Page 1
K.T.N Metals
INDUSTRY PROFILE
The pump and valve Industry has different features compared to machine
tool or general non electrical machinery industry.
The manufacturing companies are concentrated at centers like
Coimbatore, Hubli, and Belgaum. The major portion of the industry ownership
lies with private limited company or proprietary concerns. It becomes very
difficult to distinguish between organized and unorganized sectors as most of
the companies deal with these products partly and no company has more than
50% of the revenue from this sector alone. L &T and BEML the minor players
of valve industry account for 29.6% of the total market and has defined
organized player. The 50% of the companies in this industry are private limited
companies consisting of organized & unorganized sector and the rest are public
limited companies. The average sale of the private limited companies is about
rs. 20crores. The total industry is of 750crores with 40% of the contribution
from private limited firms.
K.T.N.metals has two sister concerns:
TECHNO CASTINGS:
It introduces itself as a manufacturer of graded cast iron castings,
alloy castings and S G iron castings. It was established in the year 1995
with having experience of more than 30 years from its parent company
M/s. K.T.N metals. Looking in to export market in the year 1995 this
concern was established. It is being looked after by the sons of Kallapa,
Narayan Saple who holds B.com degree from R.P.D. college, Belgaum
and Bhairu saple who is civil engineer and completed its B.E degree
from GIIT college Belgaum.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 1
Page 2
K.T.N Metals
U.S. ENGINEERING:
It was established in the year 1997 as a proprietary firm, Uttam
Saple being the proprietot of this concern who is the son of Tukaram and
who is I.T.I graduate from government I.T.I college. Initially it was
started in 2700 sq. feet with 4 lath machines and presently its business is
carried on the area of 8200 sq.feet with 6 lath machines. It does only
massing or finishing of the products and not production of the products.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 2
Page 3
K.T.N Metals
COMPANY PROFILE
NAME : KTN METALS
ADDRESS (main concern) : KTN METALS
S.NO. 781/1, B, Plot Nos. 149-50-51
Udyambag, Belgaum – 590008,
Karnataka, India.
(Unit 2) : TECHNO Castings
R. S.No.346, Plot Nos. 146-147
Udyambag, Belgaum – 590008,
Karnataka, India.
Machine shop (unit 3) : U. S. Engineers
S. NO.346, Plot No. 154/2.
Udyambag, Belgaum – 590008,
Karnataka, India.
E-MAIL : [email protected]
WEBSITE : www.ktntechno.com
ORGANISATION : Private Limited Company
BANKERS : State Bank of India,
Bank of Baroda.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 3
Page 4
K.T.N Metals
DIRECTORS : Mr. Kallappa. Saple
Mr. Tukaram. Saple
Mr. Nagendra. Saple
Mr. Bhairu. Saple
Mr. Narayan. Saple
Mr. Uttam. Saple.
CERTIFICATION : ISO 9001:2000
ESTABLISHED : 1978
CAPITAL INVESTED : Rs 5 Lakhs
MAUFACTURING
CAPACITY : 1800 Tons/Annum
ANNUAL TURNOVER : 2006-07= Rs 6.40 Crores
2007-08= Rs 7.26 Crores
WORK FORCE : Engineering—5 members
Workers—104 members
AUDITORS : Rajendra Sanjiv & company, Belgaum.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 4
Page 5
K.T.N Metals
NATURE OF OWNERSHIP
K.T.N.metals is being successfully carried on as a partnership firm
consisting of three partners as well as brothers namely Kallappa, Tukaram and
Nagendra which represents the name K.T.N who were born in a maratha family
in Belgaum in 1942, 1951, 1955 respectively, having basic education till SSLC,
and who have passed experience of 35 years in the similar field, as at the start
used to work in some other foundry for around 10 years to have enough
experience and knowledge in the given field. All three partners have equal
profit sharing ratio.
They started their business with the initial investment of 5lakh rs and
having 10-15 employees. Previously the business was started in a smll area of
udyambag and slowly as the business expanded it purchased more and more
land which resulted in the increase of its area of operation. And presently it is
well known for its reputation build since 30 years.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 5
Page 6
K.T.N Metals
QUALITY POLICY
K.T.N. metals will continously improve its processes to attain the supply
of quality castings and on time delivery, to achieve customer satisfaction.
OBJECTIVES
99% dispatch
5% Rejection
Job base training
VISION
Our vision is to achieve market leadership and prosper in business through
satisfaction of customer needs, by way of constant improvement in quality, cost,
timely delivery of products and services rendered.
MISSION
Our mission is to increase production and to achieve total customer satisfaction
by supplying cost effective flow control products to our Indian as well as
overseas customers by providing them value added products and services at
their doorsteps.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 6
Page 7
K.T.N Metals
QUALITY MANAGEMENT SYSTEM
QMS is established document implement and is maintained in the
company. Top management will ensure the continual improvement of it for
effectiveness with ISO 9001:2000. Documents required to maintain the QMS
are as follows:
Documents standard of a quality policy and quality objective.
