Top Banner
Kungsbacka sportcenter Geoteknisk PM avseende detaljplan 2016-11-01
107

Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Jul 06, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Kungsbacka sportcenter

Geoteknisk PM avseende detaljplan

2016-11-01

Page 2: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Kungsbacka sportcenter Geoteknisk PM avseende detaljplan 2016-11-01 Beställare: Kungsbacka kommun 434 81 Kungsbacka Beställarens representant: Andrea Ericsson

Konsult: Norconsult AB

Box 8774 402 76 Göteborg

Uppdragsledare David Rudebeck Teknikansvarig Daniel Svärd Handläggare David Rudebeck Carl-Fredrik Larsson

Uppdragsnr: 104 22 35

Filnamn och sökväg: N:\104\22\1042235\5 Arbetsmaterial\01

Dokument\G\PM\Geotekniskt PM_Kungsbacka sportcenter.docx

Kvalitetsgranskad av: Daniel Strandberg

Tryck: Norconsult AB

Page 3: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan

Innehållsförteckning 1 Förutsättningar ............................................................................................... 4 2 Syfte ................................................................................................................. 4 3 Styrande dokument ........................................................................................ 5 4 Underlag .......................................................................................................... 5 5 Befintliga förhållanden ................................................................................... 5 5.1 Topografi och markbeskaffenhet .............................................................. 5 5.2 Jordlagerbeskrivning ................................................................................ 5 5.3 Geohydrologiska förhållanden ................................................................ 10

5.3.1 Kungsbackaån ................................................................................ 10 5.3.2 Hantverksgatan .............................................................................. 11

5.4 Befintliga byggnationer ........................................................................... 11 6 Stabilitet ......................................................................................................... 12 6.1 Allmänt .................................................................................................... 12 6.2 Indata ...................................................................................................... 13 6.3 Resultat .................................................................................................. 14 7 Erosion .......................................................................................................... 18 8 Sättningar ...................................................................................................... 19 9 Bergras och blocknedfall ............................................................................. 19 10 Radon ............................................................................................................. 19 11 Rekommendationer ...................................................................................... 20 11.1 Allmänt .................................................................................................... 20 11.2 Stabilitet .................................................................................................. 20

11.2.1 Sektion A-A och B-B, Kungsbackaån ............................................ 20 11.2.2 Sektion C-C, Hantverksgatan ......................................................... 21

11.3 Erosion ................................................................................................... 21 11.4 Grundläggning ........................................................................................ 21 11.5 Markarbeten ........................................................................................... 21 11.6 Vibrationer .............................................................................................. 22 11.7 Radon ..................................................................................................... 22 12 Kontroll vid schakt- och grundläggningsarbeten ..................................... 22

Bilagor Sammanställning kompressionsmodul, ML Bilaga 1 Konstruktionsritningar, tråg Hantverksgatan Bilaga 2 Stabilitetsberäkningar Bilaga 3:1-3:12

Ritningar Lastrestriktioner G401

Kompletterande handling Kungsbacka sportcenter – Markteknisk undersökningsrapport MUR/Geo, daterad 2016-11-01.

Page 4: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Geoteknisk PM avseende detaljplan

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\pm

\geo

tekn

iskt

pm

_kun

gsba

cka

spor

tcen

ter.d

ocx

1 Förutsättningar Norconsult AB har på uppdrag av Kungsbacka kommun utfört geoteknisk undersökning inför ny detaljplan inom Kungsbacka sportcenter i södra delen av Kungsbacka tätort. Se figur 1.1 nedan för översiktsbild av området.

Figur 1.1 Översiktsbild av Kungsbacka sportcenter med anvisat läge för planerad simhall samt avgränsning av detaljplaneområdet (tjock svart linje).

2 Syfte Den geotekniska undersökningen har utförts i samband med framtagandet av en ny detaljplan. Den nya detaljplanen innefattar uppförande av en ny simhall, parkområden i väster samt parkeringsytor alternativt parkeringshus i öster och norr.

Ny simhall

Page 5: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan

3 Styrande dokument Denna PM ansluter till SS-EN 1997-1 med tillhörande nationell bilaga. Utförda stabilitetsberäkningar följer anvisningar i tillämpningsdokumenten nedan:

IEG:s tillämpningsdokument Rapport 4:2010, ”Tillståndsbedömning/klassificering av naturliga slänter och slänter med befintlig bebyggelse och anläggningar”.

4 Underlag Geotekniska fält- och laboratorieundersökningar har utförts i aktuellt område och redovisas separat i ”Markteknisk undersökningsrapport, geoteknik (MUR/Geo)” med samma datum och uppdragsnummer. Rapporten har utförts av Norconsult.

5 Befintliga förhållanden

5.1 Topografi och markbeskaffenhet För detaljer avseende topografi, se ritning G101 Situations- och borrplan. Samtliga nivåer i denna handling är givna i höjdsystemet RH2000.

Markytan inom undersökningsområdet är plan med nivåer generellt varierande mellan ca +1 till +3 med svag lutning från öst till väst.

Området utgörs av växlande gräsytor/öppen mark samt grus- och asfaltsytor. I söder finns en lätt träbyggnad i ett plan som nyttjas av en förskola.

5.2 Jordlagerbeskrivning Generellt består jordlagren från markytan i huvudsak av:

Fyllning och/eller torrskorpelera till ca 0,7-1,9 m djup.

Lerig gyttja alternativt gyttjig lera till ca 6-8 m djup.

Lera till djup större än 30 m.

Friktionsjord

Berg

Djupet till berg har inte verifierats. En trycksondering har utförts till påtvingat stopp på djupet ca 35 m i läget för den planerade simhallen. I områdets västra delar, nära Kungsbackaån och runt ishallen bedöms jorddjupen vara större än 45 m. Övriga sonderingar i områdets östra delar avslutades på djupet 30 m utan att fast botten hade påträffats.

Page 6: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Geoteknisk PM avseende detaljplan

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\pm

\geo

tekn

iskt

pm

_kun

gsba

cka

spor

tcen

ter.d

ocx

Fyllningen utgörs nära Kungsbackaån av lösa material såsom mulljord, silt samt lera och har en uppmätt vattenkvot på ca 40 %. I östra delen av detaljplaneområdet är fyllningen fastare och består av grus, sand, silt och lera. Uppmätta vattenkvoter och varierar i östra delen mellan ca 10-30 %.

Torrskorpeleran förekommer över hela området med undantag från anlagda ytor där den har grävts ur och ersatts med fyllnadsmaterial. Torrskorpeleran är siltig och innehåller rikligt med mulljord och växtrester.

Den leriga gyttjan/gyttjiga leran har etappvis inslag av silt, skalrester och växtdelar. Vattenkvot och konflytgräns är i ler-/gyttjelagret ca 90-170 %. Densiteten varierar mellan ca 1,3-1,5 ton/m3. Den gyttjiga leran/leriga gyttjan bedöms vara huvudsakligen mellansensitiv med uppmätta St-kvoter mellan 15-21.

Leran innehåller skalrester i den västra delen av området nära Kungsbackaån. I områdets östra del innehåller leran silt och är sulfidflammig. Vattenkvot och konflytgräns varierar mellan ca 75-85 % där de lägre värdena förekommer på större djup. Densiteten varierar mellan ca 1,5-1,65 ton/m3. Leran bedöms huvudsakligen vara mellansensitiv med uppmätta St-kvoter mellan 21-23.

Gyttjan och leran har utifrån dess odränerade (korrigerade) skjuvhållfasthet indelats i tre områden, ett i väster nära Kungsbackaån, ett i läget för den planerade simhallen och ett i nordöst vid Hantverksgatan.

Norr, Hantverksgatan

Utvärderingen av leran/gyttjans skjuvhållfasthet är för detta delområde baserat på tidigare utförda undersökningar i samband med byggnation av järnvägsbron för västkustbanan (1996) samt ombyggnationen av gatu- och VA-nätet inom Aranäsområdet etapp 2D (2008).

Lerans/gyttjans skjuvhållfasthet är från lagrets överkant (+1,0) ca 9,5 kPa med en svag ökning mot djupet med ca 0,4 kPa ned till nivå -3. Skjuvhållfasthetstillväxten ökar mot djupet till ca 0,6 kPa/m mellan nivåerna -3 till -10 och med ca 0,8 kPa/m mellan nivåerna -10 till -18. Därunder ökar skjuvhållfastheten med ca 1 kPa/m till ca 26,5 kPa vid nivå -23. Se Figur 2 för redovisning av valda värden.

Page 7: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan

Figur 2. Norr, vid Hantverksgatan. Sammanställning av fält- och laboratorieförsök

för lerans odränerade skjuvhållfasthet (korrigerad).

Page 8: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Geoteknisk PM avseende detaljplan

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\pm

\geo

tekn

iskt

pm

_kun

gsba

cka

spor

tcen

ter.d

ocx

Väster, Kungsbackaån

Lerans/gyttjans skjuvhållfasthet är från lagrets överkant (nivå ±0) ca 9 kPa med en svag ökning mot djupet med ca 0,4 kPa/m ned till nivå -5. Därunder ökar skjuvhållfastheten med ca 1,2 kPa/m till 23 kPa vid nivå -15. Från nivå -15 ökar skjuvhållfastheten med ca 0,7 kPa/m till att vara 37 kPa vid nivå -24. Se Figur 3 för redovisning av valda värden.

Figur 3. Väster, vid Kungsbackaån. Sammanställning av fält- och

laboratorieförsök för lerans odränerade skjuvhållfasthet (korrigerad).

Page 9: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan

Öster, simhallen

Lerans/gyttjans skjuvhållfasthet är enligt utförda direkta skjuvförsök ca 12 kPa vid nivå -1. Skjuvhållfastheten minskar till 9 kPa vid nivå -2 och ökar därunder med ca 1,5 kPa/m till att vara ca 26 kPa vid nivå -13. Se Figur 4 för redovisning av härledda värden.

Lerans kompressionsmodul i läget för simhallen varierar mellan ca 200-700 kPa där de lägre värdena uppmätts i den gyttjiga kohesionsjorden och de högre värdena i lerlagret på större djup. Kohesionsjordens kompressionsmodul redovisas grafiskt i bilaga 1.

Figur 4. Öster, simhallen. Sammanställning av fält- och laboratorieförsök för

lerans odränerade skjuvhållfasthet (korrigerad).

Page 10: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Geoteknisk PM avseende detaljplan

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\pm

\geo

tekn

iskt

pm

_kun

gsba

cka

spor

tcen

ter.d

ocx

5.3 Geohydrologiska förhållanden

5.3.1 Kungsbackaån Vid undersökningstillfället observerades den övre grundvattenytan i provtagningshålen på djupen ca 1,2-1,8 m under markytan vilket motsvarar nivåerna ca ±0 till +1,2.

Vattennivåerna i Kungsbackaån bedöms styras av vattennivåerna i havet. Olika vattennivåer för Kungsbackaån redovisas nedan.

Högsta högvattenstånd: HHW50 + 1,72 Medelhögvattenstånd: MHW +1,12 Medelvattenstånd: MW +0,12 Lägsta lågvattenstånd: LLW -0,83

År 2006 utförde SMHI särskilda studier avseende översvämningsrisken i Kungsbacka (Översvämningskartering). Mätningar gjordes också i samband med översvämningen i december samma år. Särskilt höga vattenstånd (upp till +1,7 m) kan uppstå längst in i Kungsbackafjorden vid högvattenstånd i havet i kombination med sydliga vindar. I Kungsbackaån vid Kollaområdet ger då detta en högsta vattennivå på +2,0 m.

Portrycket i leran har uppmätts med hjälp av portrycksmätare i 2 punkter på totalt 3 nivåer. Portrycken har avlästs vid två tillfällen.

En sammanställning av uppmätta portryck redovisas i Tabell 1.

Tabell 1. Sammanställning av uppmätta portryck.

Punkt (nivå markyta)

Djup [m u my] (nivå spets)

Portryck, min [kPa]

Portryck, max [kPa]

NC3PP1 (+1,3)

5 (-3,7)

41,7 (160602)

42,1 (160616)

NC3PP2 (+1,3)

10 (-8,7)

94,0 (160602)

94,6 (160616)

NC6PP1 (+2,0)

7 (-5,0)

66,4 (160602)

66,5 (160616)

Baserat på resultaten ovan bedöms portrycksförhållanden vid Kungsbackaån motsvara en medelgrundvattenyta belägen ca 1 m under markytan med hydrostatisk ökning mot djupet.

I läget för simhallen bedöms portrycksförhållanden motsvara en medelgrundvattenytan belägen ca 0,5 m under markytan med hydrostatisk ökning mot djupet.

Page 11: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan

5.3.2 Hantverksgatan Inga portryckmätningar har utförts vid Hantverksgatan i samband med denna utredning. En sammanställning av tidigare utförda portrycksmätningar redovisas i tabell 2. Portrycksmätningarna utfördes i samband med byggnationen av Västkustbanan och tråget för Hantverksgatan. Underfarten för Hantverksgatan ligger vid km 28/830 i Västkustbanans längdmätning.

Tabell 2. Sammanställning av uppmätta portryck, Hantverksgatan.

Västkustbanan (nivå markyta)

Djup spets [m u my]

Nivå spets Portryck [kPa]

Km 28/600 (+2,9)

4 8 12

-1,1 -5,1 -9,1

39 82 123

Km 28/975 (+2,4)

3,9 7,9 11,3

-1,5 -5,5 -8,9

40 87 123

Km 29/100 (+2,4)

6 12

-3,6 -9,6

60 126

Hantverksgatan (nivå markyta)

Djup spets [m u my]

Nivå spets Portryck [kPa]

Bp 4 (+2,5)

4 8 12

-1,5 -5,5 -9,5

40 94 125

Baserat på resultaten ovan bedöms portrycksförhållanden vid Hantverksgatan motsvara en medelgrundvattenyta belägen vid markytan med hydrostatisk ökning mot djupet.

5.4 Befintliga byggnationer Inom den norra delen av det aktuella detaljplaneområdet fanns tidigare en vägbro över Hantverksgatan ca 12 m väster om Västkustbanan. I samband med byggnationen av de båda broarna byggdes ett tråg i passagen under dem. Tråget byggdes sedan om 2008-2009 och breddades i sin västra del samtidigt som vägbron över Hantverksgatan (västra bron) demonterades. Gamla konstruktionselement såsom grundplattor och pålar kan därför förekomma i marken. Bilaga 2 innehåller relationsritningar daterade från 1996 då tråget byggdes och konstruktionsritningar från 2008 då tråget byggdes om.

I områdets södra del finns en träbyggnad i ett plan som utgör lokal för en förskola. I övrigt finns hårdgjorda ytor för lokalgator och uppställningsplatser för bilar/fordon. I områdets östra del vid Södra infarten finns en anlagd grusplan.

Page 12: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Geoteknisk PM avseende detaljplan

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\pm

\geo

tekn

iskt

pm

_kun

gsba

cka

spor

tcen

ter.d

ocx

Söder om Aranäshallen finns en fotbollsplan. Övriga delar utgörs av huvudsakligen av parkområden.

6 Stabilitet

6.1 Allmänt Nivåskillnaden mellan Västkustbanan och detaljplaneområdet är generellt ca 0,5 m eller lägre. Det bedöms därför inte föreligga någon risk för stabilitetsproblem längs detaljplaneområdets östra sida.

Stabiliteten i områdets västra del har kontrollerats mot Kungsbackaån i två sektioner (A-A och B-B). Stabiliteten i områdets nora del mot Hantverksgatan har kontrollerats i sektion C-C- För läge i plan se ritning G401.

Beräkningarna har utförts med odränerad/kombinerad analys med totalsäkerhetsfaktorer enligt IEG:s dokument 4:2010. Beräkningar har gjorts för cirkulärcylindriska glidytor med Morgenstern-Price’s lamellmetod i Geostudio, Slope/W, version 7.16.

Topografiskt underlag är inhämtat från grundkartan. Grundkartans nivåer har verifierats mot de inmätta nivåerna på borrpunkterna. I sektionerna A-A och B-B har Kungsbackaåns bottentopografi modellerats enligt resultaten från lodningarna vid gc-bron över Kungsbackaån strax nordväst om ishallen. I sektion C-C passerar Hantverksgatan under Västkustbanan genom ett tråg som uppfördes 1996. En ombyggnation av tråget och gatu- och VA-nätet i området gjordes 2008. Relationsritningarna från dessa projekt utgör underlag för stabilitetsberäkningarna i sektion C-C.

