Material Number Manufacturer Number Material Description Manufacturer Name Contact
PIPE;METALLIC;SPOOL;FABRICATED,ANY METALPIPE;METALLIC;SPOOL;FABRICATED,ANY METALPIPE;METALLIC;SPOOL;FABRICATED,ANY METALPIPE;METALLIC;SPOOL;FABRICATED,ANY METAL
PIPE;METALLIC;SPOOL;FABRICATED,ANY METAL
PIPE;METALLIC;SPOOL;FABRICATED,ANY METAL
PIPE;METALLIC;SPOOL;FABRICATED,ANY METAL
PIPE;METALLIC;SPOOL;FABRICATED,ANY METAL
PIPE;METALLIC;SPOOL;FABRICATED,ANY METALPIPE;METALLIC;SPOOL;FABRICATED,ANY METALPIPE;METALLIC;SPOOL;FABRICATED,ANY METALPIPE;METALLIC;SPOOL;FABRICATED,ANY METALPIPE;METALLIC;SPOOL;FABRICATED,ANY METALPIPE;METALLIC;SPOOL;FABRICATED,ANY METALPIPE;METALLIC;SPOOL;FABRICATED,ANY METALPIPE;METALLIC;SPOOL;FABRICATED,ANY METAL
6000000025 30003044 CHICAGO BRIDGE & IRON/HOWE-BAKER 903-510-1000/
6000000025 30003151 H BUTTING GMBH & CO KG 058 34 50-0/058 34 50-372
6000000025 30003153 IODS 1355 249 224/
6000000025 30003393 SHAW SUNLAND FABRICATORS, INC. 225-932-2600/
6000000025 30003579 KLAD MANUFACTURING COMPANY 713-433-5151/
6000000025 30003921 PROCLAD INTERNATIONAL LTD 01592 772 568/01592 772 568
6000000026 30000078 PIPE; SCRAPER TRAP; STEEL; 02-SAMSS-009 BASSI LUIGI & C. S.P.A. 0377 56023/
6000000104 10031928 FLANGE; LAP JOINT; ANY METAL; CHAUDHRY HAMMER WORKS PVT. LTD. ANISH CHAUDARY 120-4388000/6000000104 10031928 FLANGE; LAP JOINT; ANY METAL; CHAUDHRY HAMMER WORKS PVT. LTD. MUKUL CHAUDHRY, MANAGING DIREC 120-4388000/6000000104 30000110 FLANGE; LAP JOINT; ANY METAL; RINGROLLERS /
6000000104 30000192 FLANGE; LAP JOINT; ANY METAL; OFFICINE NICOLA GALPERTI & FIGLIO S 344 97200/344 97200
6000000104 30000221 FLANGE; LAP JOINT; ANY METAL; ULMA FORJA 943 78 0552/6000000104 30001095 FLANGE; LAP JOINT; ANY METAL; BRUCK GMBH ENSHEIM 0689 3840/0689 38406000000104 30001207 FLANGE; LAP JOINT; ANY METAL; OFFICINE A. MELESI AND CO. 341 98 341/
6000000104 30001209 FLANGE; LAP JOINT; ANY METAL; METALFAR PRODOTTI INDUSTRIALI SPA 031 655441/030 2629561
6000000104 30001211 FLANGE; LAP JOINT; ANY METAL; SBS 077-96-8000/077-96-8000
6000000104 30001378 FLANGE; LAP JOINT; ANY METAL; KOREA FLANGE CO LTD 52 279 4251/
6000000104 30001619 FLANGE; LAP JOINT; ANY METAL; DYNAMIC PRODUCTS, INCORPORATED 281-457-3500/
6000000104 30003237 FLANGE; LAP JOINT; ANY METAL; PRECISION FORGINGS 3812-3800/388.../
6000000104 30003412 FLANGE; LAP JOINT; ANY METAL; CHAUDHRY HAMMER WORKS PVT. 120-2794921/
6000000104 30003659 FLANGE; LAP JOINT; ANY METAL; GALPERTI INCORPORATED 713 433 0700/
6000000104 30004472 FLANGE; LAP JOINT; ANY METAL; GALPERTI SRL 0341 988 011/
6000000104 30004767 FLANGE; LAP JOINT; ANY METAL; OFFICINE SANTAFEDE SRL 0341 979 980/
6000000119 30001245 SPOOL: PIPE; JOINT INSULATING; FOR CP RMA KEHL GMBH & CO KG 07851 8680/
6000000119 30001378 SPOOL: PIPE; JOINT INSULATING; FOR CP KOREA FLANGE CO LTD 52 279 4251/
6000000119 30002031 SPOOL: PIPE; JOINT INSULATING; FOR CP T.D. WILLIAMSON INCORPORATED 918-447-5208/
6000000123 30000215 NIPPLE; PIPE; ANY METAL I.M.L. INDUSTRIA MECCANICA 185 467 661/6000000123 30000216 NIPPLE; PIPE; ANY METAL DELCORTE SA 0327 691 414/6000000123 30001206 NIPPLE; PIPE; ANY METAL M.E.G.A. SPA 35 661 280/6000000123 30001208 NIPPLE; PIPE; ANY METAL MERWEDE VALVES BV 0184 657 710/0184 677 3006000000123 30002015 NIPPLE; PIPE; ANY METAL W F I INTERNATIONAL INCORPORATED 713-695-3633/6000000123 30002959 NIPPLE; PIPE; ANY METAL WESTBROOK MANUFACTURING 713-675-6438/6000000123 30003069 NIPPLE; PIPE; ANY METAL WILSONS PLC 1480 456 421-223/1480 416 421-2636000000123 30003069 NIPPLE; PIPE; ANY METAL WILSONS PLC 1480 456 421-223/1480 416 421-263
6000000123 30003817 NIPPLE; PIPE; ANY METAL WARD MANUFACTURING 570-638-2131/
6000000123 30004253 NIPPLE; PIPE; ANY METAL PIANA SPA 0385 251 111/6000000123 30004533 NIPPLE; PIPE; ANY METAL MANNESMANN-DMV STAINLESS /6000000123 30004641 NIPPLE; PIPE; ANY METAL MANNESMANN DMV STAINLESS 713-466-7278/6000000123 30004679 NIPPLE; PIPE; ANY METAL BOTH-WELL STEEL FITTINGS CO LTD 7 3711536/
6000000123 30005166 NIPPLE; PIPE; ANY METAL SBC BEND CO LTD 55 580 9900/
CROSS; PIPE; ANY METAL; SIZE; AND CONNECCROSS; PIPE; ANY METAL; SIZE; AND CONNECCROSS; PIPE; ANY METAL; SIZE; AND CONNECCROSS; PIPE; ANY METAL; SIZE; AND CONNECCROSS; PIPE; ANY METAL; SIZE; AND CONNECCROSS; PIPE; ANY METAL; SIZE; AND CONNECCROSS; PIPE; ANY METAL; SIZE; AND CONNECCROSS; PIPE; ANY METAL; SIZE; AND CONNECCROSS; PIPE; ANY METAL; SIZE; AND CONNECCROSS; PIPE; ANY METAL; SIZE; AND CONNEC
TRAP: STEAM; MECHANICAL; THERMODYNAMICTRAP: STEAM; MECHANICAL; THERMODYNAMICTRAP: STEAM; MECHANICAL; THERMODYNAMICTRAP: STEAM; MECHANICAL; THERMODYNAMICTRAP: STEAM; MECHANICAL; THERMODYNAMICVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED OR
6000000239 30000337 AUDCO INDIA LIMITED 04112-264323/
VALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED OR
VALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED OR
VALVE; BALL; FULL OR REDUCED; FLANGED OR
VALVE; BALL; FULL OR REDUCED; FLANGED OR
VALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; FULL OR REDUCED; FLANGED ORVALVE; BALL; SOCKET WELD; THREADED; OR SVALVE; BALL; SOCKET WELD; THREADED; OR SVALVE; BALL; SOCKET WELD; THREADED; OR SVALVE; BALL; SOCKET WELD; THREADED; OR S
VALVE; BALL; SOCKET WELD; THREADED; OR S
VALVE; BALL; SOCKET WELD; THREADED; OR SVALVE; BALL; SOCKET WELD; THREADED; OR S
VALVE; BALL; SOCKET WELD; THREADED; OR S
VALVE; BALL; SOCKET WELD; THREADED; OR SVALVE; BALL; SOCKET WELD; THREADED; OR S
6000000245 30004843 NETHER SEAL 0172 572215/0000000642037556
6000000246 10016433 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT MCCANNA-MARPAC INCORPORATED 847 426 4100/847 426 4100
6000000246 10016433 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT MCCANNA-MARPAC INCORPORATED MAUREEN LASSE 847 426 4100/847 426 4100
6000000246 10016493 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT FLOWSERVE PUMP DIVISION 713 803 4412/713 803 4400
6000000246 10016493 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT FLOWSERVE PUMP DIVISION DAN SHEEHY 713 803 4412/713 803 4400
6000000246 10016498 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT FLOW SOLUTIONS 269 226 3496/269 226 3982
6000000246 10016498 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT FLOW SOLUTIONS PAUL ERBE 269 226 3496/269 226 3982
6000000246 10016499 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT FLOWSERVE US INCORPORATED 713-218-4211/713 218 4202
6000000246 10016499 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT FLOWSERVE US INCORPORATED DAVID C. SWIENTON 713-218-4211/713 218 4202
6000000246 10016500 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT VALTEK INC / FLOWSERVE CORP 801 489 8611/801 489 8611
6000000246 10016500 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT VALTEK INC / FLOWSERVE CORP SOURCE NB0202-10 801 489 8611/801 489 8611
6000000246 10016501 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT VALVE DIVISION 615 432 4021/
6000000246 10016501 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT VALVE DIVISION GARY BOWMAN 615 432 4021/
6000000246 10021940 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT AUTOMAX / FLOWSERVE 931 432 4021/409/357-2561
6000000246 10021940 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT AUTOMAX / FLOWSERVE 931 432 4021/409/357-2561
6000000246 10031968 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT INDUSTRIAL VALVES MANUFACTURER 03-812-3450/
VALVE; BALL; FLANGED OR BUTTWELD; STEEL;
VALVE; BALL; FLANGED OR BUTTWELD; STEEL;VALVE; BALL; FLANGED OR BUTTWELD; STEEL;VALVE; BALL; FLANGED OR BUTTWELD; STEEL;VALVE; BALL; FLANGED OR BUTTWELD; STEEL;VALVE; BALL; FLANGED OR BUTTWELD; STEEL;VALVE; BALL; FLANGED OR BUTTWELD; STEEL;VALVE; BALL; FLANGED OR BUTTWELD; TOP EN
VALVE; BALL; FLANGED OR BUTTWELD; TOP EN
VALVE; BALL; FLANGED OR BUTTWELD; TOP ENVALVE; BALL; FLANGED OR BUTTWELD; TOP EN
6000000246 30000035 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT OLIVER VALVES LTD 01565 632636/
6000000246 30000184 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT FLOWSERVE FLOW CONTROL GMBH 07243 103 1/07243 103 0
6000000246 30001166 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT HARTMANN VALVES GMBH 05085-9801-0/
6000000246 30001227 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT PIBIVIESSE SPA 0331 408781/
6000000246 30001364 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT TYCO FLOW CONTROL JAPAN CO LTD 48 878 1113/
6000000246 30001376 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT KITZ CORPORATION 0551 20 4133/
6000000246 30001516 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT FLOWSERVE CORPORATION (COOKEVILLE) 931-432-4021/
6000000246 30001581 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT SWAGELOK HIGHLAND 440-473-1050/
6000000246 30001868 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT PARKER-HANNIFIN 256-435-2130/
6000000246 30001999 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT VELAN INCORPORATED 514-748-7743/
6000000246 30002000 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT VELAN INCORPORATED 514-378-2305/
6000000246 30002061 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT KF INDUSTRIES INCORPORATED 405-631-1533/
6000000246 30002062 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT HOKE INC./CIRCOR INTL INC 864-574-7966-.../
6000000246 30003038 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT TIX CORPORATION 0257 48 2121/03-3492-6365
6000000246 30003243 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT OMS SALERI S.R.L. 0365 826610/
6000000246 30003425 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT VIRGO VALVES AND CONTROLS LIMITED 20-66744000/0000009822678892
6000000246 30003442 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT DELLA FOGLIA S.A.S. 0331 602059/
6000000246 30003603 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT INDUSTRIAL VALVES MANUFACTURER 3899-5156/889.../
6000000246 30003651 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT CONBRACO INDUSTRIES, INC. 843-347-4666/
6000000246 30004316 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT DK TECH CORPORATION 055 338 0031/
6000000246 30004725 VALVE; BALL; 1/4 INCH TO 2 INCH; ANY RAT SWI VALVE CO LTD 31 422 7495/
VALVE; BUTTERFLY; UP TO 12 INCH; NON-FERVALVE; BUTTERFLY; UP TO 12 INCH; NON-FERVALVE; BUTTERFLY; UP TO 12 INCH; NON-FERVALVE; BUTTERFLY; UP TO 12 INCH; NON-FERVALVE; BUTTERFLY; UP TO 12 INCH; NON-FERVALVE; BUTTERFLY; UP TO 12 INCH; NON-FERVALVE; BUTTERFLY; UP TO 12 INCH; NON-FERVALVE; BUTTERFLY; UP TO 12 INCH; NON-FERVALVE; BUTTERFLY; HIGH PERFORMANCE; 2 INVALVE; BUTTERFLY; HIGH PERFORMANCE; 2 INVALVE; BUTTERFLY; HIGH PERFORMANCE; 2 INVALVE; BUTTERFLY; HIGH PERFORMANCE; 2 INVALVE; BUTTERFLY; HIGH PERFORMANCE; 2 INVALVE; BUTTERFLY; HIGH PERFORMANCE; 2 IN
VALVE; BUTTERFLY; HIGH PERFORMANCE; 2 IN
VALVE; BUTTERFLY; HIGH PERFORMANCE; 2 INVALVE; BUTTERFLY; HIGH PERFORMANCE; 2 INVALVE; BUTTERFLY; HIGH PERFORMANCE; 2 INVALVE; BUTTERFLY; HIGH PERFORMANCE; 2 IN
6000000260 30001845 NIBCO INC. (BLYTHEVILLE PLANT) 870-763-7044-250/
VALVE; BUTTERFLY; HIGH PERFORMANCE; 2 IN
VALVE; BUTTERFLY; 14 INCH AND UP; NON-FEVALVE; BUTTERFLY; 14 INCH AND UP; NON-FEVALVE; BUTTERFLY; 14 INCH AND UP; NON-FEVALVE; BUTTERFLY; 14 INCH AND UP; NON-FEVALVE; BUTTERFLY; 14 INCH AND UP; NON-FEVALVE; BUTTERFLY; 14 INCH AND UP; NON-FEVALVE; BUTTERFLY; 14 INCH AND UP; CAST OVALVE; BUTTERFLY; 14 INCH AND UP; CAST OVALVE; BUTTERFLY; 14 INCH AND UP; CAST OVALVE; BUTTERFLY; 14 INCH AND UP; CAST O
6000000260 30003710 ADVANCE VALVES GLOBAL 120-2462374/
6000000261 30003450 TY VALVE CORP. 051 264 2385 -8/
6000000262 30000040 PETROLVALVES SRL 0331 334111/
6000000262 30000219 TYCO VALVES & CONTROLS ITALIA SRL 0322-94333/0322-94333
6000000262 30001238 POYAM VALVES 0943 80 53 43/
6000000262 30001315 VALVOSIDER SRL 0163-22991/
VALVE; BUTTERFLY; 14 INCH AND UP; CAST O
VALVE; BUTTERFLY; 14 INCH AND UP; CAST OVALVE; BUTTERFLY; 14 INCH AND UP; CAST OVALVE; BUTTERFLY; 14 INCH AND UP; CAST OVALVE; CHECK;SWING;METAL SEAT;2 TO 24 INVALVE; CHECK;SWING;METAL SEAT;2 TO 24 INVALVE; CHECK;SWING;METAL SEAT;2 TO 24 INVALVE; CHECK;SWING;METAL SEAT;2 TO 24 INVALVE; CHECK;SWING;METAL SEAT;2 TO 24 INVALVE; CHECK;SWING;METAL SEAT;2 TO 24 INVALVE; CHECK;SWING;METAL SEAT;2 TO 24 INVALVE; CHECK;SWING;METAL SEAT;2 TO 24 INVALVE; CHECK;SWING;METAL SEAT;2 TO 24 INVALVE; CHECK;SWING;METAL SEAT;2 TO 24 INVALVE; CHECK;SWING;METAL SEAT;2 TO 24 INVALVE; CHECK;SWING;METAL SEAT;2 TO 24 INVALVE; CHECK;SWING;METAL SEAT;2 TO 24 IN
VALVE; CHECK;SWING;METAL SEAT;2 TO 24 IN
VALVE;CHECK;SWING;FULL OPENING;26 IN &UPVALVE;CHECK;SWING;FULL OPENING;26 IN &UPVALVE;CHECK;SWING;FULL OPENING;26 IN &UPVALVE;CHECK;SWING;FULL OPENING;26 IN &UP
6000000262 30001319 VITAS - DIVISION OF VALVITALIA SPA 0444 337111/
6000000266 30003650 VALVE; CHECK; API 6A 2000 THRU 5000 PSI; CRANE VALVES NORTH AMERICA 936-588-4427/
VALVE;CHECK;SWING;FULL OPENING;26 IN &UPVALVE;CHECK;SWING;FULL OPENING;26 IN &UPVALVE;CHECK;SWING;FULL OPENING;26 IN &UPVALVE;CHECK;SWING;FULL OPENING;26 IN &UPVALVE;CHECK;SWING;FULL OPENING;26 IN &UPVALVE;CHECK;SWING;FULL OPENING;26 IN &UPVALVE; CHECK; SWING; SINGLE PLATE; WAFERVALVE; CHECK; SWING; SINGLE PLATE; WAFERVALVE; CHECK; SWING; SINGLE PLATE; WAFERVALVE; CHECK; SWING; SINGLE PLATE; WAFERVALVE; CHECK; SWING; SINGLE PLATE; WAFER
6000000266 30003710 VALVE; CHECK; API 6A 2000 THRU 5000 PSI; ADVANCE VALVES GLOBAL 120-2462374/
6000000268 30000020 VALVE; CHECK; 2 INCH AND UP; ANSI 150 AN CRANE STOCKHAM VALVE LTD 028 9070 4222/01232 704222
6000000268 30000040 VALVE; CHECK; 2 INCH AND UP; ANSI 150 AN PETROLVALVES SRL 0331 334111/
6000000268 30000152 VALVE; CHECK; 2 INCH AND UP; ANSI 150 AN GESTRA AG 0421-3503424/
6000000268 30000182 VALVE; CHECK; 2 INCH AND UP; ANSI 150 AN KSB AMVI SA 0947-298 527/
6000000268 30001161 VALVE; CHECK; 2 INCH AND UP; ANSI 150 AN GOODWIN INT. LIMITED 01782-220000/
6000000268 30003650 VALVE; CHECK; 2 INCH AND UP; ANSI 150 AN CRANE VALVES NORTH AMERICA 936-588-4427/
VALVE;CHECK;WAFER;UP TO 12 IN;NONFERROUSVALVE;CHECK;WAFER;UP TO 12 IN;NONFERROUSVALVE;CHECK;WAFER;UP TO 12 IN;NONFERROUSVALVE;CHECK;WAFER;UP TO 12 IN;NONFERROUSVALVE;CHECK;WAFER;UP TO 12 IN;NONFERROUS
VALVE;CHECK;WAFER;UP TO 12 IN;NONFERROUS
VALVE;CHECK;WAFER;UP TO 12 IN;NONFERROUSVALVE;CHECK;WAFER;UP TO 12 IN;NONFERROUSVALVE;CHECK;WAFER;UP TO 12 IN;NONFERROUS
6000000268 30003710 VALVE; CHECK; 2 INCH AND UP; ANSI 150 AN ADVANCE VALVES GLOBAL 120-2462374/
6000000268 30004661 VALVE; CHECK; 2 INCH AND UP; ANSI 150 AN RITAG RITTERHUDER ARMATUREN GMBH & 047 9192 090/
6000000268 30004717 VALVE; CHECK; 2 INCH AND UP; ANSI 150 AN VELAN INC /
6000000272 30003445 TOMOE PROCESS VALVES & CONTROL SYST 01633 274707/0374 269052
VALVE; BUTTERFLY; HIGH PERFORMANCE; TRIPVALVE; BUTTERFLY; HIGH PERFORMANCE; TRIPVALVE; BUTTERFLY; HIGH PERFORMANCE; TRIPVALVE; BUTTERFLY; HIGH PERFORMANCE; TRIPVALVE; BUTTERFLY; HIGH PERFORMANCE; TRIPVALVE; BUTTERFLY; HIGH PERFORMANCE; TRIP
6000000272 30003710 ADVANCE VALVES GLOBAL 120-2462374/
6000000272 30004405 CURTISS-WRIGHT FLOW CONTROL (UK) LT 01308 422 256/
6000000272 30004717 VELAN INC /
6000000273 10012189 VALVE; CHECK; 2 THRU 24 IN; METAL SEAT AUDCO INDIA LIMITED 44 2342323/0091 44 2342323
6000000273 10012189 VALVE; CHECK; 2 THRU 24 IN; METAL SEAT AUDCO INDIA LIMITED VISHAL MAPHUR 44 2342323/0091 44 2342323
6000000273 10025970 VALVE; CHECK; 2 THRU 24 IN; METAL SEAT SAUDI MECHANICAL INDUSTRIES CO. RIYADH AL-DIHAN/AYMEN ABDULGHA 12651979-133/0000000505204346
6000000273 10025970 VALVE; CHECK; 2 THRU 24 IN; METAL SEAT SAUDI MECHANICAL INDUSTRIES CO. RIYADH AL-DIHAN/AYMEN ABDULGHA 12651979-133/0000000505204346
6000000286 30000040 VALVE; GATE; PARALLEL SLIDE; 2 INCH AND PETROLVALVES SRL 0331 334111/
6000000286 30001070 VALVE; GATE; PARALLEL SLIDE; 2 INCH AND BEL VALVES 091-2659091/
VALVE; CHOKE; PLUG AND CAGE OR INTERNALVALVE; CHOKE; PLUG AND CAGE OR INTERNALVALVE; CHOKE; PLUG AND CAGE OR INTERNALVALVE; CHOKE; PLUG AND CAGE OR INTERNALVALVE; CHOKE; PLUG AND CAGE OR INTERNALVALVE; CHOKE; PLUG AND CAGE OR INTERNALVALVE; CHOKE; PLUG AND CAGE OR INTERNALVALVE; CHOKE; PLUG AND CAGE OR INTERNALVALVE; CHOKE; PLUG AND CAGE OR INTERNAL
6000000286 30001121 VALVE; GATE; PARALLEL SLIDE; 2 INCH AND DRESSER CONSOLIDATED 44-695-24234/
6000000286 30001179 VALVE; GATE; PARALLEL SLIDE; 2 INCH AND WEIR VALVES & CONTROLS UK LTD 01484 820820/
6000000286 30001292 VALVE; GATE; PARALLEL SLIDE; 2 INCH AND TAYLORSHAW VALVES LTD 01484 484880/
6000000286 30001319 VALVE; GATE; PARALLEL SLIDE; 2 INCH AND VITAS - DIVISION OF VALVITALIA SPA 0444 337111/
6000000286 30001637 VALVE; GATE; PARALLEL SLIDE; 2 INCH AND M&J VALVE OPERATIONS 281-469-0550/
6000000286 30001998 VALVE; GATE; PARALLEL SLIDE; 2 INCH AND VELAN VALVE CORPORATION 802-863-2562/
6000000286 30001999 VALVE; GATE; PARALLEL SLIDE; 2 INCH AND VELAN INCORPORATED 514-748-7743/
6000000286 30003675 VALVE; GATE; PARALLEL SLIDE; 2 INCH AND TYCO ENERGY VALVES 0541 581 818/
6000000286 30004305 VALVE; GATE; PARALLEL SLIDE; 2 INCH AND WEIR VALVES & CONTROLS UK LTD 01422 282 000/01422 282 000
6000000287 30000040 VALVE; GATE; SPLIT WEDGE; 1 INCH AND UP; PETROLVALVES SRL 0331 334111/
6000000287 30001315 VALVE; GATE; SPLIT WEDGE; 1 INCH AND UP; VALVOSIDER SRL 0163-22991/
6000000287 30001376 VALVE; GATE; SPLIT WEDGE; 1 INCH AND UP; KITZ CORPORATION 0551 20 4133/
6000000287 30001377 VALVE; GATE; SPLIT WEDGE; 1 INCH AND UP; KITZ CORPORATION 265 78 1111/
6000000293 30000219 TYCO VALVES & CONTROLS ITALIA SRL 0322-94333/0322-94333
VALVE; GATE; THRU CONDUIT;EXPANDING GATEVALVE; GATE; THRU CONDUIT;EXPANDING GATEVALVE; GATE; UP TO 12 INCH; NON-FERROUS;VALVE; GATE; UP TO 12 INCH; NON-FERROUS;VALVE; GATE; UP TO 12 INCH; NON-FERROUS;VALVE; GATE; UP TO 12 INCH; NON-FERROUS;VALVE; GATE; UP TO 12 INCH; NON-FERROUS;VALVE; GATE; UP TO 12 INCH; NON-FERROUS;VALVE; GATE; UP TO 12 INCH; NON-FERROUS;VALVE; GATE; UP TO 12 INCH; NON-FERROUS;
VALVE; GATE; WEDGE; 26 INCH AND UP; FLANVALVE; GATE; WEDGE; 26 INCH AND UP; FLANVALVE; GATE; WEDGE; 26 INCH AND UP; FLANVALVE; GATE; WEDGE; 26 INCH AND UP; FLAN
VALVE; GATE; WEDGE; 26 INCH AND UP; FLAN
VALVE; GATE; WEDGE; 26 INCH AND UP; FLANVALVE; GATE; WEDGE; 26 INCH AND UP; FLANVALVE; GATE; WEDGE; 26 INCH AND UP; FLANVALVE; GATE; WEDGE; 26 INCH AND UP; FLAN
6000000294 30001319 VITAS - DIVISION OF VALVITALIA SPA 0444 337111/
VALVE; GATE; WEDGE; 26 INCH AND UP; FLANVALVE; GATE; WEDGE; 26 INCH AND UP; FLANVALVE; GATE; WEDGE; 26 INCH AND UP; FLANVALVE; GATE; WEDGE; 26 INCH AND UP; FLANVALVE; GATE; WEDGE; 26 INCH AND UP; FLAN
VALVE; GATE; WEDGE; 26 INCH AND UP; FLAN
VALVE; GATE; WEDGE; 26 INCH AND UP; FLAN
VALVE; GATE; WEDGE; UP TO 4 INCH; THREADVALVE; GATE; WEDGE; UP TO 4 INCH; THREADVALVE; GATE; WEDGE; UP TO 4 INCH; THREADVALVE; GATE; WEDGE; UP TO 4 INCH; THREADVALVE; GATE; WEDGE; UP TO 4 INCH; THREADVALVE; GATE; WEDGE; UP TO 4 INCH; THREAD
6000000297 10013855 SAUDI VALVES MANUFACTURING (3)341-8514/0000000504987265
6000000297 10013855 SAUDI VALVES MANUFACTURING ADIL MISBAH SABRI (3)341-8514/0000000504987265
6000000297 10013867 SAUDI VALVES MANUFACTURING COMPANY 2637-1570/0000000006371570
6000000297 10013867 SAUDI VALVES MANUFACTURING COMPANY 2637-1570/0000000006371570
6000000297 10013867 SAUDI VALVES MANUFACTURING COMPANY DAMAD IMTIYAZ, PROJ. MFR 2637-1570/0000000006371570
6000000297 10013867 SAUDI VALVES MANUFACTURING COMPANY DAMAD IMTIYAZ, PROJ. MFR 2637-1570/0000000006371570
VALVE; GATE; WEDGE; UP TO 4 INCH; THREAD
VALVE; GATE; WEDGE; UP TO 4 INCH; THREAD
VALVE; GATE; WEDGE; UP TO 4 INCH; THREADVALVE; GATE; WEDGE; UP TO 4 INCH; THREADVALVE; GATE; WEDGE; UP TO 4 INCH; THREADVALVE; GATE; WEDGE; UP TO 4 INCH; THREADVALVE; GATE; WEDGE; UP TO 4 INCH; THREADVALVE; GATE; WEDGE; UP TO 4 INCH; THREAD
VALVE; GATE; WEDGE; UP TO 4 INCH; THREAD
VALVE; GATE; WEDGE; UP TO 4 INCH; THREAD
VALVE; GATE; WEDGE; UP TO 4 INCH; THREADVALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DBL DISC; UP TO 12VALVE; GATE; WEDGE OR DOUBLE DISC; 14 INVALVE; GATE; WEDGE OR DOUBLE DISC; 14 INVALVE; GATE; WEDGE OR DOUBLE DISC; 14 INVALVE; GATE; WEDGE OR DOUBLE DISC; 14 INVALVE; GATE; WEDGE OR DOUBLE DISC; 14 INVALVE; GATE; WEDGE OR DOUBLE DISC; 14 IN
6000000297 30000041 AVK INTERNATIONAL 087 542100/