Quality manual
Documents needed by the organization to ensure the effective planning
process like checklist, plans, lists format, control plans
Scope of QMS including details and justification for exclusion
Documents identified in the QMS will be controlled and recorded.
Records are identified, designed, established and maintained to provide
evidence of confirming to the requirement and of the effective operation of
QMS and also shall satisfy the regulatory and customer requirements record
will be ensured to remain legible readily identifiable and retrievable.
QMS PLANNING:
Planning of QMS in order to meet the requirement specified of the standard and
planning of objectives. Whenever any changes done to the QMS that is
introduction of new process, addition of new products etc, the integrity of the
QMS is to be maintained.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 7
Page 8
K.T.N Metals
SALIENT FEATURES OF ISO-9000
Brings you closer to the customer by understanding customer needs
Focuses on continuous improvement.
Individual department performance is monitored through company level
data.
Better utilization of available resources and facilities.
Prepares you well in advance for the product development.
Provides confidence in you and the customer to meet the customer needs.
Helps in monitoring and controlling the processes.
Emphasizes on defect prevention rather than detection.
Makes you competent by reducing wastages and variations in entire
supply chain.
Helps in realization of importance of inventory management.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 8
Page 9
K.T.N Metals
FUTURE PLANS
Its future plan in to combine TECHNOCASTING and K.T.N. and result
in the increased production which will fulfill the growing needs of the
customers.
It also aims at increasing its number of customers overseas, in order to
stay competitive in this global market and increase its share in the given
field.
K.T.N. has planned to increase its effectiveness and efficiency by
reducing labor work and concentrating totally mechanical work, which
can be possible through employing modern and latest technology
machines and plants which will increase the efficiency of the product and
at the same save time and cost.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 9
Page 10
K.T.N Metals
PRODUCT PROFILE
Our product range includes:
Globe valve bodies
Pump casing
Gear case body
Friction sheaves
Flywheel housings
Strainers and globe valve body
Strainers and sight flow indicators
Cylinder block and heads
Friction sheaves
Engine parts
Strainer
High pressure compressors components
LIST OF SUPPLIERS
Supriya traders, Belgaum: pig iron
Minex mettallergical co. pvt ltd, Chennai: alloys
M.S metals and steels pvt ltd: scrap and pig iron
C.Arihant taders link: coke supplier
Shivam engineering solution: sand
Mahalaxmi industries, Shinoli: rasing sand
Magna industries:enograls
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 10
Page 11
K.T.N Metals
COMPETITION
As 80% of the industries in Belgaum are foundry, it faces tough
competition in the market. It distinguishes itself from their competitors in the
market by concentrating more on the quqlity aspect of the products which helps
to ensure long term customer relationship and in turn reap good name and
reputation in the market. It faces competition not only in the local market but
also in national markets, some of its competitors in local market are as follows:
Ashok iron works
Prahat casting
Techno system
Reliance engineering group
Renuka metals
Abhishek alloys
J.P. foundries
Shanti iron works
CUSTOMERS
The firm has 40% of its customers in India and 60% of its customers from
outside India. Some of its reputed customers in India are:
Otis elevator co.ltd
Krombach India ltd
Virgo engineers ltd
Kirloskar oil engines ltd
Addision and co. ltd
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 11
Page 12
K.T.N Metals
Ksb pumps ltd
Polihydron pvt ltd
Atlas copco ltd
L & T tractor division
Kirloskar oil engines
Burchardt compression India pvt ltd
Some of its overseas customers are as follows:
M/s. Caprari S.p.a
Modena Mo-
Italy
M/s. Akmi Corporation
California-94545
U.S.A
M/s. PSA Wasserarmaturen Gmbh
Germany
M/s. Construcciones
Mecanicas F. Zumarraga S.A
Spain
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 12
Page 13
K.T.N Metals
ACHIEVEMENTS OF THE ORGANIZATION
K.T.N. Company had received many awards by reputed organizations, some
of them are:
Best excise award by the government
Awarded by the Institution of Indian foundries, for having received
ISO certificate
Certificate of excellence by Reengineering Corporation
Certificate of attendance, for the participation of Narayan Saple in the
CBI seminar
Awarded by TENGL, tractor engineering’s ltd
Engineering export promotion council certificate of appreciation for
their participation at Hannover messe’ 06 held in Hannover,
Germany.
Best chapter award by institude of indian foundries.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 13
Page 14
K.T.N Metals
ORGANIZATIONAL CHART
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 14
Page 15
K.T.N Metals
DEPARTMENTS
Various Departments of KTN metals ltd.
Marketing Department.
Finance and Accounting Department
Material & Stores Department.
Production Planning & Control Department.
Safety & maintenance Department.
Purchase Department.
Dispatch Department.
H R Department.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 15
Page 16
K.T.N Metals
MARKETING AND EXPORT DEPARTMENT
Mr. Narayan.Sapple is the head of marketing department. Marketing is the
most important activity in organization as it is a 100% export oriented business.