Den västra delen av detaljplaneområdet utgörs av parkområde med en gc-väg. I enlighet med IEG:s rapport 4:2010 klassas området som ”Annan mark”, vilket avser markanvändning som endast medför dagvistelse och/eller anläggningar av mindre betydelse såsom parker, befintliga GC-vägar, bodar, garage samt fritidsområden och områden med små miljömässiga konsekvenser av skred.. För detaljerad utredning erfordras en beräknad totalsäkerhetsfaktor i odränerad analys om minst Fc ≥ 1,6-1,4 samt i kombinerad analys Fkomb ≥ 1,4-1,3. Leran inom området är mellansensitiv och geotekniska förutsättningarna inom området, exempelvis topografi, jordparametrar etc., är välkända. Hydrologiska förutsättningar är konservativt valda i beräkningarna. Vald vattennivå är LLW för Kungsbackaån i kombination med en grundvattenyta i nivå med underkant av torrskorpeleran. Därför har de lägre värdena Fc ≥ 1,4 samt Fkomb ≥ 1,3 valts som gällande för sektionerna A-A och B-B.

Page 13: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan

För sektion C-C planeras för möjligheten att anlägga uppställningsytor eller uppföra ett parkeringshus inom ytan söder om Hantverksgatan. Inom området har en kritisk sektion valts med avseende på nivåskillnad mellan släntfot och släntkrön. I slänten finns en kvarvarande kohesionspålad platta från en tidigare vägbro, vilken redovisas i bilaga 2. Stabilitetsförbättrande effekt av dessa geokonstruktioner har dock inte beaktats i aktuella beräkningar enligt ett konservativt val. Det bedöms därmed vara befogat att för områdesklassningen ”nyexploatering/planering” välja de lägre erforderliga säkerhetsfaktorerna på Fc ≥ 1,5 och Fkomb ≥ 1,4.

6.2 Indata I tabell 3 redovisas valda karkateristiska materialparametrar för beräkningarna.

Tabell 3. Valda karakteristiska parametrar. Jordlager Materialegenskap Karakteristiskt värde

Gata Tunghet

Effektiv tunghet under gvy γ = 20 kN/m3

γ’ = 12 kN/m3 Friktionsvinkel φ’ = 34

Torrskorpelera/ torrskorpegyttja

Tunghet Effektiv tunghet under gvy

γ = 18 kN/m3

γ’ = 8 kN/m3 Odränerad skjuvhållfasthet 15 kPa

Lerig gyttja/ gyttjig lera

Tunghet Effektiv tunghet under gvy

γ = 15 kN/m3

γ’ = 5 kN/m3 Odränerad skjuvhållfasthet Sektion A-A & B-B: se figur 2.

Sektion C-C: se figur 4. Lera

Tunghet Effektiv tunghet under gvy

γ = 16 kN/m3

γ’ = 6 kN/m3 Odränerad skjuvhållfasthet Sektion A-A & B-B: se figur 2.

Sektion C-C: se figur 4.

Marklaster Aktuell sektion har modellerats med tillförda karakteristiska trafiklaster enligt anvisningar i Tk Geo13 och IEG:s rapport 4:2010.

GC-trafik: 5 kPa Parkerings- och uppställningsytor 5 kPa

Sektion C-C, befintliga konstruktioner Relationsritningar och konstruktionsritningar avseende tråget (Scandiaconsult, 1996) (GF Konsult, 2008) under Västkustbanan (sektion C-C) visar att tråget är utfört med en pålad betongplatta med tjockleken 500 mm, se bilaga 2. Pålarna bedöms vara installerade för att förhindra hydraulisk upptryckning (dragpålar).

Page 14: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Geoteknisk PM avseende detaljplan

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\pm

\geo

tekn

iskt

pm

_kun

gsba

cka

spor

tcen

ter.d

ocx

I beräkningarna förutsätts därför att inga glidytor kan slå upp under eller bakom tråget.

Västkustbanan är grundlagd på påldäck med längden 25 m på vardera sidan järnvägsbron.

Hydrogeologi I sektion A-A och B-B har portrycksförhållandena modellerats med en lägsta lågvattennivå (LLW) i Kungsbackaån i kombination med en grundvattenyta i torrskorpelerans/torrskorpegyttjans underkant. Portrycken har en hydrostatisk ökning mot djupet. Utifrån rimliga antaganden bedöms detta vara den kritiska portryckssituationen.

I sektion C-C har portrycksprofilen baserats på resultaten i tabell 2 samt underlaget i ritning 0-531015/1 och ritning 1-531015/6 i bilaga 2 som visar att dräneringsledningar finns direkt under samt på vardera sidan tråget. Vattengången på dräneringsledningarna vid sidan om tråget ligger på nivå -1. Portrycken bedöms i området generellt motsvara en grundvattenyta vid markytan med en hydrostatisk ökning mot djupet. Dräneringsledningarna och fyllnadsmassorna antas ge upphov till en avsänkning motsvarande en grundvattenytan belägen ca 1 m under markytan med en hydrostatisk ökning mot djupet till ca 8 m under markytan. På avstånd större än ca 20 m från tråget har grundvattenytan placerats vid markytan.

6.3 Resultat Sektion A-A

Tabell 4 redovisar resultat från utförda beräkningar för sektion A-A i odränerad och kombinerad analys.

Tabell 4. Resultat stabilitetsberäkningar, befintliga förhållanden. Sektion

Befintliga

förhållanden (LLW i Kungsbackaån)

Bilaga Erfordrad säkerhet

A-A

Fc = 1,39* Fc = 1,49**

Fkomb = 1,31*

Fkomb = 1,44**

3:1-3:2

Fc ≥1,4 Fkomb ≥1,3

*Kritisk glidyta närmast Kungsbackaån **Kritisk glidyta från detaljplaneområdet till Kungsbackaån.

Resultatet visar att stabiliteten för glidytor från detaljplaneområdet mot Kungsbackaån är tillfredställande i sektion A-A.

Page 15: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan

Direkt söder om sektion A-A (utanför detaljplanegränsen) finns en personbilsparkering för ishallen. Vid lokalt lägre stabilitet i detta område riskerar detta att sänka totalstabiliteten för det angränsande detaljplaneområdet. En kompletterande sektion med beteckningen A2-A2 har modellerats med samma jordlagerföljd och bottentopografi i Kungsbackaån som i sektion A-A. Förändrade förutsättningar mot sektion A-A är:

förändringar av markytans topografi gc-lasten är närmare släntkrönet utbredd marklast bakom gc-vägen om 5 kPa över parkeringsytan.

Tabell 5 redovisar beräknad stabilitet i odränerad och kombinerad analys för kritiska glidytor i sektion A-A och A2-A2 med utbredd marklast på 5 kPa.

Tabell 5. Resultat stabilitet, utbredd marklast 5 kPa. Sektion Säkerhet kritisk

glidyta Bilaga Erfordrad säkerhet

A-A (+5 kPa)

Fc = 1,39* Fc = 1,48**

Fkomb = 1,31* Fkomb = 1,44**

3:3-3:4

Fc ≥1,4 Fkomb ≥1,3

A2-A2 (+5 kPa)

Fc = 1,45* Fkomb = 1,37* 3:5-3:6 -

* Glidytan ligger utanför/väster om detaljplanegränsen. ** Glidytan ligger inom detaljplanegränsen

Resultatet i tabell 5 visar att stabiliteten för områdesklassningen ”Annan mark” är tillfredställande i både sektion A-A och A2-A2. Lokalstabilitetsen för parkeringen riskerar därmed inte att reducera totalstabiliteten för detaljplaneområdet under valda gränsvärden.

Page 16: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Geoteknisk PM avseende detaljplan

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\pm

\geo

tekn

iskt

pm

_kun

gsba

cka

spor

tcen

ter.d

ocx

Sektion B-B

Tabell 7 redovisar resultat från utförda beräkningar för sektion B-B i odränerad och kombinerad analys.

Tabell 7. Resultat stabilitetsberäkningar, befintliga förhållanden. Sektion

Befintliga

förhållanden (LLW i Kungsbackaån)

Bilaga Erfordrad säkerhet

B-B

Fc = 1,31* Fc = 1,53**

Fkomb = 1,16*

Fkomb = 1,52**

3:7-3:8 Fc ≥1,4

Fkomb ≥1,3

*Kritisk glidyta närmast Kungsbackaån **Kritisk glidyta från detaljplaneområdet till Kungsbackaån.

Resultatet visar att stabiliteten för glidytor från detaljplaneområdet mot Kungsbackaån är tillfredställande i sektion B-B.

I området mellan Kungsbackaån och detaljplanegränsen är stabiliteten låg i kombinerad analys. För att bedöma hur ett initialskred inom denna zon påverkar totalstabiliteten har beräkningar utförts för ett initialskred för kritisk glidyta i kombinerad analys.

Geometrierna för initialskredet är valda enligt figur 4 nedan. Massorna förväntas rotera till läget då massjämvikt uppstår på vardera sidan om rotationscentrum,. Översiktligt uppstår det på nivån mittemellan släntfot och släntkrön. Med hänsyn till att skredmassor flyter ut och transporteras bort i Kungsbackaån har en släntlutning på 1:5 valts från släntfot till skredmassornas överkant.

Figur 4. Valda geometrier efter initialskred.

Beräknade säkerheter i tabell 8 avser kritisk glidyta från detaljplaneområdet mot Kungsbackaån.

Page 17: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan

Tabell 8. Resultat stabilitet efter initialskred. Sektion

Säkerhet efter

initialskred (kritisk glidyta befintliga

förhållanden)

Bilaga Erfordrad säkerhet

B-B

Fc = 1,47

Fkomb = 1,46* 3:9-3:10

Fc ≥1,4 Fkomb ≥1,3

*Små glidytor närmast initialskredet har försummats i kombinerad analys.

Resultatet i tabell 8 visar att totalstabiliteten har sänkts något efter initialskredet men att stabiliteten för detaljplaneområdet är tillfredställande även efter detta.

Sektion C-C

Tabell 7 redovisar resultat från utförda beräkningar för sektion C-C i odränerad och kombinerad analys.

Tabell 7. Resultat stabilitetsberäkningar, befintliga/planlagda förhållanden. Sektion

Befintliga

förhållanden Bilaga Erfordrad

säkerhet

C-C Fc = 1,53 Fkomb = 1,49

3:11-3:12 Fc ≥1,5 Fkomb ≥1,4

Pålarna som tråget är grundlagt på bedöms vara dragbelastade pålar. I beräkningarna förutsätts att inga glidytor kan slå upp under eller bakom tråget. Kritiska glidytor under tråget redovisas i beräkningsbilagorna men har försummats i tabell 7.

Resultatet visar att stabiliteten för glidytor mot Hantverksgatan (sektion C-C) är tillfredställande för befintliga förhållanden.

Inom detaljplanens norra delområde mot Hantverksgatan vill Kungsbacka kommun utreda möjligheten att tillåta uppförande av ett parkeringshus alternativt anläggning av parkeringsyta för personfordon. I tabell 8 har sektion C-C beräknats med en utbredd marklast om 5 kPa på avståndet 30 m bakom detaljplanegränsen.

Ca 29 m väster om sektion C-C har en sektion C2-C2 beräknats för att kontrollera stabiliteten för den befintliga parkeringen i det norra områdets västra del. Tabell 8 redovisar beräknad stabilitet i odränerad och kombinerad analys för kritiska glidytor i sektion C-C och C2-C2.

Page 18: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Geoteknisk PM avseende detaljplan

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\pm

\geo

tekn

iskt

pm

_kun

gsba

cka

spor

tcen

ter.d

ocx

Tabell 8. Resultat stabilitetsberäkningar, planlagda förhållanden. Sektion

Säkerhet planlagda

förhållanden

Bilaga Erfordrad säkerhet

C-C +5 kPa

Fc = 1,53

Fkomb = 1,49 3:13-3:14

Fc ≥1,5 Fkomb ≥1,4

C2-C2

Fc = 1,84

Fkomb = 1,75 3:15-3:16

Fc ≥1,5 Fkomb ≥1,4

Resultatet i tabell 8 visar att totalstabiliteten är tillfredställande för planlagda förhållanden.

7 Erosion Kungsbackaåns slänter utgörs av erosionskänsligt material. Den östra slänten har okulärbesiktigats med avseende på förekomst av eventuella erosionsskydd. Sprängsten/bergkross har utplacerat i Kungsbackaåns östra slänt från ishallens norra del till ca 25 m norr om gc-bron, en sträcka på ca 90 m. I figur 5 redovisas ett foto taget ca 110 m söder om detaljplanegränsen under en befintlig träbrygga. Liknande utförande finns under bryggorna väster om det aktuella detaljplaneområdet. Erosionsskyddets kondition kunde inte bedömas under platsbesöket.

Figur 5. Erosionsskydd under brygga ca 110 m söder om detaljplaneområdet.

Page 19: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan

8 Sättningar Baserat på utförda belastningsförsök (CRS-försök) bedöms gyttjan/leran vara normalkonsoliderad med en OCR på ca 1,0 från torrskorpans underkant till djupet ca 14 m. På större djup än 14 m ökar OCR till ca 1,25. Detta innebär att ytterligare påförd last på jordlagret resulterar i sättningar. Marken i området bedöms ha pågående krypsättningar.

9 Bergras och blocknedfall Risk för bergras eller blocknedfall föreligger ej. Berg i dagen förekommer inte inom eller i närheten av detaljplaneområdet.

10 Radon Norconsult har utfört en radonundersökning vid området för det planerade badhuset. Vid tidpunkten för radon- och gammastrålningsmätningen hade en cirkus etablerat sig på platsen, varför åtkomsten till det aktuella områdets östra och nordöstra delar var begränsad. Mätvärden saknas för dessa delområden.

Aktuellt område har undersökts med avseende på gammastrålning samt förekomst av radon i fyllningens porgas. Porgasen har undersökts i 5 punkter (1R-3R, 5R och 7R) och gammastrålning från markytan har undersökts i 10 punkter (1R-10R). Beskrivning av metod, läge och resultat ges i den kompletterande handlingen ”Markteknisk undersökningsrapport, MUR geoteknik”.

Följande mätningar har utförts inom området för det planerade badhuset:

Gammastrålning från berg i eller nära dagen uppmättes med hjälp av en spektrometer av typen GT-30.

Mätning av radon i porgas med emanometer/Markus 10-instrument.

Markradon Undersökningen utfördes i augusti 2016. I 4 punkter av 5 var marken alltför tät för att kunna resultera i några värden, men i den sista mätpunkten uppgick det uppmätta värdet på radongas i jordens porgas till 21 kBg/m3.

Klassificering av mark avseende radongas i jordens porluft sker enligt följande:

Lågradonmark < 10 kBq/m3 Normalradonmark 10 - 50 kBq/m3 Högradonmark > 50 kBq/m3

Page 20: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Geoteknisk PM avseende detaljplan

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\pm

\geo

tekn

iskt

pm

_kun

gsba

cka

spor

tcen

ter.d

ocx

Gammastrålning Undersökningen utfördes i augusti 2016. Uppmätta värden varierade mellan ca 0,061-0,162 μSv/h.

Radonklassificering baseras på följande rekommenderade intervaller för uppmätta halter av gammastrålning från berg:

Lågradonmark < 0,08 μSv/h Normalradonmark 0,08-0,20 μSv/h Högradonmark > 0,20 μSv/h Vidare mäter spektrometern urankoncentrationen, vilket räknas om till radiumhalt. I punkt 10R, ett stycke utanför detaljplanen, uppmättes radiumhalten till 80 Bq/kg, men i övriga punkter varierade radiumhalten mellan 13,5 och 46,7 Bq/kg.

Klassificering av mark med avseende på radiumhalt görs enligt följande:

Lågradonmark: <25 Bq/kg Normalradonmark: 25 – 50 Bq/kg Högradonmark: >50 Bq/kg

Baserat på utförda mätningar klassas aktuell fastighet som normalradonmark.

11 Rekommendationer

11.1 Allmänt Detaljplanens intentioner bedöms kunna fullföljas ur ett geotekniskt perspektiv förutsatt att rekommendationerna nedan beaktas.

11.2 Stabilitet

11.2.1 Sektion A-A och B-B, Kungsbackaån Utförda beräkningar visar att befintlig totalstabilitet från detaljplaneområdet mot Kungsbackaån är tillfredställande. Valda stabilitetsvillkor avser ”Annan mark” vilket omfattar parkområden, befintliga gc-vägar, fritidsområden etc. Det rekommenderas att området 0-25 m innanför detaljplanegränsen vid Kungsbackaån inte belastas högre än 5 kPa utifrån befintlig topografi och markförhållanden. Notera att detta inkluderar all tillskottsspänning, dvs även tillfällig maskinlast, grundvattensänkning etc. Lastrestriktioner redovisas i ritning G401.