6000000297 30000959 SAUDI VALVES MANUFACTURING COMPANY 2637-1570/
6000000297 30001845 NIBCO INC. (BLYTHEVILLE PLANT) 870-763-7044-250/
6000000300 30000127 DOUGLAS CHERO SPA 0523 850047/0523-854011
6000000300 30000428 DRESSER AL-RUSHAID VALVE AND (3) 341-0278/
6000000300 30001070 BEL VALVES 091-2659091/
6000000300 30001081 BFE SPA 035 584290/035-584111
VALVE; GATE; WEDGE OR DOUBLE DISC; 14 INVALVE; GATE; WEDGE OR DOUBLE DISC; 14 INVALVE; GATE; WEDGE OR DOUBLE DISC; 14 INVALVE; GATE; WEDGE OR DOUBLE DISC; 14 INVALVE; GATE; WEDGE; FLANGED OR BUTTWELD;VALVE; GATE; WEDGE; FLANGED OR BUTTWELD;VALVE; GATE; WEDGE; FLANGED OR BUTTWELD;VALVE; GATE; WEDGE; FLANGED OR BUTTWELD;VALVE; GATE; WEDGE; FLANGED OR BUTTWELD;VALVE; GATE; WEDGE; FLANGED OR BUTTWELD;
VALVE; GATE; WEDGE; FLANGED OR BUTTWELD;
VALVE; GLOBE; UP TO 4 INCH; THREADED; SOVALVE; GLOBE; UP TO 4 INCH; THREADED; SOVALVE; GLOBE; UP TO 4 INCH; THREADED; SOVALVE; GLOBE; UP TO 4 INCH; THREADED; SO
6000000301 10012189 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN AUDCO INDIA LIMITED 44 2342323/0091 44 2342323
6000000301 10012189 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN AUDCO INDIA LIMITED VISHAL MAPHUR 44 2342323/0091 44 2342323
6000000301 10013867 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN SAUDI VALVES MANUFACTURING COMPANY 2637-1570/0000000006371570
6000000301 10013867 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN SAUDI VALVES MANUFACTURING COMPANY 2637-1570/0000000006371570
6000000301 10013867 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN SAUDI VALVES MANUFACTURING COMPANY DAMAD IMTIYAZ, PROJ. MFR 2637-1570/0000000006371570
6000000301 10013867 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN SAUDI VALVES MANUFACTURING COMPANY DAMAD IMTIYAZ, PROJ. MFR 2637-1570/0000000006371570
VALVE; GLOBE; UP TO 4 INCH; THREADED; SOVALVE; GLOBE; UP TO 4 INCH; THREADED; SOVALVE; GLOBE; UP TO 4 INCH; THREADED; SO
VALVE; GLOBE; UP TO 4 INCH; THREADED; SO
VALVE; GLOBE; UP TO 4 INCH; THREADED; SOVALVE; GLOBE; UP TO 4 INCH; THREADED; SOVALVE; GLOBE; UP TO 4 INCH; THREADED; SOVALVE; GLOBE; UP TO 4 INCH; THREADED; SOVALVE; GLOBE; UP TO 4 INCH; THREADED; SOVALVE; GLOBE; UP TO 4 INCH; THREADED; SOVALVE; GLOBE; UP TO 4 INCH; THREADED; SO
VALVE; GLOBE; UP TO 4 INCH; THREADED; SO
VALVE; GLOBE; UP TO 4 INCH; THREADED; SO
VALVE; GLOBE; UP TO 4 INCH; THREADED; SO
VALVE; GLOBE; UP TO 4 INCH; THREADED; SO
6000000301 10025970 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN SAUDI MECHANICAL INDUSTRIES CO. RIYADH AL-DIHAN/AYMEN ABDULGHA 12651979-133/0000000505204346
6000000301 10025970 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN SAUDI MECHANICAL INDUSTRIES CO. RIYADH AL-DIHAN/AYMEN ABDULGHA 12651979-133/0000000505204346
6000000301 10035438 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN ABAHSAIN NEWAY INDUSTRIAL CO. LTD. ZIA KUREISHY 812-3619/20/21/
6000000301 10037852 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN NSSL LIMITED SAJI T. N., MANAGER (EXPORTS) 104 232726/0000919373218262
6000000301 10039645 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN JCF FLUID FLOW FZE 6 5263271/
6000000301 30000040 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN PETROLVALVES SRL 0331 334111/
6000000301 30000219 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN TYCO VALVES & CONTROLS ITALIA SRL 0322-94333/0322-94333
6000000301 30000336 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN AUDCO INDIA LIMITED 044-224-92323/
6000000301 30000337 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN AUDCO INDIA LIMITED 04112-264323/
6000000301 30000959 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN SAUDI VALVES MANUFACTURING COMPANY 2637-1570/
6000000301 30001070 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN BEL VALVES 091-2659091/
6000000301 30001179 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN WEIR VALVES & CONTROLS UK LTD 01484 820820/
6000000301 30001199 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN MALBRANQUE S.A. 33-2088-5600/
6000000301 30001208 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN MERWEDE VALVES BV 0184 657 710/0184 677 300
6000000301 30001238 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN POYAM VALVES 0943 80 53 43/
6000000301 30001248 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN CAMERON VALVES ITALY SRL 0341 932215/0341 932200
6000000301 30001315 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN VALVOSIDER SRL 0163-22991/
6000000301 30001319 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN VITAS - DIVISION OF VALVITALIA SPA 0444 337111/
6000000301 30001376 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN KITZ CORPORATION 0551 20 4133/
6000000301 30001377 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN KITZ CORPORATION 265 78 1111/
6000000301 30001388 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN NAKAKITA SEISAKUSHO CO LTD 072 871 1331/
6000000301 30001495 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN FLOWSERVE - RALEIGH 919-832-0525/
6000000301 30001558 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN CONVAL INCORPORATED 860-749-0761/
6000000301 30001997 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN VELAN INCORPORATED 514-748-7743/
6000000301 30001998 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN VELAN VALVE CORPORATION 802-863-2562/
6000000301 30001999 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN VELAN INCORPORATED 514-748-7743/
6000000301 30002000 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN VELAN INCORPORATED 514-378-2305/
6000000301 30003141 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN SAUDI MECHANICAL INDUSTRIES 1265-1979/
6000000301 30003203 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN MSA AS 0653 541 118/0653 541111
6000000301 30003205 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN LEADER VALVES LIMITED 181-290341/
6000000301 30003333 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN PK VALVE CO LTD 055 268 3777/055 268 3750
6000000301 30003450 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN TY VALVE CORP. 051 264 2385 -8/
6000000301 30004096 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN AUDCO INDIA LIMITED 44 28462105/
6000000301 30004289 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN NSSL LIMITED 104 232726/0000919373218262
6000000301 30004296 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN ABAHSAIN NEWAY INDUSTRIAL CO. LTD. 812-3618/19/2.../
6000000301 30004588 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN ZHEJIANG FANGZHENG VALVE 577 6735 6851/
6000000301 30004600 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN TOKAI CORPORATION 0545 81 1080/
6000000301 30004693 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN LARSEN & TOUBRO(JIANGSU) 21 52387990-27/515 8299200
6000000301 30004754 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN MTS VALVES AND TECHNOLOGY 094 648 12 15/
6000000301 30004889 VALVE; GLOBE; 2 IN & UP; ANSI 150 AN JCF FLUID FLOW FZE 6 5263271/
6000000302 30001845 VALVE; GLOBE; CAST OR DUCTILE IRON; NIBCO INC. (BLYTHEVILLE PLANT) 870-763-7044-250/
6000000304 30000035 VALVE; NEEDLE; SIZE UP TO 2 IN OLIVER VALVES LTD 01565 632636/6000000304 30001777 VALVE; NEEDLE; SIZE UP TO 2 IN KEROTEST MANUFACTURING 318-253-9683/6000000304 30001868 VALVE; NEEDLE; SIZE UP TO 2 IN PARKER-HANNIFIN 256-435-2130/
6000000304 30001935 VALVE; NEEDLE; SIZE UP TO 2 IN AUTOCLAVE ENGINEERS INCORPORATED 814-838-5700/
6000000304 30002061 VALVE; NEEDLE; SIZE UP TO 2 IN KF INDUSTRIES INCORPORATED 405-631-1533/
6000000304 30003728 VALVE; NEEDLE; SIZE UP TO 2 IN CESARE BONETTI SPA 02 9907 2264/
6000000304 30003735 VALVE; NEEDLE; SIZE UP TO 2 IN ANDERSON GREENWOOD 0161 790 7741/6000000304 30004251 VALVE; NEEDLE; SIZE UP TO 2 IN HY-LOK CORPORATION 82 51 970 0871/6000000304 30004316 VALVE; NEEDLE; SIZE UP TO 2 IN DK TECH CORPORATION 055 338 0031/6000000304 30004448 VALVE; NEEDLE; SIZE UP TO 2 IN SABRE INSTRUMENT VALVES LTD 00161 925 4000/6000000304 30004778 VALVE; NEEDLE; SIZE UP TO 2 IN MAXIMATOR GMBH 05586 803 0/02812 0671 777
6000000307 30000189 VALVE; PLUG; EXPANDING;04-SAMSS-041; CONTROL SEAL B.V. 0596 658 243/
6000000307 30001568 VALVE; PLUG; EXPANDING;04-SAMSS-041; CAMERON VALVES AND MEASUREMENT 800-643-6544/
6000000307 30004843 VALVE; PLUG; EXPANDING;04-SAMSS-041; NETHER SEAL 0172 572215/0000000642037556
6000000308 30000139 SERCK AUDCO VALVES - A DIVISION OF 01444 414133/
6000000371 10013973 GASKET: SOLID METAL, RING TYPE SMITH INTERNATIONAL GULF SERVICES L 4 8836248/284261 / 2842626000000371 10013973 GASKET: SOLID METAL, RING TYPE SMITH INTERNATIONAL GULF SERVICES L MIKE MURRAY 4 8836248/284261 / 2842626000000371 30000281 GASKET: SOLID METAL, RING TYPE AMIANTIT RUBBER INDUSTRIES LIMITED 3847-1500/
6000000371 30000427 GASKET: SOLID METAL, RING TYPE GULF GASKET FACTORY 3812-1121/812.../
6000000371 30000558 GASKET: SOLID METAL, RING TYPE GASKET FACTORY BRANCH OF AL-IMAN 03 812 2135/050 484 40736000000371 30000982 GASKET: SOLID METAL, RING TYPE SMITH INTERNATIONAL GULF SEVICES 4 284261 / 28.../6000000371 30001152 GASKET: SOLID METAL, RING TYPE FLEXITALLIC LTD. 01274 851 273/
6000000371 30003053 GASKET: SOLID METAL, RING TYPE LAMONS METAL GASKET COMPANY 713-547-9549/
6000000371 30003644 GASKET: SOLID METAL, RING TYPE FLEXITALLIC LP 281 604 2400/
6000000374 10027050 GASKET: PRECUT, SYNTHETIC FIBER BASED, DELMON INDUSTRIAL AND MECHANICAL T. S. SULAIMAN 3812-1771-30/050-5888-768
6000000379 30003764 GASKET MATERIAL, ELASTOMER BASED BAHRAIN RUBBER COMPANY W.L.L. 17 830188/
6000000380 30000427 GASKET: METAL GROOVED GULF GASKET FACTORY 3812-1121/812.../
6000000380 30000558 GASKET: METAL GROOVED GASKET FACTORY BRANCH OF AL-IMAN 03 812 2135/050 484 40736000000380 30001152 GASKET: METAL GROOVED FLEXITALLIC LTD. 01274 851 273/6000000380 30001321 GASKET: METAL GROOVED JAMES WALKER & CO. LTD. /6000000380 30001553 GASKET: METAL GROOVED A.W. CHESTERTON COMPANY 978-469-6588/
6000000380 30003052 GASKET: METAL GROOVED STERLING RUBBER AND GASKET 713-224-6311/6000000380 30003053 GASKET: METAL GROOVED LAMONS METAL GASKET COMPANY 713-547-9549/6000000380 30003644 GASKET: METAL GROOVED FLEXITALLIC LP 281 604 2400/
6000000381 30000427 GASKET: SPECIALTY, RING NON-METALLIC GULF GASKET FACTORY 3812-1121/812.../
6000000381 30000558 GASKET: SPECIALTY, RING NON-METALLIC GASKET FACTORY BRANCH OF AL-IMAN 03 812 2135/050 484 4073
GASKET: METAL GROOVED, HEAT EXCHANGER,GASKET: METAL GROOVED, HEAT EXCHANGER,GASKET: METAL GROOVED, HEAT EXCHANGER,GASKET: METAL GROOVED, HEAT EXCHANGER,GASKET: METAL GROOVED, HEAT EXCHANGER,GASKET: METAL GROOVED, HEAT EXCHANGER,GASKET: METAL GROOVED, HEAT EXCHANGER,GASKET: METAL GROOVED, HEAT EXCHANGER,
HOSE; GENERAL SERVICE; RATED FOR GREATERHOSE; GENERAL SERVICE; RATED FOR GREATERHOSE; GENERAL SERVICE; RATED FOR GREATERHOSE; GENERAL SERVICE; RATED FOR GREATERHOSE; GENERAL SERVICE; RATED FOR GREATERHOSE; GENERAL SERVICE; RATED FOR GREATERHOSE; GENERAL SERVICE; RATED FOR GREATERHOSE; GENERAL SERVICE; RATED FOR GREATERHOSE; GENERAL SERVICE; RATED FOR GREATERHOSE; GENERAL SERVICE; RATED FOR GREATER
6000000764 30001709 TRANSFORMER, POWER, OIL-FILLED ABB POWER T & D 434-575-2201/
6000000764 30003641 TRANSFORMER, POWER, OIL-FILLED JAPAN AE POWER SYSTEMS CORP. 0294 36 8000/6000000764 30003642 TRANSFORMER, POWER, OIL-FILLED JAPAN AE POWER SYSTEMS CORP. 0436 42 8119/
6000000764 30003827 TRANSFORMER, POWER, OIL-FILLED ABB ELEKTRIK SANAYI A.S. 0216 528 2423/
ADJUSTABLE FREQUENCY DRIVE 1KV AND ABOVEADJUSTABLE FREQUENCY DRIVE 1KV AND ABOVEADJUSTABLE FREQUENCY DRIVE 1KV AND ABOVEADJUSTABLE FREQUENCY DRIVE 1KV AND ABOVEADJUSTABLE FREQUENCY DRIVE 1KV AND ABOVEADJUSTABLE FREQUENCY DRIVE 1KV AND ABOVEADJUSTABLE FREQUENCY DRIVE LESS THAN 1KVADJUSTABLE FREQUENCY DRIVE LESS THAN 1KVADJUSTABLE FREQUENCY DRIVE LESS THAN 1KVADJUSTABLE FREQUENCY DRIVE LESS THAN 1KVADJUSTABLE FREQUENCY DRIVE LESS THAN 1KV
ADJUSTABLE FREQUENCY DRIVE LESS THAN 1KV
ADJUSTABLE FREQUENCY DRIVE LESS THAN 1KVADJUSTABLE FREQUENCY DRIVE LESS THAN 1KVBATTERY CHARGER/ RECTIFIER MORE 100 ADCBATTERY CHARGER/ RECTIFIER MORE 100 ADCBATTERY CHARGER/ RECTIFIER MORE 100 ADCBATTERY CHARGER/ RECTIFIER MORE 100 ADC
6000000947 30002588 LA MARCHE MFG. CO. 847-299-1188-359/
6000000994 30004091 WEG EQUIPAMENTOS ELETRICOS S.A. 55 47 3276 4695/
6000000995 30001456 INDUCTION MOTOR, UP TO 250 HP VERTICAL TECO ELECTRIC & MACHINERY CO LTD 03-452-5101/
INDUCTION MOTOR, UP TO 250 HP HORIZONTALINDUCTION MOTOR, UP TO 250 HP HORIZONTALINDUCTION MOTOR, UP TO 250 HP HORIZONTALINDUCTION MOTOR, UP TO 250 HP HORIZONTAL
INDUCTION MOTOR, UP TO 250 HP HORIZONTAL
INDUCTION MOTOR, UP TO 250 HP HORIZONTALINDUCTION MOTOR, UP TO 250 HP HORIZONTALINDUCTION MOTOR, UP TO 250 HP HORIZONTALINDUCTION MOTOR, UP TO 250 HP HORIZONTALINDUCTION MOTOR, UP TO 250 HP HORIZONTAL
INDUCTION MOTOR, UP TO 250 HP HORIZONTAL
INDUCTION MOTOR, UP TO 250 HP HORIZONTAL
INDUCTION MOTOR, UP TO 250 HP HORIZONTALINDUCTION MOTOR, UP TO 250 HP HORIZONTALINDUCTION MOTOR, UP TO 250 HP HORIZONTALINDUCTION MOTOR, UP TO 250 HP HORIZONTAL
6000000995 30001639 INDUCTION MOTOR, UP TO 250 HP VERTICAL U.S. ELECTRICAL MOTORS DIVISION 479-394-1650-.../
6000000995 30001905 INDUCTION MOTOR, UP TO 250 HP VERTICAL BALDOR ELECTRIC COMPANY 706-583-4159-.../
6000000995 30001929 INDUCTION MOTOR, UP TO 250 HP VERTICAL SIEMENS S.A. DE C.V. 52-33-31342650/
6000000995 30001965 INDUCTION MOTOR, UP TO 250 HP VERTICAL TOSHIBA INTERNATIONAL INC 713-466-0277-.../
6000000995 30003471 INDUCTION MOTOR, UP TO 250 HP VERTICAL SCHORCH ELEKTRISCHE MASCHINEN UND 0175/1 85 26 17/021 66 9250
6000000995 30003694 INDUCTION MOTOR, UP TO 250 HP VERTICAL ABB AB 21 329 680/705 340803
6000000995 30003695 INDUCTION MOTOR, UP TO 250 HP VERTICAL ABB OY 010 22 11/
6000000995 30003727 INDUCTION MOTOR, UP TO 250 HP VERTICAL LOHER GMBH 08531 390/
6000000995 30003729 INDUCTION MOTOR, UP TO 250 HP VERTICAL F.S.E. TAMEL SA / BROOK CROMPTON 014 632 16 00/014 632 16 00
6000000995 30004091 INDUCTION MOTOR, UP TO 250 HP VERTICAL WEG EQUIPAMENTOS ELETRICOS S.A. 55 47 3276 4695/
6000002246 10036606 COMPRESSOR; RECIPROCATING; DRESSER-RAND INDIA PVT. LTD RAJ H. BHTT, MANAGER EXPORT 20 8336 7327/
6000002246 10038626 COMPRESSOR; RECIPROCATING; HOERBIGER SERVICE MIDDLE EAST FZE MR. DANNY B. FOURNEL 4-881 4567/6000002246 30000022 COMPRESSOR; RECIPROCATING; THOMASSEN COMPRESSION SYSTEMS BV 026 4975247/
COMPRESSOR; RECIPROCATING; 31-SAMSS-003COMPRESSOR; RECIPROCATING; 31-SAMSS-003COMPRESSOR; RECIPROCATING; 31-SAMSS-003COMPRESSOR; RECIPROCATING; 31-SAMSS-003COMPRESSOR; RECIPROCATING; 31-SAMSS-003PUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE ST
PUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE ST
PUMP, CENTRIFUGAL, HORIZONTAL, SINGLE ST
PUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP, CENTRIFUGAL, HORIZONTAL, SINGLE STPUMP; CENTRIFUGAL; VERTICALLY SUSPENDED;PUMP; CENTRIFUGAL; VERTICALLY SUSPENDED;PUMP; CENTRIFUGAL; VERTICALLY SUSPENDED;PUMP; CENTRIFUGAL; VERTICALLY SUSPENDED;PUMP; CENTRIFUGAL; VERTICALLY SUSPENDED;PUMP; CENTRIFUGAL; VERTICALLY SUSPENDED;PUMP; CENTRIFUGAL; VERTICALLY SUSPENDED;PUMP; CENTRIFUGAL; VERTICALLY SUSPENDED;PUMP; CENTRIFUGAL; VERTICALLY SUSPENDED;
6000002309 10006615 SKID; CHEMICAL INJECTION UNIT TYPE MARITIME INDUSTRIAL SERVICES ARABIA 03 341-6376-100/03 341 6376
6000002309 10006615 SKID; CHEMICAL INJECTION UNIT TYPE MARITIME INDUSTRIAL SERVICES ARABIA MR. MAZEN A. SHAAT 03 341-6376-100/03 341 6376
6000002309 10006615 SKID; CHEMICAL INJECTION UNIT TYPE MARITIME INDUSTRIAL SERVICES ARABIA MR. MAZEN SHAAT 03 341-6376-100/03 341 6376
6000002309 10039981 SKID; CHEMICAL INJECTION UNIT TYPE PETRONASH FZE MR. SRIRAM LYER 4 8833525/
6000002309 30000001 SKID; CHEMICAL INJECTION UNIT TYPE PROMINENT DOSIERTECHNIK GMBH 06221 842 322/
6000002309 30000256 SKID; CHEMICAL INJECTION UNIT TYPE AES ARABIA LIMITED /
6000002309 30000335 SKID; CHEMICAL INJECTION UNIT TYPE MARITIME INDUSTRIAL SERVICES 3341-6376/883.../
6000002309 30000654 SKID; CHEMICAL INJECTION UNIT TYPE VEOLIA WATER SOLUTIONS AND TECHNOLO 3857-6081/50-491-1034
6000002309 30000931 SKID; CHEMICAL INJECTION UNIT TYPE GULF STEEL WORKS 3 341-9594/
6000002309 30001086 SKID; CHEMICAL INJECTION UNIT TYPE SPX PROCESS EQUIPMENT 1604 880751/
6000002309 30001117 SKID; CHEMICAL INJECTION UNIT TYPE MILTON ROY EUROPE 0232 683063/
6000002309 30001192 SKID; CHEMICAL INJECTION UNIT TYPE LEWA GMBH 07152 140/
6000002309 30001476 SKID; CHEMICAL INJECTION UNIT TYPE BRAN & LUEBBE INCORPORATED 800-252-5200/
6000002309 30001771 SKID; CHEMICAL INJECTION UNIT TYPE JOHNSON MARCH SYSTEMS, INC 215-364-4295/
6000002309 30003058 SKID; CHEMICAL INJECTION UNIT TYPE Unknown Plant /
6000002309 30004501 SKID; CHEMICAL INJECTION UNIT TYPE VDL KTI NV 014 346270/
6000002309 30004991 SKID; CHEMICAL INJECTION UNIT TYPE PETRONASH FZE 4 8833525/
6000002315 10033335 MECHANICAL SEAL API TYPE EAGLE SEALS AND SYSTEMS INDIA LTD. RAVI SWAMINATHAN 20-2699-3910/6000002315 10037919 MECHANICAL SEAL API TYPE JOHN CRANE SEALING SYSTEMS INDIA PV MR. RAJEEV PATWARDHAN (80)28392200/6000002315 10039646 MECHANICAL SEAL API TYPE FLOWSERVE SANMAR LTD. 44 2450 4150/
6000002315 10041160 MECHANICAL SEAL API TYPE JOHN CRANE SAUDI ARABIA COMPNAY LTD 38121656-230/50-482-3013
6000002315 10041160 MECHANICAL SEAL API TYPE JOHN CRANE SAUDI ARABIA COMPNAY LTD KHALID GOBRAN 38121656-230/50-482-3013
6000002315 30000218 MECHANICAL SEAL API TYPE JOHN CRANE U.K. LTD 01753 224000/6000002315 30000332 MECHANICAL SEAL API TYPE ARABIAN SEALS COMPANY LIMITED 03-847-2710/8.../50-043-9825
6000002315 30000388 MECHANICAL SEAL API TYPE FLOWSERVE/ ABAHSAIN COMPANY LIMITED 857-3150/
6000002315 30001083 MECHANICAL SEAL API TYPE FLOWSERVE BV FLUID SEALING DIVISION 0165 581400/6000002315 30001097 MECHANICAL SEAL API TYPE BURGMANN INDUSTRIES GMBH & CO KG 08171-230/6000002315 30001512 MECHANICAL SEAL API TYPE FLOWSERVE CORPORATION FPD 269-381-2650/6000002315 30001553 MECHANICAL SEAL API TYPE A.W. CHESTERTON COMPANY 978-469-6588/6000002315 30001576 MECHANICAL SEAL API TYPE JOHN CRANE, INCORPORATED 847-967-2400/6000002315 30001577 MECHANICAL SEAL API TYPE JOHN CRANE SEALOL 401-463-8700/6000002315 30003289 MECHANICAL SEAL API TYPE EAGLEBURGMANN JAPAN CO LTD 0250 47 1238/0250 47 11116000002315 30003792 MECHANICAL SEAL API TYPE JOHN CRANE JAPAN INC 077 558 3211/
6000002315 30003822 MECHANICAL SEAL API TYPE NIPPON PILLAR PACKING CO LTD 079-567-2461/
6000002315 30003876 MECHANICAL SEAL API TYPE EAGLE SEALS AND SYSTEMS INDIA LTD. 20-2699-3900/6000002315 30004156 MECHANICAL SEAL API TYPE BURGMANN 551937499740/6000002315 30004157 MECHANICAL SEAL API TYPE JOHN CRANE 011551133712552/
6000002315 30004263 MECHANICAL SEAL API TYPE JOHN CRANE SEALING SYSTEMS INDIA PV (80)28392200/
6000002315 30004653 MECHANICAL SEAL API TYPE FLOWSERVE SANMAR LIMITED 44 2450 4130/
6000002315 30004817 MECHANICAL SEAL API TYPE EAGLEBURGMANN INDUSTRIES LP 713-939-9515/
6000002315 30005216 MECHANICAL SEAL API TYPE JOHN CRANE SAUDI ARABIA COMPANY LTD 3-812-1708/50-482-3013
6000002338 30000204 COMPRESSOR; SCREW, FOR AIR SERVICE ATLAS INDUSTRIAL EQUIPMENT CO 03870 2111/03 450 6011
6000002338 30001365 COMPRESSOR; SCREW, FOR AIR SERVICE KOBE STEEL LIMITED 81-794-45-7135/
6000002338 30001762 COMPRESSOR; SCREW, FOR AIR SERVICE INGERSOLL RAND 704-896-4853/
6000002338 30003746 COMPRESSOR; SCREW, FOR AIR SERVICE COMPAIR DRUCKLUFTTECHNIK GMBH 06761 832 0/
6000002338 30004971 COMPRESSOR; SCREW, FOR AIR SERVICE ATLAS COPCO COMPRESSORS LLC 281 776 4900/
6000002339 30001196 COMPRESSOR; PROCESS; SCREW; API 619; MAN TURBO AG 0209 692 01/
6000002346 10018711 GRAINGER, W W INCORPORATED 708 541 8040/
PUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTI
6000002346 30004626 EBARA GREAT PUMPS CO LTD 577 6532 2331/
6000002346 30004775 TSURUMI MANUFACTURING CO LTD 075 971 0831/
PUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTI
PUMP; CENTRIFUGAL; GENERAL SERVICE;VERTI
PUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTIPUMP; CENTRIFUGAL; GENERAL SERVICE;VERTI
PUMP; CENTRIFUGAL; GENERAL SERVICE;VERTI
6000002346 30004876 YEOMANS CHICAGO CORPORATION 630 236-5500/
6000002350 10013834 PUMP; CENT, HORIZ, ASMEB73.1 OR ISO5199 SAUDI PUMP FACTORY 1265-2123/3864-1366/389...
