Top Banner
KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome We are Proud to Welcome the Particpant of the the Particpant of the Conference Conference GIS/AM/FM Solution for GIS/AM/FM Solution for The Complex and The Complex and Comprehensive Comprehensive Electrical Network Management Electrical Network Management ISMAIL SYED SHAMSUDDIN, TECHNICAL & MARKETING MANAGER ISMAIL SYED SHAMSUDDIN, TECHNICAL & MARKETING MANAGER STAR ME, Saudi Arabia STAR ME, Saudi Arabia www.starme.com.sa www.starme.com.sa
24

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

Mar 29, 2015

Download

Documents

Ibrahim Laxton
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

We are Proud to Welcome the We are Proud to Welcome the Particpant of the ConferenceParticpant of the Conference

GIS/AM/FM Solution for The GIS/AM/FM Solution for The Complex and Complex and

ComprehensiveComprehensiveElectrical Network ManagementElectrical Network Management

ISMAIL SYED SHAMSUDDIN, TECHNICAL & MARKETING MANAGERISMAIL SYED SHAMSUDDIN, TECHNICAL & MARKETING MANAGER

STAR ME, Saudi ArabiaSTAR ME, Saudi Arabia

www.starme.com.sawww.starme.com.sa

Page 2: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

TABLE OF CONTENTS

IntroductionChallengesAim & Objectives of the ProjectGoals and Methods AdoptedLevels of ProjectsSystems DevelopedOverview of the SystemsConclusion

Page 3: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Introduction

In Yesterday topics Lectures of IWPP, KUWAIT for Building Infrastructure in of KUWAIT depends on availability of adequate infrastructure to its sustain growth and tangible benefits depends on the best practices that is adopted to the KUWAIT ENVIORNMENT

My topic will be covering the Utilities Section of the Environment which is influencing the Geographical Locations.

Most AM/FM/GIS electric power studies and analysis applications were developed for electrical distribution systems analysis and design. AM/FM/GIS was used as a component of a full-featured Distribution Automation system Other applications tackled the problem of designing the electrical supply system for new residential development

GIS was also used to rebuild the design of the whole work procedures in electric utilities

GIS and Automated Mapping and Facilities( GIS/AM/FM) are also integrated for mapping and analysis of electric distribution as Enterprise methods.

Page 4: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Challenges

As modern technologies arise, power utilities are seeking new methods to improve system reliability, power quality and satisfaction in Implementing and Awarding the contractors.

High quality of the power can only be achieved if the system losses are at their minimum level and the voltage level is within an acceptable range.

In order to reach an optimal solution of the problem presented above, it is necessary to perform a large number of scenarios and output analyses for both the economical and the technical grounds.

The system models for this analysis is derived from a large database model. Thus a powerful data management tool with query, analyses and interfaces capabilities is a major necessity for the complete solution of the problem.

Automated Mapping, Facilities Management and Geographic Information System (AM/FM/GIS) provide a real solution to the management of the data required for engineering analyses.

Page 5: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

AIMS and OBJECTIVES OF THE PROJECT

SAUDI ELECTRICAL COMPANY SAUDI ARABIA, WHICH MANAGES THE ELECTRICAL DISTRIBUTION/TRANSMISSION AND GENERATION NETWORKS FOR THE WHOLE KINGDOM OF SAUDI ARABIA

THE EASTERN REGION HAS IMPLEMENTED THE GIS/AM/FM SOLUTION WITH INTEGRATION OF POWER ANLAYSIS tools FOR BETTER MANAGABILITY

DAY TO DAY OPERATIONAL METHODS ARE AUTOMATED FOR BETTER SERVICES and prompt action

THE APPLICATION AIM TO DRAW AUTOMATED MAPS COVERING COMMON SEQUENCE OF PROCEDURES

( DESIGNING, C REATION, OPERATION AND MAINTEANCE )

Page 6: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Levels Adopted in the Projects

Level one, designing and creating to help map drawer and to implement various options including connecting electricity to the customers.

Level two, is an application aimed at performing query using various options and displaying different charts in order to analyze the electricity network and print reports.

Level three, using the system through Ethernet and Internet, used by the Eastern Zone Distribution Sector staff which includes the head quarter, Distribution Engineering Department and Electricity Department in Dammam covering Electricity Services Office in Al-Khobar and Qattif.