Technical functions of marketing department are as follows:
1) Customer related process:
PURPOSE: -
To determine PURPOSE: - To determine, review the requirement of
customer related to the product and for the communication between customer
and company.
SCOPE: -
This flowchart covers all activities of M/s Aqua Alloys pvt ltd. In
marketing for determining the requirement related to the product and any
communication between the customers.
The marketing executive has to perform the following responsibilities:
Monitor, conduct and coordinate the customer satisfaction survey ti
increase customer satisfaction 80% to 90%.
Look after the enquiry review and order review activities.
To co-ordinate with other departmental heads to take corrective and
preventive action for customer complaints.
To inform market status, forecasting and planning to the partner.
To take corrective action for the audit findings.
To monitor the dispatch activity.
To prepare procedures for his departments and implementation of the
same.
To identify resources of his department.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 16
Page 17
K.T.N Metals
To identify the training needs of his people.
Advance shipment notification to the customers.
Follow up for payments from customers.
To review the quotation in consultation with the partners.
To conduct customer satisfaction survey and take corrective actions on
dissatisfied areas with consultation of respective departments.
To accept orders in consultation with the partners.
To maintain good relations with the customers.
To carry out sales promotion activities.
To maintain and increase the sales.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 17
Page 18
K.T.N Metals
FINANCE AND ACCOUNTING DEPARTMENT
This section looks after the allocation of funds for various activities
accounting of the transactions in monitory terms and manage the cash
flow. All the major financial decision is taken at the head office. It will
take care of all financial activities of the company.
FUNCTIONS
1. Preparing and maintaining accounts
2. Financing day-to-day activities of company
3. Managing accounts receivables and accounts payables
4. Preparing and handle costing information
5. To prepare budget
6. To prepare profitability statements and reports.
The firm has turnover of 18crore.
Only this information was revealed in terms of financial aspects. As a
part of the Company’s policy the revealing of financial information is strictly
confidential.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 18
Page 19
K.T.N Metals
MATERIAL AND STORES DEPARTMENT
Material Department deals with purchase, sub-contractors and stores.
The head of Material Department though the management respective issue
materials as per work instruction and maintains records of the same.
Material Department plans for manpower, selected sub-contractors and
ensure receipts, storage handling preservation and issue of materials.
Stores Department is one of the important branches of material
department. The Stores Department receives materials in the following ways;-
1. Sales Return from customers.
2. Customer supplied product.
3. Material purchased for manufacturing.
4. Finished product.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 19
Page 20
K.T.N Metals
PRODUCTION PLANNING AND CONTROL DEPARMENT
PROCESS CONTROL IN PLANNING PROCEDURE:
1. Work order amendments are received from sales co-ordination
department work order is studied.
2. Material requirement is studied and required material are indented and
given department considering the stock of items.
3. Monthly production plan is prepared as per the procedure for planning
(PPC). The material storage, which is required for the production plan is
prepared and given before the last week of previous month as applicable
to the material department.
4. Monthly planning and indenting is as per the requirement of material
planning.
5. Material requirement for the production0 plan of sub contracting and
rubber processing development prepare during the last week of the
previous month as applicable and handed over to the respective section or
departments.
6. As per the availability of raw materials and considering the process cycle,
materials are loaded to the sub-contractors, which are required for the
production plan and also subsequent monthly stock.
7. Inspection schedule for the month for the customer inspection are
prepared by the first week of every month in consultation with the sales
co-ordination department.
8. Material requisition is issued to stores for arranging to send the materials
to respective sub-contractors
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 20
Page 21
K.T.N Metals
PURCHASE DEPARTMENT
Responsibilities
Responsible for KTN Metals purchase of all direct and
indirect materials.
Responsible for re-solving all commercial issues in
purchases with the suppliers and vendors.
Responsible for monitoring the purchase data and looking
for alternative competitive sources for material and services.
Responsible for all stores activities for the indirect material,
physical verification and movement control of all such
material of KTN Metals and sub-contractors.
Responsible for training of stores personnal.
Objectives
To receive indent from various departments.
To ensure with the stores regarding the availability of
intended material.
To follow the order placed.
To deal with the merchant about quality.
To send the developed accessories to the buyer for the
approval.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 21
Page 22
K.T.N Metals
DISPATCH DEPARTMENT
The main function of this department is to dispatch the produced goods to
the customers. The working of this department is systemized as checking of
excise number, batch no., lot no., month and year, type net and gross weight is
done. The records are maintained and reconciliation statement of the inventory
is prepared daily.
Responsibilities
Organizing dispatches as per shipment pre-planning.
Overall supervision of dispatch department.
Responsible for packaging.
Overall responsible for painting activity.
Responsible for monitoring the house keeping of dispatch
area.
Responsible for stock related to shipment.
Maintenance of machine and equipments on a regular basis
as per preventive maintenance plan.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 22
Page 23
K.T.N Metals
SAFETY AND MAINTAINANCE DEPARTMENTS
The employees are given the safety gears such as goggles, helmets, hand
gloves and safety shoes when they are working in the factory and special first
aid medical facilities are also available in health care.