6000002350 10013834 PUMP; CENT, HORIZ, ASMEB73.1 OR ISO5199 SAUDI PUMP FACTORY ALI MOUSA 1265-2123/3864-1366/389...
6000002356 30002080 NUOVO PIGNONE SPA 080-5051111/
6000002356 30003177 GOULDS PUMPS COMPANY LIMITED 82 432757051-5/
6000002356 30003187 UNION PUMPS SAS 04 50055600/
6000002356 30003354 SHIN NIPPON MACHINERY CO LTD 0823-71-1111/
6000002356 30003449 DMW CORPORATION 055-975-8221/
PUMP; CENTRIFUGAL; FIREWATER;HORIZONTAL;
PUMP; CENTRIFUGAL; FIREWATER;HORIZONTAL;PUMP; CENTRIFUGAL; FIREWATER;HORIZONTAL;PUMP; CENTRIFUGAL; FIREWATER;HORIZONTAL;PUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE S
PUMP; CENTRIFUGAL; END SUCTION; SINGLE S
PUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE S
PUMP; CENTRIFUGAL; END SUCTION; SINGLE S
PUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE S
PUMP; CENTRIFUGAL; END SUCTION; SINGLE S
PUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE S
6000002356 30003564 KSB AG 09241 711357/06233 862750
6000002357 30001764 ITT CORP. INDUSTRIAL PROCESS 315-568-2811/
6000002357 30002080 NUOVO PIGNONE SPA 080-5051111/
6000002357 30002225 Sulzer Pumps (Canada) Inc. 604-420-0030/
6000002357 30003187 UNION PUMPS SAS 04 50055600/
6000002357 30003354 SHIN NIPPON MACHINERY CO LTD 0823-71-1111/
PUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; END SUCTION; SINGLE SPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLE
PUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLE
PUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLE
PUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLE
PUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLE
PUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLEPUMP; CENTRIFUGAL; SINGLE STAGE; DOUBLE
6000002358 30003187 PUMP: CENTRIFUGAL; HORIZONTAL, 2 STAGE UNION PUMPS SAS 04 50055600/
6000002368 30000934 PUMP: RECIPROCATING, API 674 SAUDI PUMP FACTORY 1265-2123/
PUMP; CENTRIFUGAL; MAGNETIC DRIVE;HORIZOPUMP; CENTRIFUGAL; MAGNETIC DRIVE;HORIZOPUMP; CENTRIFUGAL; MAGNETIC DRIVE;HORIZOPUMP; CENTRIFUGAL; MAGNETIC DRIVE;HORIZOPUMP; CENTRIFUGAL; MAGNETIC DRIVE;HORIZOPUMP; CENTRIFUGAL; MAGNETIC DRIVE;HORIZOPUMP; CENTRIFUGAL; MAGNETIC DRIVE;HORIZO
PUMP; CENTRIFUGAL; MAGNETIC DRIVE;HORIZO
PUMP; CENTRIFUGAL; MAGNETIC DRIVE;HORIZOPUMP; CENTRIFUGAL; MAGNETIC DRIVE;HORIZO
6000002393 10035864 BOILER; FIRE TUBE; AND COMONENTS THERMAX LTD(BOILER AND HEATER GROUP MR. S. V. PENDSE 20 5612 6349/9225 024024
6000002393 30001054 BOILER; FIRE TUBE; AND COMONENTS AALBORG INTERNATIONAL A/S /
6000002393 30001146 BOILER; FIRE TUBE; AND COMONENTS WELLMAN ROBEY LTD. 0121-552-3311/
6000002393 30001204 BOILER; FIRE TUBE; AND COMONENTS LOINTEK /
6000002393 30001232 BOILER; FIRE TUBE; AND COMONENTS MITSUI BABCOCK ENERGY SERVICES LTD 0141-886-4141/
6000002393 30001383 BOILER; FIRE TUBE; AND COMONENTS MITSUI ENGINEERING & SHIPBUILDING 0863 23 2592/
6000002393 30001535 BOILER; FIRE TUBE; AND COMONENTS G.C. BROACH COMPANY 918-627-9632/
6000002393 30001957 BOILER; FIRE TUBE; AND COMONENTS TECHNOTHERM CORPORATION 918 446 1533/
6000002393 30003245 BOILER; FIRE TUBE; AND COMONENTS DAEKYUNG MACHINERY & ENGINEERING 052 278 9170/052 278 9000
6000002393 30003497 BOILER; FIRE TUBE; AND COMONENTS BABCOCK-HITACHI KK 0823 21 1224/
6000002393 30004161 BOILER; FIRE TUBE; AND COMONENTS THERMAX LTD(BOILER AND HEATER GROUP 20-56126505/
6000002394 10035864 BOILER; WATER TUBE THERMAX LTD(BOILER AND HEATER GROUP MR. S. V. PENDSE 20 5612 6349/9225 0240246000002394 30000095 BOILER; WATER TUBE MITSUBISHI HEAVY INDUSTRIES LIMITED 045 775 1202/6000002394 30000370 BOILER; WATER TUBE BILFAL HEAVY INDUSTRIES LTD. 3341-9304-250/6000002394 30001054 BOILER; WATER TUBE AALBORG INTERNATIONAL A/S /6000002394 30001146 BOILER; WATER TUBE WELLMAN ROBEY LTD. 0121-552-3311/
6000002394 30001232 BOILER; WATER TUBE MITSUI BABCOCK ENERGY SERVICES LTD 0141-886-4141/
6000002394 30001241 BOILER; WATER TUBE ALSTOM POWER ENERGY RECOVERY GMBH 0561 9527-0/6000002394 30001383 BOILER; WATER TUBE MITSUI ENGINEERING & SHIPBUILDING 0863 23 2592/6000002394 30001535 BOILER; WATER TUBE G.C. BROACH COMPANY 918-627-9632/6000002394 30001550 BOILER; WATER TUBE CERREY, S.A. DE C.V. 011-5281-8369.../
6000002394 30001957 BOILER; WATER TUBE TECHNOTHERM CORPORATION 918 446 1533/
6000002394 30003199 BOILER; WATER TUBE FOSTER WHEELER ENERGIA S.A. 977 258 100/
6000002394 30003245 BOILER; WATER TUBE DAEKYUNG MACHINERY & ENGINEERING 052 278 9170/052 278 90006000002394 30003497 BOILER; WATER TUBE BABCOCK-HITACHI KK 0823 21 1224/6000002394 30003769 BOILER; WATER TUBE MACCHI 0331 738452/6000002394 30004161 BOILER; WATER TUBE THERMAX LTD(BOILER AND HEATER GROUP 20-56126505/
6000002419 10013686 FILTER: FILTER MEDIA; SAND, ANTHRACITE, WATER AND ENVIRONMENT TECHNOLOGIES 01-492 9000/0000000055908026
6000002419 10013686 FILTER: FILTER MEDIA; SAND, ANTHRACITE, WATER AND ENVIRONMENT TECHNOLOGIES DAWOOD FANATSEH 01-492 9000/0000000055908026
6000002419 10013686 FILTER: FILTER MEDIA; SAND, ANTHRACITE, WATER AND ENVIRONMENT TECHNOLOGIES EASTERN AREA SALES MANAGER 01-492 9000/0000000055908026
PUMP; CENTRIFUGAL;VERTICAL;MOLTON SULFUR
6000002419 30000654 FILTER: FILTER MEDIA; SAND, ANTHRACITE, VEOLIA WATER SOLUTIONS AND TECHNOLO 3857-6081/50-491-1034
6000002419 30000845 FILTER: FILTER MEDIA; SAND, ANTHRACITE, WATER AND ENVIRONMENT TECHNOLOGIES 2652084/
HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;
HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;
HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;HEAT EXCHANGER; AIR COOLED; 32-SAMSS-11;
6000002523 30000370 BILFAL HEAVY INDUSTRIES LTD. 3341-9304-250/
6000002523 30000500 GULF HEAVY INDUSTRIES COMPANY 03 340 0098/050 396 0125
6000002523 30000630 LARSEN AND TOUBRO LIMITED POWAI 22 6705 1656/
VESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROU
VESSEL; PRESSURE; HIGH ALLOY; NON FERROU
VESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROU
6000002523 30001357 ISHIKAWAJIMA-HARIMA HEAVY INDUSTRIE 045 759 2540/
6000002523 30001359 THE JAPAN STEEL WORKS LTD 143 22 0469/
VESSEL; PRESSURE; HIGH ALLOY; NON FERROU
VESSEL; PRESSURE; HIGH ALLOY; NON FERROU
VESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROU
6000002523 30001360 KAWASAKI HEAVY INDUSTRIES LTD 0794 35 2073/
6000002523 30003308 HIDADA COMPANY LIMITED 2637-4450/
6000002523 30003403 WALTER TOSTO SPA 0871 5801/
6000002523 30003550 G & G INTERNATIONAL NV 03 860 20 13/03 860 20 11
6000002523 30003643 DOOSAN MECATEC CO LTD 055 2700446/055 2700510
6000002523 30003657 GODREJ and BOYCE MANUFACTURING. 22-6796 4559/98 2080 7890
VESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROU
VESSEL; PRESSURE; HIGH ALLOY; NON FERROU
VESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROU
6000002524 10007619 ZAMIL HEAVY STEEL INDUSTRIES CO. LT IBRAHIM BIN SALEH ALZAMIL 02 699-2411/02 699 2411
6000002524 10007619 ZAMIL HEAVY STEEL INDUSTRIES CO. LT IBRAHIM S. AL ZAMIL 02 699-2411/02 699 2411
6000002524 10012705 GULF HEAVY INDUSTRIES COMPANY 03 340 0098/3417320/3617320
VESSEL; PRESSURE; HIGH ALLOY; NON FERROU
VESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROU
VESSEL; PRESSURE; HIGH ALLOY; NON FERROU
VESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL; PRESSURE; HIGH ALLOY; NON FERROUVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MM
6000002524 10012705 GULF HEAVY INDUSTRIES COMPANY AWAD M. AL-ANAZI 03 340 0098/3417320/3617320
6000002524 10012705 GULF HEAVY INDUSTRIES COMPANY FAROOQ KHATRI 03 340 0098/3417320/3617320
6000002524 10013095 LARSEN AND TOUBRO LIMITED 91 44 2846 2000/011-71693
6000002524 10013095 LARSEN AND TOUBRO LIMITED 91 44 2846 2000/011-71693
6000002524 10013095 LARSEN AND TOUBRO LIMITED MR. GIRISH NATARAJAN 91 44 2846 2000/011-71693
6000002524 10013095 LARSEN AND TOUBRO LIMITED MR. GIRISH NATARAJAN 91 44 2846 2000/011-71693
6000002524 10013095 LARSEN AND TOUBRO LIMITED S. SURYANARAYANAN 91 44 2846 2000/011-71693
6000002524 10013095 LARSEN AND TOUBRO LIMITED S. SURYANARAYANAN 91 44 2846 2000/011-71693
VESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MM
VESSEL;PRES.;CS;WALL THK FROM 38 TO 76MM
VESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MM
VESSEL;PRES.;CS;WALL THK FROM 38 TO 76MM
VESSEL;PRES.;CS;WALL THK FROM 38 TO 76MM
6000002524 30000370 BILFAL HEAVY INDUSTRIES LTD. 3341-9304-250/
6000002524 30000500 GULF HEAVY INDUSTRIES COMPANY 03 340 0098/050 396 0125
6000002524 30000630 LARSEN AND TOUBRO LIMITED POWAI 22 6705 1656/
VESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MM
6000002524 30001443 SUNGJIN GEOTEC COMPANY LIMITED 052 228 5828/
6000002524 30001445 SUMITOMO HEAVY INDUSTRIES, LTD. 0898-64-6933/
6000002524 30001656 ENPRO SYSTEMS INCORPORATED 281-452-5865/
6000002524 30001694 GENERAL WELDING WORKS INCORPORATED 713-869-6401/
6000002524 30003550 G & G INTERNATIONAL NV 03 860 20 13/03 860 20 11
6000002524 30003643 DOOSAN MECATEC CO LTD 055 2700446/055 2700510
6000002524 30003657 GODREJ and BOYCE MANUFACTURING. 22-6796 4559/98 2080 7890
VESSEL;PRES.;CS;WALL THK FROM 38 TO 76MM
VESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MM
6000002524 30004689 ABJ ENGNEERING AND CONTRACTING 5 4762655-6550/
6000002524 30004921 JMC HEAVY INDUSTRIES CO LTD 41 564 0116/
6000002525 10012705 GULF HEAVY INDUSTRIES COMPANY 03 340 0098/3417320/3617320
6000002525 10012705 GULF HEAVY INDUSTRIES COMPANY AWAD M. AL-ANAZI 03 340 0098/3417320/3617320
VESSEL;PRES.;CS;WALL THK FROM 38 TO 76MM
VESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MM
VESSEL;PRES.;CS;WALL THK FROM 38 TO 76MM
VESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK FROM 38 TO 76MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
6000002525 10012705 GULF HEAVY INDUSTRIES COMPANY FAROOQ KHATRI 03 340 0098/3417320/3617320
6000002525 10013095 LARSEN AND TOUBRO LIMITED 91 44 2846 2000/011-71693
6000002525 10013095 LARSEN AND TOUBRO LIMITED MR. GIRISH NATARAJAN 91 44 2846 2000/011-71693
6000002525 10013095 LARSEN AND TOUBRO LIMITED S. SURYANARAYANAN 91 44 2846 2000/011-71693
6000002525 30000370 BILFAL HEAVY INDUSTRIES LTD. 3341-9304-250/
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
6000002525 30000500 GULF HEAVY INDUSTRIES COMPANY 03 340 0098/050 396 0125
6000002525 30000630 LARSEN AND TOUBRO LIMITED POWAI 22 6705 1656/
6000002525 30001445 SUMITOMO HEAVY INDUSTRIES, LTD. 0898-64-6933/
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
6000002525 30001656 ENPRO SYSTEMS INCORPORATED 281-452-5865/
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MM
6000002528 30000370 BILFAL HEAVY INDUSTRIES LTD. 3341-9304-250/
6000002528 30000500 GULF HEAVY INDUSTRIES COMPANY 03 340 0098/050 396 0125
6000002528 30000554 INMA STEEL FABRICATORS COMPANY 3364-0675/
6000002528 30000630 LARSEN AND TOUBRO LIMITED POWAI 22 6705 1656/
6000002528 30000741 OLAYAN DESCON ENGINEERING COMPANY 966 3/
6000002528 30000931 GULF STEEL WORKS 3 341-9594/
VESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMVESSEL;PRES.;CS;WALL THK MORE THAN 76 MMHEAT EXCHANGER, SHELL AND TUBE, CARBON SHEAT EXCHANGER, SHELL AND TUBE, CARBON SHEAT EXCHANGER, SHELL AND TUBE, CARBON SHEAT EXCHANGER, SHELL AND TUBE, CARBON SHEAT EXCHANGER, SHELL AND TUBE, CARBON SHEAT EXCHANGER, SHELL AND TUBE, CARBON SHEAT EXCHANGER, SHELL AND TUBE, CARBON SHEAT EXCHANGER, SHELL AND TUBE, CARBON S
HEAT EXCHANGER, SHELL AND TUBE, CARBON S
HEAT EXCHANGER, SHELL AND TUBE, CARBON SHEAT EXCHANGER, SHELL AND TUBE, CARBON SHEAT EXCHANGER, SHELL AND TUBE, CARBON SHEAT EXCHANGER, SHELL AND TUBE, CARBON S
HEAT EXCHANGER, SHELL AND TUBE, CARBON S
HEAT EXCHANGER, SHELL AND TUBE, CARBON S
6000002528 30001072 BELLELI ENERGY SRL 39-03763331/0.../
6000002528 30001191 STAHL-UND APPARATEBAU HANS LEFFER 49-6897-793-0/
6000002528 30001204 LOINTEK /
6000002528 30001224 OLMI 035 999111/
6000002528 30001232 MITSUI BABCOCK ENERGY SERVICES LTD 0141-886-4141/
6000002528 30001241 ALSTOM POWER ENERGY RECOVERY GMBH 0561 9527-0/
6000002528 30001244 OFFICINE LUIGI RESTA S.P.A. 035 661130/
6000002810 10001100 REGULATOR; PRESSURE OR FLOW; DRESSER VALVES EUROP GMBH RENE VAN LIESHOUT 010 4384122/010 23 11 217
6000002810 10001213 REGULATOR; PRESSURE OR FLOW; DRESSER JAPAN LTD 043 297 9231/6000002810 10001213 REGULATOR; PRESSURE OR FLOW; DRESSER JAPAN LTD MR. F. TANAKA 043 297 9231/6000002810 10004242 REGULATOR; PRESSURE OR FLOW; DRESSER FLOW CONTROL - DI UK LTD 01895 454900/6000002810 10004417 REGULATOR; PRESSURE OR FLOW; DRESSER PRODUITS INDUSTRIELS 02 3159 5959/6000002810 10012486 REGULATOR; PRESSURE OR FLOW; DRESSER AL-RUSHAID VALVE AND 3341-0278/341.../3410278/34126956000002810 10012486 REGULATOR; PRESSURE OR FLOW; DRESSER AL-RUSHAID VALVE AND ABDUL RAZAK AL - AKHALAF 3341-0278/341.../3410278/3412695
6000002810 10017073 REGULATOR; PRESSURE OR FLOW; LESLIE CONTROLS COMPANY 813 978 1000-291/813 978 1000
6000002810 10017073 REGULATOR; PRESSURE OR FLOW; LESLIE CONTROLS COMPANY KEN LAZZARA 813 978 1000-291/813 978 1000
6000002810 10017148 REGULATOR; PRESSURE OR FLOW; COLE-PARMER INSTRUMENT COMPANY 800 323 4340/800 323 43406000002810 10017148 REGULATOR; PRESSURE OR FLOW; COLE-PARMER INSTRUMENT COMPANY TONY JUVINALL 800 323 4340/800 323 43406000002810 10017723 REGULATOR; PRESSURE OR FLOW; DRESSER INCORPORATED 281-671-1659/281-671-16596000002810 10017723 REGULATOR; PRESSURE OR FLOW; DRESSER INCORPORATED DEBBIE VAUGHAN 281-671-1659/281-671-16596000002810 10018059 REGULATOR; PRESSURE OR FLOW; FISHER CONTROLS INTERNATIONAL 641 754 2643/641 754 26436000002810 10018059 REGULATOR; PRESSURE OR FLOW; FISHER CONTROLS INTERNATIONAL SOURCE: NP6620-04 641 754 2643/641 754 26436000002810 10018066 REGULATOR; PRESSURE OR FLOW; FISHER CONTROLS INTERNATIONAL 214 542 5512/6000002810 10021543 REGULATOR; PRESSURE OR FLOW; SIEMENS MOORE PROCESS 215 646 7400/215 646 74006000002810 10021543 REGULATOR; PRESSURE OR FLOW; SIEMENS MOORE PROCESS SOURCE NA0043-01 215 646 7400/215 646 74006000002810 10023005 REGULATOR; PRESSURE OR FLOW; PORTER INSTRUMENT COMPANY 215 723 4000/215 723 40006000002810 10023005 REGULATOR; PRESSURE OR FLOW; PORTER INSTRUMENT COMPANY NANCY/CUST.SERVICE 215 723 4000/215 723 40006000002810 10023205 REGULATOR; PRESSURE OR FLOW; WATTS REGULATOR COMPANY 978 688 1811/978 688 18116000002810 10023205 REGULATOR; PRESSURE OR FLOW; WATTS REGULATOR COMPANY HELMUT BILLER 978 688 1811/978 688 18116000002810 10023208 REGULATOR; PRESSURE OR FLOW; CIRCLE SEAL CORPORATION REFER NC4185-.../909 270 63926000002810 10023208 REGULATOR; PRESSURE OR FLOW; CIRCLE SEAL CORPORATION LINDA WRIGHT REFER NC4185-.../909 270 63926000002810 10023233 REGULATOR; PRESSURE OR FLOW; WELKER ENGINEERING COMPANY 281 491 2331/281 491 23316000002810 10023233 REGULATOR; PRESSURE OR FLOW; WELKER ENGINEERING COMPANY EDDIE BAEZ 281 491 2331/281 491 23316000002810 10023692 REGULATOR; PRESSURE OR FLOW; RUELCO INCORPORATED 504 340 0055/504 340 00556000002810 10023692 REGULATOR; PRESSURE OR FLOW; RUELCO INCORPORATED MARK GONZALES 504 340 0055/504 340 00556000002810 10024366 REGULATOR; PRESSURE OR FLOW; SCHLEY WILHELM GMBH 04154 80810/6000002810 10026451 REGULATOR; PRESSURE OR FLOW; PT. PETROTECH BATAM 07 7841 2407/6000002810 10028965 REGULATOR; PRESSURE OR FLOW; KYUNG DONG CO. LTD. 055 296 9606/6000002810 30000428 REGULATOR; PRESSURE OR FLOW; DRESSER AL-RUSHAID VALVE AND (3) 341-0278/
6000002810 30001611 REGULATOR; PRESSURE OR FLOW; MASONEILAN DIVISION DRESSER IND 508-586 4600/
6000002810 30002567 REGULATOR; PRESSURE OR FLOW; KEANE CONTROLS CORPORATION 714-526-3341/
CUSTODY SYSTEM GAS PIPELINE, ULTRASONICCUSTODY SYSTEM GAS PIPELINE, ULTRASONICCUSTODY SYSTEM GAS PIPELINE, ULTRASONICCUSTODY SYSTEM GAS PIPELINE, ULTRASONICCUSTODY SYSTEM GAS PIPELINE, ULTRASONIC
CUSTODY SYSTEM GAS PIPELINE, ULTRASONIC
CUSTODY SYSTEM GAS PIPELINE, ULTRASONICCUSTODY SYSTEM GAS PIPELINE, ULTRASONICCUSTODY SYSTEM GAS PIPELINE, ULTRASONICCUSTODY SYSTEM GAS PIPELINE, ULTRASONICCUSTODY SYSTEM, TRUCK LOADING, POS DISPCUSTODY SYSTEM, TRUCK LOADING, POS DISPCUSTODY SYSTEM, TRUCK LOADING, POS DISPCUSTODY SYSTEM, TRUCK LOADING, POS DISP
6000009921 30004396 STEPHEN GILLESPIE CONSULTANTS LTD 01324-486800/
6000009921 30004423 OVAL ASIA PACIFIC PTE LTD 6266 1178/
6000009921 30004508 KROHNE OIL AND GAS 076 711 2000/06 52 64 19 35
CUSTODY METERING CONTROL SYSTEM, LIQUIDCUSTODY METERING CONTROL SYSTEM, LIQUIDCUSTODY METERING CONTROL SYSTEM, LIQUIDCUSTODY METERING CONTROL SYSTEM, LIQUIDCUSTODY METERING CONTROL SYSTEM, LIQUIDCUSTODY METERING CONTROL SYSTEM, LIQUIDCUSTODY METERING CONTROL SYSTEM, LIQUIDCUSTODY METERING CONTROL SYSTEM, LIQUIDCUSTODY METERING CONTROL SYSTEM, LIQUID
6000010115 10013686 WATER AND ENVIRONMENT TECHNOLOGIES 01-492 9000/0000000055908026
6000010115 10013686 WATER AND ENVIRONMENT TECHNOLOGIES DAWOOD FANATSEH 01-492 9000/0000000055908026
6000010115 10013686 WATER AND ENVIRONMENT TECHNOLOGIES EASTERN AREA SALES MANAGER 01-492 9000/0000000055908026
6000010115 30000256 AES ARABIA LIMITED /
6000010115 30000256 AES ARABIA LIMITED /
6000010115 30000654 VEOLIA WATER SOLUTIONS AND TECHNOLO 3857-6081/50-491-1034
6000010115 30000845 WATER AND ENVIRONMENT TECHNOLOGIES 2652084/
6000010115 30003367 SIEMENS WATER TECHNOLOGIES 715-359-7211/
6000010115 30004925 NUEVAS TECHNOLOGIAS COMES SA 977 471050/
6000010182 10035381 GLOBAL ANTI CORROSION TECHNIQUE CO. MOHAMMED S. ALRIYAMI 33400011/
6000010182 10035381 GLOBAL ANTI CORROSION TECHNIQUE CO. SALEH SAGR 33400011/
6000010182 30000317 ARABIAN PIPE COATING COMPANY 3895-3552/
SANITARY WASTEWATER MEMBRANE BIO REACTORSANITARY WASTEWATER MEMBRANE BIO REACTORSANITARY WASTEWATER MEMBRANE BIO REACTORSANITARY WASTEWATER MEMBRANE BIO REACTORSANITARY WASTEWATER MEMBRANE BIO REACTORSANITARY WASTEWATER MEMBRANE BIO REACTOR
BATTERY CHARGER/ RECTIFIER LESS 100 ADCMECHANICAL SEAL; DRY GAS FOR STEAM TURBIMECHANICAL SEAL; DRY GAS FOR STEAM TURBIMECHANICAL SEAL; DRY GAS FOR STEAM TURBIMECHANICAL SEAL; DRY GAS FOR STEAM TURBI
6000010464 30001553 MECHANICAL SEAL: REPLACEMENT IN-KIND A.W. CHESTERTON COMPANY 978-469-6588/
6000010464 30001576 MECHANICAL SEAL: REPLACEMENT IN-KIND JOHN CRANE, INCORPORATED 847-967-2400/
MECHANICAL SEAL; DRY GAS FOR STEAM TURBIMECHANICAL SEAL; DRY GAS FOR STEAM TURBIMECHANICAL SEAL; DRY GAS FOR STEAM TURBIMECHANICAL SEAL; DRY GAS FOR STEAM TURBI
6000010464 30001577 MECHANICAL SEAL: REPLACEMENT IN-KIND JOHN CRANE SEALOL 401-463-8700/
6000010464 30003289 MECHANICAL SEAL: REPLACEMENT IN-KIND EAGLEBURGMANN JAPAN CO LTD 0250 47 1238/0250 47 1111
6000010464 30003792 MECHANICAL SEAL: REPLACEMENT IN-KIND JOHN CRANE JAPAN INC 077 558 3211/
IBN BEYTAR, 4TH STREET (7C), 1ST IN, Box ,/0000079577,KHOBAR,31952,Saudi Arabia 806-1658,50-682-8954,(3)825-2499 [email protected] Yes Yes
VIA CAMPO DEI FIORI 28, Box ,/,VENEGONO-SUPERIORE,21040,Italy 0331-827700,,0331-827722 Yes Yes1524 RUE DE LA PAIX, Box ,/,FRESNES SUR ESCAUT,59970,France 33 27 284428,,33 27 284400 [email protected] Yes YesVIA CAMPO DEI FIORI 28, Box ,/,VENEGONO-SUPERIORE,21040,Italy 0331-827700,,0331-827722 Yes Yes1524 RUE DE LA PAIX, Box ,/,FRESNES SUR ESCAUT,59970,France 33 27 284428,,33 27 284400 [email protected] Yes Yes
Note: Existing QM sys. was changed to “Quality system NOT-APPROVED” to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
The link is based on RVL Synchronization Initiative Alaa Abuemarah October 17, 2005
12" to 66" Pipes. This factory provides pipe size only for 700 MM and above. This factory provides pipe size only for 700 MM and above.
