KTH - SCOPE OF WORK KTH - 5055 Highway 6 North Houston, TX 77084 Contractor: KAT'S PLUMBING Date: 02/08/2012 CSI DESCRIPTION: SCOPE OF WORK QTY UM $/UM TOTAL ADDITIONAL INSTRUCTIONS / INFO 1 Divi sion 01 - General Requirements: Side walks X Contractor to power wash all exterior concrete after project is complete 1 LOT - -  Siding X Contractor to clean with either degreaser of 50/50 bleach and water mixture. 1 LOT - -  Pavement Markings X Contractor to re-stripe all spaces and paint all previously painted parking and sidewalk areas 1 LOT - -  Curbs X Replace missing or broken speed bumps 0 LOT - - Insert Quantity 0 LOT - -  Subtotal Division 01: -  2 Divi sion 02 - Si te Work  Demolition Guestroom X Contractor to remove all items not being reused and place in contractor provided container or dumpster. All other items are to be placed in the center of the room and wrapped in visqueen to keep safe and free of debris. Contractor to ensure all sprinkler heads are protected during renovation. Any heads with overspray will be the responsibility of the contractor to replace, at the contractors cost. 121 EA - -  EVAC Signage X Remove, repair door , paint door Intown specs. Manager will reinstall after painting 121 EA - -  Floor Door Stops X Remove and dispose of existing floor mounted stops 121 EA - -  Old Paint X Remove any old paint from window and window lock. 121 SF - -  Drapery X Existing drapes and drape rods to be reused. Owner to remove and store drapes. Owner to reinstall drapes, contractor to install rods. 121 EA - -  Bathroom X Contractor to supply all labor to remove and dispose of vinyl flooring, lighti ng, mirrors, hardware, vinyl base, etc. Contractor to place carpet in tub with fibers down to store toilet and other hardware to remain. Contractor to tape and visqueen entire tub area during renovation. 121 EA - -  Bath Tub Caulk / Paint X Remove existing caulk and old paint from perimeter of shower / tub unit 121 EA - -  Water Closet X Remove and place in tub during renovation 121 EA 45.00 5,445.00  Phones X Property to remove, store and reinstall existing phones and cords. 0 EA - - Property to complete scope Fridge X Protect during painting 121 EA - -  Subtotal Division 02: 5,445.00  O S O I O S C I C S C I 1
7

KTH Bid Scope New Format

Apr 05, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: KTH Bid Scope New Format

7/31/2019 KTH Bid Scope New Format

http://slidepdf.com/reader/full/kth-bid-scope-new-format 1/7

KTH - SCOPE OF WO

KTH - 5055 Highway 6 North

Houston, TX 77084

CSI DESCRIPTION: SCOPE OF WORK QTY

1 Division 01 - General Requirements: 

Side walks XContractor to power wash all exterior concrete after project is

complete

Siding XContractor to clean with either degreaser of 50/50 bleach and

water mixture.

Pavement Markings XContractor to re-stripe all spaces and paint all previously painted

parking and sidewalk areas

Curbs X Replace missing or broken speed bumps

Subtotal Division 01: 

2 Division 02 - Site Work 

Demolition

Guestroom X

Contractor to remove all items not being reused and place in

contractor provided container or dumpster. All other items are to

be placed in the center of the room and wrapped in visqueen to

keep safe and free of debris.

Contractor to ensure all sprinkler heads are protected during

renovation. Any heads with overspray will be the responsibility ofthe contractor to replace, at the contractors cost.

EVAC Signage XRemove, repair door , paint door Intown specs. Manager will

reinstall after painting

Floor Door Stops X Remove and dispose of existing floor mounted stops

Old Paint X Remove any old paint from window and window lock.

Drapery XExisting drapes and drape rods to be reused. Owner to remove and

store drapes. Owner to reinstall drapes, contractor to install rods.

Bathroom X

Contractor to supply all labor to remove and dispose of vinyl

flooring, lighting, mirrors, hardware, vinyl base, etc. Contractor to

place carpet in tub with fibers down to store toilet and otherhardware to remain. Contractor to tape and visqueen entire tub

area during renovation.

Bath Tub Caulk / Paint XRemove existing caulk and old paint from perimeter of shower /

tub unit

Water Closet X Remove and place in tub during renovation

Phones X Property to remove, store and reinstall existing phones and cords.