The records of accidents, which have taken place and accidents not taken
place are maintained. To see that the people work safety there are special safety
awards given. There is a training program conducted as regarding safety.
FUNCATIONS:
1. Conducting periodic safety training programs.
2. On the job training.
3. Liberating on us of raw materials.
4. Conducting periodic tests and essay program on safety.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 23
Page 24
K.T.N Metals
DESIGN AND DEVELOPMENT DEPARTMENT
An organization has an authoritative design and development department
to meet the changing needs of the market. With well-qualified and experienced
personnel to design and develop quality products that are reliable, economical
and satisfying.
First they study the market about the materials whether they are available
or not. After getting the materials they give materials to design to design
department. Management and customer give feedback to design the product.
The designer, designs the product under the restricted standards.
OBJECTIVES
1. To ensure that the design and development manual is controlled
regarding adequacy, review, authorization, distribution and revision.
2. To ensure that documents that effect quality are controlled regarding
adequacy review, authorization, distribution and revision.
3. To explain the method followed for issues of document directories to
user department.
4. To continuously improve the quality of the product.
5. To maintain quality records to demonstrate achievements of the
required quality as a proof of the effective operation of the quality
system.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 24
Page 25
K.T.N Metals
HUMAN RESOURCE DEPARTMENT
Human Resource is the integral part as well as an important part of any
organization. . It is a department, which looks after all the objectives of each
department and gives order’s to perform their individual activities. To perform
any activity in an organization there is the necessity of various people at various
levels possessing different kinds of skills. But before we go in depth with the
Human Resource Department, let us see what does Human Resource actually
mean.
OBJECTIVES OF HRD:-
Each and every person or a firm must have an objective. Knowing of
objectives, goals are a must without which it is not known as to go on which
path. Similarly KTN Metals Pvt ltd. also has certain objectives. The following
are some of objectives of the Human Resources Department.
1. To factor organizational goals in the individual’s career growth:-
This is an important objective and that every employee must know the
objective of an organization he/she is working in. Also it is that he/she must
build in those objectives as matter of personal interest and hence that will
enhance the efficiency of the employee.
2. To create facilities and opportunities so as to match it with the
organizational growth:-
If the organization has to grow then every employee has to be given fair
amount of opportunities. All of them must be given a chance to show their
inbuilt talents.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 25
Page 26
K.T.N Metals
3. To strengthen and appreciate the human assets continuously by providing
training and development programmes:-
By this the employees will be exposed to new types of working conditions
and facilities. Hence that will develop their efficiency also.
4. To provide facilities and conditions of work and creation of favorable
atmosphere for maintaining stability of employment :-
5. Maintenance of good quality human resource is also a difficult task,
because to do this a lot of steps have to be taken in regards to providing
of facilities and good working conditions to be given to the employees.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 26
Page 27
K.T.N Metals
EMPLOYEE SATISFACTION
Definition:
“Employee satisfaction is the terminology used to describe whether employees
are happy and contented and fulfilling their desires and needs at work. Many
measures purport that employee satisfaction is a factor in employee motivation,
employee goal achievement, and positive employee morale in the workplace.”
Employee satisfaction, while generally a positive in your organization, can also
be a downer if mediocre employees stay because they are satisfied with your
work environment.
Employee satisfaction is a measure of how happy workers are with their job and
working environment. Keeping morale high among workers can be of
tremendous benefit to any company, as happy workers will be more likely to
produce more, take fewer days off, and stay loyal to the company. There are
many factors in improving or maintaining high employee satisfaction, which
wise employers would do well to implement.
Many experts believe that one of the best ways to maintain employee
satisfaction is to make workers feel like part of a family or team. Holding office
events, such as parties or group outings, can help build close bonds among
workers. Many companies also participate in team-building retreats that are
designed to strengthen the working relationship of the employees in a non-work
related setting. Camping trips, paintball wars and guided backpacking trips are
versions of this type of team-building strategy, with which many employers
have found success.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 27
Page 28
K.T.N Metals
NEEDS OF EMPLOYEE SATISFACTION
The need for employee satisfaction arises because of performance of the human
being and their behavior when engaged on a particular job is influenced by
intangible psychological &social factors such as family breeding, education,
personal likes & dislikes, emotions etc.
The workers have now come to realize their demand can be satisfied if they
resort to concentrated and collective action while the employers are aware of
the fact they can resist these demands . This refusal to meet the genuine
demands has often led to dissatisfaction on the part of workers, to their distress
and even to violet activities on their part which has hindered production and
harmed both the workers and employees
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 28
Page 29
K.T.N Metals
BENEFITS OF EMPLOYEE SATISFACTION
It helps to earn goodwill and enhance public image.
Promotion to advancement facilities led to employee’s satisfaction.
The employee satisfaction will lead to increase in productivity of the
employees.
If employees are satisfied, then they reduce the wastage and it also
reduces the cost of production with the increased productivity.
Employee satisfaction will reduce labour turnover and absenteeism of
organization.