it's added manually. see the atachement. 10/08/2007 Meshari Al-Ghuryri it's added manually. see the atachement. 10/08/2007 Meshari Al-Ghuryri
3-1/2 IN. THRU 30 IN. RFQ AND PO TO TS8207-01, SUMITOMO - LINE PIPES.
Comments entered by Angela McFadden on 1/9/09: Due to the lack of a documented quality program, full inspection should be performed on all purchase orders placed with Cement Lining Company. ***END*************************************** Remarks entered 12/9/2003 by Linda Stowell: Limitation: Due to the lack of a documented quality program, full inspection should be performed on all purchase orders placed with Cement Lining Company (J.S. Whitenton 10/16/2003) Technical review and plant survey, as needed, is required prior to plant approval.
Saudi Arabia
Japan
United States Of America
Saudi Arabia
Japan
Japan
United States Of America
Saudi Arabia
Saudi Arabia
India
Egypt
Saudi Arabia
Germany Limitations: Production limitation from 24" and up
Turkey
Germany
Japan
United Kingdom From 42 inch up to 84 inch max pipe length 9.1 meter.
United Kingdom
Germany
Germany
Japan
Japan
Japan
Japan
Japan
United States Of America
Brazil
Saudi Arabia
<H>LIMITATION:-</> <H>Saudi Steel Pipe Company is only approved to manufacture ERW pipe to ASTM A 53 Grade (A) chemistry. The limitation was applied because of the lack of on line heat treatment capability required for manufacturing pipe to the ASTM A 53 Grade (B) specification.</> <H>Michael Eric Ward</> <H>2nd September 2006.</>
Nominal diameter is limited from 8 inch till 120 inch scope of supply is OD from 8 inch up till 120 inch Added from inspection lot 107000029351. Following limitations need to be observed for scope of supply: Pipe outside diameter is limited from 24 inch to 100 inch
limited OD of 16" till 42" material grade up to X70 pipe length 12.6 meter. Following limitations need to be observed for 9COM 6000000009: Scope of supply: Pipes from 16 inch up to 180 inch with maximum length of 13.4 meter.
France API 5L UP TO X-80 20"-64" DIA.
India
India
South Korea
Japan
Egypt
China
India
Saudi Arabia
India
Turkey
Turkey
Germany MAX W.T. 20.6 MM and OD of 66"
Japan
Japan
Brazil
Mexico
<H>NOTE ADDED BY M. E. WARD 28th MARCH 2004</> APPROVAL REQUESTED BY M. SANNAA for SAP MATERIAL 6000000009. SEE SERVICES TO OBJECTS ATTACHMENT:- <H>SANNAA_APPROVE_6000000009.</> <U>Note previous inspection lots 107000000651 & 107000014905.</> MICHAEL ERIC WARD MARCH 14th 2004 <H>NOTE ADDED JUNE 15th 2004. </> The corrective actions were closed because they related to hydrocarbon service pipe and Welspun were approved for material 6000000009. Welspun will be re-assessed for hydrocarbon service during the next visit to India and the laboratory services etc will be evaluated ( see services to objects attachment SANNA_APPROVE_6000000009). Michael Eric Ward 15th June 2004
With the concurrence by RSA Mr. Tony Dib, 6000000009 was added manually since this vendor has been approved for 6000000012 If 6000000012 is approved, 6000000009 is automatically approved. (Request by vendor through Mr. A. Narita , AOCT Inspection ) Please see the attached the e-mail for your reference. AOCT Inspection 8-1-08
<H><U>LIMITATIONS</></> i) IPIC must issue the welding procedure and qualification record for review by Saudi Aramco CSD for the first Saudi Aramco Order prior to the start of pipe manufacture. ii) IPIC Management must confirm to Saudi Aramco that they have the required pipe forming procedure prior to starting manufacture for the first Saudi Aramco order. iii) Either a Saudi Aramco Quality Control Unit Inspector, or approved third party inspector must be present in the IPIC manufacturing facility throughout the pipe manufacturing process for the first Saudi Aramco order. Note that CSD Pipe Unit must be informed of the start date for the first order to allow witness if required. Michael Eric Ward July 21st 2008
<H>Limitation:-</> i) Drop Weight testing, if required, must be completed at the SAW Pipes Mundra One Facility or Saudi Aramco approved facility.
Nominal diameter is limited from 8 inch till 120 inch scope of supply is OD from 8 inch up till 120 inch
China
India
India
Germany
Turkey
Germany
Japan
United Kingdom From 42 inch up to 84 inch max pipe length 9.1 meter.
United Kingdom
India
Germany
Germany
Italy
Japan
Japan
Japan
Japan
Japan
United States Of America
The limitation was entered By Akira Narita AOCT/ Inspection Engineer as follow; OD size range is 16 - 56 inches
These materials can be supplied with the limitation of water and non-sour applications only, not for sour application because they do not have enough experience of production for sour service materials and also they do not have corrosion laboratory in the plant. A. Narita, AOCT Dec 19, 2007
<H>NOTE ADDED 19th APRIL 2004.</> Date and approval added on the 19th April 2004 to align the material approval to the vendor master. M. E. Ward. ==================================================== Limitations: Production limitation from 24" and up
Nominal diameter is limited from 8 inch till 120 inch scope of supply is OD from 8 inch up till 120 inch
Following limitations need to be observed for scope of supply: Pipe outside diameter is limited from 24 inch to 100 inch
limited OD of 16" till 42" material grade up to X70 pipe length 12.6 meter.
1.0. Limitations straight seams only SAW 16 Inches to 48 Inches See attachment 142_00. M.E. Ward 10-09-2002 2.0. Approve with limitations as defined above in note number one and approve the HIC laboratory with corrective actions ( see services to objects attachment ABDULLATIF_APPROVE_HIC_FACILITY). The corrective actions to be closed by 30th February 2005. Michael Eric Ward 23rd February 2005.
From: [email protected] [mailto:[email protected]] Sent: Monday, September 08, 2003 2:44 PM To: Salmon, Phil G Subject: Rif: Our 4200141146 We confirm contents of our previous message i.e : 24 inch pipe with wall thickness of 25,4 mm, is out of our range of production. Best Regards ILVA S.p.A. Genoa Pipes Dept. C. Franchini Ph. +39-010-607.9440 Fx. +39-010-607.9698 or .....9077 E-Mail: [email protected]
Brazil
France API 5L UP TO X-80 20"-64" DIA.
India
India
India
South Korea
Japan
Russian Fed.
China
China
India
Japan
Japan
India
India
India
India
South Africa LIMITED TO MAX. 6 INCH NPS AND API GRADES B , X42, X46 AND X52.
Austria OD from 3/4 inch up till 6 inch
Japan
China Size Range 30000101 250 (MPM) Mill : 7" TO 9-5/8" (10-3/4")
France MAX. OD 13 3/8
Remarks updated 02/17/2004 by Linda Stowell: Limitation: Not approved for HIC resistant SAW pipe at this time. Remarks entered 12/2/2003 by Linda Stowell: Confab is limited to not produce Sour Service pipes at this time for S. Aramco until they upgrade their facility. Corrective action letter has been issed to Confab.
The Assessment team recommended that Welspun are approved with the following limitation:- <H>HIC testing must not be completed by Welspun and must be completed by a Saudi Aramco approved HIC testing facility approved for HIC testing to Saudi Aramco Standard 01-SAMSS-016.</> <H><U>Michael Eric Ward.</></> <H><U>12th January 2004.</></>
The Assessment team recommended that Welspun are approved with the following limitation:- <H>HIC testing must not be completed by Welspun and must be completed by a Saudi Aramco approved HIC testing facility approved for HIC testing to Saudi Aramco Standard 01-SAMSS-016.</> <H><U>Michael Eric Ward.</></> <H><U>12th January 2004.</></>
This limitation restricts the manufacturer to supply pipes for Non-Sour Service only. The limitation was entered By Akira Narita AOCT/ Inspection Engineer as follow; OD size range is 16 - 56 inches SAW with sour service is not recommended.
<H>Limitation:-</> i) HIC testing must be completed at a Saudi Aramco approved facility for example, SAW Pipes Mundra One located near by or Saw Pipes Kosi Kalan Facility. ii) Drop Weight testing must be completed at the SAW Pipes Mundra One Facility or Saudi Aramco approved facility.
France OD 7" THROUGH 16" MAX.
Spain
India
Germany
Germany
Italy
Spain Maximum OD 7" produces pipes limited to maximum OD of 7 inch.
Japan
Japan
Japan
Argentina
Brazil
Range between 8 and 20 inch O.D. See fax message dated Jan-29-02 ( attached to vendor ) HCK Aug-09-2002
10/27/02: Limitation placed on 7/17/02 was modified per Shuler Cox email dated 10/26/2002 as agreed by Muhsen Sanna (RSA class 01 & 02, CSD). The new limitatiom is: "No purchase orders shall be placed with Indian Seamless Metal Tubes Limited for line pipes in sizes less than scheduled 40 (schedule 40 and higher is acceptable.)" Afaq Ahmed 10/27/02 LIMITATIONS - X60, 10 INCH, SCH. 140 MAX Previous limitation: Per Shuler P Cox of CSD email dated 7/17/02: No purchase orders shall be placed with Indian Seamless Metal Tubes Limited for line pipes 6", 8" and 10" if the wall thickness is less than schedule 80 (schedule 80 and higher is acceptable.) Afaq Ahmed 7/17/02 NOTE ADDED MAY 31st 2003 INDIAN SEAMLESS HAVE THE CURRENT CAPABILITY TO MANUFACTURE SEAMLESS GRADE "B" UP TO X60 FROM 6" TO 275mm. SEE ALSO SERVICES TO OBJECTS ATTACHMENT INDIAN_SEAMLESS_CAPABILITY NOTE THIS ASSESSMENT RELATES TO THE BARAMATI FACILITY, B13,M.I.D.C., INDUSTRIAL AREA, BARAMATI-4131133. PHONE 0091 2112 243861 FAX 0091 241 243 873 MICHAEL ERIC WARD NOTE ADDED 16th JUNE 2003 Note that Indian Seamless only produce the following materials as indicated by the services to objects attachment INDIAN_SEAMLESS_CA PABILITY :- 6000000013 6000000051 6000000063 Note the limitation stated above still applies ie ORDERS SHALL ONLY BE PLACED FOR SCHEDULE 40 AND ABOVE. Indian Seamless have two plants as indicated by the services to objects attachment INDIAN_SEAMLESS_CAPABILITY and only the Baramati Facility is approved and this plant was formally known as Kalyani Seamless Tubes ref Patis report 005/98 ( see services to objects attachment 005_98). Indian Seamless were placed on hold on 9th July 2003 because the RSA failed to concur (See services to objects attachments RSA_Indian_Seamless and QCU_INDIAN_SEAMLESS). Michael Eric Ward 9th July 2003. 1. Application is limitded for non-sour service. 2. Available size range is limited from 2-7/8" to 10-3/4".
Valourec & Mannesmann Tubes produces pipe/casing from 7" till 28" with wall thickness from 5.6 mm till 110.0 mm Concur with VID recommendation to approve 9com 6000000013. Thanks, Husain Al-Muslim
United States Of America
Mexico
United States Of America
United States Of America
China
Russian Fed. Maximum pipe OD : 14"
China 30004352 168 Mill : > 6-5/8"
India
China Size Range 30004774 460 Mill : (9-5/8") 10-3/4" TO 16"
As per the RSA Mr. Muslim, Husain M's request, UD has been changed to QSAL with the limitations up to 12# NPS and up X56 for all evaluated materials. AOCT Inspection 7/25/2007
From: Dib, Tony G Sent: Wednesday, June 03, 2009 5:05 PM To: Tabei, Miho Cc: Narita, Akira X Subject: RE: Maharashtra Seamless India 30004649 Certainly I will concur with the Master. Regards, Tony G. Dib, Engineering Consultant Piping & Pipeline Unit Mech. Eng. Div./CSD Tel.966-3- 876-0195 FAX .966-3- 876-0311 From: Tabei, Miho Sent: Wednesday, June 03, 2009 8:14 AM To: Dib, Tony G Cc: Narita, Akira X Subject: RE: Maharashtra Seamless India 30004649 Tony-san, Please note the below Narita-san's comment. Could you please concur us to change the QM status from QSAL to QSAA manually ? Or if we need to go through a new WF, please instruct so. Thank you. Quote from Narita-san) 1). For I/L No.107000051167, I finalized the above company as QS Acceptable with Limitation due to no UST inspection tester. I confirmed today by plant survey that they introduced the updated UST inspection machine and already operated with good condition. From this situation, we can remove this limitation. Unquote) Material Limitation as below: Available material grade upto X56 Applicable service range Non-sour services and non-offshore application.
6000000013 PIPE; METALLIC; 6 IN & LARGER; SEAMLESS Size limitation up to 9-5/8 inch. AOCT Inspection
limited OD of 16" till 42" material grade up to X70 pipe length 12.6 meter.
Remarks updated 2/17/2004 by Linda Stowell: Limitation: Not approved for HIC resistant SAW pipe at this time. Remarks entered 12/2/2003 by Linda Stowell: Confab is limited to not produce Sour Service pipes at this time for S. Aramco until they upgrade their facility. Corrective action letter has been issed to Confab.
Saudi Arabia
Germany
India
India
China
India
Netherlands
Bahrain
Belgium
United Kingdom
Japan
Japan
South Korea
United States Of America
Italy
United States Of America
India
Italy
India
India
India
Utd.Arab Emir.
Utd.Arab Emir.
Germany
<H><U>LIMITATION</></> <H>GROUP FIVE ARE NOT APPROVED FOR SOUR SERVICE PIPE.</> <H>MICHAEL ERIC WARD</> <H>7th FEBRUARY 2006</> Limitations need to be observed: Spiral welded pipe only in the range of 20 inch through 72 inch OD. Application range is limited to non-sour service. The QM status has been changed manually to QSAL from QSNA as concurred by RSA Mr. Tony Dib as attached the e-mail dated on Oct 20, 08. AOCT Inspection Oct 20, 2008
These materials can be supplied with the limitation of water and non-sour applications only, not for sour application because they do not have enough experience of production for sour service materials and also they do not have corrosion laboratory in the plant. A. Narita, AOCT Dec 19, 2007
Maximum 16" in Diam. pipe. No thickness limitation. Afaq 12/14/2008 (See attached RSA email) <H>Note:-</> RECORD CORRECTED TO REPORT ( see services to objects attachment) Michael Eric Ward 2nd October 2006 NOTE:- RSA CONCURRED INSPECTION LOT 107000041317. M.E. Ward Oct 2nd 2006
Maximum 48" in Diam. No thickness limitation. Afaq Ahmed 12/14/2008. (see attached RSA email)
Maximum 42" dia. with 1" thickness. Afaq Ahmed 12/14/2008 (See ttached RSA email) <H>NOTE:-</> Corrective actions closed out by desk review 2nd July 2007. Michael Eric Ward July 3rd 2007
Following limitations need to be observed for scope of supply: Pipe outside diameter is limited from 24 inch to 100 inch.
Japan
United Kingdom From 42 inch up to 84 inch max pipe length 9.1 meter.
Germany
Germany
Italy
Japan
Japan
Japan
Japan
Japan
Japan
United States Of America
Brazil
France API 5L UP TO X-80 20"-64" DIA.
India
Japan
China
China
India
Japan
Japan
Austria OD from 3/4 inch up till 6 inch
Japan
China Size Range 30000101 250 (MPM) Mill : 7" TO 9-5/8" (10-3/4")
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
SAW Pipes of Mundra are not ready to receive Saudi Aramco orders at this time due to major NDE deficiencies, requirement for major procedural re-writing and training of both NDE and Laboratory personnel. However, the staff and workforce are keen, enthusiastic, team orientated and have the potential to become satisfactory suppliers of longitudinal line pipe. SAW Pipes at Mundra should be given the opportunity to undergo a re-survey at a future date when SAW Pipes of Mundra are able to provide Saudi Aramco with evidence that all the deficiencies detailed by this report have been corrected. M. E. Ward. 6th January 2003.
The limitation was entered By Akira Narita AOCT/ Inspection Engineer as follow; OD size range is 16 - 56 inches
<H>Limitation:-</> i) Drop Weight testing, if required, must be completed at the SAW Pipes Mundra One Facility or Saudi Aramco approved facility.
France OD 1" THROUGH 6" MAX.
France OD 7" THROUGH 16" MAX.
Germany
Spain
Germany
France
Germany
Italy
Spain
Spain
Spain Maximum OD 7" produces pipes limited to maximum OD of 7 inch.
Japan
Japan
Japan
Japan
Japan
Argentina
Brazil
United States Of America
Mexico
United States Of America
United States Of America
Germany Limitation to 4 inch max.
China
China 30004352 168 Mill : > 6-5/8"
China Size Range 30004774 460 Mill : (9-5/8") 10-3/4" TO 16"
China
LIMITED TO MAX. PIPE SIZE OF 6-5/8" Concur with VID recommendation to approve 9com 6000000018. Thanks, Husain Al-Muslim
<H><U>LIMITATION</></> SIX INCH O.D. MAXIMUM- SEE SERVICES TO OBJECTS SAP REPORT <H>"ANSWER APPROVAL QUESTION".</> <H>Note:-</> The vendor record was updated following clarification request received from Saudi Armco Quality Control Unit. Michael Eric Ward June 2nd 2008
Valourec & Mannesmann Tubes produces pipe/casing from 7" till 28" with wall thickness from 5.6 mm till 110.0 mm Concur with VID recommendation to approve 9com 6000000018. Thanks, Husain Al-Muslim
As per the RSA Mr. Muslim, Husain M's request, UD has been changed to QSAL with the limitations up to 12# NPS and up X56 for all evaluated materials. AOCT Inspection 7/25/2007
6000000018PIPE; METALLIC; SEAMLESS; LOW TEMP Size limitation between 4-1/2" and 9-5/8". AOCT Inspection
Saudi Arabia Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Quality System re-assessed reference patis report number 145/01. Five on-going improvements were identified and one observation was noted. The vendor agreed to complete the on-going improvements by 27th January 2002. ITEM CLOSED BY ON-SITE VISIT - M. E. WARD.
<H><U>NOTE</></> See inspection lot 107000050603 approving the new Bondstrand line three with corrective actions for the following nine com items 6000000020 6000000021 Michael Eric Ward November 24th 2008 <H><U>PREVIOUS NOTE OF UNKOWN ORIGIN</></> All recommendations and notes highlighted in evaluation report shall be checked and verified by VID, If these notes and recommendations are not implemented during next evaluation then these notes shall be considered as findings to be corrected
<H><U>Zahrani, Saleh A (CSD) has recommended extension of AMIPOX temporary approval till close-out of the RSA's comments raised against the test results.</></> (refer to services for object for email details) <H>Abdullah Al Guwaifli</> <H>VID-QAU</> ************************************************************* Per RSA email (Khalid Mulhim) following limitation was added: Limitation: AMIPOX pipes & fittings are not approved for fire water system. No procurement of pipes and fittings for fire water use is permitted till successful completion of long term 10,000 hours HDB test at 93 degree F. Afaq Ahmed 10/28/2006 Per RSA email (Khalid Mulhim) following limitation was added: We have reviewed the submitted design type qualification tests for Amipox plant. Those tests were conducted in accordance with the requirements under 01-SAMSS-034 for the flange pressure rating and joint integrity tests. The results are acceptable and are limited only for the below submitted series: ",,Flange fitting up to 16 bars (CL-150) for sizes up to 600 mm. ",,Gaskets joist up to 12 bars. ",,Adhesive joints up to 12 bars. ",,All piping and fittings shall not be used for concentrated chimerical services. ",,All piping and fittings SHALL NOT be used for aboveground applications. The SAP shall reflect the above limitations for the subject manufacturer. Afaq Ahmed 03/13/2006 Size limitations: Per RSA email (Khalid A Mulhim) following limitations are added: "Amiantit/Amipox produces pipes and fittings in limited sizes in limited pressure (80 mm to 600 mm up to 16 bar). All procurements from Amiantit shall be limited to the above sizes and pressures. As such no other pipe size/pressure class ratings will be considered for supply to Saudi Aramco." See RSA email (item # 2) in the services for objects. Afaq 06/2005
Saudi Arabia
Saudi Arabia
Netherlands
Saudi Arabia
Saudi Arabia
United States Of America
Bahrain
Bahrain
Quality system re-assessed reference Patis report number 145/01. Five on-going improvements and one observation were noted. The vendor agreed to complete the on-going improvements by 27th January 2002. ITEM CLOSED BY ON-SITE VISIT - M. E. WARD.
<H><U>NOTE</></> See inspection lot 107000050603 approving the new Bondstrand line three with corrective actions for the following nine com items 6000000020 6000000021 Michael Eric Ward November 24th 2008 <H><U>PREVIOUS NOTE OF UNKNOWN ORIGIN</></> All recommendations and notes highlighted in evaluation report shall be checked and verified by VID , If these notes and recommendations are not implemented during next evaluation then these notes shall be considered as findings to be corrected.