Page 21: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan

11.2.2 Sektion C-C, Hantverksgatan Stabilitet för planerade förhållanden har beräknats genom områdesindelning avseende markanvändning och lastrestriktioner. Tillåten markanvändning med tillhörande lastrestriktioner redovisas i plan i ritning G 401.

Beräknad stabilitet i nordöst mot Hantverksgatan är tillfredställande för befintliga förhållanden. Inom ett område av 0-30 m innanför detaljplanegränsen erfordras en lastfri zon med områdesklassning ”Annan mark”. Alla påförda laster inom detta område skall fullständigt lastkompenseras.

Inom området ”Nyexploatering/Befintlig bebyggelse & anläggning” ges möjlighet för uppförande av ett parkeringshus alternativt anläggning av en parkeringsplats för personbilar. Vid uppförande av ett parkeringshus erfordras pålgrundläggning av byggnaden så att byggnadslasten förs ner till stora jorddjup. Alla tillskottslaster överstigande 5 kPa skall fullständigt laskompenseras.

11.3 Erosion Utförd beräkning i sektion B-B (bilaga 3:9-3:10 ) visar att stabiliteten för detaljplaneområdet är tillfredställande även efter ett initialskred mot Kungsbackaån. Konsekvensen av erosion är därmed utredd och bedöms inte ha någon begränsande inverkan på detaljplanens intentioner.

11.4 Grundläggning Grundläggning av den planerade simhallen föreslås preliminärt bli utförd med spetsbärande pålar till fast botten eller berg för att undvika risken för skadliga differens- och totalsättningar.

Om källarplan kommer byggas under grundvattennivån rekommenderas att konstruktionen görs vattentät. Dräneringsnivån bör inte sättas lägre än nivå +1,7.

Risken för påhängslaster skall beaktas för de yttre pålraderna vid byggnation.

För att klarlägga lämpligt utförande av grundläggningen skall detta studeras i detalj i en kompletterande utredning.

11.5 Markarbeten Byggnadstekniska åtgärder som medför en permanent grundvattensänkning bör ej utföras. Detta är viktigt inte enbart för planerade byggnader utan även för närliggande mark som kan utsättas för sättningar vid sänkning av grundvattenytan.

Page 22: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Geoteknisk PM avseende detaljplan

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\pm

\geo

tekn

iskt

pm

_kun

gsba

cka

spor

tcen

ter.d

ocx

11.6 Vibrationer Lermäktigheten är stor inom området och med anledning av tung trafik (vägar och järnväg) bör därför vibrationer beaktas vid grundläggning av byggnader. Kohesions- eller spetsbärande pålgrundläggning anses översiktligt vara den grundläggningsmetod som lämpar sig bäst för byggnader inom områden där det föreligger risk för vibrationspåverkan från trafik, byggverksamhet etc.

11.7 Radon Det översta markskiktet inom aktuellt område utgörs i dagsläget av ditförda massor. Det förhöjda radiumvärdet i punkt R10 härrör sannolikt från grusmaterialet och inte från den ursprungliga marken. För att kunna bortse från risken att detta material även förekommer inom en större dela av badhusets område rekommenderas att ytlagret schaktas bort ned till ostörd mark, för att sedan ersättas med låg- till normalstrålande fyllnadsmassa. Under förutsättning att detta görs, kan marken klassas som normalradonmark. Byggnader inom sådana områden skall uppföras i radonskyddande utförande. Detta innebär att väggar och golv i källare görs täta samt att speciell omsorg skall vidtas vid tätning av rör- och kabelgenomföringar i byggnadsdelar mot mark, så att inläckage av markluft förhindras.

12 Kontroll vid schakt- och grundläggningsarbeten Entreprenören skall installera mätpunkter för rörelser på sponter samt närliggande befintliga byggnader, brunnar, och ledningar. I god tid innan markarbeten påbörjas skall ett kontrollprogram upprättas.

Vid schaktning och pålning skall rörelser, till en början, mätas dagligen. Mätningsintervallen kan senare justeras beroende på rörelseutveckling.

Utöver kontrollprogram m.a.p. markrörelser ska även en riskanalys tas fram m.a.p. vibrationer till följd av pålningsarbeten mm. Riskanalysen bör även omfatta sprickbesiktning för närliggande byggnader.

Page 23: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan

Norconsult AB Väg och Bana Geoteknik David Rudebeck [email protected] Carl-Fredrik Larsson [email protected]

Daniel Svärd daniel.svä[email protected]

Page 24: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Norconsult AB Theres Svensson gata 11 Box 8774, 402 76 Göteborg 031 – 50 70 00, fax 031-50 70 10 www.norconsult.se

Page 25: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Kungsbacka sportcenter - simhallen Bilaga 1

-30

-25

-20

-15

-10

-5

0

50 100 200 300 400 500 600 700 800 900 1000

Niv

å (m

)

SammanställningKompressionsmodul, ML (kPa)

NC 6Kompressionsmodul, ML

N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sammanställning Cu

Page 26: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

BILAGA 2

Page 27: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

BILAGA 2

Page 28: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

BILAGA 2

Page 29: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

BILAGA 2

Page 30: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

BILAGA 2

Page 31: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Let Let

gyLe Od

Le Od

Gata Gata

Kungsbacka sportcenter104 22 35

Sektion A-AOdränerad analysBefintliga förhållanden2016-09-22

LLW -0,83

5 kPa 5 kPa

Gräns detaljplaneområde

Name: Let Model: Undrained (Phi=0) Unit Weight: 18 kN/m³Cohesion: 15 kPaPiezometric Line: 1

Name: gyLe Od Model: S=f(datum) Unit Weight: 15 kN/m³Piezometric Line: 1 C-Datum: 9 kPaC-Rate of Change: 0.4 kPa/mLimiting C: 11 kPaElevation: 0 m

Name: Le Od Model: S=f(datum) Unit Weight: 16 kN/m³Piezometric Line: 1 C-Datum: 11 kPaC-Rate of Change: 1.2 kPa/mLimiting C: 23 kPaElevation: -5 m

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Cohesion: 0 kPaPiezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Phi: 34 °Phi-B: 0 °

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion A\Sektion A_Odrän.gsz

F=1,39

F=1,49

-10 0 10 20 30 40 50 60 70-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:1

Page 32: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Let Let Komb

gyLe Komb

Le Komb

Gata Gata

Kungsbacka sportcenter104 22 35

Sektion A-AKombinerad analysBefintliga förhållanden2016-10-24

LLW -0,83

0kPa

0kPa

Gräns detaljplaneområde

Name: Let Model: Undrained (Phi=0) Unit Weight: 18 kN/m³Cohesion: 15 kPaPiezometric Line: 1

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Cohesion: 0 kPaPiezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Phi: 34 °Phi-B: 0 °

Name: Let Komb Model: Combined, S=f(depth) Unit Weight: 18 kN/m³Piezometric Line: 1 Phi: 30 °C-Top of Layer: 0 kPaC-Rate of Change: 0 kPa/mCu-Top of Layer: 15 kPaCu-Rate of Change: 0 kPa/mC/Cu Ratio: 0.1

Name: gyLe Komb Model: Combined, S=f(datum) Unit Weight: 15 kN/m³Piezometric Line: 1 Phi: 30 °C-Rate of Change: 0 kPa/mCu-Rate of Change: 0.4 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 9 kPaElevation: 0 m

Name: Le Komb Model: Combined, S=f(datum) Unit Weight: 16 kN/m³Piezometric Line: 1 Phi: 30 °C-Rate of Change: 0 kPa/mCu-Rate of Change: 1.2 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 11 kPaElevation: -5 m

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion A\Sektion A_Komb_5kPa.gsz

F=1,31

F=1,44

-10 0 10 20 30 40 50 60 70-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:2

Page 33: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Let Let

gyLe Od

Le Od

Gata Gata

Kungsbacka sportcenter104 22 35

Sektion A-AOdränerad analysBefintliga topografi+5kPa2016-09-23

LLW -0,83

5 kPa 5 kPa

Gräns detaljplaneområde

Name: Let Model: Undrained (Phi=0) Unit Weight: 18 kN/m³Cohesion: 15 kPaPiezometric Line: 1

Name: gyLe Od Model: S=f(datum) Unit Weight: 15 kN/m³Piezometric Line: 1 C-Datum: 9 kPaC-Rate of Change: 0.4 kPa/mLimiting C: 11 kPaElevation: 0 m

Name: Le Od Model: S=f(datum) Unit Weight: 16 kN/m³Piezometric Line: 1 C-Datum: 11 kPaC-Rate of Change: 1.2 kPa/mLimiting C: 23 kPaElevation: -5 m

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Cohesion: 0 kPaPiezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Phi: 34 °Phi-B: 0 °

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion A\Sektion A_Odrän_5kPa.gsz

F=1,39

F=1,48

-10 0 10 20 30 40 50 60 70-15-14-13-12-11-10

-9-8-7-6-5-4-3-2-1012345

BILAGA 3:3

Page 34: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Let Let Komb

gyLe Komb

Le Komb

Gata Gata

Kungsbacka sportcenter104 22 35

Sektion A-AKombinerad analysBefintliga förhållanden +5kPa2016-09-26

LLW -0,83

0 kPa 5kPa

Gräns detaljplaneområde

Name: Let Model: Undrained (Phi=0) Unit Weight: 18 kN/m³Cohesion: 15 kPaPiezometric Line: 1

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Cohesion: 0 kPaPiezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Phi: 34 °Phi-B: 0 °

Name: Let Komb Model: Combined, S=f(depth) Unit Weight: 18 kN/m³Piezometric Line: 1 Phi: 30 °C-Top of Layer: 0 kPaC-Rate of Change: 0 kPa/mCu-Top of Layer: 15 kPaCu-Rate of Change: 0 kPa/mC/Cu Ratio: 0.1

Name: gyLe Komb Model: Combined, S=f(datum) Unit Weight: 15 kN/m³Piezometric Line: 1 Phi: 30 °C-Rate of Change: 0 kPa/mCu-Rate of Change: 0.4 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 9 kPaElevation: 0 m

Name: Le Komb Model: Combined, S=f(datum) Unit Weight: 16 kN/m³Piezometric Line: 1 Phi: 30 °C-Rate of Change: 0 kPa/mCu-Rate of Change: 1.2 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 11 kPaElevation: -5 m

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion A\Sektion A_Komb_5kPa.gsz

F=1,31

F=1,44

-10 0 10 20 30 40 50 60 70-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:4

Page 35: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Let Let

gyLe Od

Le Od

Gata

Kungsbacka sportcenter104 22 35

Sektion A2-A2Odränerad analysBefintliga förhållanden2016-10-24

LLW -0,83

5 kPa 5 kPa

Name: Let Model: Undrained (Phi=0) Unit Weight: 18 kN/m³Cohesion: 15 kPaPiezometric Line: 1

Name: gyLe Od Model: S=f(datum) Unit Weight: 15 kN/m³Piezometric Line: 1 C-Datum: 9 kPaC-Rate of Change: 0.4 kPa/mLimiting C: 11 kPaElevation: 0 m

Name: Le Od Model: S=f(datum) Unit Weight: 16 kN/m³Piezometric Line: 1 C-Datum: 11 kPaC-Rate of Change: 1.2 kPa/mLimiting C: 23 kPaElevation: -5 m

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Cohesion: 0 kPaPiezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Phi: 34 °Phi-B: 0 °

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion A\Sektion A2\Sektion A2_Odrän_5kPa.gsz

F=1,45

-10 0 10 20 30 40 50 60 70-15-14-13-12-11-10

-9-8-7-6-5-4-3-2-1012345

BILAGA 3:5

Page 36: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Let Let Komb

gyLe Komb

Le Komb

Gata

Kungsbacka sportcenter104 22 35

Sektion A2-A2Kombinerad analysBefintliga förhållanden2016-10-24

LLW -0,83

0 kPa 0 kPa

F=1,64

Name: Let Model: Undrained (Phi=0) Unit Weight: 18 kN/m³Cohesion: 15 kPaPiezometric Line: 1

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Cohesion: 0 kPaPiezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Phi: 34 °Phi-B: 0 °

Name: Let Komb Model: Combined, S=f(depth) Unit Weight: 18 kN/m³Piezometric Line: 1 Phi: 30 °C-Top of Layer: 0 kPaC-Rate of Change: 0 kPa/mCu-Top of Layer: 15 kPaCu-Rate of Change: 0 kPa/mC/Cu Ratio: 0.1

Name: gyLe Komb Model: Combined, S=f(datum) Unit Weight: 15 kN/m³Piezometric Line: 1 Phi: 30 °C-Rate of Change: 0 kPa/mCu-Rate of Change: 0.4 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 9 kPaElevation: 0 m

Name: Le Komb Model: Combined, S=f(datum) Unit Weight: 16 kN/m³Piezometric Line: 1 Phi: 30 °C-Rate of Change: 0 kPa/mCu-Rate of Change: 1.2 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 11 kPaElevation: -5 m

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion A\Sektion A2\Sektion A2_Komb_5kPa.gsz

F=1,37

-10 0 10 20 30 40 50 60 70-15-14-13-12-11-10

-9-8-7-6-5-4-3-2-1012345

BILAGA 3:6

Page 37: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Let Let

gyLe Od

Le Od

Gata

Kungsbacka sportcenter104 22 35

Sektion B-BOdränerad analysBefintliga förhållanden2016-10-24

LLW -0,83

5 kPaF=1,31

Gräns detaljplaneområde

Name: Let Model: Undrained (Phi=0) Unit Weight: 18 kN/m³Cohesion: 15 kPaPiezometric Line: 1

Name: gyLe Od Model: S=f(datum) Unit Weight: 15 kN/m³Piezometric Line: 1 C-Datum: 9 kPaC-Rate of Change: 0.4 kPa/mLimiting C: 11 kPaElevation: 0 m

Name: Le Od Model: S=f(datum) Unit Weight: 16 kN/m³Piezometric Line: 1 C-Datum: 11 kPaC-Rate of Change: 1.2 kPa/mLimiting C: 23 kPaElevation: -5 m

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Cohesion: 0 kPaPiezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Phi: 34 °Phi-B: 0 °

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion B\Sektion_B_Odrän.gsz

F=1,53

-10 0 10 20 30 40 50 60 70-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:7

Page 38: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Let Komb Let Komb

gyLe Komb

Le Komb

Gata

Kungsbacka sportcenter104 22 35

Sektion B-BKombinerad analysBefintliga förhållanden2016-10-24

LLW -0,83

0 kPaF=1,16

Gräns detaljplaneområde

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Cohesion: 0 kPaPiezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Phi: 34 °Phi-B: 0 °

Name: Let Komb Model: Combined, S=f(depth) Unit Weight: 18 kN/m³Piezometric Line: 1 Phi: 30 °C-Top of Layer: 0 kPaC-Rate of Change: 0 kPa/mCu-Top of Layer: 15 kPaCu-Rate of Change: 0 kPa/mC/Cu Ratio: 0.1

Name: gyLe Komb Model: Combined, S=f(datum) Unit Weight: 15 kN/m³Piezometric Line: 1 Phi: 30 °C-Rate of Change: 0 kPa/mCu-Rate of Change: 0.4 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 9 kPaElevation: 0 m

Name: Le Komb Model: Combined, S=f(datum) Unit Weight: 16 kN/m³Piezometric Line: 1 Phi: 30 °C-Rate of Change: 0 kPa/mCu-Rate of Change: 1.2 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 11 kPaElevation: -5 m

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion B\Sektion_B_Komb.gsz

F=1,52

-10 0 10 20 30 40 50 60 70-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:8

Page 39: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

LetLet

gyLe Od

Le Od

Gata

Kungsbacka sportcenter104 22 35

Sektion B-BOdränerad analysEfter initialskred +5kPa2016-10-24

LLW -0,83

5 kPa

Initialskred(F=1,16)

Gräns detaljplaneområde

Name: Let Model: Undrained (Phi=0) Unit Weight: 18 kN/m³Cohesion: 15 kPaPiezometric Line: 1

Name: gyLe Od Model: S=f(datum) Unit Weight: 15 kN/m³Piezometric Line: 1 C-Datum: 9 kPaC-Rate of Change: 0.4 kPa/mLimiting C: 11 kPaElevation: 0 m

Name: Le Od Model: S=f(datum) Unit Weight: 16 kN/m³Piezometric Line: 1 C-Datum: 11 kPaC-Rate of Change: 1.2 kPa/mLimiting C: 23 kPaElevation: -5 m