Employee satisfaction will increase co-operation in the whole
organization and satisfied employee will feel increased responsibility for
the jobs.
Satisfied employees are ready to take the challenge job, so intern it will
increase the talent of the employees.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 29
Page 30
K.T.N Metals
FUNCTIONS
1. MAN POWER PLANNING
The company knows the importance of man power planning and therefore
it utilizes the man power to the fullest capacity avoid a low productivity,
inefficiency, wastage of time, energy and high cost of production. They ensure
the workers satisfactory, working conditions and other incentives for improving
their productivity. This helps the company to improve and expand its growth.
2. RECRUITMENT AND SELECTION
Recruitment and selection is done by Managing Director and General
Manager.
PROCEDURE:-
1) Advertisements for vacancies in the newspapers are given.
2) After receiving the application, suitable candidates are called
for interview.
3) Interview is taken by managing director and general manager.
4) Manager selects the right kind of candidate and appoints the
candidates.
5) Selection mainly depends on the qualification and experience of
the candidates.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 30
Page 31
K.T.N Metals
RECRUITMENT: -
In K.T.N metals. Centralized and decentralized recruitment is done.
Centralized recruitment for management staff and decentralized for blue colored
employees.
For operating category they need SSLC or ITI passed candidates. They
have both internal and external source of recruitment.
It is the process of searching for prospective employee and
stimulating and encouraging them to apply for jobs in the organization.
SELECTION:-
The process of selecting workers after carefully weighing the
requirements of the jobs on the one hand and after assessing and
evaluating the abilities and aptitudes of the candidates on the other, is
selection. The company gives more preference for the external sources of
recruitment and selection.
The procedure of recruitment is centralized in this company. It
also makes use of internal sources of recruitment and selection. Internal
sources contain promotion, transfer of present employees and External
sources contains Advertisement, employee exchange etc.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 31
Page 32
K.T.N Metals
3. TRAINING AND DEVELOPMENT
TRAINING AND DEVELOPMENT PROCESS:-
NEEDS ANALYSIS
INSTRUCTIONAL DESIGN
VALIDATION
IMPLEMENT
EVALUATION
Training and development consists of planned programs designed
to improve performance at the individual, group, and organizational
levels. Improved performance in turn implies that there have been
measurable changes in knowledge, skill, attitudes, and social behavior.
These results in better performance and leads to reduction in the cost of
production. It results in organizational stability and flexibility.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 32
Page 33
K.T.N Metals
TRAINING
Training is the act of increasing the knowledge and skills of an
employee for doing a particular job.
There are two types of training:
1. Training on material specification standard.
2. Training on communication skills.
ENHANCING EFFECTIVE COMMUNICATION SKILLS:
For training to have impact, it must be memorable and achieve the
purpose for which it was designed. This training programme is related to
business need. Enhancing communication skills has specific and measurable
objectives and uses a variety of appropriate adult learning methods. It has been
designed keeping in mind the fact that learners need to identify the benefit of
training to be interested in the topic and its application.
Target Group
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 33
Page 34
K.T.N Metals
This programme is tailor made to enhance the communication
skills of the employees working at supervisory level.
Objective of the Programme
To enhance participants to sharpen their communication skills with
respect to the supervisory role. To help participants enhance specific
skills in the areas of written and oral communication skills.
SPECIFIC AREAS OF FOCUS:-
Written skills
Oral skills
Presentation skills
Training methodologies used:-
Innovative and interactive training methodologies will be adopted
to enhance the training of the participants.
Role-plays, case studies, management games and group discussions
will also be conducted.
Training would be based on an average group size of 20
participants, all with similar responsibilities and training needs.
The turning session will be begin with a feedback from participants
on their expectations, and at the end feedback on their views.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 34
Page 35
K.T.N Metals
DURATION OF THE PROGRAM:-
This programme is ideally designed for a half-day. The programme
will consist of three modules of one hour each.
EXTERNAL TRAINING CONDUCTED:-
Training on gauging practice
Time management
Continual improvement
Surface finish parameter
Identification of products
JIT AWARENESS CHECK
Many jobs consist of a logical sequence of steps and are best taught step-
by-step. Listing each job’s basic tasks, along with key points, in order to
provide step-by-step training for employees. The step-by-step process is called
Job Instruction Training (JIT). An original idea of JIT came from supermarket.
OBJECTIVE OF THIS PROGRAMME
To save inventory cost.
To determine devices which eliminate operator’s careless mistake.
A high productivity.
A demand function.
Reductions of production lead time.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 35
Page 36
K.T.N Metals
The programme is primarily designed to create awareness of this concept
and to discuss how Japanese and quite a few other countries have
successfully adopted.
4. EMPLOYMENT EXCHANGE
Before recruiting, the company provides information about recruitment to
the employment exchange and this exchange tries to send the best candidates
required for the company.
5. HOLIDAYS
The company has five public holidays and five festival holidays.