One of the most important applications is managing electricity network, creating a new network, performing queries on the network, handling base map and creating single line diagram. In addition, performing an estimation cost for the new projects and linking data with PSS/engine. Among the other used application is callout system, Mainteance and Operation which helps company staff determine the location of the customer quickly

Page 7: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

System Developed

The Application TemplatesProject Management Simulation and updating Locating and Updating the Electrical features or componentsTracingSchematic Generation Accumulation of Load Voltage Drop Switching OrderIntegration of Electrical Analysis Tools

Page 8: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Object oriented application with a list of specific equipments of the network

For every equipment, specific toolbar to Manage the network.

Overview for GIS Elec Layout Simple User Friendly enviornment

Page 9: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Project Management

Contractors approval process

Classification of Contractors

Types of Applicable Contracts

Evaluation Systems for Contractors Performance

Safety and health standards and practices 

Economic analyses and forecasts 

Environmental requirements and opportunities

Risk management

Project management 

Management of projects Can be maintained:

Page 10: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Creating aproject around a features

In the attribute record form, give a name to your project (so that you can easily retrieve it later in the demonstration) : e.g.=”My demo project”

Page 11: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Project computing

Page 12: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Generating Work Orders

You HAVE TO generate Works Orders for your project. This is a mandatory operation prior to access to Work Orders functionalities. Click on the “Work Order Generation” button.

Work orders are generated for the different assemblies of your project. Choose a contractor for each work order.

Page 13: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Print Work Orders

Once a Work Order is selected, you can print one of the following reports - Material issue request Bill (you will have to select a sub-account first) - Work Order Labor - Work Order Labor Contractor - Work Order Labor Bill

Page 14: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Finding and Locating Substations,

CABLES and others features/ Components

of information

Searching for equipments or customer location (2)

Page 15: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Searching for equipments or customer location (1)

Identifying the Parcel Information

Note:

It took hours to do manually.

Result:

With GIS we can find the details in less than one

minute

Page 16: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Searching for equipments or customer location (1)

You can search using any of these criteria

City

Municipality

District

Plan No.

Parcel No.

Parcel Water

Electricity Meter

Page 17: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Tracing (1)

In the Elec tools menu, select the « Analyses » sub-menu and « Tracing » sub-menu , then « Gridstation to

Substation » command

Page 18: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Schematic ( SLD ) Diagrams Dynamically Created/Updated

Page 19: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Accumulate customer load to mini-pillar. This function trace all the meters connected to a mini-pillar, sums the loads of each customer and stores this value in the appropriate attribute of the mini-pillar database record. A diversity factor is applied during the load summation efforts to estimate the mini-pillar loads more accurately…

This function operates for:MINIPILLAR : one single mini-pillar graphically selected on screenAREA : all mini-pillar graphically selected on screenTRANSFORMER : all mini-pillars supplied by a transformer selectedSUBSTATION : all mini-pillar supplied by a substation selectedFEEDER: all mini-pillar supplied by a feeder selected

Accumulation of Accumulation of loadload

Page 20: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Voltage drop MV calculation. This function calculates the voltage drop on MV cables and lines feeding from a feeder graphically selected on screen. The MV cables voltage drop is calculated by using the length and impedance of the MV cables and the accumulated loads

Voltage dropVoltage drop

Page 21: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

-- Switching load studies- Switching load studies

- Power flow calculation- Power flow calculation Integration of Electrical Integration of Electrical

Analysis Software'sAnalysis Software's ETAPETAPPTIPTIOTHERSOTHERS

Integrated Electric Network calculation Integrated Electric Network calculation

Page 22: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 22

Switching Order

Page 23: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

Conclusion

Sustainable Growth of the Electrical Networks is Maintained by Designing, Installing and Maintaining the Infrastructure more precisely

More Efficient and Effective of services to the Community

Achieving a pragmatic & systematic approach in resolving the challenges .

Page 24: KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010 We are Proud to Welcome the Particpant of the Conference GIS/AM/FM Solution for The Complex.

KUWAIT CONTRACTORS CONFERENCE – ELECTRICITY AND WATER MAY 2010

http://www.starme.com.sahttp://www.starme.com.sa

Any Questions ?Any Questions ?