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Cohesion: 0 kPaPiezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Phi: 34 °Phi-B: 0 °

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion B\Sektion_B_Odrän_Initialskred+5kPa.gsz

F=1,47

5 kPa

-10 0 10 20 30 40 50 60 70-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:9

Page 40: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Let KombLet Komb

gyLe Komb

Le Komb

Gata

Kungsbacka sportcenter104 22 35

Sektion B-BKombinerad analysEfter initialskred +5 kPa2016-10-24

LLW -0,83

0 kPa

Initialskred(F=1,16)

Gräns detaljplaneområde

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Cohesion: 0 kPaPiezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Phi: 34 °Phi-B: 0 °

Name: Let Komb Model: Combined, S=f(depth) Unit Weight: 18 kN/m³Piezometric Line: 1 Phi: 30 °C-Top of Layer: 0 kPaC-Rate of Change: 0 kPa/mCu-Top of Layer: 15 kPaCu-Rate of Change: 0 kPa/mC/Cu Ratio: 0.1

Name: gyLe Komb Model: Combined, S=f(datum) Unit Weight: 15 kN/m³Piezometric Line: 1 Phi: 30 °C-Rate of Change: 0 kPa/mCu-Rate of Change: 0.4 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 9 kPaElevation: 0 m

Name: Le Komb Model: Combined, S=f(datum) Unit Weight: 16 kN/m³Piezometric Line: 1 Phi: 30 °C-Rate of Change: 0 kPa/mCu-Rate of Change: 1.2 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 11 kPaElevation: -5 m

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion B\Sektion_B_Komb_Initialskred+5kPa.gsz

F=1,46

5kPa

-10 0 10 20 30 40 50 60 70-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:10

Page 41: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Le 1 Od

Le 2 Od

Le 3 Od

gyLe 1 Od

Btg

GytgyLe 1 OdgyLe 2 Od gyLe 2 Od

Gata GataFy

FyFy

Kungsbacka sportcenter104 22 35

Sektion C-COdränerad analysBefintliga förhållanden2016-10-19

F=1,53

Gräns detaljplaneområde

Name: gyLe 2 Od Model: S=f(datum) Unit Weight: 15 kN/m³C-Datum: 9.5 kPaC-Rate of Change: 0.4 kPa/mLimiting C: 11 kPaElevation: 1 mPiezometric Line: 1

Name: Le 1 Od Model: S=f(datum) Unit Weight: 15 kN/m³C-Datum: 11 kPaC-Rate of Change: 0.6 kPa/mLimiting C: 15 kPaElevation: -3 mPiezometric Line: 1

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Piezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Cohesion: 0 kPaPhi: 45 °Phi-B: 0 °

Name: Le 2 Od Model: S=f(datum) Unit Weight: 16 kN/m³C-Datum: 15 kPaC-Rate of Change: 0.8 kPa/mLimiting C: 21.5 kPaElevation: -10 mPiezometric Line: 1

Name: Le 3 Od Model: S=f(datum) Unit Weight: 16 kN/m³C-Datum: 21.5 kPaC-Rate of Change: 1 kPa/mLimiting C: 26.5 kPaElevation: -18 mPiezometric Line: 1

Name: gyLe 1 Od Model: Undrained (Phi=0) Unit Weight: 15 kN/m³Piezometric Line: 1 Cohesion: 9.5 kPa

Name: Fy Model: Mohr-Coulomb Unit Weight: 20 kN/m³Piezometric Line: 1 Unit Wt. Above Water Table: 18 kN/m³Cohesion: 0 kPaPhi: 32 °Phi-B: 0 °

Name: Btg Model: Mohr-Coulomb Unit Weight: 24 kN/m³Piezometric Line: 1 Cohesion: 1000 kPaPhi: 0 °Phi-B: 0 °

Name: Gyt Model: Undrained (Phi=0) Unit Weight: 16 kN/m³Piezometric Line: 1 Cohesion: 15 kPa

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion C\Sektion_C_Odrän.gsz

F=1,46

0 10 20 30 40 50 60 70 80 90-20-19-18-17-16-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:11

Page 42: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Le 1 Komb

Le 2 Komb

Le 3 Komb

gyLe 1 Komb

Btg

Gyt KombgyLe 1 KombgyLe 2 Komb gyLe 2 Komb

Gata GataFy

FyFy

Kungsbacka sportcenter104 22 35

Sektion C-CKombinerad analysBefintliga förhållanden2016-10-19

F=1,49

Gräns detaljplaneområde

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Unit Wt. Above Water Table: 20 kN/m³Cohesion: 0 kPaPhi: 45 °Phi-B: 0 °Piezometric Line: 1

Name: Fy Model: Mohr-Coulomb Unit Weight: 20 kN/m³Unit Wt. Above Water Table: 18 kN/m³Cohesion: 0 kPaPhi: 32 °Phi-B: 0 °Piezometric Line: 1

Name: Btg Model: Mohr-Coulomb Unit Weight: 24 kN/m³Cohesion: 1000 kPaPhi: 0 °Phi-B: 0 °Piezometric Line: 1

Name: Gyt Komb Model: Combined, S=f(depth) Unit Weight: 16 kN/m³Phi: 30 °Piezometric Line: 1 C-Top of Layer: 0 kPaC-Rate of Change: 0 kPa/mCu-Top of Layer: 15 kPaCu-Rate of Change: 0 kPa/mC/Cu Ratio: 0.1

Name: gyLe 1 Komb Model: Combined, S=f(depth) Unit Weight: 15 kN/m³Phi: 30 °Piezometric Line: 1 C-Top of Layer: 0 kPaC-Rate of Change: 0 kPa/mCu-Top of Layer: 9.5 kPaCu-Rate of Change: 0 kPa/mC/Cu Ratio: 0.1

Name: gyLe 2 Komb Model: Combined, S=f(datum) Unit Weight: 15 kN/m³Phi: 30 °Piezometric Line: 1 C-Rate of Change: 0 kPa/mCu-Rate of Change: 0.4 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 9.5 kPaElevation: 1 m

Name: Le 1 Komb Model: Combined, S=f(datum) Unit Weight: 15 kN/m³Phi: 30 °Piezometric Line: 1 C-Rate of Change: 0 kPa/mCu-Rate of Change: 0.6 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 11 kPaElevation: -3 m

Name: Le 2 Komb Model: Combined, S=f(datum) Unit Weight: 16 kN/m³Phi: 30 °Piezometric Line: 1 C-Rate of Change: 0 kPa/mCu-Rate of Change: 0.8 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 15 kPaElevation: -10 m

Name: Le 3 Komb Model: Combined, S=f(datum) Unit Weight: 16 kN/m³Phi: 30 °Piezometric Line: 1 C-Rate of Change: 0 kPa/mCu-Rate of Change: 1 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 21.5 kPaElevation: -18 m

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion C\Sektion_C_Komb.gsz

F=1,40

0 10 20 30 40 50 60 70 80 90-20-19-18-17-16-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:12

Page 43: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Le 1 Od

Le 2 Od

Le 3 Od

gyLe 1 Od

Btg

GytgyLe 1 OdgyLe 2 Od gyLe 2 Od

Gata GataFy

FyFy

5kPa

F=1,53

Gräns detaljplaneområde

Name: gyLe 2 Od Model: S=f(datum) Unit Weight: 15 kN/m³C-Datum: 9.5 kPaC-Rate of Change: 0.4 kPa/mLimiting C: 11 kPaElevation: 1 mPiezometric Line: 1

Name: Le 1 Od Model: S=f(datum) Unit Weight: 15 kN/m³C-Datum: 11 kPaC-Rate of Change: 0.6 kPa/mLimiting C: 15 kPaElevation: -3 mPiezometric Line: 1

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Piezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Cohesion: 0 kPaPhi: 45 °Phi-B: 0 °

Name: Le 2 Od Model: S=f(datum) Unit Weight: 16 kN/m³C-Datum: 15 kPaC-Rate of Change: 0.8 kPa/mLimiting C: 21.5 kPaElevation: -10 mPiezometric Line: 1

Name: Le 3 Od Model: S=f(datum) Unit Weight: 16 kN/m³C-Datum: 21.5 kPaC-Rate of Change: 1 kPa/mLimiting C: 26.5 kPaElevation: -18 mPiezometric Line: 1

Name: gyLe 1 Od Model: Undrained (Phi=0) Unit Weight: 15 kN/m³Piezometric Line: 1 Cohesion: 9.5 kPa

Name: Fy Model: Mohr-Coulomb Unit Weight: 20 kN/m³Piezometric Line: 1 Unit Wt. Above Water Table: 18 kN/m³Cohesion: 0 kPaPhi: 32 °Phi-B: 0 °

Name: Btg Model: Mohr-Coulomb Unit Weight: 24 kN/m³Piezometric Line: 1 Cohesion: 1000 kPaPhi: 0 °Phi-B: 0 °

Name: Gyt Model: Undrained (Phi=0) Unit Weight: 16 kN/m³Piezometric Line: 1 Cohesion: 15 kPa

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion C\Sektion_C_Odrän.gsz

F=1,46

Kungsbacka sportcenter104 22 35

Sektion C-COdränerad analysBefintlig topografi + Marklast 5 kPa2016-10-19

0 10 20 30 40 50 60 70 80 90-20-19-18-17-16-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:13

Page 44: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Le 1 Komb

Le 2 Komb

Le 3 Komb

gyLe 1 Komb

Btg

Gyt KombgyLe 1 KombgyLe 2 Komb gyLe 2 Komb

Gata GataFy

FyFy

5kPa

F=1,49

Gräns detaljplaneområde

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Unit Wt. Above Water Table: 20 kN/m³Cohesion: 0 kPaPhi: 45 °Phi-B: 0 °Piezometric Line: 1

Name: Fy Model: Mohr-Coulomb Unit Weight: 20 kN/m³Unit Wt. Above Water Table: 18 kN/m³Cohesion: 0 kPaPhi: 32 °Phi-B: 0 °Piezometric Line: 1

Name: Btg Model: Mohr-Coulomb Unit Weight: 24 kN/m³Cohesion: 1000 kPaPhi: 0 °Phi-B: 0 °Piezometric Line: 1

Name: Gyt Komb Model: Combined, S=f(depth) Unit Weight: 16 kN/m³Phi: 30 °Piezometric Line: 1 C-Top of Layer: 0 kPaC-Rate of Change: 0 kPa/mCu-Top of Layer: 15 kPaCu-Rate of Change: 0 kPa/mC/Cu Ratio: 0.1

Name: gyLe 1 Komb Model: Combined, S=f(depth) Unit Weight: 15 kN/m³Phi: 30 °Piezometric Line: 1 C-Top of Layer: 0 kPaC-Rate of Change: 0 kPa/mCu-Top of Layer: 9.5 kPaCu-Rate of Change: 0 kPa/mC/Cu Ratio: 0.1

Name: gyLe 2 Komb Model: Combined, S=f(datum) Unit Weight: 15 kN/m³Phi: 30 °Piezometric Line: 1 C-Rate of Change: 0 kPa/mCu-Rate of Change: 0.4 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 9.5 kPaElevation: 1 m

Name: Le 1 Komb Model: Combined, S=f(datum) Unit Weight: 15 kN/m³Phi: 30 °Piezometric Line: 1 C-Rate of Change: 0 kPa/mCu-Rate of Change: 0.6 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 11 kPaElevation: -3 m

Name: Le 2 Komb Model: Combined, S=f(datum) Unit Weight: 16 kN/m³Phi: 30 °Piezometric Line: 1 C-Rate of Change: 0 kPa/mCu-Rate of Change: 0.8 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 15 kPaElevation: -10 m

Name: Le 3 Komb Model: Combined, S=f(datum) Unit Weight: 16 kN/m³Phi: 30 °Piezometric Line: 1 C-Rate of Change: 0 kPa/mCu-Rate of Change: 1 kPa/mC/Cu Ratio: 0.1 C-Datum: 0 kPaCu-Datum: 21.5 kPaElevation: -18 m

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion C\Sektion_C_Komb.gsz

F=1,40

Kungsbacka sportcenter104 22 35

Sektion C-CKombinerad analysBefintlig topografi + Marklast 5 kPa2016-10-19

0 10 20 30 40 50 60 70 80 90-20-19-18-17-16-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:14

Page 45: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Le 1 Od

Le 2 Od

Le 3 Od

GytgyLe 1 OdGatagyLe 2 Od gyLe 2 OdBtg

Gata

Kungsbacka sportcenter104 22 35

Sektion C2-C2Odränerad analysBefintliga förhållanden2016-10-18

5kPa

F=1,84

Gräns detaljplaneområde

Name: gyLe 2 Od Model: S=f(datum) Unit Weight: 15 kN/m³C-Datum: 9.5 kPaC-Rate of Change: 0.4 kPa/mLimiting C: 11 kPaElevation: 1 mPiezometric Line: 1

Name: Le 1 Od Model: S=f(datum) Unit Weight: 15 kN/m³C-Datum: 11 kPaC-Rate of Change: 0.6 kPa/mLimiting C: 15 kPaElevation: -3 mPiezometric Line: 1

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Piezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Cohesion: 0 kPaPhi: 45 °Phi-B: 0 °

Name: Le 2 Od Model: S=f(datum) Unit Weight: 16 kN/m³C-Datum: 15 kPaC-Rate of Change: 0.8 kPa/mLimiting C: 21.5 kPaElevation: -10 mPiezometric Line: 1

Name: Le 3 Od Model: S=f(datum) Unit Weight: 16 kN/m³C-Datum: 21.5 kPaC-Rate of Change: 1 kPa/mLimiting C: 26.5 kPaElevation: -18 mPiezometric Line: 1

Name: gyLe 1 Od Model: Undrained (Phi=0) Unit Weight: 15 kN/m³Piezometric Line: 1 Cohesion: 9.5 kPa

Name: Btg Model: Mohr-Coulomb Unit Weight: 24 kN/m³Piezometric Line: 1 Cohesion: 1000 kPaPhi: 0 °Phi-B: 0 °

Name: Gyt Model: Undrained (Phi=0) Unit Weight: 16 kN/m³Piezometric Line: 1 Cohesion: 15 kPa

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion C\Sektion C2\Sektion_C2_Odrän.gsz

0 10 20 30 40 50 60 70 80 90-20-19-18-17-16-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:15

Page 46: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Le 1 Komb

Le 2 Komb

Le 3 Komb

Gyt KombgyLe 1 KombGatagyLe 2 Od gyLe 2 KombBtg

Gata

Kungsbacka sportcenter104 22 35

Sektion C2-C2Kombinerad analysBefintliga förhållanden2016-10-18

5kPa

F=1,75

Gräns detaljplaneområde

Name: gyLe 2 Od Model: S=f(datum) Unit Weight: 15 kN/m³C-Datum: 9.5 kPaC-Rate of Change: 0.4 kPa/mLimiting C: 11 kPaElevation: 1 mPiezometric Line: 1

Name: Gata Model: Mohr-Coulomb Unit Weight: 22 kN/m³Piezometric Line: 1 Unit Wt. Above Water Table: 20 kN/m³Cohesion: 0 kPaPhi: 45 °Phi-B: 0 °

Name: Btg Model: Mohr-Coulomb Unit Weight: 24 kN/m³Piezometric Line: 1 Cohesion: 1000 kPaPhi: 0 °Phi-B: 0 °

Name: Gyt Komb Model: Combined, S=f(depth) Unit Weight: 16 kN/m³C-Rate of Change: 0 kPa/mPiezometric Line: 1 Phi: 30 °C-Top of Layer: 0 kPaCu-Top of Layer: 15 kPaCu-Rate of Change: 0 kPa/mC/Cu Ratio: 0.1

Name: gyLe 1 Komb Model: Combined, S=f(depth) Unit Weight: 15 kN/m³C-Rate of Change: 0 kPa/mPiezometric Line: 1 Phi: 30 °C-Top of Layer: 0 kPaCu-Top of Layer: 9.5 kPaCu-Rate of Change: 0 kPa/mC/Cu Ratio: 0.1

Name: gyLe 2 Komb Model: Combined, S=f(datum) Unit Weight: 15 kN/m³C-Datum: 0 kPaC-Rate of Change: 0 kPa/mElevation: 1 mPiezometric Line: 1 Phi: 30 °Cu-Rate of Change: 0.4 kPa/mC/Cu Ratio: 0.1 Cu-Datum: 9.5 kPa