<H>Zahrani, Saleh A (CSD) has recommended extension of AMIPOX temporary approval till close-out of the RSA's comments raised against the test results.</> (refer to services for object for email details) <H>Abdullah Al Guwaifli</> <H>VID-QAU</> ************************************************************* Per RSA email (Khalid Mulhim) following limiation was added: Limitation: AMIPOX pipes & fittings are not approved for fire water system. No procurement of pipes and fittings for fire water use is permitted till successful completion of long term 10,000 hours HDB test at 93 degree F. Afaq Ahmed 10/28/2006 Per RSA email (Khalid Mulhim) following limitation was added: We have reviewed the submitted design type qualification tests for Amipox plant. Those tests were conducted in accordance with the requirements under 01-SAMSS-034 for the flange pressure rating and joint integrity tests. The results are acceptable and are limited only for the below submitted series: ",,Flange fitting up to 16 bars (CL-150) for sizes up to 600 mm. ",,Gaskets joist up to 12 bars. ",,Adhesive joints up to 12 bars. ",,All piping and fittings shall not be used for concentrated chimerical services. ",,All piping and fittings SHALL NOT be used for aboveground applications. The SAP shall reflect the above limitations for the subject manufacturer. Afaq Ahmed 03/13/2006 Potable and fire water limitations were removed (see RSA, Khalid Mulhim email dated 09/17/2005). Size and pressure limiations are still applicable as shown below. Afaq 09/17/2005 Size limitations: Per RSA email (Khalid A Mulhim) following limitations are added: "Amiantit/Amipox produces pipes and fittings in limited sizes in limited pressure (80 mm to 600 mm up to 16 bar). All procurements from Amiantit shall be limited to the above sizes and pressures. As such no other pipe size/pressure class ratings will be considered for supply to Saudi Aramco." See RSA email (item # 2) in the services for objects. Afaq 06/2005 1) Limitation: No pipe shall be supplied to Saudi Aramco for potable water application 2) Limitation: No pipe shall be supplied to Saudi Aramco for fire water application Afaq Ahmed 02/13/2005
United States Of America
Italy
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Italy
Belgium
United Kingdom
France
South Korea
Japan
United States Of America
United States Of America
South Korea
Saudi Arabia
Saudi Arabia
Saudi Arabia
France MAX. OD 13 3/8
Italy
Saudi Arabia
Saudi Arabia
Saudi Arabia
NOTE THE APPROVAL OF THIS MATERIAL IS DETAILED BY PATIS REPORT 108/01 LOCATED WITHIN THE SERVICES TO OBJECTS ATTACHMENT SECTION OF THIS REPORT AS ATTACHMENT 108_00_SAFAMI. NOTE THE SIGNATURE OF THE RSA ON REPORT 108/00. M. E. WARD. 19th JANUARY 2003 Please confirm closure of the corrective actions before proceeding with the approval. Regards, Husain Al-Muslim
Remarks entered 11/06/2001 by Y. Dawkins: Howe-Baker's approval is restricted to 1) desalter, or other separator internals, however if VME is used to fabricate the internals, Howe-Baker is required to perform all welding on the internals, 2) desalter vessels that are completely fabricated by others, with Howe-Baker providing the internals to the vessel fabricator for installation. For very small desalters, HB is permitted to fabricate the vessels. Currently, there is no restriction on which vessel fabricators HB can use; additional evaluation is required. (B.E. Roberts - 5/10/96)
The limitation was place on Geyad by the CSD RSA to restrict the approval to exclude bends ( see attachment section with Patis report). Record entered/updated by M.E. Ward on 18th June 2002
Saudi Arabia
Utd.Arab Emir.
Saudi Arabia
Saudi Arabia
Saudi Arabia
Bahrain
Saudi Arabia
Saudi Arabia
Sweden
Germany
Italy
Belgium
United Kingdom
France
South Korea
Japan
NOTE THE APPROVAL OF THIS MATERIAL IS DETAILED BY PATIS REPORT 108/01 LOCATED WITHIN THE SERVICES TO OBJECTS ATTACHMENT SECTION OF THIS REPORT AS ATTACHMENT 108_00_SAFAMI. NOTE THE SIGNATURE OF THE RSA ON REPORT 108/00. M. E. WARD. 19th JANUARY 2003
<H>Note:-</> RECORD CORRECTED TO REPORT ( see services to objects attachment) Michael Eric Ward 2nd October 2006 <H>NOTE:-</> RSA CONCURRED INSPECTION LOT 107000041317. M.E. Ward Oct 2nd 2006
The SAP record for vendor DS7465 ( plant ID 01 ) SAP vendor 30000979 failed to indicate approval of materials. The record for the approval was changed to align it with Patis details and in particular report Patis 093/01 included in the attachment section of this SAP report. M. E. Ward. 12th October 2002.
QSOH is changed to QSAA, since purchasing hold issue was solved, for more detail see IL # 107000052951. Othman Alamoudi December 24, 2008 00966 3 8626176 ************************************************************************ ******************************************************** QSAA IL 107000052951 Othman Alamoudi September 07, 2008 00966 8626176 ************************************************************************ ******************************************************** Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code 07/26/2008 Meshari Al-Ghuryri
United States Of America
Germany
United Kingdom
United States Of America
United States Of America
United Kingdom
Italy
United Kingdom
Saudi Arabia
Saudi Arabia
Saudi Arabia
Italy
Germany
United States Of America
United Kingdom
Italy
Germany
Sweden
United Kingdom
Japan
United States Of America United States Of America Canada Canada United States Of America United States Of America Japan Japan
India
Remarks entered 11/06/2001 by Y. Dawkins: Howe-Baker's approval is restricted to 1) desalter, or other separator internals, however if VME is used to fabricate the internals, Howe-Baker is required to perform all welding on the internals, 2) desalter vessels that are completely fabricated by others, with Howe-Baker providing the internals to the vessel fabricator for installation. For very small desalters, HB is permitted to fabricate the vessels. Currently, there is no restriction on which vessel fabricators HB can use; additional evaluation is required. (B.E. Roberts - 5/10/96)
<H>NOTE:-</> LIMITATION REMOVED AS AGREED BY RSA ( see services to objects attachment) Michael Eric Ward July 10th 2007
Germany
Turkey
Germany
Japan
United Kingdom
India
Germany
Italy
Japan
Japan
Japan
Brazil
France API 5L to X 80, OD 20-80"
India
Japan
Russian Fed.
Germany
China
China
India
Japan
Japan
Japan
<H>NOTE ADDED 19th APRIL 2004</> Date and approval added on the 19th April 2004 to align the material approval to the vendor master. M. E. Ward. ======================================================= Limitations: Production limitation from 24" and up Nominal diameter is limited from 8 inch till 120 inch scope of supply is OD from 8 inch up till 120 inch
Following limitations need to be observed for scope of supply: Pipe outside diameter is limited from 24 inch to 100 inch.
limited OD of 16" till 42" material grade up to X70 pipe length 12.6 meter.
1.0. Limitation straight seams only SAW 16 Inches to 48 Inches See attachment 142_00. M.E. Ward 10-09-2002 2.0. Approve with limitations as detailed by note one above and approve the HIC laboratory with corrective actions ( see services to objects attacvhment:- ABDULLATIF_ APPROVE_HIC_FACILITY). The corrective actions to be closed by 30th February 2005. Michael Eric Ward 23rd February 2005
The limitation is for the manufacturer to supply pipe for Non-Sour service only
The limitation was entered By Akira Narita AOCT/ Inspection Engineer as follow; OD size range is 16 - 56 inches SAW with sour service is not recommended.
<H>Limitation:-</> i) HIC testing must be completed at a Saudi Aramco approved facility for example, SAW Pipes Mundra One located near by or Saw Pipes Kosi Kalan Facility. ii) Drop Weight testing must be completed at the SAW Pipes Mundra One Facility or Saudi Aramco approved facility.
China
France MAX. OD 13 3/8
Germany
Italy
Spain Maximum OD 7" produces pipes limited to maximum OD of 7 inch.
Japan
Japan
Japan
Argentina
United States Of America
China
Russian Fed. Maximum pipe OD : 14"
China 30004352 168 Mill : > 6-5/8"
South Korea
South Korea
United Kingdom
Denmark
Bahrain
Bahrain
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
South Korea
Germany
Saudi Arabia
Turkey
Saudi Arabia
Size Range 30000101 250 (MPM) Mill : 7" TO 9-5/8" (10-3/4") Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
Valourec & Mannesmann Tubes produces pipe/casing from 7" till 28" with wall thickness from 5.6 mm till 110.0 mm Concur with VID recommendation to approve 9com 6000000034. Thanks, Husain Al-Muslim
As per the RSA Mr. Muslim, Husain M's request, UD has been changed to QSAL with the limitations up to 12# NPS and up X56 for all evaluated materials. AOCT Inspection 7/25/2007
Japan
Japan
Japan
United Kingdom
Saudi Arabia
South Korea
Saudi Arabia
Germany Maximum OD 20", Maximum wall thickness 16.1 mm.
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Germany Maximum OD 20", Maximum wall thickness 16.1 mm.
India India India India
South Africa LIMITED TO API 5L , GRADES B, X42, X46 AND X52. Max OD 6"
Austria OD from 3/4 inch up till 6 inch
China Size Range 30000101 250 (MPM) Mill : 7" TO 9-5/8" (10-3/4")
Germany
LIMITATION ON CCC 010048. SUBJECT TO INITIAL PRODUCT APPROVALS FOR ALL SIZES AND THICKNESSES IN ACCORDANCE WITH ANNEX B OF 01-SAMSS-332. NON SOUR LIQUID SERVICE
Following limitations need to be observed: Minimum OD: 8 inch Maximum OD: 20 inch Minimum length: 6 meter (19.68 foot) Maximum length: 14.5 meter (47.57 foot) <H>Note:-</> SAP updated to reflect corrective actions closed. Michael Eric Ward March 4th 2008 Must meet size and thickness qualification requirements of 01-SAMSS-332. (02/14/2002)
VENDOR IS APPROVED BECAUSE THE VENDOR COMPLETED THE CSD QUALIFICATION (SEE SERVICES TO OBJECTS ATTACHMENT VENDOR_SOUR_SERVICE_MARCH2004). M. E. WARD. 3rd March 2004. <H>Note:-</> SAP updated to reflect corrective actions closed. Michael Eric Ward March 4th 2008
<H>Note:-</> SAP updated to reflect corrective actions closed. Michael Eric Ward March 4th 2008
India
Germany Material limitation 160 mm OD or 6" maximum.
Germany Max. diameter 6"
Spain Japan Japan Argentina United States Of America Germany Limitation to 4 inch max.
China
China 30004352 168 Mill : > 6-5/8"
LIMITATIONS- X60 MAX. Hold was removed as per CSD letter CSD/M&CED/L-670/02 dated 7/1/02. Afaq 7/17/02 NOTE ADDED MAY 31st 2003 INDIAN SEAMLESS HAVE THE CAPABILITY FOR 4 INCH AND SMALLER SEAMLESS GRADE "B" TO X60. SEE SERVICES TO OBJECTS ATTACHMENT INDIAN_SEAMLESS_CAPABILITY NOTE THIS ASSESSMENT RELATES TO THE BARAMATI FACILITY, B13,M.I.D.C., INDUSTRIAL AREA, BARAMATI-4131133. PHONE 0091 2112 243861 FAX 0091 241 243 873 M. E. WARD NOTE ADDED JUNE 16th 2003. Note that Indian Seamless only produce the following materials as indicated by the services to objects attachment INDIAN_SEAMLESS_CAPABILITY :- 6000000013 6000000051 6000000063 NOTE THE X60 MAX LIMITATION APPLIES Indian Seamless have two plants as indicated by the services to objects attachment INDIAN_SEAMLESS_CAPABILITY and only the Baramati Facility is approved and this plant was formally known as Kalyani Seamless Tubes ref Patis report 005/98 ( see services to objects attachment 005_98). Indian Seamless were placed on hold because the RSA failed to concur (See services to objects attachments RSA_Indian_Seamless and QCU_INDIAN_SEAMLESS). Michael Eric Ward 9th July 2003. 1. Application is limitded for non-sour service. 2. Available size range is limited from 2-7/8" to 10-3/4".
As per the RSA Mr. Muslim, Husain M's request, UD has been changed to QSAL with the limitations up to 12# NPS and up X56 for all evaluated materials. AOCT Inspection 7/25/2007
India
China Size Range 30004774 460 Mill : (9-5/8") 10-3/4" TO 16"
China
France MAX. OD 13 3/8"
France OD 1" THROUGH 6" MAX.
France OD 7" THROUGH 16" MAX.
Spain
Sweden
Germany
Germany
France
Spain
Spain Maximum OD 7"
Japan
United States Of America
Germany Limitation to 4 inch max.
United States Of America
Germany
United States Of America
From: Dib, Tony G Sent: Wednesday, June 03, 2009 5:05 PM To: Tabei, Miho Cc: Narita, Akira X Subject: RE: Maharashtra Seamless India 30004649 Certainly I will concur with the Master. Regards, Tony G. Dib, Engineering Consultant Piping & Pipeline Unit Mech. Eng. Div./CSD Tel.966-3- 876-0195 FAX .966-3- 876-0311 From: Tabei, Miho Sent: Wednesday, June 03, 2009 8:14 AM To: Dib, Tony G Cc: Narita, Akira X Subject: RE: Maharashtra Seamless India 30004649 Tony-san, Please note the below Narita-san's comment. Could you please concur us to change the QM status from QSAL to QSAA manually ? Or if we need to go through a new WF, please instruct so. Thank you. Quote from Narita-san) 1). For I/L No.107000051167, I finalized the above company as QS Acceptable with Limitation due to no UST inspection tester. I confirmed today by plant survey that they introduced the updated UST inspection machine and already operated with good condition. From this situation, we can remove this limitation. Unquote) aterial Limitation as below: Available material grade upto X56 Applicable service range Non-sour services and non-offshore application.
6000000051 PIPE; METALLIC; API 5L, SEAMLESS Size limitation between 4-1/2" and 9-5/8". AOCT Inspection
Limited to 8 to 20 inch OD See vendor fax dated Jan-29-2002 ( attached to vendor ) HCK Aug-09-2002
LIMITED TO MAX. DIAMETER OF 6 INCHES ONLY. LIMITED TO MAX. DIAMETER OF 6 INCHES ONLY. LIMITED TO MAX. DIAMETER OF 6 INCHES ONLY. LIMITED TO MAX. DIAMETER OF 6 INCHES ONLY.
China
Germany
China
Italy
Japan
Austria SEAMLESS; UP TO 250MM OD, UP TO 30MM WT
Sweden
Spain
Sweden
France
Germany WELDED; 200MM-1320MM OD.
Sweden
Spain SEAMLESS; 19MM - 219 MM OD, UP TO 30MM WT
Spain
Japan
Japan
Japan
Japan
Canada
United States Of America
Germany
Germany
As per RSA Mr. Tony's request, the limitation has been added: Available size range of Balidian Plant is 19 mm # 219 mm (3/8# # 8#). The QM status has been revised as QSAL from QSAA. AOCT Inspection 6/3/2008 Based on the attached e-mail by RSA, the QM has been updated as QSOH until RSA conduct the technical evaluation in this year 2007. Until then, it will be on HOLD. AOCT Inspection 6/19/2007
NSC/Hikari Works has two pipe mills: one is ERW mill which is now manufactured for 18-5/8" ERW Casing with BTC thread for Aramco, and 24" ERW Pipe to Vetco and OMS for Aramco's Conductor casing, and another is Hot Extrusion Mill which is manufacturing mainly seamless stainless pipe and alloy pipe based on ASTM. They exported small quantities of alloy pipe to Aramco 3-4 years ago. NSC/Hikari requested AOCT to survey and approve their hot extrusion mill. So New WF could be created after RSA review all the documents and concur this new plant registration intiation. The QSAT status will be updated after the PA by AOCT in 2007. AOCT Inspection 2/27/2007
Limited to 8 to 20 inch OD See vendor fax dated Jan-29-2002 ( attached to vendor ) HCK Aug-09-2002
Note: Existing QM sys. was changed to “Quality system NOT-APPROVED” to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
Germany
Taiwan
South Korea
United States Of America
Japan
China
Germany
Italy
United States Of America
United States Of America
China
Germany
Belgium
South Korea
Netherlands
Netherlands
Italy
United States Of America
Japan
Japan
United Kingdom
Germany
Japan
Japan
United Kingdom LIMITED UP TO 6.625" OUTSIDE DIA. ONLY
Netherlands
United Kingdom
As per AOCT inspector Mr. Narita's request, please limit to the apporval only EXCEPT Steinless Pipe of 6000000055 PIPE; METALLIC; ASTM; ANY PROCESS, SS. AOCT Inspection 10-15-08 As per RSA Mr. Tony's request, the limitation has been added: Available size range of Balidian Plant is 19 mm # 219 mm (3/8# # 8#). The QM status has been revised as QSAL from QSAA. AOCT Inspection 6/3/2008 Based on the attached e-mail by RSA, the QM has been updated as QSOH until RSA conduct the technical evaluation in this year 2007. Until then, it will be on HOLD. AOCT Inspection 6/19/2007
Only acceptable from Ladish when low temperature requirements are not applicable (JAV - 03/01/2003)
The link was created based on RVL Synchronization Initiative Alaa Abuemarah October 17, 2005
France
Sweden
Spain
Japan
Japan
Japan
Japan
Japan
United States Of America
United States Of America
United States Of America
United Kingdom Produces only U bends/hairpins out of purchased tubing
United States Of America
Japan Japan
Italy
United States Of America United States Of America United States Of America United States Of America United States Of America
Netherlands
Netherlands
United Kingdom
Belgium
Italy
United States Of America United States Of America South Korea
Netherlands
Netherlands
Italy
India
Italy
France
Note: Existing QM sys. was changed to “Quality system NOT-APPROVED” to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
Sweden
Japan
Japan
United States Of America
Canada
United States Of America
United States Of America
Japan
Canada
United Kingdom Produces only U bends/hairpins out of purchased tubing
United States Of America
China
Italy
Germany
status for the plant approval of Sumikin Stainless Steel Tube Co., Ltd (Shonan Works). We had finished the survey on Oct. 30, 2001 and sent the report on Nov. 1, 2001 to Dhahran. Thank you and kind regards, Junko -----Original Message----- From: ,,Matsui, Naoko A Sent:,,Wednesday, February 27, 2002 5:16 PM To:,,Junko Suematsu Subject:,,FW: Sumikin Stainless for ZUAE-M98-01-4031-DA09 Could you forward this e-mail to AOC Leiden VLU? As this long e-mails below show, this survey is to allow this subject PO to be processed (one-time approval). << File: Sumikin-10-30-01.doc >> Thank you. Matsui -----Original Message----- From: ,,Matsui, Naoko A Sent:,,Wednesday, February 27, 2002 5:10 PM To:,,Marwah, Ashok K; Maghlouth, Emad S Cc:,,Ohno, Hirobumi O; Humoud, Adel A; Ugaily, Bassam I Subject:,,RE: Sumikin Stainless for ZUAE-M98-01-4031-DA09 Thank you very much. I will ask AOC Leiden Vendor Liaison about the status. Regards, Matsui -----Original Message----- From: ,,Marwah, Ashok K Sent:,,Wednesday, February 27, 2002 5:00 PM To:,,Maghlouth, Emad S Cc:,,Matsui, Naoko A Subject:,,RE: Sumikin Stainless for ZUAE-M98-01-4031-DA09 I'm assuming this company is in the Far East. AOC vendor liaison is supposed to initiate the registration process via SAP inspection workflow. This question should be directed to them! Thx Ashok -----Original Message----- From: ,,Maghlouth, Emad S Sent:,,Wednesday, February 27, 2002 10:57 AM To:,,Marwah, Ashok K Subject:,,FW: Sumikin Stainless for ZUAE-M98-01-4031-DA09 Importance:,,High Pls advise. -----Original Message----- From: ,,Matsui, Naoko A Sent:,,Wednesday, February 27, 2002 10:50 AM To:,,Maghlouth, Emad S; Ugaily, Bassam I Cc:,,Ohno, Hirobumi O; Adel Al-Humoud Subject:,,FW: Sumikin Stainless for ZUAE-M98-01-4031-DA09 Importance:,,High Please advise who is taking care of the vendor registration for this Sumikin Stainless / Shonan Works, and what is the status. Sumitomo Corp. who represents Sumikin Stainless, needs to know the status. Best regards, Naoko Matsui AOC Tokyo - Inspection Tel :,,+81-3-5563-0584/2430 with an answering machine Fax :,,+81-3-5563-0533 e-mail :,, <> -----Original Message----- From: ,,Ohno, Hirobumi O Sent:,,Friday, January 18, 2002 9:34 AM To:,,Maghlouth, Emad S Cc:,,Humoud, Adel A (AOCT); Matsui, Naoko A Subject:,,RE: PO ZUAE-M98-01-4031-DA09 Adel-san Do you know the status of the process of vendor registration for Sumikin/ Shonan Works? Emad Please refer attached e-mail file and our Plant Survey Report (I already submitted to Mr. Bassam on 1 & 7 Nov. 2001). << Message: RE: Highlights - Emergency Order >> << File: Sumikin-10-30-01.doc >> H. Ohno Sr. Inspector AOC Tokyo -----Original Message----- From: ,,Maghlouth, Emad S Sent:,,Thursday, January 17, 2002 9:05 PM To:,,Ohno, Hirobumi O Cc:,,Humoud, Adel A (AOCT); Matsui, Naoko A Subject:,,FW: PO ZUAE-M98-01-4031-DA09 Importance:,,High Mr. Ohno, Pls advise what is the plant ID for shonan works so I can proceed with a change order you requested. Regards, Emad . -----
Czech Republic
India
China
India
Italy
Italy
Spain
Germany
Italy
France
South Korea
United States Of America
United States Of America
Max. pipe diameter 76 mm. Eddy current tested in lieu of hydrotesting.
The limitation is to manufacture seamless and autogenously welded (without filler addition) stainless steel tubes.
6000000068 has been linked manually with the limitation of "Available size range 0.5 in to 8-5/8 in" and replaced with 6000000059 as per the below note pointed out by AOCT auditor. (See the detailed as in the attached) AOCT Inspection 5-14-09 6000000059 is ASTM A335: Ferritic Stainless Steel, not Austenitic stainless steel such as A249 and A688. Jiuli has not produce this kind of Ferritic Stainless Steel. 6000000068 is Tubing; Metallic; Stainless Steel; ASTM; (this number include Austenitic SS as well as ferritic SS. We need to resister 6000000068 for their plant, instead of 6000000059. This wrong number is specified by Mr. Anizi, RSA for Tubing.
The limitation is to manufacture seamless and autogenously welded (without filler addition) stainless steel tubes.
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection If there is a drawing, they can produce. Shabib Sudairi 12/31/2003
Remarks entered by Angela McFadden on 02/02/2005: In efforts to synchronize SAP and SAES-L-101, it was requested that this plant be reactivated and linked to 9COM's 6000000072 & 6000000189. A full evaluation will be performed by ASC's Quality Systems Unit later this year. ********************END********************************** The temporary approval has expired and the plant is now QSNA. (Linda Stowell - 05/14/2003) This material is approved for ONE-TIME ONLY to allow for placement of urgent Purchase requisition - 1000024295, L/I 1,2,3,4,9,10,11 & 12 (PO#4500499838) to MMC Corp (30003401) for the Jeddah Refinery. This temporary approval will expire on 03/31/2003. At that time, the Q-Info record will be changed to QSNA Linda Stowell - 02/27/2003
United States Of America
Italy
Austria
Italy
Italy
Netherlands
Italy
South Korea
Germany
United Kingdom
Bahrain
France
Italy
Spain
Japan
Japan
Japan
Japan
United States Of America
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
United States Of America
United States Of America
United States Of America
Italy Max OD 60"
Italy
Italy
South Korea
Austria
Italy
Italy
Italy
<H>Note:-</> RECORD CORRECTED TO REPORT ( see services to objects attachment) Michael Eric Ward 2nd October 2006 <H>NOTE:-</> RSA CONCURRED INSPECTION LOT 107000041317. M.E. Ward Oct 2nd 2006
12. diameter and 1. wall thickness and up only made at Russellville, AR (JAV-03/31/2003)
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
United States Of America
United States Of America
United States Of America
Italy
Italy
Italy
Austria
Italy
Italy
Italy
South Korea
Germany
United Kingdom
France
Italy
Spain
Japan
Japan
<H>Note:-</> RECORD CORRECTED TO REPORT ( see services to objects attachment) Michael Eric Ward 2nd October 2006 <H>NOTE:-</> RSA CONCURRED INSPECTION LOT 107000041317. M.E. Ward Oct 2nd 2006
Japan
United States Of America
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
United States Of America
United States Of America
United States Of America
Italy
Italy
Italy
Italy FROM 1/4" THRU 2". France Italy Netherlands
United States Of America
Italy Italy
South Korea
Italy FROM 1/8" THRU 4".
France
Italy
United States Of America
United States Of America
United Kingdom
Italy
United States Of America
South Korea
Austria
Italy
Italy
12. diameter and 1. wall thickness and up only made at Russellville, AR (JAV-03/31/2003)
Remarks entered by Angela McFadden on 01/19/2005: In efforts to reconcile synchronization between SAP and SAES-L-101, it was requested that this 9COM be linked to plant ID 30002015. *************************END************************************
Remarks entered by Angela McFadden on 01/19/2005: In efforts to reconcile synchronization between SAP and SAES-L-101, it was requested that this 9COM be linked to plant ID 30002015. *************************END************************************
Comments entered by Angela McFadden on 04/25/05: Plant temporary approval has expired. Plant is now QSNA. ***********************END*********************
Italy ERRONEOUSLY DELETED (SHOULD HAVE BEEN 020080).
South Korea
South Korea Germany Italy
Japan
Japan United States Of America United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619) United States Of America United States Of America United States Of America United States Of America Canada United Kingdom Italy Thailand Italy
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 02/27/02) Please refer to the attachments of Plant Evaluation IL 107000002200 for details about RSA concurrence. (By Humoaa0b on 01/07/03)
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Canada
United Kingdom
Italy
Thailand
Italy
South Korea
Italy
Italy
Italy
South Korea
South Korea
Germany
Italy
Japan
Japan
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
United States Of America
United States Of America
United States Of America
Canada
United Kingdom
Italy
Italy FROM 1/8" THRU 4".
France
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 02/27/02) Please refer to the attachments of Plant Evaluation IL 107000002200 for details about RSA concurrence. (By Humoaa0b on 01/07/03)
Spain
Italy
Japan
United States Of America
Italy
Italy
South Korea
Italy FROM 1/8" THRU 4".
Spain
Italy
Japan
United States Of America
Italy
Italy
Taiwan
South Korea
United Kingdom
Belgium
United Kingdom
Germany
Italy
United States Of America
Italy FROM 1/8" THRU 4".
France
Spain
Italy
Japan
United States Of America
United States Of America
United States Of America
United Kingdom
United States Of America
Taiwan
South Korea
Austria OD from 3/4 inch up till 6 inch
Italy FROM 1/8" THRU 4".
France
Spain
Italy
Japan
United States Of America
United Kingdom
South Korea
Italy
Italy
France
Italy
Netherlands
United States Of America
United States Of America
United States Of America
United Kingdom
South Korea
Austria 1/2" THROUGH 36"
Italy
Italy
South Korea
South Korea
Comments entered by Angela McFadden on 04/25/05: Plant temporary approval has expired. Plant is now QSNA. ***********************END*********************
The 9COM listed in the workflow with condition that forged material shall be sourced from reliable forging facilities and they must identify the source for every order. Muhsen S. Al-Sannaa RSA Class 01&02 Chairman Piping Standards Committee Tel 966 3 874-6679 Fax 966 3 873-7308
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
Germany
United Kingdom
Austria 4" AND SMALLER ONLY.
