL RBS
7 1 PREFERRED UTILITIES LEAK DETÈCTÔR SWITCH MODEL HD-A1
8 . 1 PREFERRED UTILITIES TANK HIGH ALARM SWITCH - MODEL HLS
LOGAN INTERNATIONAL AIRPORT EAST BOSTON, MASSACHUSETTS
OLD TOWER GENERATOR REPLACEMENT
PLUMBING FUEL OIL PIPING DIAGRAMMECHANICAL
JACOBS ENGINEERING GROUP INC.BOSTON, MASSACHUSETTS
DES. BY: DWN. BY: VP
SCALE: M0 SCALE
CHKD. BY: 6M
APPROVED:
SHEET 82 OF 90
LOC. CODE:
DATE:08/2016
MPA PROJECT NO. L1271-C1
DWG. NO.:
P 105Jacobs - P:\2Q1-6.17.00 Massport Generator-! July 29, 2016
LOGAN INTERNATIONAL AIRPORT OLD TOWER GENERATOR REPLACEMENT
AUGUST 2016
2.9 UNDERGROUND FUEL OIL STORAGE TANK
A. Acceptable manufacturers subject to compliance with the specifications:1. Xerxes2. Containment Solutions3. Approved equal
B. Quality Assurance: Underground Fuel Oil Tank shall meet the following governing standards:1. Underwriters Laboratories (UL) Standard for Safety 1316, File MH 9061 for storage of
flammable liquids. A UL label shall be attached to each tank.2. National Fire Protection Association (NFPA) Standards:3. NFPA 30: Flammable and Combustible Liquids Code4. NFPA 30A: Automotive and Marine Service Station Code5. NFPA 31 : Installation of Oil-Burning Equipment.
C. Warranty: Tank manufacturers shall provide at least one year limited warranty for double-wallunderground petroleum tanks in effect from owner acceptance for system operation andoccupancy.
D. General: Provide Double-Wall Fiberglass Reinforced Plastic (FRP) Underground Storage Tank.1. Loading Conditions - Tank shall meet the following design criteria:
a. Internal Load - Tank shall withstand a 5-psig air-pressure test with 5:1 safety factor. Contractor shall individually test tanks for leakage prior to installation. Maximum test pressure is 5 psig.
b. Vacuum Test - To verify structural integrity, every standard 10'-diameter tank and smaller shall be vacuum tested by the manufacturer at the factory to 11.5" of mercury.
c. Surface Loads - Tank shall withstand surface H-20 axle loads when properly installed according to manufacturer's current Installation Manual and Operating Guidelines.
d. External Hydrostatic Pressure - Tank shall be capable of being buried in ground with T of overburden over the top of the tank, the hole fully flooded and a safety factor of 5:1 against general buckling.
e. Tank shall support accessory equipment - such as heating coils, drop tubes,submersible pumps and ladders - when installed according to tank manufacturer’s current Installation Manual and Operating Guidelines.
2. Product Storagea. Tank shall be capable of storing petroleum products with specific gravity up to 1.1.b. Tank shall be vented to atmospheric pressure.c. Tank shall be capable of storing products identified in the manufacturer’s current
standard limited warranty.3. Materials: Tank shall be manufactured with 100% resin and glass-fiber reinforcement. No
sand fillers.
4. Tank Capacity: Tank shall have nominal capacity of 4,000 gallons.
5. Interstitial Space: Tank shall have a space between the primary and secondary walls toallow for the free flow and containment of leaked product from the primary tank. The space also allows the insertion of a monitoring device through a monitoring fitting.