NATIONAL HOLIDAYS
26th January - Republic Day
1st May - Workers Day
15th August – Independence Day
2nd October – Gandhi Jayanti
1st November- Karnataka Rajyotsava
FESTIVAL HOLIDAY
20th March- Dhulivandan
7th September- Ganesh Chaturthi
12th October- Dasera
2nd November- Balipratipada
3rd November- Bhavbij
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 36
Page 37
K.T.N Metals
MATERNITY BENEFIT
Ladies workers are given maternity leaves for 3months with pay.
6. LEAVE
Every worker who has worked for 240 days or more for calendar year is
entitled for leave 1 day for 30 days or more for calendar year. Leave is
calculated on net present days.
7. PROVIDENT FUND
Provident fund is paid to those employees who have worked in this
company for 6 months. Total contribution of provident fund is 24% half of
which is paid by the employer and remaining by the employees.
8. TRANSFER, PROMOTION & DEMOTION
TRANSFER:
Transfer means movement of an employee from one job to another. In
this, company transfers are rare but the company follows initiated transfer i,e.
employees are transferred for temporary adjustment such as leave, replacement
and shortage of worker in any department and to meet other emergencies.
PROMOTION:
A promotion means an idea of advancement of employee from lower job
to higher job. Promotion of an employee is done on merit bases this is used to
fill the higher vacancies. An employee is promoted on his past performance,
services and his behavior in the company.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 37
Page 38
K.T.N Metals
DEMOTION:
In case of misbehavior of any worker at work or alcoholic
consumption at work place etc, strict actions are taken to punish the workers.
9. PERFORMANCE APPRAISAL
Performance appraisal means the systematic evaluation of the individual
with respect to his performance on the job and his potential for development.
In the company performance of employees are periodically evaluated
which helps to determine weakness and strength of employees. Depending upon
the performance increment is decided. This performance appraisal program
develops a sense of confidence to categories efficient and inefficient workers
performance appraisal is done by keeping the records for previous year and
current year.
10. HEALTH FACILITIES
Cleanliness - Inside walls, ceilings, petitions, lops of passages,
staircase in factory shall be kept whitewashed at least once in every
period of 14 months the floor shall be cleaned once in a week.
Disposal of water - Effective arrangements shall be made in every
factory for disposal of water.
Ventilation and temperature - Effective and suitable provision shall
be made in every factory for securing and maintaining in every
work room. Adequate ventilation by the circulation and fresh air
and such a temperature as will secure to workers there is
responsible conditions of comfort and prevent injury to health.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 38
Page 39
K.T.N Metals
Lighting- Where workers are working or passing their lighting
shall be provided and maintained sufficient and suitable lighting
natural or artificial.
Drinking Water - Effective arrangements for sufficient supply of
drinking water for all employees shall be made.
Latrine and Urinals - In every factory sufficient latrines and urinals
shall be provided separately. Sweepers shall be employed for
cleaning.
Spittoons - Sufficient numbers of spittoons are kept inconvenient
places and they shall be maintained clean and hygienic.
11.WORKING HOURS
The manager has to display working hours and they cannot be
changed suddenly. He has to maintain adult’s register showing names and
workers nature of work and time period. The workers work 48 hours, 9 hours
daily with ½ hour rest required.
12.WELFARE ACTIVITIES
In every factory adequate washing facility shall be provided along
with soap.
First aid box with prescribed contents shall be kept.
The provision of canteen is not requirement under the act if the
factory employees are less than 250 workers. A balance and
welfare officer is required for more than 500 workers.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 39
Page 40
K.T.N Metals
If any accident occurs, its notice should be given to ESIC office
and hospital within 48 hours.
BONUS
It depends upon the company profits. As per the act the company should
pay 8.33% bonus but the company pays 20% bonus.
GRATUITY
Employees who have worked for 5 years are given gratuity.
MINIMUM WAGES
Wages are paid to workers according to their skills i.e. skilled, semi-
skilled, and un-skilled.
WORKMENS COMPENSATION
If any worker is to be discontinued from his job he will be given a notice
about this and he will be removed. If the company does not give notice before 3
months the worker will be discontinued with 3 months salary.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 40
Page 41
K.T.N Metals
1) Canteen facilities to the Employees
Name of the Department
Canteen facility DEG PROD PER QCD STORE PPC Total
V. Satisfied 5 2 1 2 2 0 12
Neutral - - 1 1 - 1 3
Dis- Satisfied - 2 1 0 1 1 5
Total 5 4 3 3 3 2 20
The most of the employees are satisfied with the canteen facility provided by
the Co. But employees from production & PPC department are not satisfied
with the canteen facility. Because the co. provides twice tea & Snacks every day
to the employees. IT does not provides drunks co. is not providing lunch but it
is producing only tea & Snacks.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 41
Page 42
K.T.N Metals
2) Water facility provided to the Employee?
Name of the Department
Canteen facility DEG PROD PER QCD STORE PPC Total
V. Satisfied 5 3 3 3 3 1 18
Neutral - 1 0 0 0 1 2
Dis- Satisfied - 0 0 0 0 0 0
Total 5 4 3 3 3 2 20
According to the survey conducted. It was formed that the
employees are happy with the water facility provided by the CO’s.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 42
Page 43
K.T.N Metals
3) Medical facility provided to the Employees?