Name: Le 1 Komb Model: Combined, S=f(datum) Unit Weight: 15 kN/m³C-Datum: 0 kPaC-Rate of Change: 0 kPa/mElevation: -3 mPiezometric Line: 1 Phi: 30 °Cu-Rate of Change: 0.6 kPa/mC/Cu Ratio: 0.1 Cu-Datum: 11 kPa

Name: Le 2 Komb Model: Combined, S=f(datum) Unit Weight: 16 kN/m³C-Datum: 0 kPaC-Rate of Change: 0 kPa/mElevation: -10 mPiezometric Line: 1 Phi: 30 °Cu-Rate of Change: 0.8 kPa/mC/Cu Ratio: 0.1 Cu-Datum: 15 kPa

Name: Le 3 Komb Model: Combined, S=f(datum) Unit Weight: 16 kN/m³C-Datum: 0 kPaC-Rate of Change: 0 kPa/mElevation: -18 mPiezometric Line: 1 Phi: 30 °Cu-Rate of Change: 1 kPa/mC/Cu Ratio: 0.1 Cu-Datum: 21.5 kPa

Directory: N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sektion C\Sektion C2\Sektion_C2_Komb.gsz

0 10 20 30 40 50 60 70 80 90-20-19-18-17-16-15-14-13-12-11-10-9-8-7-6-5-4-3-2-1012345

BILAGA 3:16

Page 47: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

15

14

14

16

7

1514

6A

1312

6

5

11

10

9

24

2325

22

21

1920

1615

14

13

12

12-9

1-2

3-6

7-8

44

42

75

29

3031

5B-6B5A-6A

3B-4B3A-4A

2

1

1-4 5-

8

39404142

9-10

38

3736

11

35

13

33

34

14-1015

9-7

16

3-6

1-2

9

3

8

4

11B11

1

10

12

2

8A

2B

5D

5C

25-2329-26

22

21

36 201937

18173839

16

1 15

10

1312

11

26-23 22-17

27-3

0

31-3

6

37-38

1

2

3

6 874-5

2728 26

29-30

21

24-28

22-23

16 15

11-14

9-103-8

1-2

151613B-14B

13A-14A

30-3

1

32-3

5

3-2

9-4

1

14 1531-34

11B-12B

11A-12A

9B-10B

9A-10A

7B-8B7A-8A

9A-10A9B-10B7B-8B

11 7A-8

A

20

19

2728

29

3230

31

18

17

14

1920

12H

ugin

s vä

g

Hugins väg

Balders väg

Yggd

rasi

lsväg

en

Midgårdsvägen

Valhallsvägen

Munins väg

Yggd

rasil

sväg

en Frejas väg

Kungsbacka Sportcenter

Kungsbacka Sportcenter

Kungsbacka Sportcenter

Kungsbacka SportcenterKungsbacka Sportcenter

Gym

nasiegatan

Kungsbacka Sportcenter

Södra infarten

Lilla Hantverksg

4:29

4:62

4:58

1:20

1:29

1:31

1:20

4:6

2

1

4:6

7:1

4:29

4:6

4:30

4:28

1:35

1:35

1:36

1:33

1:36

1:20

4:6

4:65

1

4:6

7:1

4:274:6

1:30

1:28

s:5

Boulehall

Ishall

Förskola

Ishall Länsförsäkringar Arena

AranäshallenSporthall

Simhall

Aranäsgymnasiet

Teater

Kv.gård

Kv.gård

Kv.

gård

stationstationstation Pump-

Idrottshall

Kungsbackaån

INLAGSBYINLAGSGÄRDE

KUNGSBACKA

KUNGSBACKA

Norconsult ABBox 8774, 402 76 Göteborg

Tfn 031-50 70 00www.norconsult.se

Page 48: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Kungsbacka sportcenter

Markteknisk undersökningsrapport, MUR geoteknik

2016-11-01

Page 49: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Kungsbacka sportcenter Markteknisk undersökningsrapport, MUR geoteknik 2016-11-01 Beställare: Kungsbacka kommun

434 41 Kungsbacka Beställarens representant: Andrea Ericsson

Konsult: Norconsult AB

Box 8774 402 76 Göteborg

Uppdragsledare/ David Rudebeck handläggare Teknikansvarig Daniel Svärd Uppdragsnr: 104 22 35

Filnamn och sökväg: N:\104\22\1042235\5 Arbetsmaterial\01

Dokument\G\MUR\MUR_KbaSportcenter.docx

Kvalitetsgranskad av: Daniel Strandberg

Page 50: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Markteknisk undersökningsrapport, MUR geoteknik

3 (9)

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\mur

\mur

_kba

spor

tcen

ter.d

ocx

Innehållsförteckning 1 Förutsättningar .................................................................................... 4 2 Syfte .................................................................................................... 4 3 Styrande dokument ............................................................................. 5 4 Geotekniska undersökningar ............................................................... 6

4.1 Tidigare utförda undersökningar ........................................... 6 4.2 Nu utförda undersökningar.................................................... 6

5 Befintliga förhållanden ......................................................................... 7 5.1 Topografi och markbeskaffenhet ........................................... 7

6 Utsättning och höjdbestämning ........................................................... 7 7 Redovisning ........................................................................................ 7 8 Härledda värden .................................................................................. 7

8.1 Hållfasthetsegenskaper ........................................................ 7 8.2 Deformationsegenskaper ...................................................... 8 8.3 Hydrogeologiska egenskaper ................................................ 8 8.4 Radon ................................................................................... 8

9 Värdering av undersökning .................................................................. 8 Bilagor Sammanställning av utförda fältundersökningar (ID-lista) Bilaga 1:1-1:2 Utvärdering CPT-sonderingar Bilaga 2:1-2:9 Sammanställning av laboratorieresultat Bilaga 3:1-3:3 CRS-försök Bilaga 4:1-4:25 Direkta skjuvförsök Bilaga 5:1-5:4 Sammanställning skjuvhållfasthet: härledda värden Bilaga 6:1-6:3 Radon, mätresultat Bilaga 7 Ritningar Situations- och borrplan Ritning G101 Plan, radonundersökning Ritning G102 Sonderingsresultat Ritning G301-302 Beteckningssystem, SGF (se SGFs hemsida – http://www.sgf.net, beteckningssystem)

Page 51: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Markteknisk undersökningsrapport, MUR geoteknik

4 (9)

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\mur

\mur

_kba

spor

tcen

ter.d

ocx

1 Förutsättningar Norconsult AB har på uppdrag av Kungsbacka kommun utfört geoteknisk undersökning inför ny detaljplan inom Kungsbacka sportcenter i södra delen av Kungsbacka tätort. Se figur 1.1 nedan för översiktsbild av området.

Figur 1.1 Översiktsbild av Kungsbacka sportcenter med anvisat läge för planerad simhall samt avgränsning av detaljplaneområdet (tjock svart linje).

2 Syfte Den geotekniska undersökningen har utförts i samband med framtagandet av en ny detaljplan. Den nya detaljplanen innefattar uppförande av en ny simhall, parkområden i väster samt parkeringsytor alternativt parkeringshus i öster och norr.

Ny simhall

Page 52: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Markteknisk undersökningsrapport, MUR geoteknik

5 (9)

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\mur

\mur

_kba

spor

tcen

ter.d

ocx

3 Styrande dokument Denna rapport ansluter till SS-EN 1997-1 med tillhörande nationell bilaga.

Tabell 2.1. Planering och redovisning Undersökningsmetod Standard eller annat styrande dokument Fältplanering SS-EN 1997-2

Fältutförande Geoteknisk fälthandbok SGF Rapport 1:2013 samt SS-EN-ISO 22475-1

Beteckningssystem SGF/BGS beteckningssystem 2001:2 Tabell 2.2. Fältundersökningar Undersökningsmetod Standard eller annat styrande dokument Trycksondering Geoteknisk fälthandbok SGF Rapport 1:2013

CPT-sondering SS-EN ISO 22476-1:2012

Vingsondering Geoteknisk fälthandbok SGF Rapport 1:2013

Skruvprovtagning Geoteknisk fälthandbok SGF Rapport 1:2013

Kolvprovtagning Geoteknisk fälthandbok SGF Rapport 1:2013

Tabell 2.3. Laboratorieundersökningar Undersökningsmetod Standard eller annat styrande dokument Klassificering SS-EN ISO 14688-1

SIS-CEN ISO/TS 17892-6:2005

Vattenkvot SIS-CEN ISO/TS 17892-1:2005

Konflytgräns SIS-CEN ISO/TS 17892-12:2004

Skrymdensitet SIS-CEN ISO/TS 17892-2:2005

Konförsök ISO/TS 17892-6:2004

CRS SS 027126

Direkta skjuvförsök SS 027127

Tabell 2.4. Hydrogeologiska undersökningar Undersökningsmetod Standard eller annat styrande dokument Grundvattenmätning SGF Fälthandbok 1:2013 Portrycksmätning Geoteknisk fälthandbok SGF Rapport 1:2013

Page 53: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Markteknisk undersökningsrapport, MUR geoteknik

6 (9)

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\mur

\mur

_kba

spor

tcen

ter.d

ocx

4 Geotekniska undersökningar 4.1 Tidigare utförda undersökningar Fältundersökningar har tidigare utförts vid den norra detaljplanegränsen mot Hantverksgatan samt längs Västkustbanan vid den östra detaljplanegränsen. Undersökningarna redovisas i dokumenten nedan.

Västkustbanan Göteborg-Fjärås, Geoteknisk undersökning. Utförd 1994 av J&W Bygg & Anläggning AB på uppdrag av Banverket Västra Regionen. Uppdragsnummer 4 250 051.

Aranäsområdet, etapp 2C och 2D, Kungsbacka. Gatu- och VA-anläggning. Rapport, geoteknisk undersökning, Rgeo, Fält- och laboratorieresultat. Utförd av GF Konsult, daterad 2007-12-19 med uppdragsnummer 101 01 98.

4.2 Nu utförda undersökningar Geotekniska fältundersökningar

Fältundersökningar utfördes av Norconsult Fältgeoteknik AB i april 2016 av fältgeoteknikerna Richard Carlsson och Johan Brunberg. Undersökningarna omfattade följande metoder:

Vingsondering i 2 punkter för utvärdering av kohesionsjordens odränerade skjuvhållfasthet in situ.

Trycksondering i 7 punkter för bestämning av kohesionsjordens mäktighet och relativa fasthet.

CPT-sondering i 2 punkter för bestämning av kohesionsjordens mäktighet, relativa fasthet samt förekomst av skikt.

Upptagning av störda jordprover med skruvprovtagare i 10 punkter till 3-4 m djup för klassificering av ytjordlagren.

Upptagning av ostörda jordprover med kolvprovtagare i 1 punkt till 25 m djup.

Inmätning av borrpunkter med GPS samt lodning av en sektion i Kungsbackaån.

Provtagningar och hantering av jordprover har utförts i enlighet med Geoteknisk fälthandbok SGF Rapport 1:2013. Geotekniska laboratorieundersökningar

Jordproverna har analyserats i Rambölls laboratorium i Göteborg och omfattade följande:

Page 54: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter Markteknisk undersökningsrapport, MUR geoteknik

7 (9)

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\mur

\mur

_kba

spor

tcen

ter.d

ocx

Undersökning av störda prover omfattande bestämning av jordart, vattenkvot och konflytgräns.

Undersökning av ostörda prover omfattande jordart, densitet, vattenkvot, konflytgräns, skjuvhållfasthet, sensitivitet och deformationsegenskaper.

Geohydrologiska undersökningar

Korttidsobservation av fria grundvattenytor i skruvprovtagningshål. Installation av portrycksmätare (BAT-spets) i 2 punkter på totalt 3 nivåer.

5 Befintliga förhållanden 5.1 Topografi och markbeskaffenhet För detaljer avseende topografi, se ritning G101 Borrplan.

Markytan inom undersökningsområdet är plan med nivåer generellt varierande mellan ca +1 till +3 med svag lutning från öst till väst. Alla nivåangivelser i texten anges i höjdsystem RH2000.

Området utgörs av växlande gräsytor/öppen mark samt grus- och asfaltsytor. I söder finns en lätt träbyggnad i ett plan som nyttjas av en förskola.

6 Utsättning och höjdbestämning Utsättning och inmätning av nu utförda borrpunkterna gjordes med GPS enligt koordinatsystem SWEREF 991200 i plan och RH2000 i höjd. Samtliga borrpunkter på ritning G101 och G301 refererar till dessa system.

7 Redovisning Fält- och laboratorieundersökningarna (samt resultat från grundvattenobservationer) redovisas på bifogade bilagor och ritningar enligt innehållsförteckningen. Jordartsbeteckningar redovisas enligt SGF:s beteckningssystem med svenska förkortningar.

8 Härledda värden 8.1 Hållfasthetsegenskaper Härledda korrigerade värden gällande lerans odränerade skjuvhållfasthet framgår av sammanställning i bilaga 6.

Page 55: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-11-01 Kungsbacka sportcenter

Markteknisk undersökningsrapport, MUR geoteknik

8 (9)

n:\1

04\2

2\10

4223

5\5

arbe

tsm

ater

ial\0

1 do

kum

ent\g

\mur

\mur

_kba

spor

tcen

ter.d

ocx

8.2 Deformationsegenskaper Resultat från utförda CRS-försök redovisas i bilaga 4.

8.3 Hydrogeologiska egenskaper Korttidsobservationer av stabiliserad vattenyta i skruvprovtagningshålen redovisas i ritning G301 liksom uppmätta portrycksnivåer.

8.4 Radon Metodval, lägen och resultat från utförda radonundersökningar redovisas i ritning G102 och bilaga 7.

9 Värdering av undersökning I labbprotokollet för den störda provtagningen redovisas för punkterna NC1, NC2, NC6, NC8 och NC10 höga eller mycket höga vattenkvoter för torrskorpeleran. Sambandet mellan den okulära jordartsbestämningen och uppmätta vattenkvoter betraktas som avvikande för dessa prover.

Norconsult AB Väg och Bana Geoteknik David Rudebeck [email protected]

Daniel Svärd daniel.svä[email protected]

Page 56: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Norconsult AB Theres Svensson gata 11 Box 8774, 402 76 Göteborg 031 – 50 70 00, fax 031-50 70 10 www.norconsult.se

Page 57: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Proj.nr. 104 22 35Proj.namn Kungsbacka sportcenter

Punkt Metod X Y Z KommentarNC1 CPT, Vb, Skr 6373532,1 154456,5 1,6NC2 CPT, Skr 6373531,5 154485,7 2,6NC3 Tr, Skr, PP 6373503,5 154454,6 1,3NC4 Tr, Vb, Skr 6373494,4 154485,2 1,8NC5 Tr, Skr 6373351,3 154578,0 2,1NC6 Tr, Skr, Kv, PP 6373440,2 154637,8 2,0

NC6B Tr 6373440,1 154640,7 2,0NC7 Tr, Skr 6373526,0 154683,5 2,3NC8 Tr, Skr 6373353,7 154706,8 2,3NC9 Tr, Skr 6373614,3 154733,0 2,5NC10 Skr 6373479,2 154664,3 2,1

1R M10, Gsm 6373511,5 154634,1 -2R M10, Gsm 6373478,4 154648,4 -3R M10, Gsm 6373441,6 154641,0 -4R Gsm 6373439,7 154649,8 -5R M10, Gsm 6373442,1 154620,5 -6R Gsm 6373453,3 154628,8 -7R M10, Gsm 6373381,5 154633,9 -8R Gsm 6373536,8 154612,9 -9R Gsm 6373506,8 154620,4 -10R Gsm 6373398,9 154655,8 -

Tr - TrycksonderingCPT - Cone penetration testVb - VingsonderingSkr - SkruvprovtagningKv - Kolvprovtagning

M10 - Emanometer/Markus 10-instrument

ID-lista borrpunkter

KoordinatsystemHöjdsystem

Gsm - Gammaspektrometer

RH2000Sweref 99 12 00

PP - Portryckmätning (BAT-spets)

BILAGA 1:1

Page 58: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Proj.nr. 104 22 35Proj.namn Kungsbacka sportcenter

Punkt X Y Nivå bottenyta KommentarL1 6373520,6 154449,4 -0,5L2 6373520,6 154448,5 -0,7L3 6373520,7 154447,4 -0,9L4 6373521,0 154446,6 -1,1L5 6373521,4 154445,3 -1,4L6 6373521,2 154444,5 -0,5L7 6373521,2 154443,5 -1,4L8 6373521,2 154442,5 -1,3

L10 6373521,4 154440,4 -1,3L12 6373521,8 154438,6 -1,3L14 6373521,8 154436,4 -1,4L16 6373522,0 154434,4 -1,3L18 6373522,3 154432,5 -1,4L20 6373522,4 154430,5 -1,4L21 6373522,6 154429,5 -1,3L22 6373522,7 154428,4 -1,4L23 6373522,8 154427,5 -1,1L24 6373523,0 154426,5 -0,4L25 6373523,0 154425,4 -0,2L26 6373522,9 154424,4 -0,1

Manuell lodning utförd vid GC-bron över Kungsbackaån nordväst om ishallen.Lodning utförd från öst till väst med utgångspunkt från den östra änden på bronsbetongbalk. Lodningspunkternas lägen i plan är inmätta med GPS.