Fridge X Protect during painting

Subtotal Division 02: 

OS

O

I

OS

C

I

CS

C

I

1

Page 2: KTH Bid Scope New Format

7/31/2019 KTH Bid Scope New Format

http://slidepdf.com/reader/full/kth-bid-scope-new-format 2/7

KTH - SCOPE OF WO

CSI DESCRIPTION: SCOPE OF WORK QTY

O

S

O

I

O

S

C

I

C

S

C

I

 

3 Division 03 - Concrete 

Gypcrete Repair

Subtotal Division 03: 

4 Division 04 - Masonry 

Subtotal Division 04: 

5 Division 05 - Metals 

Subtotal Division 05: 

6 Division 06 - Wood & Plastics 

Window Sill X Furnish and install new window sill

Counter / End Splash / P'lam Backsplash X

OSCI:

Contractor to cut 2 back splashes OR 5 (24") side splashes per

sheet. Fully adhere side and bask splashes to kitchen walls.

Contractor to cut out top for sink and burner installation.

Wire Shelving - Vinyl Coated X

Contractor to install 16" deep wire shelf with side and back

supports under cook top. Height is established with existing

garbage cans plus 2".

Cabinet Doors X

OSCI first floor only , reuse all other doors on second and third

floor. Place as directed any doors on the 2nd and 3rd floors with

the 1st floor doors as directed by the ITS PM.

Kitchen Counter Skirts & Drawer Fronts X OSCI first floor only.

Registration Desk X

Contractor to furnish and install new wider opening at registration

counter for ADA counter top to match existing. Replace trim,

drywall and texture to match adjacent walls.

Subtotal Division 06: 

7 Division 07 - Thermal & Moisture Protection 

Entry Threshold X

Remove during flooring installation. Re-install with new White

Lightning 3006 Elastomeric Caulking, Color: Gray. Install at

underside of threshold prior to setting. Caulk both sides where it

meets door frame at exterior.

Caulking X Perimeter of window

X Base of interior entry, closet and bath door frame

2

Page 3: KTH Bid Scope New Format

7/31/2019 KTH Bid Scope New Format

http://slidepdf.com/reader/full/kth-bid-scope-new-format 3/7

KTH - SCOPE OF WO

CSI DESCRIPTION: SCOPE OF WORK QTY

O

S

O

I

O

S

C

I

C

S

C

I

X Perimeter of shower / tub surround

X Shower diverter and / or tub spout

Counter / End Splash / P'lam Backsplash XCaulk ends and joints with DAP 35 year White Silicone and side

splash to countertop DAP 35 Year Aluminum Gray

Kitchen Sink & Cook Top XReuse existing, Contractor to caulk perimeter of sink with clear

silicone.

Subtotal Division 07: 

8 Division 08 - Doors, Windows & Hardware 

Weather Stripping X OSCI weather-strippingSecurity Latch X Remove, store and re-install after entry door is painted.

Door Sweeps X

Remove existing and install owner supplied door sweeps on entry

door only. Ensure there is not light showing under door when

closed.

Drapery Rods XContractor to reinstall drapery supports, rod and Wall bracket

hook. Supports are to receive 3 hex head screws each.

Bath Wall Door Stop X

Contractor to remove existing stop and reinstall with anchor after

painting is complete. Contractor to ensure all paint (old or new) is

removed from hardware.

Vanity Mirror X OSCI, install 5" above vanity / splash and centered above faucet.

Closet Door Roller Stop XOSCI roller door stop with contractor provided screws, lock

washers and nuts. Install per ITS specifications.

Subtotal Division 08: 

9 Division 09 - Finishes 

Drywall Prep X Prep and patch all surfaces to receive new paint/texture.

Painting - Guest Room, Bath

Guest Laundry, Front Office, Lobby, Back Hall & RR

Walls & Ceilings X

Contractor to prime all walls and ceiling prior to application of

paint.