Name of the Department
Medical Facility DEG PROD PER QCD STORE PPC total
V. Satisfied 5 3 2 3 2 2 17
Neutral - 1 1 0 1 0 3
Dis- Satisfied - 0 0 0 0 0 0
Total 5 4 3 3 3 2 20
All the Employees are covered V/s ESI Benefits Employees are issued
V/s GSLI ( Group Saving Ltd. Insurance) Nearly 85% of the employees are
satisfied with the Medical Facility provided by the Cos. The company conducts
medical checkup for employees.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 43
Page 44
K.T.N Metals
4) Is the Salary earned by the Employees Sufficient for reasonable living ?
Name of the Department
DEG PROD PER QCD STORE PPC total
Yes 2 1 3 3 2 1 12
No 3 3 0 0 1 1 8
Total 5 4 3 3 3 2 20
Nearly 8 Employees are not happy with the salary . They say that it is
not sufficient for reasonable living
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 44
Page 45
K.T.N Metals
5) Do you have Leave facility?
Name of the Department
Leaves DEG PROD PER QCD STORE PPC Total
Yes 4 3 3 3 3 2 18
No 1 1 0 0 0 0 2
Total 5 4 3 3 3 2 20
Most of Employees are satisfied with the leave facility provided by the
company. Every employee has 1 day leave for every 30 days. if the employee
exceeds the number of leave then his some percentage of salary is cut off.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 45
Page 46
K.T.N Metals
6) Freedom at work
Name of the Department
DEG PROD PER QCD STORE PPC Total
V. Good 1 3 1 1 2 1 9
Satisfactory 1 0 2 2 1 1 7
Fair 1 1 0 0 0 0 2
Poor 2 0 0 0 0 0 0
Total 5 4 3 3 3 2 20
There is no such rule that is followed by the co, regarding work most of
the employees are satisfied. The H.R manager says that employees should get
freedom at work place to show their talent in company. Most of employeesare
happy by the freedom given in the company.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 46
Page 47
K.T.N Metals
7). Are you satisfied with your working time?
Name of the Department DEG PROD PER QCD STORE PPC TOTALSatisfied 2 3 1 2 3 3 12not satisfied 3 1 1 1 1 1 8Total 5 4 3 3 3 2 20
Analysis :
60% of the employees are satisfied with there work timeings which
results in high performance at their work.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 47
Page 48
K.T.N Metals
8) Are you satisfied getting holiday packages?
Name of the Department
DEG PROD PER QCD STORE PPC TOTAL
Satisfied 3 2 3 2 3 2 13
not satisfied 1 0 1 2 1 2 7
Total 5 4 3 3 3 2 20
Analysis:
Most of the employees are provided sick leaves, paid
packages ,entertainment allowances are given to the employees. So the
employees find relaxed from their routine work.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 48
Page 49
K.T.N Metals
9) do you believe whether the work atmosphere is friendly.
Name of the Department
DEG PROD PER QCD STORE PPC TOTAL
Satisfied 2 3 4 2 4 3 16
not satisfied 2 0 1 0 1 0 4
Total 5 4 3 3 3 2 20
Analysis:
There is a friendly atmosphere in the organization. Views and
suggestion are freely invited from the employees for improvement and up
gradation of organization. And it was found that most of the employees are
satisfied with working environment of the company because the environment is
good and clean. The company provides good and healthy environment.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 49
Page 50
K.T.N Metals
10). Do you have a job security?
Name of the Department
work atmosphere
DEG PROD PER QCD STORE PPC TOTAL
yes 3 3 2 3 3 2 16No 2 1 1 0 0 0 4Total 5 4 3 3 3 2 20
Analysis:
Employees are asssured of job , so there is job security in the company.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 50
Page 51
K.T.N Metals
11). Do you think management should take care of the work load of
employees?
DEG PROD PER QCD STORE PPC TOTAL
Yes 3 2 2 2 3 2 14
No 1 0 2 1 1 1 6
Total 5 4 3 3 3 2 20
Analysis:
By analysing the above data we can come to the decision that the management
has to take care of the work load of the employees.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 51
Page 52
K.T.N Metals
12). Do you feel is it necessary to train at work place?
ANALYSIS:
When this question was asked to the employees, they were confused
they did not understand what to say, some told no spme told yes. Company
provides training wherever it is needed.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 52
Name of the Department
DEG PROD PER QCD STORE PPC TOTAL
Yes 2 1 5 1 4 4 17
No 1 1 1 0 0 0 3
Total 3 2 6 1 4 4 20
Page 53
K.T.N Metals
13). Are you satisfied with your work according to your qualification?
Name of the Department
DEG PROD PER QCD STORE PPC TOTAL
Yes 1 1 4 1 1 4 12
No 1 1 1 0 2 0 5
cant say 1 0 1 0 1 0 3
Total 3 2 6 1 4 4 20
ANALYSIS:
The above chart shows that maximum number of employees in
each department are satisfied with their work according to their qualification.