ID-lista utförd lodning

KoordinatsystemHöjdsystem RH2000

Sweref 99 12 00

BILAGA 1:2

Page 59: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

CPT-sondering utförd enligt EN ISO 22476-1

0

2

4

6

8

10

12

14

16

18

20

22

24

0 1 2 3 4 5 0 50 100 150 200 0 500 1000Portryck u, uo, u (kPa)

0 1 2 3 4 0.0 0.5 1.0

Uo

Uo

Uo

Uo

Uo

U

U

U

U

U

U

FörborrningsdjupStart djupStopp djupGrundvattennivå

1.60 m1.60 m

25.02 m1.60 m

Portrycksparameter Bq

Djup (m

)

ProjektProjekt nrPlatsBorrhålDatum

Kungsbacka sportcenter104 22 35Kba sportcenNC12016-04-26

2016-06-17N:\104\22\1042235\5 Arbetsmaterial\02 Cad\G\Autograf\STACK\NC1.cpw

0 5 10Lutning (grader)

ReferensNivå vid referensFörborrat materialGeometri

My1.20 mLetNormal

Friktion ft (kPa)Friktion ft (kPa) Friktionskvot Rft (%)Friktionskvot Rft (%)

Vätska i filterBorrpunktens koord.Utrustning NovasondSond nr 4598

Spetstryck qt (MPa)Spetstryck qt (MPa)

BILAGA 2:1

Page 60: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

0

2

4

6

8

10

12

14

16

18

20

22

24

0 10 20 30 40 50Friktionsvinkel (o)

xxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x xxxxxxxxxxxxxxxx xx xxx xxxx xxxxx xxxx xxx xxxxxxxxx xxxxxxxxxxxxxxxxxx

Odränerad skjuvhållfasthet fu (kPa)30 40 50Klassificering

ReferensNivå vid referensGrundvattenytaStartdjup

My1.20 m1.60 m1.60 m

FörborrningsdjupFörborrat materialUtrustningGeometri

1.60 mLetNovasondNormal

Djup (m

)

ProjektProjekt nrPlatsBorrhålDatum

Kungsbacka sportcenter104 22 35Kba sportcenNC12016-04-26

2016-06-17N:\104\22\1042235\5 Arbetsmaterial\02 Cad\G\Autograf\STACK\NC1.cpw

vL

EL

vL EL

vL

L

OC

NCSi

NC NCSi

NC

0 5 10 15 20 25 30 35 40Modul (MPa)

Cl

xo

+

Svensk empiriLunne, överkonsolideradLunne, normalkonsoliderad

0 50 100Relativ lagringstäthet ID (%)

UtvärderareDatum för utvärdering

David Rudebeck2016-05-26

CPT-sondering utvärderad enligt SGI Information 15 rev.2007

BILAGA 2:2

Page 61: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

0

2

4

6

8

10

12

14

16

18

20

22

24

0 10 20 30 40 50Effektivtryck (kPa)

xxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x xxxxxxxxxxxxxxxx xx xxx xxxx xxxxx xxxx xxx xxxxxxxxxxxxxxxxxxxxxxxxxxx

Odränerad skjuvhållfasthet fu (kPa)0 20 40 60 80 100 120 140 160 180Klassificering

ReferensNivå vid referensGrundvattenytaStartdjup

My1.20 m1.60 m1.60 m

FörborrningsdjupFörborrat materialUtrustningGeometri

1.60 mLetNovasondNormal

Djup (m

)

ProjektProjekt nrPlatsBorrhålDatum

Kungsbacka sportcenter104 22 35Kba sportcenNC12016-04-26

2016-06-17N:\104\22\1042235\5 Arbetsmaterial\02 Cad\G\Autograf\STACK\NC1.cpw

vL

EL

vL EL

vL

L

OC

NCSi

NC NCSi

NC

Cl

ooooooo ooo ooooo ooooooooooooo oooooooooooo oo o ooo oooo o o o ooo oooooo oo oooo o oo o o o oooo ooo o o o ooo oo o o o oo oo oo o o ooo oooo oo oooooooo

UtvärderareDatum för utvärdering

David Rudebeck2016-05-26

CPT-sondering utvärderad enligt SGI Information 15 rev.2007

BILAGA 2:3

Page 62: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

C P T - sonderingKungsbacka sportcenter104 22 35

2016-06-17

1.60 m1.60 m25.02 m1.60 mMy1.20 m

LetNormal

Markus Eskilsson HelénNovasond

Djup (m)

Kba sportcenNC12016-04-26

Projekt Plats

Borrhål

FörborrningsdjupStartdjupStoppdjupGrundvattenytaReferensNivå vid referens

Förborrat materialGeometriVätska i filterOperatörUtrustning

KalibreringsdataSpetsDatumAreafaktor aAreafaktor b

4598

0.8330.000

Inre friktion OcInre friktion OfCross talk c1Cross talk c2

0.0 kPa0.0 kPa0.0000.000

SkalfaktorerPortryck Friktion SpetstryckOmråde Område Faktor Område FaktorFaktor

FöreEfterDiff

1.60

Datum

282.20283.80

1.60

121.80121.70

-0.10

2.942.940.00

Nollvärden, kPa

Portryck Friktion Spetstryck

Använd skalfaktorer vid beräkning

KorrigeringPortryckFriktionSpetstryck

(ingen)(ingen)(ingen)

Portrycksobservationer

Portryck (kPa)0.00

Skiktgränser

Djup (m)

Klassificering

Från TillDjup (m)

0.001.302.003.004.006.00

12.00

1.302.003.004.006.00

12.0025.00

Densitet(ton/m3)

1.801.501.601.601.501.551.60

0.700.900.800.850.850.70

Jordart

Anmärkning

N:\104\22\1042235\5 Arbetsmaterial\02 Cad\G\Autograf\STACK\NC1.cpw

Portryck registrerat vid sonderingx

Flytgräns

CPT2Bedömd sonderingsklass

BILAGA 2:4

Page 63: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

CPT-sondering utförd enligt EN ISO 22476-1

0

2

4

6

8

10

12

14

16

18

20

22

24

0 1 2 3 4 5 0 10 20 30 40 50 0 500 1000Portryck u, uo, u (kPa)

0 2 4 6 0.0 0.5 1.0 1.5 2.0

Uo

Uo

Uo

Uo

U

U

U

U

U

U

FörborrningsdjupStart djupStopp djupGrundvattennivå

2.00 m2.00 m

25.06 m1.40 m

Portrycksparameter Bq

Djup (m

)

ProjektProjekt nrPlatsBorrhålDatum

Kungsbacka sportcenter104 22 35kba sportcenNC22016-04-21

2016-06-17N:\104\22\1042235\5 Arbetsmaterial\02 Cad\G\Autograf\STACK\NC2.cpw

0 5 10Lutning (grader)

ReferensNivå vid referensFörborrat materialGeometri

Ny2.20 mLetNormal

Friktion ft (kPa)Friktion ft (kPa) Friktionskvot Rft (%)Friktionskvot Rft (%)

Vätska i filterBorrpunktens koord.Utrustning NovasondSond nr 4689

Spetstryck qt (MPa)Spetstryck qt (MPa)

BILAGA 2:5

Page 64: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

0

2

4

6

8

10

12

14

16

18

20

22

24

0 10 20 30 40 50Friktionsvinkel (o)

xxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxx xxxxxxxxxxxxxxxxxx xxxxx x xxxxxxxxx xxxxxxxx xxxxx xxxxxxx xxxx

Odränerad skjuvhållfasthet fu (kPa)30 40 50Klassificering

ReferensNivå vid referensGrundvattenytaStartdjup

Ny2.20 m1.40 m2.00 m

FörborrningsdjupFörborrat materialUtrustningGeometri

2.00 mLetNovasondNormal

Djup (m

)

ProjektProjekt nrPlatsBorrhålDatum

Kungsbacka sportcenter104 22 35kba sportcenNC22016-04-21

2016-06-17N:\104\22\1042235\5 Arbetsmaterial\02 Cad\G\Autograf\STACK\NC2.cpw

EL

vL

L

NC

0 5 10 15 20 25 30 35 40Modul (MPa)

Cl

xo

+

Svensk empiriLunne, överkonsolideradLunne, normalkonsoliderad

0 50 100Relativ lagringstäthet ID (%)

UtvärderareDatum för utvärdering

David Rudebeck2016-05-26

CPT-sondering utvärderad enligt SGI Information 15 rev.2007

BILAGA 2:6

Page 65: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

0

2

4

6

8

10

12

14

16

18

20

22

24

0 10 20 30 40 50Effektivtryck (kPa)

xxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxx xxxxxxxxxxxxxxxxxx xxxxx x xxxxxxxxx xxxxxxxxxxxxxxxxxxxx xxxx

Odränerad skjuvhållfasthet fu (kPa)0 20 40 60 80 100 120 140 160 180Klassificering

ReferensNivå vid referensGrundvattenytaStartdjup

Ny2.20 m1.40 m2.00 m

FörborrningsdjupFörborrat materialUtrustningGeometri

2.00 mLetNovasondNormal

Djup (m

)

ProjektProjekt nrPlatsBorrhålDatum

Kungsbacka sportcenter104 22 35kba sportcenNC22016-04-21

2016-06-17N:\104\22\1042235\5 Arbetsmaterial\02 Cad\G\Autograf\STACK\NC2.cpw

EL

vL

L

NC

Cl

oooooooooo oooooooooooooooo oooo o oo oooo oooo o o o ooo o oo o oooo o oo ooooooooo oo o oo o ooo oo o oo o oo o oooooo ooooo o o o oooo o o o oo ooo oo o o

UtvärderareDatum för utvärdering

David Rudebeck2016-05-26

CPT-sondering utvärderad enligt SGI Information 15 rev.2007

BILAGA 2:7

Page 66: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

C P T - sonderingKungsbacka sportcenter104 22 35

2016-06-17

2.00 m2.00 m25.06 m1.40 mNy2.20 m

LetNormal

Richard CarlssonNovasond

Djup (m)

kba sportcenNC22016-04-21

Projekt Plats

Borrhål

FörborrningsdjupStartdjupStoppdjupGrundvattenytaReferensNivå vid referens

Förborrat materialGeometriVätska i filterOperatörUtrustning

KalibreringsdataSpetsDatumAreafaktor aAreafaktor b

4689

0.8330.000

Inre friktion OcInre friktion OfCross talk c1Cross talk c2

0.0 kPa0.0 kPa0.0000.000

SkalfaktorerPortryck Friktion SpetstryckOmråde Område Faktor Område FaktorFaktor

FöreEfterDiff

1.40

Datum

285.50283.80

-1.70

109.90109.30

-0.60

5.255.260.00

Nollvärden, kPa

Portryck Friktion Spetstryck

Använd skalfaktorer vid beräkning

KorrigeringPortryckFriktionSpetstryck

(ingen)(ingen)(ingen)

Portrycksobservationer

Portryck (kPa)0.00

Skiktgränser

Djup (m)

Klassificering

Från TillDjup (m)

0.001.702.004.006.00

12.00

1.702.004.006.00

12.0025.00

Densitet(ton/m3)

1.751.501.501.501.551.60

1.360.960.850.850.70

Jordart

Anmärkning

N:\104\22\1042235\5 Arbetsmaterial\02 Cad\G\Autograf\STACK\NC2.cpw

Portryck registrerat vid sonderingx

Flytgräns

CPT2Bedömd sonderingsklass

BILAGA 2:8

Page 67: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

BILAGA 2:9

Page 68: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-04-22 M.E.H / R.C 2016-04-29 Henrik Karlsson

Sektion/borrhål

Djup/nivå

Vatten-kvot

w%

Konflyt-gräns

wL

%

Tjälfarlklass

Mtrltyp enl.tab. 5.1.1 TK

Geo 13 Anm

NC10,0-1,3 51 4 5A

-2,0 75 4 5B-3,0 102 90 4 5A-4,0 99 80 4 5A

NC20,0-0,2 Enl fältprotokoll

-1,1 46 4 5B-1,7 101 4 5A torr/smulig-2,0 123 136 4 5B-4,0 114 96 4 5B lös

NC30,0-0,1 Enl fältprotokoll

-0,7 42-1,4 43 4 5B-3,0 105 102 4 5B

NC40,0-1,3 39 4 5B

-2,0 111 3 6A torr/smulig-3,0 105 95 4 5A

NC50,0-0,9 40 4 5B

-1,8 96 4 5B torr/smulig-3,0 148 3 6A

NC60,0-0,7 8 1 2

-1,0 95 4 5A-2,0 132 3 5B-3,0 160 3 6A

NC70,0-0,8 14 1 2

-2,0 103 3 5B-3,0 154 3 6A

NC80,0-1,0 29

-1,9 57 4 5A-3,0 154 3 6A

Granskad och godkänd

Uppmätt vy i bh: 1,8mumy (2016-04-27)Gråbrun mullhaltig siltig TORRSKORPELERA växtrester

Provtagningsredskap

Kungsbacka sportcenter

Skr

Fältdatum / Ansvarig Laboratorieundersökningar

Uppdragsnummer:

Benämning

Uppmätt vy i bh: 1,9mumy (2016-04-26)Grå ngt sandig siltig TORRSKORPELERA mullskikt

1042235

Uppmätt vy i bh: 1,4mumy (2016-04)

Grå ngt sulfidfl gyttjig siltig LERAGrå siltig LERA skalresterGrå siltig LERA skalrester

2016-05-04 Helena Seger

Gråbrun lerig GYTTJA växtresterGrå siltig LERA gyttjeskikt

Brun grusig SAND

Gråbrun lerig GYTTJA skalrester

Grå sulfidfl gyttjig LERAGråbrun lerig GYTTJA skalrester

Uppmätt vy i bh: 1,6mumy (2016-04-22)FYLLNING/mulljord grus sand/Grå rostfl siltig TORRSKORPELERA siltskikt

Uppmätt vy i bh: 1,2mumy (2016-04-27)

Uppmätt vy i bh: 1,5mumy (2016-04-28)

Gråbrun mullhaltig siltig TORRSKORPELERA växtrester

Gråbrun lerig GYTTJAGrå gyttjig LERA

Gråbrun mullhaltig siltig LERA växtresterGråbrun lerig GYTTJA

Uppmätt vy i bh: rasat (2016-04-25)Gråbrun grusig SANDGrå sulfidfl siltig LERA torrskorpeskikt

Gråbrun gyttjig LERAGråbrun gyttjig LERA

Grå gyttjig LERA

MULLJORDGrå rostfl mullhaltig siltig TORRSKORPELERAGrå rostfl siltig TORRSKORPELERA mullskikt

Uppmätt vy i bh: 2,5mumy (2016-04-20)MULLJORDFYLLNING/mulljord silt lera/Gråbrun gyttjig sandig siltig LERA

Ramböll Sverige AB, Division SydVädursgatan 6, BOX 5343, 402 27 GÖTEBORGTelefon 010 - 615 60 [email protected]

Sammanställning avLABORATORIEUNDERSÖKNINGAR

Uppdrag

BILAGA 3:1

Page 69: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

2016-04-22 M.E.H / R.C 2016-04-29 Henrik Karlsson

Sektion/borrhål

Djup/nivå

Vatten-kvot

w%

Konflyt-gräns

wL

%

Tjälfarlklass

Mtrltyp enl.tab. 5.1.1 TK

Geo 13 Anm

NC90,0-0,5 28

-0,9 12-1,6 74 4 5A-3,0 130 4 5B

NC100,0-0,6 9 1 5B

-1,0 87 4 5B-2,0 142 3 6A-3,0 164 3 6A

Gråbrun lerig GYTTJAGråbrun lerig GYTTJA

Grå sulfidfl gyttjig siltig TORRSKORPELERA

1042235

Benämning

Uppmätt vy i bh: rasat (2016-04-28)FYLLNING/grus sand silt lera/FYLLNING/grus sand silt tegel/Gråbrun siltig LERA gyttjeskiktGråbrun gyttjig siltig LERA gyttjeskikt

Uppmätt vy i bh: rasat (2016-04-25)Brun mullhaltig grusig SAND

Kungsbacka sportcenterFältdatum / Ansvarig Laboratorieundersökningar

Provtagningsredskap Granskad och godkänd Uppdragsnummer:Skr 2016-05-04

Ramböll Sverige AB, Division SydVädursgatan 6, BOX 5343, 402 27 GÖTEBORGTelefon 010 - 615 60 [email protected]

Sammanställning avLABORATORIEUNDERSÖKNINGAR

Uppdrag

BILAGA 3:2

Page 70: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Densitet

Vatten-kvotW

Konflyt-gräns

WL

Sensiti-vitet

enl.kon

Skjuvhållfasthet(oreducerad)fu kPa *)

Omrördskjuvhållf

Korrekt.faktorμ

t/m³ % % St tryckprov konprov kPa enl SGI

NC6 Uppmätt vy i bh iu mumy (2016-04-25)

141 1,28 167 luftfickor232 3,0 1,30 167 162 15 18 1,22 0,55

1965 1,32

138 1,43297 4,0 1,44 107 92 16 11 0,70 0,71719 1,42

111 1,47 luftfickor2646 6,0 1,49 98 86 21 14 0,70 0,734284 1,50

192 1,49235 8,0 1,49 98 88 21 17 0,81 0,72

2519 1,50

55 1,542084 15,0 1,53 84 81 21 28 1,33 0,752130 1,55

273 1,58363 25,0 1,58 75 75 23 37 1,63 0,78377 1,58

Skjuvhållfastheten har ej reducerats med hänsyn till gyttjehalt eller

Handläggare

/Beställare:

David

Rudebeck

Cylindernummer

Sektion/borrhålDjup/nivå Benämning Anm.