Walls: Soft Off-White #A0082

Walls 1416-0110

#44YY 76/094

Ceiling: White High-Hiding RM #A0113

Ceilings 1412-0100

Interior Doors & Frames

Lobby Accent: ICI Special Formula Blue 1403-0500V

Smoke Detector X Protect during renovation

Sprinkler Heads X Protect during renovation

3

Page 4: KTH Bid Scope New Format

7/31/2019 KTH Bid Scope New Format

http://slidepdf.com/reader/full/kth-bid-scope-new-format 4/7

KTH - SCOPE OF WO

CSI DESCRIPTION: SCOPE OF WORK QTY

O

S

O

I

O

S

C

I

C

S

C

I

Interior Doors & Frames X

Contractor to remove all hardware, sand prime and finish with two

coats of ITS specified paint:

Semi Gloss Paint on interior door and frame:

ICI White High-Hiding #A0113

Contractor to paint hinges if previously painted. Contractor to

remove any old paint from all hardware

Exterior Doors & Frames X

Contractor to remove all hardware, sand prime and finish with two

coats of ITS Specified

Frame: ICI White High-Hiding #A0113 Semi Gloss

Door: ICI Colonial Red #A0299 Semi Gloss.

Auxiliary Doors: ICI Obelisk #A1797

Stair Treads, Risers & Stringers XContractor to sand, prep, prime and apply two coats of ITS

Specified ICI Colonial Red #A0299 Semi Gloss.

Belly Bands XContractor to paint per Intown specs the colored bans at the

walkway perimeter

Exterior Fire Extinguisher Cabinets XContractor to prep, prime and paint face of FE Cabinet to match

exterior frames

Window Sills X

Contractor to sand, prime and finish with two coats of ITS

Specified ICI White High-Hiding #A0113 Semi Gloss Paint. Any

cracks in wood sill are to be floated to a smooth finish.

Bath Exhaust Fan Cover X

Contractor to remove, clean and paint all metal covers. Remove,

clean and re-install plastics covers.

A/C Wall Sleeves XContractor to paint PTAC Sleeves with Krylon Appliance Paint,

color is white.

Hood Vent XContractor to remove, clean and paint all sides of hood vent. Re-

install after painting

Switches, Outlets, Coax, Phone, Cat 5, GFI XClean all outlets (new and existing) after painting; Remove and

install new jumbo cover place

Flooring

Carpet - Guestrooms & Front Office X

Contractor to prep floor to accept new OSCI direct glued

carpeting. Contractor to install OS transition strips where carpet

meet vinyl flooring. Contractor to ensure all miters are tight andinstalled after base. Do not trim base around transition strip.

Pad - Front Office XContractor to furnish and install two layers of mildew resistant

padding.

Vinyl Flooring (Entry, Closet, Kitchen, Bathroom) X

Contractor to prep floors and install Mapei Primer L; float floors

with a self-leveling compound and install OS vinyl sheet goods.

Trim all edges to walls.

VCT - Guest Laundry X 12" x 12" Vinyl Composite Tile

Base

4

Page 5: KTH Bid Scope New Format

7/31/2019 KTH Bid Scope New Format

http://slidepdf.com/reader/full/kth-bid-scope-new-format 5/7

KTH - SCOPE OF WO

CSI DESCRIPTION: SCOPE OF WORK QTY

O

S

O

I

O

S

C

I

C

S

C

I

Carpet Base X

Contractor to prep wall to receive new OSCI carpet base. Base is

to be glued to walls minimizing the use of staples. Corner are to

be turned so that binding wraps the edge. Clip seam as to ensure

piles are even.

Vinyl Cove Base:

Entry, Closet, Kitchen, BathroomX

OSCI 4" vinyl base. Ensure all inside and outside corners are

tight. Caulk any gaps along top of base.

Vinyl Cove Base:

Guest LaundryX

OSCI 4" vinyl base. Ensure all inside and outside corners are

tight. Caulk any gaps along top of base.

Tub Strips XContractor to install OS 60" vinyl tub strips. Tub strips are to

receive additional adhesive caulking prior to installation.

Subtotal Division 09: 

10 Division 10 - Specialties 

Room Number Signage X

Owner supplied and contractor to install (number will go on wall,

install on latch side of door). Install signage 4" from edge of

frame and 60" AFF.

Misc. Exterior Signage X OSCI misc signage, 12 pieces.

ITS Logo X OSCI front office logo

Toilet Paper Holder XOSCI - 18" AFF centered between toilet tank and vanity/vanity

support.

24" Towel Bar XOSCI, install on wall behind bath door, 48" AFF and centered on

wall.