Germany
Romania
Germany
France
Italy
Spain
Germany
Japan
Japan
Japan
Thailand
Japan
Japan
Japan
United States Of America
United States Of America
Canada
United Kingdom
Italy
Italy
Thailand
United Kingdom
Italy
Thailand
South Korea
Austria 1/2" THROUGH 36".
Italy
Please refer to the attachments of Plant Evaluation IL 107000002200 for details about RSA concurrence. (By Humoaa0b on 01/07/03)
Note: Existing QM sys. was changed to “Quality system NOT-APPROVED” to synchronize SAP with RVL SAES. (By Humoaa0b on 02/27/02)
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02) Note: Existing QM sys. was changed to “Quality system NOT-APPROVED” to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
United States Of America
United States Of America
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
MATERIAL: A234 GR. WPB ONLY. SIZE: 1) ELBOWS, 45 AND 90 DEG., LONG RADIUS, ANSI B16.9 SEAMLESS; STANDARD WEIGHT 1/2 THRU 30 IN.; EXTRA STRONG 1/2 THRU 24 IN. IN 90 DEG. ONLY: SCH.10: 14-24 IN./ SCH.20:6-24 IN / SCH.30: 8-24 IN./ SCH.40: 8-20 IN./ SCH.60: 8-16 IN./ SCH.80: 8-16 IN. 2)ELBOWS, 90 DEG. SHORT RADIUS, ANSI B16.28, SEAMLESS IN STANDARD WEIGHT AND EXTRA STRONG: 2-12 IN.
Please refer to the attachments of Plant Evaluation IL 107000002200 for details about RSA concurrence. (By Humoaa0b on 01/07/03)
Note: Existing QM sys. was changed to #Quality system NOT-APPROVED# to synchronize SAP with RVL SAES. (By Humoaa0b on 02/27/02) <H><U>NOTE ADDED MICHAEL ERIC WARD 30th JUNE 2004</></> The material 6000000091 was linked to the vendor to align with the Patis record ( see also services to objects attachment RE APPROVAL FOR BENKAN ELBO) MICHAEL ERIC WARD 30th June 2004
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
12. diameter and 1. wall thickness and up only made at Russellville, AR (JAV-03/31/2003)
United States Of America
Canada
Italy
Italy
Thailand
United Kingdom
Italy
United States Of America
Thailand
South Korea
Austria 1/2" THROUGH 36".
Italy
Italy
South Korea
South Korea
Germany
United Kingdom
Austria 4" AND SMALLER ONLY.
Germany
France
Germany
France
As per the RSA's request, as the result of technical survey by RSA Mr. Abdulkarim, Basel A in 2007, it's recommended to be approved as QSAL (with limitation) as below. All the corrective actions were completed and verified by AOCT auditor Mr. Narita. 6000000091 ELBOW; PIPE; CARBON STEEL; 02-SAMSS-005; Limitation: 24# 6000000126 REDUCER; PIPE; BW; All SIZES; ALLOY STEEL; Limitation: 16# x 14# 6000000127 REDUCER; PIPE; BUTTWELD; ALL SIZES; Limitation: 24# x 20# 6000000145 TEE; PIPE; BW; ALLOY STEEL Limitation: 16# 6000000146 TEE; PIPE; BW; CARBON STEEL Limitation: 16# AOCT Inspection (5-12-08)
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
MATERIAL: A420 WPL6 ONLY. 1)ELBOWS, ANSI B16.9, LONG RADIUS, STANDARD WEIGHT AND EXTRA STRONG; IN 45 DEG. 1-1/2 THRU 14 IN.; IN 90 DEG. 1-1/2 THRU 24 IN. 2) ELBOWS, 90 DEG. ANSI B16.9, LONG RADIUS; SCH.10: 14-24 IN./ SCH.20: 6-24 IN./ SCH.30: 8-16 IN./ SCH.40: 8-16 IN./ SCH.60: 10 IN./ SCH.80: 8 IN.
Italy
Spain
Germany
Japan
Japan
Thailand
Japan
Japan
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
United States Of America
United States Of America
Canada
Italy
Italy
Italy
South Korea
South Korea
South Korea
Italy FROM 1/8" THRU 6".
France
Spain
Italy
Japan
United States Of America
United States Of America
United Kingdom
Italy
Italy
South Korea
Please refer to the attachments of Plant Evaluation IL 107000002200 for details about RSA concurrence. (By Humoaa0b on 01/07/03)
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007 Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
South Korea
South Korea
Italy FROM 1/8" THRU 6".
France
Spain
Germany ID Cat C added as per request ~2803
Italy
Italy
Japan
United States Of America
United States Of America
United States Of America
Italy
Italy
Taiwan
South Korea
South Korea
South Korea
Italy FROM 1/8" THRU 6".
Spain
Italy
Japan
United States Of America
Italy
South Korea
United Kingdom
Italy
Italy
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007 Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
South Korea
United States Of America
United States Of America
United States Of America
Italy
Germany
Italy
Italy
Italy
Romania
South Korea
United States Of America
United States Of America
Italy
Italy
India
India
Italy
South Africa
United Kingdom
Italy
Spain
Comments entered by Angela Mcfadden on 1/9/09: Due to concerns noted during plant assessments conducted in 2004 and 2006, visual inspection should be conducted on all purchase order placements at SWECO. **********************END**********************************
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection If there ia a drawing, they can produce Shabib Sudairi 12/31/2003
Remarks entered by Angela McFadden on 10/28/05: At the request of CSD, 9COMs 6000000098 & 6000000104 have been added to the list of those 9COMS for which Galperti is currently approved. ****END***************************************************
Saudi Arabia
Germany
Italy
Italy
Italy
France
Romania
South Korea
United States Of America
United States Of America
Saudi Arabia
India
United Kingdom
United States Of America
<H>NOTE ADDED 3rd MAY 2004.</> CORRECTIVE ACTIONS CLOSED OUT DURING SITE VISIT. M. E. WARD
FLANGE RANGE 1/2" THRU 14", CLASS 150 FLANGE RANGE 1/2" THRU 12", CLASS 300 FLANGE RANGE 1/2" THRU 10", CLASS 600 FLANGE RANGE 1/2" THRU 6", CLASS 1500 FLANGE RANGE 1/2" THRU 3", CLASS 2500 Maximum nps size up to 14"
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection Size: 1/2 in. through 120 in. Rating: 150 lb through 2500 lb S. Saito 3/14/2005
reinstate from QSNA to QSAL, see attachment. Meshari Ghuryri 03/03/2009 ======================================================= <H><U>LIMITATIONS</></> <H>1.0.</> Flange items supplied to Saudi Aramco must be completely manufactured at the Precision Forging Plant in Saudi Arabia, forging, heat treated ,machined and tested. Note that <H>flange items must not be part manufactured elsewhere.</> <H>2.0.</> Mnufacturing limitations for Precision Forging ( see services to objects attachment):- i) Size 10 INCH AND BELOW ii) PRESSURE SIZE PRESSURE 2 INCH 2500 3 INCH 1500 4 INCH 1500 6 INCH 600 8 INCH 300 10 INCH 150 iii) API FLANGE API Class 2000 (limit is 7-1/16") API class 3000 (limit is 4-/16") API Class 5000 (limit is 3-1/8") Michael Eric Ward 14th November 2007
<H>The limitation restricts the Chaudrhy Hammer Works to supplying flange items manufactured in their forge. Note that Chaudrhy Hammer Works is not approved to supply Saudi Aramco with flange items procured from vendors.</>
Limitation: The 9COM listed in the workflow with condition that forged material shall be sourced from reliable forging facilities and they must identify the source for every order. Muhsen S. Al-Sannaa RSA Class 01&02 Chairman Piping Standards Committee Tel 966 3 874-6679 Fax 966 3 873-7308
Italy
Italy
India South Africa
Italy
Spain
Saudi Arabia
Italy Italy France
South Korea
United States Of America
Saudi Arabia
United States Of America India Italy
Italy
United States Of America
India
India
<H>NOTE ADDED 3rd MAY 2004.</> CORRECTIVE ACTIONS CLOSED OUT DURING SITE VISIT. M. E. WARD
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection Size: 1/2 in. through 120 in. Rating:150 lb through 2500 lb S.Saito 3/14/2005
reinstate from QSNA to QSAL, see attachment. Meshari Ghuryri 03/03/2009 ======================================================= <H><U>LIMITATIONS</></> <H>1.0.</> Flange items supplied to Saudi Aramco must be completely manufactured at the Precision Forging Plant in Saudi Arabia, forging, heat treated ,machined and tested. Note that <H>flange items must not be part manufactured elsewhere.</> <H>2.0.</> Mnufacturing limitations for Precision Forging ( see services to objects attachment):- i) Size 10 INCH AND BELOW ii) PRESSURE SIZE PRESSURE 2 INCH 2500 3 INCH 1500 4 INCH 1500 6 INCH 600 8 INCH 300 10 INCH 150 iii) API FLANGE API Class 2000 (limit is 7-1/16") API class 3000 (limit is 4-/16") API Class 5000 (limit is 3-1/8") Michael Eric Ward 14th November 2007
COMMENTS ENTERED BY ANGELA MfADDEN ON 09/22/08: RSA Tony Dibb conducted an on site evaluation of Maass Flange and recommeded the facility be approved to supply the following 9COMs: 600000101 6000000109 6000000114 *END********************************************************
Italy
South Africa
United Kingdom
Italy
Spain
Germany
Italy
Italy
Italy
France
South Korea
United States Of America
Saudi Arabia
India
United States Of America
FLANGE RANGE 1/2" THRU 14", CLASS 150 FLANGE RANGE 1/2" THRU 12", CLASS 300 FLANGE RANGE 1/2" THRU 10", CLASS 600 FLANGE RANGE 1/2" THRU 6", CLASS 1500 FLANGE RANGE 1/2" THRU 3", CLASS 2500 Maximum nps size up to 14"
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection Size:1/2 in. through 120 in. Rating: 150 lb through 2500 lb S. Saito 3/14/2005
reinstate from QSNA to QSAL, see attachment. Meshari Ghuryri 03/03/2009 ======================================================= <H><U>LIMITATIONS</></> <H>1.0.</> Flange items supplied to Saudi Aramco must be completely manufactured at the Precision Forging Plant in Saudi Arabia, forging, heat treated ,machined and tested. Note that <H>flange items must not be part manufactured elsewhere.</> <H>2.0.</> Mnufacturing limitations for Precision Forging ( see services to objects attachment):- i) Size 10 INCH AND BELOW ii) PRESSURE SIZE PRESSURE 2 INCH 2500 3 INCH 1500 4 INCH 1500 6 INCH 600 8 INCH 300 10 INCH 150 iii) API FLANGE API Class 2000 (limit is 7-1/16") API class 3000 (limit is 4-/16") API Class 5000 (limit is 3-1/8") Michael Eric Ward 14th November 2007
Chaudhry Hammer Works is approved with limitations. The limitation restricts the Chaudhry Hammer Works to flange items manufactured by Chaudhry Hammer Works. <H>Note that Chaudhry Hammer Works is not approved to supply Saudi Aramco with flange items procured from vendors. </>
Italy
India India South Africa
Italy
Spain Germany Italy
Italy
France
South Korea
United States Of America
Saudi Arabia
India
FLANGE RANGE 1/2" THRU 14", CLASS 150 FLANGE RANGE 1/2" THRU 12", CLASS 300 FLANGE RANGE 1/2" THRU 10", CLASS 600 FLANGE RANGE 1/2" THRU 6", CLASS 1500 FLANGE RANGE 1/2" THRU 3", CLASS 2500 Maximum nps size up to 14"
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection Size: 1/2 in. through 120 in. Rating: 150 lb through 2500 lb S.Saito 3/14/2005
Remarks entered by Angela McFadden on 10/28/05: At the request of CSD, 9COMs 6000000141 & 6000000104 have been added to the list of those 9COMS for which Dynamic Products is currently approved. ****END***************************************************
reinstate from QSNA to QSAL, see attachment. Meshari Ghuryri 03/03/2009 ======================================================= <H><U>LIMITATIONS</></> <H>1.0.</> Flange items supplied to Saudi Aramco must be completely manufactured at the Precision Forging Plant in Saudi Arabia, forging, heat treated ,machined and tested. Note that <H>flange items must not be part manufactured elsewhere.</> <H>2.0.</> Mnufacturing limitations for Precision Forging ( see services to objects attachment):- i) Size 10 INCH AND BELOW ii) PRESSURE SIZE PRESSURE 2 INCH 2500 3 INCH 1500 4 INCH 1500 6 INCH 600 8 INCH 300 10 INCH 150 iii) API FLANGE API Class 2000 (limit is 7-1/16") API class 3000 (limit is 4-/16") API Class 5000 (limit is 3-1/8") Michael Eric Ward 14th November 2007
Chaudhry Hammer Works is approved with limitations. The limitation restricts the Chaudhry Hammer Works to flange items manufactured by Chaudhry Hammer Works. <H>Note that Chaudhry Hammer Works is not approved to supply Saudi Aramco with flange items procured from vendors. </>
United States Of America
Italy
Italy
United States Of America
Italy
India
India
India
South Africa
Italy
Spain
Germany
Italy
Italy
Italy
France
South Korea
United States Of America
United Kingdom
Remarks entered by Angela McFadden on 10/28/05: At the request of CSD, 9COMs 6000000098 & 6000000104 have been added to the list of those 9COMS for which Galperti is currently approved. ****END***************************************************
FLANGE RANGE 1/2" THRU 14", CLASS 150 FLANGE RANGE 1/2" THRU 12", CLASS 300 FLANGE RANGE 1/2" THRU 10", CLASS 600 FLANGE RANGE 1/2" THRU 6", CLASS 1500 FLANGE RANGE 1/2" THRU 3", CLASS 2500 Maximum nps size up to 14"
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection Size:1/2 in. through 120 in. Rating: 150 lb through 2500 lb S.Saito 3/14/2005
Saudi Arabia
India
India
Italy
India
India
South Africa
Italy
Spain
Germany
Italy
Germany RF: 150 LBS-40", 300-24", 600-8" MAX.
Italy
Italy
France
reinstate from QSNA to QSAL, see attachment. Meshari Ghuryri 03/03/2009 ======================================================= <H><U>LIMITATIONS</></> <H>1.0.</> Flange items supplied to Saudi Aramco must be completely manufactured at the Precision Forging Plant in Saudi Arabia, forging, heat treated ,machined and tested. Note that <H>flange items must not be part manufactured elsewhere.</> <H>2.0.</> Mnufacturing limitations for Precision Forging ( see services to objects attachment):- i) Size 10 INCH AND BELOW ii) PRESSURE SIZE PRESSURE 2 INCH 2500 3 INCH 1500 4 INCH 1500 6 INCH 600 8 INCH 300 10 INCH 150 iii) API FLANGE API Class 2000 (limit is 7-1/16") API class 3000 (limit is 4-/16") API Class 5000 (limit is 3-1/8") Michael Eric Ward 14th November 2007
Chaudhry Hammer Works is approved with limitations. The limitation restricts the Chaudhry Hammer Works to flange items manufactured by Chaudhry Hammer Works. <H>Note that Chaudhry Hammer Works is not approved to supply Saudi Aramco with flange items procured from vendors. </>
FLANGE RANGE 1/2" THRU 14", CLASS 150 FLANGE RANGE 1/2" THRU 12", CLASS 300 FLANGE RANGE 1/2" THRU 10", CLASS 600 FLANGE RANGE 1/2" THRU 6", CLASS 1500 FLANGE RANGE 1/2" THRU 3", CLASS 2500 Maximum nps size up to 14"
South Korea
United States Of America
United Kingdom
Saudi Arabia
India
United States Of America
Italy
Italy
India
India
South Africa
Italy
Spain
Germany
Italy
Italy
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection Size:1/2 in. through 120 in. Rating: 150 lb through 2500 lb S. Saito 3/14/2005
reinstate from QSNA to QSAL, see attachment. Meshari Ghuryri 03/03/2009 ======================================================= <H><U>LIMITATIONS</></> <H>1.0.</> Flange items supplied to Saudi Aramco must be completely manufactured at the Precision Forging Plant in Saudi Arabia, forging, heat treated ,machined and tested. Note that <H>flange items must not be part manufactured elsewhere.</> <H>2.0.</> Mnufacturing limitations for Precision Forging ( see services to objects attachment):- i) Size 10 INCH AND BELOW ii) PRESSURE SIZE PRESSURE 2 INCH 2500 3 INCH 1500 4 INCH 1500 6 INCH 600 8 INCH 300 10 INCH 150 iii) API FLANGE API Class 2000 (limit is 7-1/16") API class 3000 (limit is 4-/16") API Class 5000 (limit is 3-1/8") Michael Eric Ward 14th November 2007
Chaudhry Hammer Works is approved with limitations. The limitation restricts the Chaudhry Hammer Works to flange items manufactured by Chaudhry Hammer Works. <H>Note that Chaudhry Hammer Works is not approved to supply Saudi Aramco with flange items procured from vendors. </>
Italy
France
South Korea
United States Of America
Saudi Arabia
India
United States Of America
Italy
Netherlands
Italy
Italy
Belgium
South Korea
South Korea
South Africa
United States Of America
FLANGE RANGE 1/2" THRU 14", CLASS 150 FLANGE RANGE 1/2" THRU 12", CLASS 300 FLANGE RANGE 1/2" THRU 10", CLASS 600 FLANGE RANGE 1/2" THRU 6", CLASS 1500 FLANGE RANGE 1/2" THRU 3", CLASS 2500 Maximum nps size up to 14"
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection Size:1/2 in. through 120 in. Rating: 150 lb through 2500 lb S.Saito 3/14/2005
reinstate from QSNA to QSAL, see attachment. Meshari Ghuryri 03/03/2009 ======================================================= <H><U>LIMITATIONS</></> <H>1.0.</> Flange items supplied to Saudi Aramco must be completely manufactured at the Precision Forging Plant in Saudi Arabia, forging, heat treated ,machined and tested. Note that <H>flange items must not be part manufactured elsewhere.</> <H>2.0.</> Mnufacturing limitations for Precision Forging ( see services to objects attachment):- i) Size 10 INCH AND BELOW ii) PRESSURE SIZE PRESSURE 2 INCH 2500 3 INCH 1500 4 INCH 1500 6 INCH 600 8 INCH 300 10 INCH 150 iii) API FLANGE API Class 2000 (limit is 7-1/16") API class 3000 (limit is 4-/16") API Class 5000 (limit is 3-1/8") Michael Eric Ward 14th November 2007
The limitation restricts the Chaudrhy Hammer Works to supplying flange items manufactured in their forge. Note that Chaudrhy Hammer Works is not approved to supply Saudi Aramco with flange items procured from vendors.
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Spain
China
India
India
India
Italy
Spain
Germany
Italy
Italy
South Korea
United States Of America
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection The link was created based on RVL Synchronization Initiative Alaa Abuemarah October 17, 2005
Remarks entered by Angela McFadden on 01/19/2005: In efforts to reconcile synchronization between SAP and SAES-L-101, it was requested that this 9COM be linked to plant ID 30001838. *************************END************************************
Saudi Arabia
India
India
United States Of America
Italy
Italy
United States Of America
Netherlands
Italy
Italy
Germany
South Korea
South Korea
South Africa
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
reinstate from QSNA to QSAL, see attachment. Meshari Ghuryri 03/03/2009 ================================================================ <H><U>LIMITATIONS</></> <H><U>1.0.</></> Flange items supplied to Saudi Aramco must be completely manufactured at the Precision Forging Plant in Saudi Arabia, forging, heat treated ,machined and tested. Note that flange items<H><U> must not be part manufactured elsewhere.</></> <H><U>2.0.</></> Mnufacturing limitations for Precision Forging ( see services to objects attachment):- i) Size 10 INCH AND BELOW ii) PRESSURE SIZE PRESSURE 2 INCH 2500 3 INCH 1500 4 INCH 1500 6 INCH 600 8 INCH 300 10 INCH 150 iii) API FLANGE API Class 2000 (limit is 7-1/16") API class 3000 (limit is 4-/16") API Class 5000 (limit is 3-1/8") Michael Eric Ward 14th November 2007
Chaudhry Hammer Works is approved with limitations. The limitation restricts the Chaudhry Hammer Works to flange items manufactured by Chaudhry Hammer Works. <H>Note that Chaudhry Hammer Works is not approved to supply Saudi Aramco with flange items procured from vendors. </>
COMMENTS ENTERED BY ANGELA MfADDEN ON 09/22/08: RSA Tony Dibb conducted an on site evaluation of Maass Flange and recommeded the facility be approved to supply the following 9COMs: 600000101 6000000109 6000000114 *END********************************************************
United States Of America
Spain
China
India
India
Italy
Spain
Germany
Italy
Italy
South Korea
United States Of America
Saudi Arabia
India
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection The link was created based on RVL Synchronization Initiative Alaa Abuemarah October 17, 2005
Remarks entered by Angela McFadden on 01/19/2005: In efforts to reconcile synchronization between SAP and SAES-L-101, it was requested that this 9COM be linked to plant ID 30001838. *************************END************************************
reinstate from QSNA to QSAL, see attachment. Meshari Ghuryri 03/03/2009 <H><U>=======================================================</></> <H><U>LIMITATIONS</></> <H>1.0.</> Flange items supplied to Saudi Aramco must be completely manufactured at the Precision Forging Plant in Saudi Arabia, forging, heat treated ,machined and tested. Note that <H>flange items must not be part manufactured elsewhere.</> <H>2.0.</> Mnufacturing limitations for Precision Forging ( see services to objects attachment):- i) Size 10 INCH AND BELOW ii) PRESSURE SIZE PRESSURE 2 INCH 2500 3 INCH 1500 4 INCH 1500 6 INCH 600 8 INCH 300 10 INCH 150 iii) API FLANGE API Class 2000 (limit is 7-1/16") API class 3000 (limit is 4-/16") API Class 5000 (limit is 3-1/8") Michael Eric Ward 14th November 2007
Chaudhry Hammer Works is approved with limitations. The limitation restricts the Chaudhry Hammer Works to flange items manufactured by Chaudhry Hammer Works. <H>Note that Chaudhry Hammer Works is not approved to supply Saudi Aramco with flange items procured from vendors. </>
United Kingdom
United States Of America
Italy
Italy
India
India
South Africa
Spain
Germany
Italy
Italy
South Korea
United States Of America
Saudi Arabia
India
FLANGE RANGE 1/2" THRU 14", CLASS 150 FLANGE RANGE 1/2" THRU 12", CLASS 300 FLANGE RANGE 1/2" THRU 10", CLASS 600 FLANGE RANGE 1/2" THRU 6", CLASS 1500 FLANGE RANGE 1/2" THRU 3", CLASS 2500 Maximum nps size up to 14" RSA Note: Remove the limitation. The maximum SW flange is 3 NPS as per ASME B16.5
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection Size: 1/2 in. through 120 in. Rating: 150 lb through 2500 lb S. Saito 3/14/2005
reinstate from QSNA to QSAL, see attachment. Meshari Ghuryri 03/03/2009 ======================================================= <H><U>LIMITATIONS</></> <H>1.0.</> Flange items supplied to Saudi Aramco must be completely manufactured at the Precision Forging Plant in Saudi Arabia, forging, heat treated ,machined and tested. Note that f<H>lange items must not be part manufactured elsewhere.</> <H>2.0.</> Mnufacturing limitations for Precision Forging ( see services to objects attachment):- i) Size 10 INCH AND BELOW ii) PRESSURE SIZE PRESSURE 2 INCH 2500 3 INCH 1500 4 INCH 1500 6 INCH 600 8 INCH 300 10 INCH 150 iii) API FLANGE API Class 2000 (limit is 7-1/16") API class 3000 (limit is 4-/16") API Class 5000 (limit is 3-1/8") Michael Eric Ward 14th November 2007
The limitation restricts the Chaudrhy Hammer Works to supplying flange items manufactured in their forge. Note that Chaudrhy Hammer Works is not approved to supply Saudi Aramco with flange items procured from vendors.
Italy
Italy
India
India
India
Italy
South Africa
United Kingdom
Italy
Spain
Germany
Italy
Italy
Italy
France
South Korea
Saudi Arabia
FLANGE RANGE 1/2" THRU 14", CLASS 150 FLANGE RANGE 1/2" THRU 12", CLASS 300 FLANGE RANGE 1/2" THRU 10", CLASS 600 FLANGE RANGE 1/2" THRU 6", CLASS 1500 FLANGE RANGE 1/2" THRU 3", CLASS 2500 Maximum nps size up to 14"
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection Size: 1/2 in. through 120 in. Rating: 150 lb through 2500 lb S. Saito 3/14/2005
reinstate from QSNA to QSAL, see attachment. Meshari Ghuryri 03/03/2009 ======================================================= <H><U>LIMITATIONS</></> <H>1.0.</> Flange items supplied to Saudi Aramco must be completely manufactured at the Precision Forging Plant in Saudi Arabia, forging, heat treated ,machined and tested. Note that f<H>lange items must not be part manufactured elsewhere.</> <H>2.0.</> Mnufacturing limitations for Precision Forging ( see services to objects attachment):- i) Size 10 INCH AND BELOW ii) PRESSURE SIZE PRESSURE 2 INCH 2500 3 INCH 1500 4 INCH 1500 6 INCH 600 8 INCH 300 10 INCH 150 iii) API FLANGE API Class 2000 (limit is 7-1/16") API class 3000 (limit is 4-/16") API Class 5000 (limit is 3-1/8") Michael Eric Ward 14th November 2007
India
United States Of America
India
Italy
Italy
United States Of America
India India Italy South Africa United Kingdom
Italy
Spain Germany Italy Italy
Italy
France Not for cement lined flanges : 9CAT : 1000027637 Romania Not for cement lined flanges : 9CAT 1000027637
South Korea
Chaudhry Hammer Works is approved with limitations. The limitation restricts the Chaudhry Hammer Works to flange items manufactured by Chaudhry Hammer Works. <H>Note that Chaudhry Hammer Works is not approved to supply Saudi Aramco with flange items procured from vendors. </>
COMMENTS ENTERED BY ANGELA MfADDEN ON 09/22/08: RSA Tony Dibb conducted an on site evaluation of Maass Flange and recommeded the facility be approved to supply the following 9COMs: 600000101 6000000109 6000000114 *END********************************************************
FLANGE RANGE 1/2" THRU 14", CLASS 150 FLANGE RANGE 1/2" THRU 12", CLASS 300 FLANGE RANGE 1/2" THRU 10", CLASS 600 FLANGE RANGE 1/2" THRU 6", CLASS 1500 FLANGE RANGE 1/2" THRU 3", CLASS 2500 Maximum nps size up to 14"
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection Size: 1/2 in. through 120 in. Rating: 150 lb through 2500 lb S. Saito 3/14/2005
Saudi Arabia
India
United Kingdom
United States Of America
Italy
Germany
South Korea
United States Of America
Italy FROM 1/8" THRU 4". France Italy Netherlands United States Of America United States Of America United Kingdom United Kingdom
United States Of America
Italy United States Of America United States Of America Taiwan
reinstate from QSNA to QSAL, see attachment. Meshari Ghuryri 03/03/2009 ======================================================= <H><U>LIMITATIONS</></> <H>1.0.</> Flange items supplied to Saudi Aramco must be completely manufactured at the Precision Forging Plant in Saudi Arabia, forging, heat treated ,machined and tested. Note that <H>flange items must not be part manufactured elsewhere.</> <H>2.0.</> Mnufacturing limitations for Precision Forging ( see services to objects attachment):- i) Size 10 INCH AND BELOW ii) PRESSURE SIZE PRESSURE 2 INCH 2500 3 INCH 1500 4 INCH 1500 6 INCH 600 8 INCH 300 10 INCH 150 iii) API FLANGE API Class 2000 (limit is 7-1/16") API class 3000 (limit is 4-/16") API Class 5000 (limit is 3-1/8") Michael Eric Ward 14th November 2007
The limitation restricts the Chaudrhy Hammer Works to supplying flange items manufactured in their forge. Note that Chaudrhy Hammer Works is not approved to supply Saudi Aramco with flange items procured from vendors.