Skjuvhållfastheten, karakteristiskt värde, har utvärderats enl. SGF.s laboratoriekommittè 1984.

Brun GYTTJA skalrester

Grå gyttjig LERA skalrester

Gråbrun gyttjig LERA skalskikt

Grå gyttjig LERA skalrester

Grå sulfidfl siltig LERA

Grå ngt sulfidfl siltig LERA

Släpper frånkant

Provtagningsredskap

Uppdragsnum

mer:

Granskad

ochgodkänd:

2016-05-03H

elenaseger

1042235S

kr,Kv

StII

2016-04-25J.B

2016-04-29H

enrikK

arlssonLaboratorieundersökningar

Provtagning:

LAB

OR

ATO

RIEU

ND

ERSÖ

KN

ING

AR

Kungsbacka

sportcenter

Uppdrag

Sam

manstälning

av

*)

Ram

böllSverigeAB

Vädursgatan6

41250

Göteborg

Tel:010-61500

00geolab.goteborg@

ramboll.se

BILAGA 3:3

Page 71: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Sektion/borrhålDjup/nivå Jordart

Densitett/m³

Vatten-kvotw%

´C

kPa

ML

kPa´L

kPaM´

CV

m2/s

ki

m/s

k

NC63,0 Gy sk 1,28 167 33 284 64 11,8 2,6E-08 1,5E-09 3,2

4,0 gyLe sk 1,43 107 27 216 44 9,9 3,0E-08 2,6E-09 4,2

6,0 gyLe _sk_ 1,49 98 23 236 44 9,4 1,6E-07 2,6E-08 6,8

8,0 gy Le sk 1,48 98 53 190 54 14,0 6,9E-08 5,5E-09 9,8

15,0 siLe 1,52 84 114 607 159 12,3 1,2E-07 3,6E-09 3,7

25,0 siLe 1,57 75 146 693 191 11,1 3,3E-07 9,5E-09 3,7

Uppdragsnummer : 1042235

Ramböll Sverige AB, Division SydVädursgatan 6BOX 5343, 402 27 GÖTEBORGTel 010 - 615 60 [email protected]

Datum 2016-05-16Helena Seger

Kungsbacka sportcenterUppdrag :

Sammanställning avCRS

BILAGA 4:1

Page 72: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14311 / HK

Sektion/borrhål: NC6 Djup: 3,0 m Ödometer nr: 1

Densitet: 1,28 t/m3 Vattenkvot: 167,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: GYTTJA skalrester Provhöjd: 20 mm

Def.hastighet: 0,67 %/h

Anm.

1 (4)

Redovisning av ödometerförsök, CRS-försök

[%] cv [m2/s]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126.Utrustningens egendeformation är beaktad. För utvärdering se bilagda diagram sid 2 - 4.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFA14311.crs 2016-05-16

'c, kPa ML, kPa 'L, kPa M' cv, min, m2/s ki , m/s k

33 284 2,6E-864 11,8 1,5E-9 3,2

0

0

200

200

400

400

600

600

0

20

40

60 1,0E- 6

1,0E- 7

1,0E- 8

1,0E- 9

1,0E- 10

1,0E- 11

'v

cv

BILAGA 4:2

Page 73: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14311 / HK

Sektion/borrhål: NC6 Djup: 3,0 m Ödometer nr: 1

Densitet: 1,28 t/m3 Vattenkvot: 167,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: GYTTJA skalrester Provhöjd: 20 mm

Def.hastighet: 0,67 %/h

Anm.

2 (4)

Utvärdering av modultal och kontroll av portryck

M [MPa] ub [kPa]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126. Utrustningens egendeformation är beaktad.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFA14311.crs 2016-05-16

0

0

100

100

200

200

300

300

3 60

2 40

1 20

0 0

M

ub

M'

11,8 64

'L, kPa

BILAGA 4:3

Page 74: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14311 / HK

Sektion/borrhål: NC6 Djup: 3,0 m Ödometer nr: 1

Densitet: 1,28 t/m3 Vattenkvot: 167,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: GYTTJA skalrester Provhöjd: 20 mm

Def.hastighet: 0,67 %/h

Anm.

3 (4)

Utvärdering av permeabilitet

[%]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126.

Permeabilitet, k, [m/s]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFA14311.crs 2016-05-16

1,0E-12 1,0E-11 1,0E-10 1,0E-09 1,0E-08 1,0E-07 1,0E-06 1,0E-05 0

5

10

15

20

25

30

35

40

ki , m/s k

1,5E-9 3,2

BILAGA 4:4

Page 75: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14311 / HK

Sektion/borrhål: NC6 Djup: 3,0 m Ödometer nr: 1

Densitet: 1,28 t/m3 Vattenkvot: 167,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: GYTTJA skalrester Provhöjd: 20 mm

Def.hastighet: 0,67 %/h

Anm.

4 (4)

Utvärdering av förkonsolideringstryck och linjär modul

[%]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126. Utrustningens egendeformation är beaktad.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFA14311.crs 2016-05-16

'c, kPa ML, kPa 'L, kPa

33 284 64

0

0

100

100

200

200

300

300

0

10

20

30

'v

BILAGA 4:5

Page 76: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14312 / HK

Sektion/borrhål: NC6 Djup: 4,0 m Ödometer nr: 2

Densitet: 1,43 t/m3 Vattenkvot: 107,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: gyttjig LERA skalrester Provhöjd: 20 mm

Def.hastighet: 0,75 %/h

Anm.

1 (4)

Redovisning av ödometerförsök, CRS-försök

[%] cv [m2/s]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126.Utrustningens egendeformation är beaktad. För utvärdering se bilagda diagram sid 2 - 4.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFB14312.crs 2016-05-16

'c, kPa ML, kPa 'L, kPa M' cv, min, m2/s ki , m/s k

27 216 3,0E-844 9,9 2,6E-9 4,2

0

0

200

200

400

400

600

600

0

20

40

60 1,0E- 5

1,0E- 6

1,0E- 7

1,0E- 8

1,0E- 9

1,0E- 10

'vcv

BILAGA 4:6

Page 77: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14312 / HK

Sektion/borrhål: NC6 Djup: 4,0 m Ödometer nr: 2

Densitet: 1,43 t/m3 Vattenkvot: 107,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: gyttjig LERA skalrester Provhöjd: 20 mm

Def.hastighet: 0,75 %/h

Anm.

2 (4)

Utvärdering av modultal och kontroll av portryck

M [MPa] ub [kPa]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126. Utrustningens egendeformation är beaktad.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFB14312.crs 2016-05-16

0

0

100

100

200

200

300

300

3 60

2 40

1 20

0 0

M

ub

M'

9,9 44

'L, kPa

BILAGA 4:7

Page 78: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14312 / HK

Sektion/borrhål: NC6 Djup: 4,0 m Ödometer nr: 2

Densitet: 1,43 t/m3 Vattenkvot: 107,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: gyttjig LERA skalrester Provhöjd: 20 mm

Def.hastighet: 0,75 %/h

Anm.

3 (4)

Utvärdering av permeabilitet

[%]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126.

Permeabilitet, k, [m/s]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFB14312.crs 2016-05-16

1,0E-12 1,0E-11 1,0E-10 1,0E-09 1,0E-08 1,0E-07 1,0E-06 1,0E-05 0

5

10

15

20

25

30

35

40

ki , m/s k

2,6E-9 4,2

BILAGA 4:8

Page 79: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14312 / HK

Sektion/borrhål: NC6 Djup: 4,0 m Ödometer nr: 2

Densitet: 1,43 t/m3 Vattenkvot: 107,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: gyttjig LERA skalrester Provhöjd: 20 mm

Def.hastighet: 0,75 %/h

Anm.

4 (4)

Utvärdering av förkonsolideringstryck och linjär modul

[%]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126. Utrustningens egendeformation är beaktad.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFB14312.crs 2016-05-16

'c, kPa ML, kPa 'L, kPa

27 216 44

0

0

100

100

200

200

300

300

0

10

20

30 'v

BILAGA 4:9

Page 80: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14313 / HK

Sektion/borrhål: NC6 Djup: 6,0 m Ödometer nr: 3

Densitet: 1,49 t/m3 Vattenkvot: 98,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: gyttjig LERA skalskikt Provhöjd: 20 mm

Def.hastighet: 0,88 %/h

Anm.

1 (4)

Redovisning av ödometerförsök, CRS-försök

[%] cv [m2/s]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126.Utrustningens egendeformation är beaktad. För utvärdering se bilagda diagram sid 2 - 4.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFC14313.crs 2016-05-16

'c, kPa ML, kPa 'L, kPa M' cv, min, m2/s ki , m/s k

23 236 1,6E-744 9,4 2,6E-8 6,8

0

0

200

200

400

400

600

600

0

20

40

60 1,0E- 5

1,0E- 6

1,0E- 7

1,0E- 8

1,0E- 9

1,0E- 10

'v

cv

BILAGA 4:10

Page 81: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14313 / HK

Sektion/borrhål: NC6 Djup: 6,0 m Ödometer nr: 3

Densitet: 1,49 t/m3 Vattenkvot: 98,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: gyttjig LERA skalskikt Provhöjd: 20 mm

Def.hastighet: 0,88 %/h

Anm.

2 (4)

Utvärdering av modultal och kontroll av portryck

M [MPa] ub [kPa]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126. Utrustningens egendeformation är beaktad.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFC14313.crs 2016-05-16

0

0

100

100

200

200

300

300

3 60

2 40

1 20

0 0

M

ub

M'

9,4 44

'L, kPa

BILAGA 4:11

Page 82: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14313 / HK

Sektion/borrhål: NC6 Djup: 6,0 m Ödometer nr: 3

Densitet: 1,49 t/m3 Vattenkvot: 98,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: gyttjig LERA skalskikt Provhöjd: 20 mm

Def.hastighet: 0,88 %/h

Anm.

3 (4)

Utvärdering av permeabilitet

[%]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126.

Permeabilitet, k, [m/s]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFC14313.crs 2016-05-16

1,0E-12 1,0E-11 1,0E-10 1,0E-09 1,0E-08 1,0E-07 1,0E-06 1,0E-05 0

5

10

15

20

25

30

35

40

ki , m/s k

2,6E-8 6,8

BILAGA 4:12

Page 83: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14313 / HK

Sektion/borrhål: NC6 Djup: 6,0 m Ödometer nr: 3

Densitet: 1,49 t/m3 Vattenkvot: 98,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: gyttjig LERA skalskikt Provhöjd: 20 mm

Def.hastighet: 0,88 %/h

Anm.

4 (4)

Utvärdering av förkonsolideringstryck och linjär modul

[%]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126. Utrustningens egendeformation är beaktad.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFC14313.crs 2016-05-16

'c, kPa ML, kPa 'L, kPa

23 236 44

0

0

100

100

200

200

300

300

0

10

20

30'v

BILAGA 4:13

Page 84: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14314 / HK

Sektion/borrhål: NC6 Djup: 8,0 m Ödometer nr: 1

Densitet: 1,48 t/m3 Vattenkvot: 98,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: gyttjig LERA skalrester Provhöjd: 20 mm

Def.hastighet: 0,67 %/h

Anm.

1 (4)

Redovisning av ödometerförsök, CRS-försök

[%] cv [m2/s]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126.Utrustningens egendeformation är beaktad. För utvärdering se bilagda diagram sid 2 - 4.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFA14314.crs 2016-05-16

'c, kPa ML, kPa 'L, kPa M' cv, min, m2/s ki , m/s k

53 190 6,9E-854 14,0 5,5E-9 9,8

0

0

200

200

400

400

600

600

0

20

40

60 1,0E- 5

1,0E- 6

1,0E- 7

1,0E- 8

1,0E- 9

1,0E- 10

'v

cv

BILAGA 4:14

Page 85: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14314 / HK

Sektion/borrhål: NC6 Djup: 8,0 m Ödometer nr: 1

Densitet: 1,48 t/m3 Vattenkvot: 98,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: gyttjig LERA skalrester Provhöjd: 20 mm

Def.hastighet: 0,67 %/h

Anm.

2 (4)

Utvärdering av modultal och kontroll av portryck

M [MPa] ub [kPa]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126. Utrustningens egendeformation är beaktad.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFA14314.crs 2016-05-16

0

0

100

100

200

200

300

300

15 60

14 56

13 52

12 48

11 44

10 40

9 36

8 32

7 28

6 24

5 20

4 16

3 12

2 8

1 4

0 0M

ub

M'

14,0 54

'L, kPa

BILAGA 4:15

Page 86: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14314 / HK

Sektion/borrhål: NC6 Djup: 8,0 m Ödometer nr: 1

Densitet: 1,48 t/m3 Vattenkvot: 98,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: gyttjig LERA skalrester Provhöjd: 20 mm

Def.hastighet: 0,67 %/h

Anm.

3 (4)

Utvärdering av permeabilitet

[%]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126.

Permeabilitet, k, [m/s]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFA14314.crs 2016-05-16

1,0E-12 1,0E-11 1,0E-10 1,0E-09 1,0E-08 1,0E-07 1,0E-06 1,0E-05 0

5

10

15

20

25

30

35

40

ki , m/s k

5,5E-9 9,8

BILAGA 4:16

Page 87: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14314 / HK

Sektion/borrhål: NC6 Djup: 8,0 m Ödometer nr: 1

Densitet: 1,48 t/m3 Vattenkvot: 98,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: gyttjig LERA skalrester Provhöjd: 20 mm

Def.hastighet: 0,67 %/h

Anm.

4 (4)

Utvärdering av förkonsolideringstryck och linjär modul

[%]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126. Utrustningens egendeformation är beaktad.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFA14314.crs 2016-05-16

'c, kPa ML, kPa 'L, kPa

53 190 54

0

0

100

100

200

200

300

300

0

10

20

30

'v

BILAGA 4:17

Page 88: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14315 / HK

Sektion/borrhål: NC6 Djup: 15,0 m Ödometer nr: 2

Densitet: 1,52 t/m3 Vattenkvot: 84,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: siltig LERA Provhöjd: 20 mm

Def.hastighet: 0,74 %/h

Anm.

1 (4)

Redovisning av ödometerförsök, CRS-försök

[%] cv [m2/s]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126.Utrustningens egendeformation är beaktad. För utvärdering se bilagda diagram sid 2 - 4.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFB14315.crs 2016-05-16

'c, kPa ML, kPa 'L, kPa M' cv, min, m2/s ki , m/s k

114 607 1,2E-7159 12,3 3,6E-9 3,7

0

0

200

200

400

400

600

600

0

20

40

60 1,0E- 5

1,0E- 6

1,0E- 7

1,0E- 8

1,0E- 9

1,0E- 10

'v

cv

BILAGA 4:18

Page 89: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14315 / HK

Sektion/borrhål: NC6 Djup: 15,0 m Ödometer nr: 2

Densitet: 1,52 t/m3 Vattenkvot: 84,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: siltig LERA Provhöjd: 20 mm

Def.hastighet: 0,74 %/h

Anm.