But some of the emloyees in some department are not satsfied with their work
accordinng to their qualification,because their qualification is high and job is
small and some of the employees are no sure of anything.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 53
Page 54
K.T.N Metals
14). Do you work with other departments with co-operation?
Name of the Department
DEG PROD PER QCD STORE PPC TOTAL
Yes 5 4 3 3 3 2 20
No 0 0 0 0 0 0 0
Total 5 4 3 3 3 2 20
ANALYSIS:
According to the survey conducted the co-ordination & co-operation
among employees of different departments is 100%. All the employees have
friendly relations among themselves.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 54
Page 55
K.T.N Metals
15). Do you get motivated with your work at your work place?
Name of the Department
DEG PROD PER QCD STORE PPC TOTAL
yes 1 1 4 1 1 4 12
No 1 1 1 0 2 0 5
cant say 1 0 1 0 1 0 3
Total 3 2 6 1 4 4 20
Analysis :
This question revals the motivational feelings at work place of the
company .From the above chart we can see that maximum number of workers in
each department get motivated at theork place because everyone help and the
support for doing their job, and some percent of workers are not sure .some
workers don’t get motivated because of nature of their work.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 55
Page 56
K.T.N Metals
QUESTIONNAIRE
Dear Sir/Madam,
I am conducting a study on employee satisfaction towards KTN
Metals, Private Limited., please answer the following questionnaires
below which is the part of my project work. So I request you to spend
some time in completing the schedule.
Name of the employee :
Post :
Qualification :
1. Are you satisfied with canteen facility provided by company?
a. Very satisfied
b. Neutral
c. Dis –satisfied
2. Are you satisfied with the drinking water facility provided by the
company?
a Very satisfied
b. Neutral
c. Dis –satisfied
3. Are you satisfied with the medical facility provided by the company?
a Very satisfied
b. Neutral
c. Dis –satisfied
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 56
Page 57
K.T.N Metals
4. Is the Salary earned by the Employees Sufficient for reasonable
living?
a Yes
b No
5. Are you satisfied with the leave facility provided by the company?
a Yes
b. No
6. Are you satisfied with the freedom given by the company at workplace?
a Very good
b satisfactory
c Fair
d Poor
7. Are you satisfied with your working time?
a. Satisfied
b. Dissatisfied
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 57
Page 58
K.T.N Metals
8. Are you satisfied getting holiday packages?
a. Satisfied
b. Dissatisfied
9. Do you believe weather the workplace is friendly?
a. Satisfied
b. Dissatisfied
10.Do you have job security?
a. Yes
b. No
11.Do you think management should take care of the work load of
employees?
a. Yes
b. No
12.Do you feel is it necessary to train at work place to employees?
a. Yes
b. No
13.Are you satisfied with your work according to your qualification?
a. Yes
b. No
c. Can’t say
14.Do you work with other departments with co-operation?
a. Yes
b. No
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 58
Page 59
K.T.N Metals
15. Do you get motivated with you work at your work place?
a. Yes
b. No
c. Can’t say
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 59
Page 60
K.T.N Metals
FINDINGS
Most of the employees were satisfied with the recruiters briefing about
the expectations.
Majority of the employees received information by post or email.
The overall employee satisfaction level at K.T.N. Pvt. Ltd. is high.
Most of the employees say that they are somewhat satisfied with the company culture & the policies & procedures of the company.
Many of the respondents are of the opinion that the working environment is satisfactory.
Most of the respondents feel that they have a good interpersonal relationship with their seniors but only a few respondents say that they have not been motivated & appreciated for the hardwork done by their team leaders/ seniors.
Most of the employees say that their boss interacts with them in a friendly manner whenever they approach him & they feel that the company is well managed.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 60
Page 61
K.T.N Metals
CONCLUSION
This project work has given me a golden opportunity to understand the
operations of KTN Metals Ltd. It enriched my knowledge in the field of
EMPLOYEE SATISACTION.
Opinions were collected through questionnaire method, which was
very useful tool and has been carried out successfully.
In this specific study the working efficiency of EMPLOYEE
SATISFACTION in the organization were analyzed and the
recommendation where made me to improve its effectiveness.
I hope the above submitted report recommendation will be helpful for
betterment of the EMPLOYEE SATISFACTION in the organization.
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 61
Page 62
K.T.N Metals
INDUSTRY PROFILE
COMPANY PROFILE
NATURE OF OWNERSHIP
QUALITY POLICY VISION, MISSON
QUALITY MANAGEMENT SYSTEM
SALIENT FEATURES OF ISO-9000
ACHIEVEMENTS OF THE ORGANIZATION
ORGANIZATIONAL CHARTDepartments
EMPLOYEE SATISFACTION
Analysis :
QUESTIONNAIRE
FINDINGS
CONCLUSION
GOGTE COLLEGE OF BUSINESS ADDMINISTRATION Page 62