Limitation : forged material shall be sourced from reliable forging facilities and they must identify the source for every order.
After all the AOCT investigation with the vendor, it was clarified that the defect flanges supplied years ago are imitation and not Korea Flange products. RSA Mr. Muslim also agreed on and emphasized the follow up with the local stockist. The hold status is removed. AOCT Inspection 10/10/2007 RSA requested Korea Flanges Co. (ID#30001378) on hold for all their currently approved commodities. A recently issued failure investigation report showed that they have supplied off-spec 316 SS flanges (the detailed report is attached). 6/29/2007 AOCT Inspection Size: 1/2 in. through 120 in. Rating: 150 lb through 2500 lb S. Saito 3/14/2005
Comments entered by Angela McFadden on 04/25/05: Plant temporary approval has expired. Plant is now QSNA. ***********************END*********************
South Korea
United Kingdom
Italy
Spain
Saudi Arabia
Saudi Arabia
Saudi Arabia
Germany
Italy
Italy
Italy
Romania
United States Of America
Italy
Austria
Italy
Italy
Italy
South Korea
South Korea
Limitation removed. Vendor has indicated that his welding qualification thickness includes 75 mm for the g dimension of a welded spect plate. This implies that all spectacles as per AD-036736 can be produced by this plant without any limitation.
<U>LIMITATION</> <H>Inma Management must provide manufacturing plans, prior to Saudi Aramco order placement, clearly indicating that spectacle plate manufacture will not compete with pressure vessel manufacture for resources.</> <H><U>NOTE ADDED 1st JULY 2008</></> <H>See the services to objects attachment indicating that he Pipe RSA agreed to maintain approval of this nine com as recommended by inspection lot 107000051317</> <H>Michael ERic Ward</> <H>1st July 2008</>
Please confirm closure of the corrective actions before proceeding with the approval. Regards, Husain Al-Muslim
Remarks Entered 10/24/2002 by Y.F. Dawkins: This material was approved on Insp. Lot #107000000404. ASC had previously been requested to de-link this material to bring SAP in line with the RVL. Update to SAES-L-101 has not been posted to include this vendor for 9COM 6000000124. Since product approval is subsequent to request, plant is again being approved for this material. END OF REMARKS Removed the Qinfo record in SAP to bring in line with RVL. I concur with VID recommendation to continue the approval of Crance Mfg (ID#30001575) Regards, Husain Al-Muslim
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
United Kingdom
Italy FROM 3/8" THRU 4".
Austria 1/2" THROUGH 12".
Germany
Italy
Japan
Japan
Japan
Thailand
Japan
Japan
United States Of America
United States Of America
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
United States Of America
United States Of America
United States Of America
Canada
United Kingdom
Italy Max OD 60"
Italy
Thailand
Italy
Thailand
South Korea
Austria
Please refer to the attachments of Plant Evaluation IL 107000002200 for details about RSA concurrence. (By Humoaa0b on 01/07/03)
8. diameter and SCH 160 and up only made at Russellville, AR (JAV - 03/31/2003)
As per the RSA's request, as the result of technical survey by RSA Mr. Abdulkarim, Basel A in 2007, it's recommended to be approved as QSAL (with limitation) as below. All the corrective actions were completed and verified by AOCT auditor Mr. Narita. 6000000091 ELBOW; PIPE; CARBON STEEL; 02-SAMSS-005; Limitation: 24# 6000000126 REDUCER; PIPE; BW; All SIZES; ALLOY STEEL; Limitation: 16# x 14# 6000000127 REDUCER; PIPE; BUTTWELD; ALL SIZES; Limitation: 24# x 20# 6000000145 TEE; PIPE; BW; ALLOY STEEL Limitation: 16# 6000000146 TEE; PIPE; BW; CARBON STEEL Limitation: 16# AOCT Inspection (5-12-08)
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
United States Of America
United States Of America
United States Of America
United States Of America
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
This commodity is for wrought reducer not fabriated one. Therefore, approval of SAFAMI will be discontinued. Regards, Husain Al-Muslim
Please refer to the attachments of Plant Evaluation IL 107000002200 for details about RSA concurrence. (By Humoaa0b on 01/07/03)
8. diameter and SCH 160 and up only made at Russellville, AR (JAV - 03/31/2003)
Remarks entered 06/18/2002 by Y.F. Dawkins: This Q-Info record was marked for deletion at the request of the MC02 RSA to bring SAP in line with the RVL for SAES-L-101. END OF REMARKS Request #1371 to add materials for Material 6000000078 (Cap, Pipe), 6000000127 (Reducer; Pipe; BW; Carbon Steel) and 6000000128 (Reducer; Pipe; BW; Low Temp Steel) was initiated during 2002. The materials from this request are being added to this request and will be evaluated with upcoming evaluation scheduled for April 2003 L. Nuru 03/27/2003.
United States Of America
Canada
Italy
Italy
Thailand
United Kingdom
Italy
United States Of America
Thailand
South Korea
Austria
Italy
Italy
Italy
South Korea
South Korea
United Kingdom
Italy FROM 3/8" THRU 4".
Austria 1/2" THROUGH 12".
Remarks entered 06/18/2002 by Y.F. Dawkins: This Q-Info record was marked for deletion at the request of the MC02 RSA to bring SAP in line with the RVL for SAES-L-101. END OF REMARKS Request #1371 to add materials for Material 6000000078 (Cap, Pipe), 6000000127 (Reducer; Pipe; BW; Carbon Steel) and 6000000128 (Reducer; Pipe; BW; Low Temp Steel) was initiated during 2002. The materials from this request are being added to this request and will be evaluated with upcoming evaluation scheduled for April 2003 L. Nuru 03/27/2003.
As per the RSA's request, as the result of technical survey by RSA Mr. Abdulkarim, Basel A in 2007, it's recommended to be approved as QSAL (with limitation) as below. All the corrective actions were completed and verified by AOCT auditor Mr. Narita. 6000000091 ELBOW; PIPE; CARBON STEEL; 02-SAMSS-005; Limitation: 24# 6000000126 REDUCER; PIPE; BW; All SIZES; ALLOY STEEL; Limitation: 16# x 14# 6000000127 REDUCER; PIPE; BUTTWELD; ALL SIZES; Limitation: 24# x 20# 6000000145 TEE; PIPE; BW; ALLOY STEEL Limitation: 16# 6000000146 TEE; PIPE; BW; CARBON STEEL Limitation: 16# AOCT Inspection (5-12-08)
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
France
Germany
Italy
Japan
Japan
Thailand
Japan
Japan
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
United States Of America
United States Of America
United States Of America
Canada
Italy
Italy
Italy
South Korea
Italy FROM 3/8" THRU 4".
France
Italy
Japan
United States Of America
Italy
MATERIAL: A234 GR. WPB ONLY. SIZE: REDUCERS, ANSI B16.9, SEAMLESS, CONCENTRIC IN STANDARD WEIGHT AND EXTRA STRONG FROM 3/4" X 1/2" - 24" X 20" AND ECCENTRIC IN STANDARD WEIGHT FROM 3/4" X 1/2" - 20" X 16" AND EXTRA STRONG FROM 3/4" X 1/2" - 16" X 14".
Please refer to the attachments of Plant Evaluation IL 107000002200 for details about RSA concurrence. (By Humoaa0b on 01/07/03)
Remarks entered 06/18/2002 by Y.F. Dawkins: This Q-Info record was marked for deletion at the request of the MC02 RSA to bring SAP in line with the RVL for SAES-L-101. END OF REMARKS Request #1371 to add materials for Material 6000000078 (Cap, Pipe), 6000000127 (Reducer; Pipe; BW; Carbon Steel) and 6000000128 (Reducer; Pipe; BW; Low Temp Steel) was initiated during 2002. The materials from this request are being added to this request and will be evaluated with upcoming evaluation scheduled for April 2003 L. Nuru 03/27/2003.
United States Of America
Italy
Taiwan
South Korea
Italy
United States Of America
United States Of America
Italy
United States Of America
United States Of America
United Kingdom
Italy
Netherlands
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
France
United States Of America
United States Of America
Italy
Comments entered by Angela McFadden on 04/25/05: Plant temporary approval has expired. Plant is now QSNA. ***********************END*********************
Remarks entered by A. McFadden on 9/14/04: This plant no longer manufactures 9 com 6000000130. ****************************************************
Comments entered by Angela Mcfadden on 1/9/09: Due to concerns noted during plant assessments conducted in 2004 and 2006, visual inspection should be conducted on all purchase order placements at SWECO. **********************END**********************************
<H>NOTE ADDED 3rd MAY 2004.</> CORRECTIVE ACTIONS CLOSED OUT DURING SITE VISIT. M. E. WARD
<U>LIMITATION</> <H>Inma Management must provide manufacturing plans, prior to Saudi Aramco order placement, clearly indicating that sleeve manufacture will not compete with pressure vessel manufacture for resources.</> <H><U>NOTE ADDED 1st JULY 2008</></> See the services to objects attachment indicating that he Pipe RSA agreed to maintain approval of this nine com as recommended by inspection lot 107000051317 Michael ERic Ward 1st July 2008
Please confirm closure of the corrective actions before proceeding with the approval. Regards, Husain Al-Muslim
Comments entered by Angela Mcfadden on 1/9/09: Due to concerns noted during plant assessments conducted in 2004 and 2006, visual inspection should be conducted on all purchase order placements at SWECO. **********************END**********************************
United States Of America
United States Of America
Italy
Saudi Arabia
Saudi Arabia
France
United States Of America
United States Of America
United Kingdom
Italy
United Kingdom
Italy
Spain
Germany
Italy
Italy
Italy
France
United States Of America
United States Of America
France
Italy
South Korea Germany Japan United States Of America United States Of America Italy South Korea
<U>LIMITATION</> <H>Inma Management must provide manufacturing plans, prior to Saudi Aramco order placement, clearly indicating that sleeve manufacture will not compete with pressure vessel manufacture for resources.</> <H><U>NOTE ADDED 1st JULY 2008</></> See the services to objects attachment indicating that he Pipe RSA agreed to maintain approval of this nine com as recommended by inspection lot 107000051317 Michael ERic Ward 1st July 2008
Comments entered by Angela Mcfadden on 1/9/09: Due to concerns noted during plant assessments conducted in 2004 and 2006, visual inspection should be conducted on all purchase order placements at SWECO. **********************END**********************************
Germany
United States Of America
Italy United States Of America South Korea Germany United States Of America United States Of America Italy
Italy
Italy
Italy
South Korea
South Korea United Kingdom Italy FROM 1/8" THRU 6".
Austria 1/4" THROUGH 12".
Germany Germany Italy
Japan
Japan Japan Japan United States Of America United States Of America United States Of America
United States Of America
United States Of America United States Of America Canada United Kingdom Italy
Remarks entered by Angela McFadden on 10/28/05: At the request of CSD, 9COMs 6000000141 & 6000000104 have been added to the list of those 9COMS for which Dynamic Products is currently approved. ****END***************************************************
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
Please refer to the attachments of Plant Evaluation IL 107000002200 for details about RSA concurrence. (By Humoaa0b on 01/07/03)
12. diameter and 1. wall thickness and up only made at Russellville, AR (JAV - 03/31/2003)
Thailand
United Kingdom Italy
Thailand
South Korea
Italy
Italy
Italy
South Korea
South Korea United Kingdom Italy FROM 1/8" THRU 6".
United Kingdom LIMITED TO KHUFF GAS FORGED FITTINGS ONLY (UP TO 10.000 PSI).
Japan
Japan Thailand
Japan
Japan United States Of America United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619) United States Of America United States Of America
United States Of America
United States Of America United States Of America Canada Italy
As per the RSA's request, as the result of technical survey by RSA Mr. Abdulkarim, Basel A in 2007, it's recommended to be approved as QSAL (with limitation) as below. All the corrective actions were completed and verified by AOCT auditor Mr. Narita. 6000000091 ELBOW; PIPE; CARBON STEEL; 02-SAMSS-005; Limitation: 24# 6000000126 REDUCER; PIPE; BW; All SIZES; ALLOY STEEL; Limitation: 16# x 14# 6000000127 REDUCER; PIPE; BUTTWELD; ALL SIZES; Limitation: 24# x 20# 6000000145 TEE; PIPE; BW; ALLOY STEEL Limitation: 16# 6000000146 TEE; PIPE; BW; CARBON STEEL Limitation: 16# AOCT Inspection (5-12-08)
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
Please refer to the attachments of Plant Evaluation IL 107000002200 for details about RSA concurrence. (By Humoaa0b on 01/07/03)
Note: Existing QM sys. was changed to .Quality system NOT-APPROVED. to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
12.diameter and 1. wall thickness and up only made at Russellville, AR (JAV-03/31/2003)
Thailand
United Kingdom Italy United States Of America
Thailand
South Korea
Italy
Italy
Italy
South Korea
South Korea United Kingdom Italy FROM 1/8" THRU 6".
Austria 1/4" THROUGH 12".
Germany Germany Italy
Japan
Japan Thailand Japan United States Of America United States Of America United States Of America
United States Of America
United States Of America United States Of America Canada Italy United Kingdom Italy
South Korea
As per the RSA's request, as the result of technical survey by RSA Mr. Abdulkarim, Basel A in 2007, it's recommended to be approved as QSAL (with limitation) as below. All the corrective actions were completed and verified by AOCT auditor Mr. Narita. 6000000091 ELBOW; PIPE; CARBON STEEL; 02-SAMSS-005; Limitation: 24# 6000000126 REDUCER; PIPE; BW; All SIZES; ALLOY STEEL; Limitation: 16# x 14# 6000000127 REDUCER; PIPE; BUTTWELD; ALL SIZES; Limitation: 24# x 20# 6000000145 TEE; PIPE; BW; ALLOY STEEL Limitation: 16# 6000000146 TEE; PIPE; BW; CARBON STEEL Limitation: 16# AOCT Inspection (5-12-08)
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007
Please refer to the attachments of Plant Evaluation IL 107000002200 for details about RSA concurrence. (By Humoaa0b on 01/07/03)
12. diameter and 1. wall thickness and up only made at Russellville, AR (JAV-03/31/2003)
South Korea
South Korea
Italy FROM 1/8" THRU 6".
France
Spain
Italy
Japan
United States Of America
United States Of America
United States Of America
United Kingdom
Italy
Italy
South Korea
South Korea
Italy FROM 1/8" THRU 6".
France
Spain
Italy
Japan
United States Of America
United States Of America
United States Of America
United States Of America
Italy
Italy
Taiwan
South Korea
United States Of America
As a result of the Follow-up Assessment conducted by AOC Tokyo on August 22 & 23, 2007, manufacturing plant (ID 30000102) is ON-HOLD through IL 107000035627. The effectiveness of corrective actions will be verified in April 2008. AOCT Inspection Oct 2007 Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
United States Of America
Italy
Belgium
Germany
Japan
United States Of America
United States Of America
Italy
South Korea
Italy FROM 1/8" THRU 6".
France
Spain
Italy
Japan
United States Of America
United States Of America
United States Of America
Italy
Italy
South Korea
Italy
Italy
Italy
Netherlands
United States Of America
United States Of America
South Korea
Saudi Arabia Saudi Arabia
Saudi Arabia
Saudi Arabia
LIMITED TO FABRICATION ONLY I concur with VID recommendation to put Inma (ID#30000554) on hold for the following 9coms: 6000000016/6000000024/6000000025/6000000124/6000000135/6000000136/600000 0160 Regards, Husain Al-Muslim
Saudi Arabia
Saudi Arabia
Japan
United States Of America
Saudi Arabia Saudi Arabia
Italy
Italy
United Kingdom
United States Of America
United Kingdom
United States Of America
Italy
NOTE ADDED BY M. E. WARD 29th MARCH 2004. <H><U>LIMITATIONS.</></> <H>LIMITATIONS RELATE TO INSPECTION LOT 107000022714 </> The new SAFAMI cement lining facility was assessed for the manufacture of cement lined fittings and the assessment team considered that SAFAMI lacked the experience and infrastructure to effectively demonstrate the cement lining process. The assessment team recommended that SAFAMI should not be approved (all parties concurred) as a manufacturing plant for the cement lining process. SAFAMI remain approved with limitations for material 6000000160 and the limitation <H><U>requires SAFAMI to subcontract the cement lining process to Saudi Aramco approved cement lining sub-vendors.</></> Note SAFAMI must not cement line fittings for Saudi Aramco in the new SAFAMI cement lining facility until the SAFAMI cement lining facility is approved by Saudi Aramco. M. E. Ward 29th March 2004.
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
Comments entered by Angela McFadden on 1/9/09: Due to the lack of a documented quality program, full inspection should be performed on all purchase orders placed with Cement Lining Company. ***END*************************************** Remarks entered 12/9/2003 by Linda Stowell: Limitation: Due to the lack of a documented quality program, full inspection should be performed on all purchase orders placed with Cement Lining Company (J.S. Whitenton 10/16/2003) Technical review and plant survey, as needed, is required prior to plant approval.
Remarks entered by Angela McFadden on 02/02/2005: In efforts to synchronize SAP and SAES-L-101, it was requested that this plant be reactivated and linked to 9COM's 6000000072 & 6000000189. A full evaluation will be performed by ASC's Quality Systems Unit later this year. ********************END********************************** The temporary approval has been removed and the plant is now QSNA (Linda Stowell - 05/14/2003) Remarks entered by Linda Stowell - 2/26/2003 This plant facility has been temporarily approved for a one-time basis (for 9COM 6000000189) to allow the PMT proponent to place an urgent order. QSU will perform an assessment of the facility in conjunction with the inspection of the order. Quality Coordinator is Julio Valdespino RSA is Muhsen Sannaa
Italy
United States Of America
United States Of America
United States Of America
United Kingdom
Italy
Italy
Italy
Taiwan
South Korea
Germany
United Kingdom
United Kingdom
Japan
United States Of America United States Of America United States Of America United States Of America Belgium Mexico
United States Of America
United States Of America
United States Of America
United States Of America
Germany
United Kingdom
Japan
United States Of America
United States Of America
United States Of America
United States Of America
Belgium
Mexico
Germany
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
The ferment linkage was activated based on synchronization task see the attached email Alaa Abuemarah; November 24, 2005
United Kingdom
Japan
United States Of America
United States Of America
United States Of America
United States Of America
Belgium
Mexico
India
India
Saudi Arabia
Utd.Arab Emir.
Italy
Germany
Germany
The ferment linkage was activated based on synchronization task see the attached email Alaa Abuemarah; Nov 24, 2005
Remarks Entered 10/24/2002 by Y.F. Dawkins: This material has been made QSNA by the RSA on Inspection Lot #107000000404. Therefore this Q-Info record is being marked for deletion. END OF REMARKS
India
Italy
Germany
Italy
Japan
Japan
Japan
United States Of America
United States Of America
Canada
- Released the hold status as per the request by RSA Mr. Akroosh, changed back to QSAA. Please see the attached correspondence. AOCT Inspection Sep 30, 2008 From: Akroosh, Fahad A Sent: Monday, September 29, 2008 9:54 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: RE: Audco status Dear Miho This is to kindly request you to remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98
LIMITED TO MAX 1" IN CLASS 2500, MAX. 2" IN CLASS 900, MAX. 3" IN CLASS 600.
Remarks entered by Linda Stowell on 2/11/2004: All order require inspection until findings are closed.
Canada
United States Of America
Japan
Italy
India
Saudi Arabia
United States Of America
Spain
South Korea
United Kingdom
Utd.Arab Emir.
Saudi Arabia
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
India
Saudi Arabia
Spain
South Korea
Comments entered by Angela McFadden on 02/14/06: Recommended for continued approval with Corrective action. Revise all 9COMs to QSAL, Visual inspection required until implementation of satisfactory corrective action. The On site evaluation performed by has successfully identified the root cause of most significant events. Corrective Action has been issued against this plant. All orders are being visually inspected until Velan provides a satisfactory response. *******************END*********************************
<H><U>NOTE ADDED APRIL 24th 2007</></> Corrective actions closed during on site visit on 24th April 2007. Michael Eric Ward 24th April 2007
Remarks entered by A McFadden on 10/20/2004: Recommendation: Recommendation is for approval of 9COMs 6000000239 & 6000000246) with limitations as noted in this report. Limitations Initial orders for valves intended for use in sour Service (NACE MR 01 75) will require inspection to include witness of hardness testing, until the effectiveness and implementation of Conbraco's hardness test program can be verified. ASC CL 04 Inspector/ Assessor - Julio Valdespino 10/5/2004
2-12 inch class 150 and 300, the only approved source for casting is ETC which belong to the same group.
Remarks entered by Linda Stowell on 2/11/2004: All order require inspection until findings are closed.
Comments entered by Angela McFadden on 6/25/09: Limitation on 9COM 6-240 and 6-246 to exclude Series 7000-M3/ 8000-M3 and Series 7200-M3/ 8200-M3 ¼" - 4" in all available working pressures. ****END*************************************
<H><U>NOTE ADDED APRIL 24th 2007</></> Corrective actions closed during on site visit on 24th April 2007. Michael Eric Ward 24th April 2007
Italy
United States Of America
Italy
Germany
Italy
Italy
Italy
Germany
Italy
United States Of America
Japan
Italy
Italy
Germany
Italy
United States Of America
Japan
Italy
Italy
India
India
Germany
Italy
Italy
Germany LIMITED TO MAX. 16" IN CLASS 1500, MAX. 12" IN CLASS 2500.
Italy
Italy
France
Italy
United States Of America
CLASS 150 - 600: 2" - 48" CLASS 900 : 2" - 36" CLASS 1,500 : 2" - 30" CLASS 2,500 : 2" - 24"
United States Of America
Italy
Italy
India
Italy
Italy
South Korea
Netherlands
United States Of America
Italy
Netherlands
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Saudi Arabia
Comments entered by Angela McFadden on 01/09/2005: Per the request of the RSA (F. Akroosh)PBV is approved with the below limitation for both 6000000244 and 6000000250 Contractors and Aramco purchasing can place order with PBV for size range 2" up to 20".pressure rating of class 150, 300 and 600. **********END******************************************* These limitations will be maintained until We get satisfied with PBV products PBV gets acquainted with Aramco specification PBV enhance their customer reference list and include major customer worldwide PBV gets good performance rating with Aramco inspection
Remarks entered 2/12/2004 by Linda Stowell: Limitations: CCV Orbit must supply Certificate of compliance that all castings comply with MSS SP 55. (JAV - 5/9/2003)
United Kingdom 1 INCH MAX; 10,000 PSI MAX.
Germany
Germany
Italy
Japan ANSI 600:1/4"-2". Any, Socket Weld/Threaded.
Japan
United States Of America
United States Of America
United States Of America
Canada
Canada
United States Of America
United States Of America
Japan
Italy
India
Italy
Saudi Arabia
United States Of America
South Korea
South Korea
LIMITED TO MAX. 1" IN CLASS 2500, MAX. 2" IN CLASS 900, MAX. 3" IN CLASS 600.
Remarks entered by Linda Stowell on 2/11/2004: All order require inspection until findings are closed.
Comments entered by Angela McFadden on 02/14/06: Recommended for continued approval with Corrective action. Revise all 9COMs to QSAL, Visual inspection required until implementation of satisfactory corrective action. The On site evaluation performed by has successfully identified the root cause of most significant events. Corrective Action has been issued against this plant. All orders are being visually inspected until Velan provides a satisfactory response. *******************END*********************************
Comments entered by Angela McFadden on 6/25/09: Limitation on 9COM 6-240 and 6-246 to exclude Series 7000-M3/ 8000-M3 and Series 7200-M3/ 8200-M3 ¼" - 4" in all available working pressures. ****END*************************************
<H><U>NOTE ADDED APRIL 24th 2007</></> Corrective actions closed during on site visit on 24th April 2007. Michael Eric Ward 24th April 2007
Remarks entered by A McFadden on 10/20/2004: Recommendation: Recommendation is for approval of 9COMs 6000000239 & 6000000246) with limitations as noted in this report. Limitations Initial orders for valves intended for use in sour Service (NACE MR 01 75) will require inspection to include witness of hardness testing, until the effectiveness and implementation of Conbraco's hardness test program can be verified. ASC CL 04 Inspector/ Assessor - Julio Valdespino 10/5/2004
Germany
Italy
Italy INCLUDING TK PRODUCT.
Italy
Italy MAX 5000 PSI, MAX. 13 5/8".
France
Italy
United States Of America
Italy
Italy
Italy
Italy
United States Of America
Germany
Italy
United Kingdom
Italy INCLUDING TK PRODUCT.
Italy SIZE LIMITATION: 56". Size limitation; 56"
Spain
Italy CLASS 150 - 600: 26"-48" CLASS 900 : 26"-36" CLASS 1,500 : 26"-30"
France
Italy
Japan ANSI 150 & 300:26"-36".
Japan
Japan
United States Of America
United States Of America
Japan
Italy
Italy
CL150 THRU 600, MAX 48"; CL900, MAX 42"; CL1500 MAX 30", 8" MIN.