2 (4)

Utvärdering av modultal och kontroll av portryck

M [MPa] ub [kPa]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126. Utrustningens egendeformation är beaktad.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFB14315.crs 2016-05-16

0

0

200

200

400

400

600

600

15 60

14 56

13 52

12 48

11 44

10 40

9 36

8 32

7 28

6 24

5 20

4 16

3 12

2 8

1 4

0 0

M

ub

M'

12,3 159

'L, kPa

BILAGA 4:19

Page 90: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14315 / HK

Sektion/borrhål: NC6 Djup: 15,0 m Ödometer nr: 2

Densitet: 1,52 t/m3 Vattenkvot: 84,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: siltig LERA Provhöjd: 20 mm

Def.hastighet: 0,74 %/h

Anm.

3 (4)

Utvärdering av permeabilitet

[%]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126.

Permeabilitet, k, [m/s]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFB14315.crs 2016-05-16

1,0E-12 1,0E-11 1,0E-10 1,0E-09 1,0E-08 1,0E-07 1,0E-06 1,0E-05 0

5

10

15

20

25

30

35

40

ki , m/s k

3,6E-9 3,7

BILAGA 4:20

Page 91: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14315 / HK

Sektion/borrhål: NC6 Djup: 15,0 m Ödometer nr: 2

Densitet: 1,52 t/m3 Vattenkvot: 84,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: siltig LERA Provhöjd: 20 mm

Def.hastighet: 0,74 %/h

Anm.

4 (4)

Utvärdering av förkonsolideringstryck och linjär modul

[%]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126. Utrustningens egendeformation är beaktad.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFB14315.crs 2016-05-16

'c, kPa ML, kPa 'L, kPa

114 607 159

0

0

100

100

200

200

300

300

0

10

20

30

'v

BILAGA 4:21

Page 92: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14316 / HK

Sektion/borrhål: NC6 Djup: 25,0 m Ödometer nr: 3

Densitet: 1,57 t/m3 Vattenkvot: 75,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: siltig LERA Provhöjd: 20 mm

Def.hastighet: 0,86 %/h

Anm.

1 (4)

Redovisning av ödometerförsök, CRS-försök

[%] cv [m2/s]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126.Utrustningens egendeformation är beaktad. För utvärdering se bilagda diagram sid 2 - 4.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFC14316.crs 2016-05-16

'c, kPa ML, kPa 'L, kPa M' cv, min, m2/s ki , m/s k

146 693 3,3E-7191 11,1 9,5E-9 3,7

0

0

200

200

400

400

600

600

0

20

40

60 1,0E- 5

1,0E- 6

1,0E- 7

1,0E- 8

1,0E- 9

1,0E- 10

'v

cv

BILAGA 4:22

Page 93: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14316 / HK

Sektion/borrhål: NC6 Djup: 25,0 m Ödometer nr: 3

Densitet: 1,57 t/m3 Vattenkvot: 75,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: siltig LERA Provhöjd: 20 mm

Def.hastighet: 0,86 %/h

Anm.

2 (4)

Utvärdering av modultal och kontroll av portryck

M [MPa] ub [kPa]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126. Utrustningens egendeformation är beaktad.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFC14316.crs 2016-05-16

0

0

200

200

400

400

600

600

6 60

4 40

2 20

0 0

M

ub

M'

11,1 191

'L, kPa

BILAGA 4:23

Page 94: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14316 / HK

Sektion/borrhål: NC6 Djup: 25,0 m Ödometer nr: 3

Densitet: 1,57 t/m3 Vattenkvot: 75,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: siltig LERA Provhöjd: 20 mm

Def.hastighet: 0,86 %/h

Anm.

3 (4)

Utvärdering av permeabilitet

[%]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126.

Permeabilitet, k, [m/s]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFC14316.crs 2016-05-16

1,0E-12 1,0E-11 1,0E-10 1,0E-09 1,0E-08 1,0E-07 1,0E-06 1,0E-05 0

5

10

15

20

25

30

35

40

ki , m/s k

9,5E-9 3,7

BILAGA 4:24

Page 95: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Projekt: Kungsbacka sportcenterUppdragsnummer:

1042235

Uppdragsgivare:

Norconsult

Datum/Sign: 2016-05-16 / HS

Löp-nr/Gransk.: 14316 / HK

Sektion/borrhål: NC6 Djup: 25,0 m Ödometer nr: 3

Densitet: 1,57 t/m3 Vattenkvot: 75,0 % Provningstemp.: 8 oC Provdiameter: 50 mm

Benämning: siltig LERA Provhöjd: 20 mm

Def.hastighet: 0,86 %/h

Anm.

4 (4)

Utvärdering av förkonsolideringstryck och linjär modul

[%]

Försöket är utfört och utvärderat enligt Svensk Standard SS 027126. Utrustningens egendeformation är beaktad.

Effektivt vertikaltryck, 'v, [kPa]

Ramböll Sverige AB, Division SydVädursgatan 6, Box 5343, 402 27 GöteborgTelefon 010-615 60 00, [email protected]

T:\39_1\39004201\CRS\CrsRitRam\DFC14316.crs 2016-05-16

'c, kPa ML, kPa 'L, kPa

146 693 191

0

0

100

100

200

200

300

300

0

10

20

30

'v

BILAGA 4:25

Page 96: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Konsolideringsspänning : 25 kPa Bh :

25 kPa 3 m

11,8 kPa 1,30 t/m³

Kungsbacka sportcenter

Konsoliderat Odränerat Skjuvförsök

NC6

2016-05-23

Skjuvspänning :

Brottspänning :

Djup :

Jordart : Densitet :Gy sk

Ramböll Sverige AB, Division SydVädursgatan 6BOX 5343, 402 27 GÖTEBORGTelefon 010 - 615 60 [email protected]

02468

1012141618202224262830323436384042444648505254565860

0,00 0,05 0,10 0,15

skju

vhål

lfas

thet

kPa

radianer

BILAGA 5:1

Page 97: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Konsolideringsspänning : 27 kPa Bh :

27 kPa 4 m

9,1 kPa 1,41 t/m³

Skjuvspänning :

Brottspänning :

Djup :

Jordart : Densitet :gyLe sk

Kungsbacka sportcenter

Konsoliderat Odränerat Skjuvförsök

NC6

2016-05-23

Ramböll Sverige AB, Division SydVädursgatan 6BOX 5343, 402 27 GÖTEBORGTelefon 010 - 615 60 [email protected]

02468

1012141618202224262830323436384042444648505254565860

0,00 0,05 0,10 0,15

skju

vhål

lfas

thet

kPa

radianer

BILAGA 5:2

Page 98: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Konsolideringsspänning : 47 kPa Bh :

47 kPa 8 m

14,9 kPa 1,43 t/m³

Skjuvspänning :

Brottspänning :

Djup :

Jordart : Densitet :gyLe sk

Kungsbacka sportcenter

Konsoliderat Odränerat Skjuvförsök

NC6

2016-05-23

Ramböll Sverige AB, Division SydVädursgatan 6BOX 5343, 402 27 GÖTEBORGTelefon 010 - 615 60 [email protected]

02468

1012141618202224262830323436384042444648505254565860

0,00 0,05 0,10 0,15

skju

vhål

lfas

thet

kPa

radianer

BILAGA 5:3

Page 99: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Konsolideringsspänning : 83 kPa Bh :

83 kPa 15 m

26,1 kPa siLe 1,49 t/m³

Skjuvspänning :

Brottspänning :

Djup :

Jordart : Densitet :

Kungsbacka sportcenter

Konsoliderat Odränerat Skjuvförsök

NC6

2016-05-23

Ramböll Sverige AB, Division SydVädursgatan 6BOX 5343, 402 27 GÖTEBORGTelefon 010 - 615 60 [email protected]

02468

1012141618202224262830323436384042444648505254565860

0,00 0,05 0,10 0,15

skju

vhål

lfas

thet

kPa

radianer

BILAGA 5:4

Page 100: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Kungsbacka sportcenter - Hantverksgatan

-40

-35

-30

-25

-20

-15

-10

-5

0

50 5 10 15 20 25 30 35 40 45 50 55 60

Niv

å (m

)Sammanställning

Odränerad skjuvhållfasthet, korrigerad (kPa)

28700V9 Kon, Tfu,korr

28700V9 Vb Tfu,korr

28750V7 Vb Tfu,korr

28780V10 Vb Tfu,korr

28900V13 Vb Tfu,korr

28975V4 Kon, Tfu,korr

28975V4 Vb Tfu,korr

SCC 4 Kon, Tfu,korr

SCC 4 Vb Tfu,korr

SCC 106 Vb Tfu,korr

SCC 107 Vb Tfu,korr

N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sammanställning Cu

BILAGA 6:1

Page 101: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Kungsbacka sportcenter - Kungsbackaån

-30

-25

-20

-15

-10

-5

0

50 5 10 15 20 25 30 35 40 45 50 55 60

Niv

å (m

)

Sammanställning Odränerad skjuvhållfasthet, korrigerad (kPa)

NC 1002 Kon, Tfu,korr

NC 1002 CPT Tfu,korr

NC 1 Vb Tfu,korr

NC 1 CPT Tfu,korr

NC 2 CPT Tfu,korr

NC 4 Vb Tfu,korr

GF 80-7 Vb Tfu,korr

GF 89-16 Vb Tfu,korr

N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sammanställning Cu

BILAGA 6:2

Page 102: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Kungsbacka sportcenter - simhallen

-30

-25

-20

-15

-10

-5

0

50 5 10 15 20 25 30 35 40 45 50 55 60

Niv

å (m

)Sammanställning

Odränerad skjuvhållfasthet, korrigerad (kPa)

NC 6 Kon, Tfu,korr

NC 6 Skjuvförsök

N:\104\22\1042235\5 Arbetsmaterial\04 Beräkningar\G\Sammanställning Cu

BILAGA 6:3

Page 103: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Proj.nr. 104 22 35

Proj.namnKungsbacka sportcenter

Mätpunkt 1R 2R 3R 4R 5R 6R 7R 8R 9R 10RMarkyta Gräs/vall Grusplan Gräs Grusplan Gräs Asfalt Gräs Gräs Gräs GrusplanDosrat [μSv/h] 60,9 113,4 96,6 139 69,4 100,3 63,9 69,7 62,4 161,5K [%] 1,6 2,8 2,3 3,4 1,9 2,8 1,7 1,7 1,7 3,1U [ppm] 0,9 3,8 2,8 3,2 1,1 2,6 1,7 1,9 1,7 6,5Th [ppm] 9 13,6 12,8 19,6 9,9 11,5 8,3 9,2 7,2 21,4Radiumhalt, beräkning [Bq/kg] 46,7 34,4 39,4 13,5 32 20,9 23,4 20,9 80Radiumhalt, emanometer [Bq/kg] 21 Tätt Tätt Ej mätt Tätt Ej mätt Tätt Ej mätt Ej mätt Ej mättMarkradonklass Låg Normal Normal Normal Låg Normal Låg Låg Låg Hög

Tabell 7.1 Gränsvärden för riskklassificering med avseende på radiumhalt [Bq/kg]

Riskklass Lågradon Normal-radon Högradon

Material [Bq/kg] [Bq/kg] [Bq/kg]Berg <60 60 - 200 >200

Sprängsten/ Morän <25 25 - 80 >80

Grus/Grov morän/Sand <25 25 - 50 >50

Silt <50 50 - 70 >70

Lera/Lerig morän <80 80 - 100 >100

Mätresultat radonundersökning

BILAGA 7

Page 104: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

15

14

14

16

7

1514

6A

1312

6

5

11

10

9

24

2325

22

21

1920

1615

14

13

12

12-9

1-2

3-6

7-8

44

42

75

29

3031

5B-6B5A-6A

3B-4B3A-4A

2

1

1-4 5-

8

39404142

9-10

38

3736

11

35

13

33

34

14-1015

9-7

16

3-6

1-2

9

3

8

4

11B11

1

10

12

2

8A

2B

5D

5C

25-2329-26

22

21

36 201937

18173839

16

1 15

10

1312

11

26-23 22-17

27-3

0

31-3

6

37-38

1

2

3

6 874-5

2728 26

29-30

21

24-28

22-23

16 15

11-14

9-103-8

1-2

151613B-14B

13A-14A

30-3

1

32-3

5

3-2

9-4

1

14 1531-34

11B-12B

11A-12A

9B-10B

9A-10A

7B-8B7A-8A

9A-10A9B-10B7B-8B

11 7A-8

A

20

19

2728

29

3230

31

18

17

14

1920

12H

ugin

s vä

g

Hugins väg

Balders väg

Yggd

rasi

lsväg

en

Midgårdsvägen

Valhallsvägen

Munins väg

Yggd

rasil

sväg

en Frejas väg

Kungsbacka Sportcenter

Kungsbacka Sportcenter

Kungsbacka Sportcenter

Kungsbacka SportcenterKungsbacka Sportcenter

Gym

nasiegatan

Kungsbacka Sportcenter

Södra infarten

Lilla Hantverksg

4:29

4:62

4:58

1:20

1:29

1:31

1:20

4:6

2

1

4:6

7:1

4:29

4:6

4:30

4:28

1:35

1:35

1:36

1:33

1:36

1:20

4:6

4:65

1

4:6

7:1

4:274:6

1:30

1:28

s:5

Boulehall

Ishall

Förskola

Ishall Länsförsäkringar Arena

AranäshallenSporthall

Simhall

Aranäsgymnasiet

Teater

Kv.gård

Kv.gård

Kv.

gård

stationstationstation Pump-

Idrottshall

Kungsbackaån

INLAGSBYINLAGSGÄRDE

KUNGSBACKA

KUNGSBACKA

Norconsult ABBox 8774, 402 76 Göteborg

Tfn 031-50 70 00www.norconsult.se

Page 105: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

15

14

14

16

7

1514

6A

1312

6

5

11

10

9

24

2325

22

21

1920

1615

14

13

12

12-9

1-2

3-6

7-8

44

42

75

29

3031

5B-6B5A-6A

3B-4B3A-4A

2

1

1-4 5-

8

39404142

9-10

38

3736

11

35

13

33

34

14-1015

9-7

16

3-6

1-2

9

3

8

4

11B11

1

10

12

2

8A

2B

5D

5C

25-2329-26

22

21

36 201937

18173839

16

1 15

10

1312

11

26-23 22-17

27-3

0

31-3

6

37-38

1

2

3

6 874-5

2728 26

29-30

21

24-28

22-23

16 15

11-14

9-103-8

1-2

151613B-14B

13A-14A

30-3

1

32-3

5

3-2

9-4

1

14 1531-34

11B-12B

11A-12A

9B-10B

9A-10A

7B-8B7A-8A

9A-10A9B-10B7B-8B

11 7A-8

A

20

19

2728

29

3230

31

18

17

14

1920

12H

ugin

s vä

g

Hugins väg

Balders väg

Yggd

rasi

lsväg

en

Midgårdsvägen

Valhallsvägen

Munins väg

Yggd

rasil

sväg

en Frejas väg

Kungsbacka Sportcenter

Kungsbacka Sportcenter

Kungsbacka Sportcenter

Kungsbacka SportcenterKungsbacka Sportcenter

Gym

nasiegatan

Kungsbacka Sportcenter

Södra infarten

Lilla Hantverksg

4:29

4:62

4:58

1:20

1:29

1:31

1:20

4:6

2

1

4:6

7:1

4:29

4:6

4:30

4:28

1:35

1:35

1:36

1:33

1:36

1:20

4:6

4:65

1

4:6

7:1

4:274:6

1:30

1:28

s:5

Boulehall

Ishall

Förskola

Ishall Länsförsäkringar Arena

AranäshallenSporthall

Simhall

Aranäsgymnasiet

Teater

Kv.gård

Kv.gård

Kv.

gård

stationstationstation Pump-

Idrottshall

Kungsbackaån

INLAGSBYINLAGSGÄRDE

KUNGSBACKA

KUNGSBACKA

Norconsult ABBox 8774, 402 76 Göteborg

Tfn 031-50 70 00www.norconsult.se

Page 106: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Norconsult ABBox 8774, 402 76 Göteborg

Tfn 031-50 70 00www.norconsult.se

Page 107: Kungsbacka sportcenter › contentassets › 80ae18206f...2016/11/01  · 2016-11-01 Kungsbacka sportcenter Geoteknisk PM avseende detaljplan n:\104\22\1042235\5 arbetsmaterial\01

Norconsult ABBox 8774, 402 76 Göteborg

Tfn 031-50 70 00www.norconsult.se