Vanity Sink Supports X

OSCI, Contractor to supply any spacers necessary to make up for

gap between support bracket and under side of vanity. Attach

base of support to sill plate of wall on top of vinyl wall base

Metal Shelf X OSCI; Install 48" AFF to top of shelf and centered above toilet

Shower Rod and Ends X OSCI

Subtotal Division 10: 

11 Division 11 - Equipment 

Miscellaneous Equipment (Shelving in Storage Rooms)

Subtotal Division 11: 

12 Division 12 - Furnishings 

Headboards (1st Floor & Double/Double's) XOSCI - install headboard 1" below top of new bed set and

centered on carpeted area.

Nightstands (1st Floor and Double Double's) X OSCI

Chest of Drawers (1st Floor and Double/Double's) X OSCI

5

Page 6: KTH Bid Scope New Format

7/31/2019 KTH Bid Scope New Format

http://slidepdf.com/reader/full/kth-bid-scope-new-format 6/7

KTH - SCOPE OF WO

CSI DESCRIPTION: SCOPE OF WORK QTY

O

S

O

I

O

S

C

I

C

S

C

I

Closet Wire Closet Rack X Remove, clean and re-install after painting

Metal Lounge Chair X OSCI - contractor to receive, store and install.

Artwork XRemove and store existing artwork during renovation. Reinstall

existing artwork 20" from ceiling to top of art.

Beds & Frames-----Fulls XOwner supplied and contractor to install new beds and frames.

Contractor to adjust feet so the frame is 11" AFF.

Platform Sofa X OSCI

Televisions (Guestrooms & Lobby) X

Existing television to be reused. Bundle cord and coax, place in a

heavy duty trash bag and place with other salvaged items in

center of room. Upon completion of renovation unbag television,

plug power cord and coax into jacks and clean for punch.

Television Remote X Give remote to manager

TV Mount X OSCI TV mounts

Kitchen Table XOSCI, contractor to install OS adjustable feet on base of each

table (4 each).

Kitchen Chairs X OSCI - Two (2) per room

Faux Wood Blinds XContractor to furnish and install new 2" white faux wood blinds at

the entry door and window.

Subtotal Division 12: 

13 Division 13 - Special Construction 

Subtotal Division 13: 

14 Division 14 - Conveying Systems 

Subtotal Division 14: 

15 Division 15 - Mechanical Systems 

Individual A/C Unit XContractor to remove existing PTACs and place in Owner storage

container. Contractor to receive, store and install new PTACs.

A/C Grills - Exterior X N/AA/C Interior Covers X Contractor to install new OS covers

Water Closet XContractor to reinstall toilet with new bolts and wax rings.

Contractor to replace bolts, washers and rubber seal at tank.

Toilet Seat XProtect during painting. If broken, contractor to notify

operations for a replacement to install.

Angle Stops & Supply Lines X

Contractor to install new 1/4 turn angle stops and metal braided

supply lines. Contractor to ensure all tags are removed from supply

lines.

6

Page 7: KTH Bid Scope New Format

7/31/2019 KTH Bid Scope New Format

http://slidepdf.com/reader/full/kth-bid-scope-new-format 7/7

KTH - SCOPE OF WO

CSI DESCRIPTION: SCOPE OF WORK QTY

O

S

O

I

O

S

C

I

C

S

C

I

Escutcheon Plates X

Contractor to install plastic split ring at toilet, bath sink and

kitchen sink. Contractor to install new escutcheon plates at bath

and kitchen sink waste lines.

Permits / Fees

Subtotal Division 15: 

16 Division 16 - Electrical Systems 

Ceiling Lights X Contractor to install new owner supplied ceiling fixture and lamps.

Bullet Lights XContractor to install new owner supplied wall mounted bullet lights

and lamps

Microwave XOwner supplied and contractor to install. Location is determined

based on Intown specs

Switch & Outlet Cover plates X Install new jumbo cover plates

6 gang outlets X OSCI behind nightstand

Round Cover plate XInstall new contoured round (TayMac SKU: 419-265)ceiling blank

cover plate over bed.

Recessed Ceiling Lights - Lobby/Front Office XContractor to relocate one (1) existing spot light to center of new

opening.

Subtotal Division 16: 

Subtotal 

17 General Conditions 

Project management

Supervision

Supervision # 2

Equip. rental -forklift

Dumpster

Housing - Apt.

Warehousing

Trailer Rental

Misc. Exp.

Postage & office suppliesFederal Express

Permit / Licenses

GC Fee

Subtotal General Conditions 

Grand