Remarks entered 11/11/2001 by Y. Dawkins: Ball valves to CCC 040020 are acceptable only from the Oklahoma plant. It should be noted that some valves of this type are supplied from a KF facility in Italy. Buyer should check for appropriate plant of manufacture prior to placement. END OF REMARKS
Italy
Italy
Italy
India
India
United States Of America
India
Germany
Italy
United Kingdom CL2500, MAX 20", 8" MINIMUM SIZE.
India
Italy INCLUDING TK PRODUCT.
Germany LIMITED TO MAX. 16" IN CLASS 1500 AND MAX. 12" IN CLASS 2500.
Italy
- Released the hold status as per the request by RSA Mr. Akroosh, changed back to QSAA. Please see the attached correspondence. AOCT Inspection Sep 30, 2008 From: Akroosh, Fahad A Sent: Monday, September 29, 2008 9:54 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: RE: Audco status Dear Miho This is to kindly request you to remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98
Spain
Italy CLASS 150 - 2,500: 2"-24"
France
Italy
Japan ANSI 150 & 300:2"-24".
Japan
Japan
United States Of America
United States Of America
United States Of America
Japan
Italy
Czech Republic
Italy
India
Italy
Saudi Arabia
Spain Maximum size 20", 600 #
Italy
Italy
Italy
Comments entered by Angela McFadden on 01/09/2005: Per the request of the RSA (F. Akroosh)PBV is approved with the below limitation for both 6000000244 and 6000000250 Contractors and Aramco purchasing can place order with PBV for size range 2" up to 20".pressure rating of class 150, 300 and 600. *END*************************************************** Comments entered by Angela McFadden on 05/17/2005: Per the request of the RSA, this plant is temporarily approved in order for Purchasing to place an order. See emails attached to plant record. ***********************END************************************ PBV will approved with the below limitation for both 6000000244 and 6000000250 Contractors and Aramco purchasing can place order with PBV for size range 2" up to 18".presure rating of class 150, 300 and 600. These limitations will be maintained until We get satisfied with PBV products PBV gets acquainted with Aramco specification PBV enhance their customer reference list and include major customer worldwide
Ball valve material (6~250) is approved with limitation from 2" to 12" and from 150 class to 600 class
South Korea
Italy
India
Italy
Italy
South Korea
Spain
United States Of America
Germany
Italy
Italy
Italy
Spain
Italy CLASS 900 : 26"-36" CLASS 1,500 : 26"-30"
France
Italy
Italy
Italy
Germany
Singapore
Italy
Italy
Germany
Italy
Spain
Italy CLASS 900 - 2,500: 3"-24"
France
Italy
United States Of America
Japan
AS per RSA Mr. Akroosh's concurrence, the limitation for 9COM 6000000250 has been changed to "Ball Valves 24# and smaller in pressure rating 600 and lower". Please see the attached e-mail as back up info. AOCT Inspection 8/22/2007 6000000250 QSAL (SIZES 2-24#- CLASS 150 AND 300 ONLY.) RSA Fahad Al-Akroosh 3/31/2007
Ball Valve is approved with limitation "small sizes only 2-10" class 600".
Remarks entered by Linda Stowell on 2/11/2004: All order require inspection until findings are closed.
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02)
Hold removed as per the RSA (Fahad Akroosh). See details under the Services for object. Afaq 11/20/02 LIMITED TO MAX. 12" IN CLASS 600, MAX. 10" IN CLASS 900, MAX. 8" IN CLASS 1500, MAX. 6" IN CLASS 2500.
Italy
Italy
South Korea
Germany
Germany LIMITED TO MAX. 12" IN CLASS 600, MAX. 8" IN CLASS 900.
France
Netherlands
France
Italy
Italy
United States Of America
South Korea
United States Of America
South Korea
Germany
Germany
France
Italy
Italy
United Kingdom
India
South Korea
United Kingdom
United Kingdom
United Kingdom
As per RSA Mr. Akroosh's request, the QM status(QSOH) has been removed and changed it to QSAC. if October visit by AOCT RIE is not satisfactory then the status can be changed again to QSOH. (Pls refer to the attached the e-mail by RSA : Services for object) AOCT Inspection 9-8-08 As per the result of follow up assessment to Advance Valve in 2008 by AOCT, the corrective actions were requested to the vendor. As per the RSA Mr. Akroosh's request, the QM status has been ON HOLD until all the actions will be verified. AOCT Inspection May 2008 Limitation requires the welding procedures and NDE procedures to be approved by Saudi Aramco before starting Saudi Aramco contracts involving welding and NDE. <H>Michael Eric Ward</> <H>3rd October 2005</>
South Korea
Saudi Arabia
Saudi Arabia
India
Germany
Netherlands
Germany
France
Italy
United States Of America
United States Of America
India
South Korea
United States Of America
South Korea
Netherlands
Spain 125#, 28" THRU 96" AND 150#, 28" THRU 56".
Italy
United States Of America
United States Of America
South Korea
Netherlands
Italy
United States Of America
United States Of America
As per RSA Mr. Akroosh's request, the QM status(QSOH) has been removed and changed it to QSAC. if October visit by AOCT RIE is not satisfactory then the status can be changed again to QSOH. (Pls refer to the attached the e-mail by RSA : Services for object) AOCT Inspection 9-8-08 As per the result of follow up assessment to Advance Valve in 2008 by AOCT, the corrective actions were requested to the vendor. As per the RSA Mr. Akroosh's request, the QM status has been ON HOLD until all the actions will be verified. AOCT Inspection May 2008 Limitation requires the welding procedures and NDE procedures to be approved by Saudi Aramco before starting Saudi Aramco contracts involving welding and NDE. <H>Michael Eric Ward</> <H>3rd October 2005</>
India
South Korea
United States Of America
South Korea
Italy
Italy
Spain
Italy
Italy
Japan
Japan
Japan
United States Of America
Canada
United States Of America
Czech Republic
South Korea
South Korea
Italy
Italy
Spain
Italy
As per RSA Mr. Akroosh's request, the QM status(QSOH) has been removed and changed it to QSAC. if October visit by AOCT RIE is not satisfactory then the status can be changed again to QSOH. (Pls refer to the attached the e-mail by RSA : Services for object) AOCT Inspection 9-8-08 As per the result of follow up assessment to Advance Valve in 2008 by AOCT, the corrective actions were requested to the vendor. As per the RSA Mr. Akroosh's request, the QM status has been ON HOLD until all the actions will be verified. AOCT Inspection May 2008 Limitation requires the welding procedures and NDE procedures to be approved by Saudi Aramco before starting Saudi Aramco contracts involving welding and NDE. <H>Michael Eric Ward</> <H>3rd October 2005</>
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 02/27/02)
South Korea Forged: 1/4 - 2 In., ,,150-4500 Ib. Casting:,,1 1/2 - 36 In.,,,150-2500 Ib
Saudi Arabia
United Kingdom
South Korea
United Kingdom
Italy
United Kingdom
Canada
United States Of America
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 02/27/02)
<H><U>NOTE ADDED APRIL 24th 2007</></> Corrective actions closed during on site visit on 24th April 2007. Michael Eric Ward 24th April 2007
India
United Kingdom
Germany
Spain
United Kingdom
United States Of America
India
South Korea
Germany
Canada
United Kingdom
Italy
Germany
Spain
United Kingdom
United States Of America
As per RSA Mr. Akroosh's request, the QM status(QSOH) has been removed and changed it to QSAC. if October visit by AOCT RIE is not satisfactory then the status can be changed again to QSOH. (Pls refer to the attached the e-mail by RSA : Services for object) AOCT Inspection 9-8-08 As per the result of follow up assessment to Advance Valve in 2008 by AOCT, the corrective actions were requested to the vendor. As per the RSA Mr. Akroosh's request, the QM status has been ON HOLD until all the actions will be verified. AOCT Inspection May 2008 Limitation requires the welding procedures and NDE procedures to be approved by Saudi Aramco before starting Saudi Aramco contracts involving welding and NDE. <H>Michael Eric Ward</> <H>3rd October 2005</>
As per RSA Mr. Akroosh's request, the QM status(QSOH) has been removed and changed it to QSAC. if October visit by AOCT RIE is not satisfactory then the status can be changed again to QSOH. (Pls refer to the attached the e-mail by RSA : Services for object) AOCT Inspection 9-8-08 As per the result of follow up assessment to Advance Valve in 2008 by AOCT, the corrective actions were requested to the vendor. As per the RSA Mr. Akroosh's request, the QM status has been ON HOLD until all the actions will be verified. AOCT Inspection May 2008 Limitation requires the welding procedures and NDE procedures to be approved by Saudi Aramco before starting Saudi Aramco contracts involving welding and NDE. <H>Michael Eric Ward</> <H>3rd October 2005</>
India
Germany
Canada
United Kingdom
Italy
Italy
Netherlands
Germany
United Kingdom
Italy
Saudi Arabia
United Kingdom
Italy
Italy
Netherlands
Japan
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Canada
Canada
United States Of America
As per RSA Mr. Akroosh's request, the QM status(QSOH) has been removed and changed it to QSAC. if October visit by AOCT RIE is not satisfactory then the status can be changed again to QSOH. (Pls refer to the attached the e-mail by RSA : Services for object) AOCT Inspection 9-8-08 As per the result of follow up assessment to Advance Valve in 2008 by AOCT, the corrective actions were requested to the vendor. As per the RSA Mr. Akroosh's request, the QM status has been ON HOLD until all the actions will be verified. AOCT Inspection May 2008 Limitation requires the welding procedures and NDE procedures to be approved by Saudi Aramco before starting Saudi Aramco contracts involving welding and NDE. <H>Michael Eric Ward</> <H>3rd October 2005</>
Italy CLASS 600 - 2,500: 2"-24" ONLY PRESSURE SEAL BONNET VALVES
Italy
United States Of America
United States Of America
Canada
United States Of America
Canada
Canada
Germany
Italy
Italy
United States Of America
Germany
United Kingdom
<H><U>NOTE ADDED APRIL 24th 2007</></> Corrective actions closed during on site visit on 24th April 2007. Michael Eric Ward 24th April 2007
MAXIMUM SIZE 2 INCH Added from Plant assessment.Plant is currently approved for this 9COM.
Comments entered by Angela McFadden on 02/14/06: Recommended for continued approval with Corrective action. Revise all 9COMs to QSAL, Visual inspection required until implementation of satisfactory corrective action. The On site evaluation performed by has successfully identified the root cause of most significant events. Corrective Action has been issued against this plant. All orders are being visually inspected until Velan provides a satisfactory response. *******************END*********************************
India
United Kingdom
Canada
India
India
Saudi Arabia
Saudi Arabia
Saudi Arabia
Italy
Italy
As per RSA Mr. Akroosh's request, the QM status(QSOH) has been removed and changed it to QSAC. if October visit by AOCT RIE is not satisfactory then the status can be changed again to QSOH. (Pls refer to the attached the e-mail by RSA : Services for object) AOCT Inspection 9-8-08 As per the result of follow up assessment to Advance Valve in 2008 by AOCT, the corrective actions were requested to the vendor. As per the RSA Mr. Akroosh's request, the QM status has been ON HOLD until all the actions will be verified. AOCT Inspection May 2008 Limitation requires the welding procedures and NDE procedures to be approved by Saudi Aramco before starting Saudi Aramco contracts involving welding and NDE. <H>Michael Eric Ward</> <H>3rd October 2005</>
India
AOCT Inspection Sep 30, 2008 From: Akroosh, Fahad A Sent: Monday, September 29, 2008 9:54 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: RE: Audco status Dear Miho This is to kindly request you to remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 <H><U>LIMITATION MODIFIED M. WARD 31st MARCH 2004</></> <H>1.0.</> <H>Audco are approved with limitations and the limitation is:-</> <H>Audco must only weld valves using welding procedures approved by Saudi Aramco CSD Materials/Welding Unit. Furthermore, Audco must not sub-contract welding of Saudi Aramco Valve Units without written approval from Saudi Aramco.SEE SERVICES TO OBJECTS ATTACHMENTS:-</> <H>RELIMITATION ON AUDCO INDIA LTD S</>
India
United Kingdom
Italy
Italy Limited to 8", forged material only.
Netherlands Limits : 2" thru 12". Class 150# and above.
Spain
Italy CLASS 150 - 2,500: 2"-24"
Italy
Italy
Japan
Japan
Japan
Canada
United States Of America
remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 This Q Info. record is created at the request of Valve RSA Fahad Akroosh to add material 6000000273 to this vendor. The VID Superintendent, AMK instructed to create the Q Info record and at the same time request CSD to process the RVL forms to obtain the required signatures. Also the QA Manual requirement and questionnaire requirements have been waived by AMK. See object for services for details under 9COM 6000000301. Afaq 01/24/2003. <H><U>LIMITATION MODIFIED M. WARD 31st MARCH 2004</></> <H>1.0.</> <H>Audco are approved with limitations and the limitation is:-</> <H>Audco must only weld valves using welding procedures approved by Saudi Aramco CSD Materials/Welding Unit. Furthermore, Audco must not sub-contract
Canada
Canada
United States Of America
Saudi Arabia
Czech Republic
India
Comments entered by Angela McFadden on 02/14/06: Recommended for continued approval with Corrective action. Revise all 9COMs to QSAL, Visual inspection required until implementation of satisfactory corrective action. The On site evaluation performed by has successfully identified the root cause of most significant events. Corrective Action has been issued against this plant. All orders are being visually inspected until Velan provides a satisfactory response. *******************END*********************************
RSA - Fahad AlAkroosh has noted the following limitation on all supplied valves by SMI: <H>Valve committee has agreed to evaluate SMI for the below 9COMs. The approval will be limited to class 150 and 300. It will be also limited to size 2-12" only. The limitation will be active for a period of six to one year depending on the success of SMI in supplying standard valves. </> <H>Fahad Ahmed Al-Akroosh</> <H>Valve Engineering Specialist </> <H>Consulting Services Department</>
From: Akroosh, Fahad A Sent: Monday, August 20, 2007 3:23 PM To: Tabei, Miho; Abuemarah, Alaa M Cc: Okura, Yozo X; Megren, Abdulaziz A (AOCT IR) Subject: leader limitation Dear Abuemarah You are kindly requested to remove the limitation imposed on Leader Valve (30003205). The limitation was compulsory at the beginning of approving leader to get them acquainted to Aramco system before they receive big order. Leader is now approved for about 4 years and they have supplied so many valves to Aramco with no problem. Leader was also granted one time approval for several occasions for large sizes hence it is recommend to add 9COM (6000000294) to their commodity list. Based on the above change the QM system for the highlighted item to QSAL and link leader to 9COM 6000000294). Please take action immediately since we have some pending order that need to be placed. I believe this action can be performed manually Best regards Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-873-8499 Fax: +9663-873-7308 Mobile: +966-505972270 approval limited to:- Valve; check; 2 inch through 24 inch ANSI CL15 for 2 inch up to 12 inch & Class 150 & 300 Only. M. E. Ward - 11th November 2002 Note the change was requested by Fahad Akroosh after the work flow was issued Viz:- From: Akroosh, Fahad A Sent: Monday, October 14, 2002 12:07 PM To: Ward, Michael E Subject: RE: I want this company to approved for the following 6000000273 VALVE; CHECK; 2 THRU 24 INCH; ANSI CL 15 for 2. up to 12. and Class 150 & 300 only 6000000293 VALVE; GATE; WEDGE; 1 THRU 24 INCH; ANSI for 2. up to 12. and Class 150 & 300 only 6000000301 VALVE; GLOBE; 2 INCH AND UP; ANSI 150 AN for 2. up to 12. and Class 150 only 6000000300 VALVE; GLOBE; UP TO 4 INCH; THREADED; SO Please reinitiate the workflow or do it from your office. This is a new company and we have to establish some limitations until we are fully satisfied with their products. Corrective Actions Closed out during site visit during April 2003. M. E. Ward. Based on RSA's recommendation (Fahad Al-Akroosh), they are limited up to 12 inch. Ibrahim Y. Al-Nujaidi 29/6/2004
South Korea
South Korea
India
Saudi Arabia
China
Japan
Following Limitations apply: 9COM #,,Type Rat. CS,,,,SS,, 6~273,,Valve, Check, 300 1-1/2 . 24 In 1/2 - 24 In. ,, 600 2 . 24 In,, 1-1/2 . 24 In ,, 900 2 . 20 In 2 . 20 In ,, 1,500 2 . 20 In 2 . 20 In ,, 2,500 2 . 12 In 2 . 12 In CS Materials: ASTM A216 WCB A217 WC1, WC6, WC9, C5, C12 A352 LCC, LCB, LC1, LC3 SS Mat.: ASTM A351 CF8, CF8M, CF3, CF3M, CF8C, CN7M, CG8M, CG3M A494 M35-1, M35-2, CW-12MW, N-12MV
- Released the hold status as per the request by RSA Mr. Akroosh, changed back to QSAA. Please see the attached correspondence. AOCT Inspection Sep 30, 2008 From: Akroosh, Fahad A Sent: Monday, September 29, 2008 9:54 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: RE: Audco status Dear Miho This is to kindly request you to remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98
Limited to Carbon steel 12 inches and classes 150 and 300. Afaq Ahmed 11/20/2006
China
Spain
Italy
Italy
Spain
Italy CLASS 150 - 600: 26"-48" CLASS 900 : 26"-36" CLASS 1,500 : 26"-30"
Italy
Italy
Japan
Japan
Japan
United States Of America
Canada
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom
Japan
United States Of America
United States Of America
Italy
Germany
Italy
United States Of America
RSA Mr. Akroosh's request, the limitation has been changed to "Size 2-24#; class 150 up to class 600; Material carbon & low alloy steel WCB, WCC, LCC and LCB." Please see the back up e-mail attached to Q-info. AOCT Inspection 1-8-09 RSA Mr. Akroosh's request, 6000000326 VALVE; CHECK; 2 THRU 24 IN; SOFT SEAT has been disapproved (QSNA) and 6000000273 VALVE; CHECK; 2 THRU 24 IN; METAL SEAT has been added (QSAL)as replacement manually. Please see the attached e-mail for your reference (Services for Object) 8-19-08 AOCT Inspection The manufacturer is limited to class 150 and 300 up to size 12".
Comments entered by Angela McFadden on 1/17/06: In efforts to synchronize the RVL listing, Velan (30001998) is now considered an approved source to supply 9 COM 6000000274.
United States Of America
Czech Republic
India
France
Singapore
United Kingdom
Ireland
United Kingdom
Singapore
United States Of America
United States Of America
United States Of America
United States Of America
India
India
Ireland
United Kingdom
Netherlands
United Kingdom
United States Of America
United States Of America
Canada
India
Italy
United Kingdom
Remarks entered 11/15/2001 by Y. Dawkins: Tech Limits/Comments - Plt. ID NE241003 Engineering Comments: CCC 040069 - Limited to S/N 0412361000 due to non-standard face to face dimension. Review of this stock number history indicates that it is an active item. RH 8/31/99
AOCT has no problem with the Quality of this manufacturer. In addition, this Plant was approved for ccc 040071 during the legacy system and there is no reason(s) in the Plant file for delinking the materials. In addition the RSA does not object to link the material to the manufacturer. SMS 04/29/2003
RSA concurrence has been submitted via email, the material changed back to QSAA. Linda Stowell 02/11/2004
Comments entered by Angela McFadden on 11/28/2006: Per the RSA's request(see email attached to plant record (MK03 Classification screen), 9COM 6000000280 was manually linked to this T3 facility. *****END***********************************************
RSA concurrence has been submitted, the material changed back to QSAA. Linda Stowell 02/11/2004
United Kingdom
United Kingdom
United Kingdom
Italy
United States Of America
United States Of America
Canada
Netherlands
United Kingdom
Italy
Italy
Japan
Japan
Italy
United Kingdom
United Kingdom
Italy
United Kingdom
Italy
United States Of America
United States Of America
Japan
Spain
Italy
United Kingdom
Italy
Italy
United States Of America
Italy
United Kingdom
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 02/27/02)
8" MIN., CL150 THRU 600 MAX 48"; CL900, MAX 36"; CL1500, MAX 30", CL2500, MAX 14".
Hold removed as per RSA email (Fahad Akroosh). See details under services for object for 9COM 6000000253. Afaq Ahmed 11/20/02
Remarks entered 2/12/2004 by Linda Stowell: Limitations: CCV Orbit must supply Certificate of compliance that all castings comply with MSS SP 55. (JAV - 5/9/2003)
Italy
United States Of America
United Kingdom
United Kingdom
United Kingdom
Japan
United States Of America
Italy
Thailand
United States Of America
India
India
Saudi Arabia
Saudi Arabia
Saudi Arabia
India
Utd.Arab Emir.
Italy
Italy
India
AOCT Inspection Sep 30, 2008 From: Akroosh, Fahad A Sent: Monday, September 29, 2008 9:54 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: RE: Audco status Dear Miho This is to kindly request you to remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 <H><U>LIMITATION MODIFIED M. WARD 31st MARCH 2004</></> <H>1.0.</> <H>Audco are approved with limitations and the limitation is:-</> <H>Audco must only weld valves using welding procedures approved by Saudi Aramco CSD Materials/Welding Unit. Furthermore, Audco must not sub-contract welding of Saudi Aramco Valve Units without written approval from Saudi Aramco.SEE SERVICES TO OBJECTS ATTACHMENTS:-</> <H>RELIMITATION ON AUDCO INDIA LTD S</>
India
United Kingdom
France
Netherlands Limits : 1" thru 12". Class 150# and up.
Spain
Italy CLASS 600 - 4,500: 2"-24"
Italy
Italy
Japan
Japan
Japan
Canada
United States Of America
Canada
AOCT Inspection Sep 30, 2008 From: Akroosh, Fahad A Sent: Monday, September 29, 2008 9:54 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: RE: Audco status Dear Miho This is to kindly request you to remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 - QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 <H><U>LIMITATION MODIFIED M. WARD 31st MARCH 2004</></> <H>1.0.</> <H>Audco are approved with limitations and the limitation is:-</> <H>Audco must only weld valves using welding procedures approved by Saudi Aramco CSD Materials/Welding Unit. Furthermore, Audco must not sub-contract welding of Saudi Aramco Valve Units without written approval from Saudi Aramco.SEE SERVICES TO OBJECTS ATTACHMENTS:-</> <H>RELIMITATION ON AUDCO INDIA
Canada
Saudi Arabia
Czech Republic minimum size is 2.#150 and maximum size is 16.#300.
India
South Korea
Comments entered by Angela McFadden on 02/14/06: Recommended for continued approval with Corrective action. Revise all 9COMs to QSAL, Visual inspection required until implementation of satisfactory corrective action. The On site evaluation performed by has successfully identified the root cause of most significant events. Corrective Action has been issued against this plant. All orders are being visually inspected until Velan provides a satisfactory response. *******************END*********************************
RSA - Fahad AlAkroosh has noted the following limitation on all supplied valves by SMI: <H>Valve committee has agreed to evaluate SMI for the below 9COMs. The approval will be limited to class 150 and 300. It will be also limited to size 2-12" only. The limitation will be active for a period of six to one year depending on the success of SMI in supplying standard valves. </> <H>Fahad Ahmed Al-Akroosh</> <H>Valve Engineering Specialist </> <H>Consulting Services Department</>
From: Akroosh, Fahad A Sent: Monday, August 20, 2007 3:23 PM To: Tabei, Miho; Abuemarah, Alaa M Cc: Okura, Yozo X; Megren, Abdulaziz A (AOCT IR) Subject: leader limitation Dear Abuemarah You are kindly requested to remove the limitation imposed on Leader Valve (30003205). The limitation was compulsory at the beginning of approving leader to get them acquainted to Aramco system before they receive big order. Leader is now approved for about 4 years and they have supplied so many valves to Aramco with no problem. Leader was also granted one time approval for several occasions for large sizes hence it is recommend to add 9COM (6000000294) to their commodity list. Based on the above change the QM system for the highlighted item to QSAL and link leader to 9COM 6000000294). Please take action immediately since we have some pending order that need to be placed. I believe this action can be performed manually Best regards Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-873-8499 Fax: +9663-873-7308 Mobile: +966-505972270 Approval limited to:- Valve; Gate; Wedge; 1 inch through 24 Inch ANSI for 2 Inch up to 12 Inch Class 150 and 300 Only. M. E. Ward. - 11th November 2002 Note the change was requested by Fahad Akroosh after the work flow was issued Viz:- From: Akroosh, Fahad A Sent: Monday, October 14, 2002 12:07 PM To: Ward, Michael E Subject: RE: I want this company to approved for the following 6000000273 VALVE; CHECK; 2 THRU 24 INCH; ANSI CL 15 for 2. up to 12. and Class 150 & 300 only 6000000293 VALVE; GATE; WEDGE; 1 THRU 24 INCH; ANSI for 2. up to 12. and Class 150 & 300 only 6000000301 VALVE; GLOBE; 2 INCH AND UP; ANSI 150 AN for 2. up to 12. and Class 150 only 6000000300 VALVE; GLOBE; UP TO 4 INCH; THREADED; SO Please reinitiate the workflow or do it from your office. This is a new company and we have to establish some limitations until we are fully satisfied with their products Corrective Actions Closed out during site visit during April 2003. M. E. Ward. Based on RSA's recommendation (Fahad Al-Akroosh), they are limited up to 12 inch. Ibrahim Y. Al-Nujaidi 29/6/2004
South Korea
India
India
India
Saudi Arabia
China
Japan
Following Limitations apply: 9COM #,,Type Rat. CS,,,, SS,, 6~273,, Gate, Wedge, 150,, 1-1/2-48 In,, 1/2-48 In ,,,,,,,,300 1-1/2-36 In 1/2-36 In ,, 600 2-24 In,, 2-24 In ,, 900 2-20 In 2-20 In ,, 1,500 2-20 In 2-20 In ,, 2,500 2-12 In 2-12 In CS Materials: ASTM A216 WCB A217 WC1, WC6, WC9, C5, C12 A352 LCC, LCB, LC1, LC3 SS Mat.: ASTM A351 CF8, CF8M, CF3, CF3M, CF8C, CN7M, CG8M, CG3M A494 M35-1, M35-2, CW-12MW, N-12MV
RSA Fahad Akroosh email dated 12/04/2005 (see services for objects for details) Gate valve limitation: ½# up to 16# class 150 up to 800 Afaq Ahmed 12/04/2005
- Released the hold status as per the request by RSA Mr. Akroosh, changed back to QSAA. Please see the attached correspondence. AOCT Inspection Sep 30, 2008 From: Akroosh, Fahad A Sent: Monday, September 29, 2008 9:54 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: RE: Audco status Dear Miho This is to kindly request you to remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98
Limited to Carbon steel 12 inches and classes 150 and 300. Afaq Ahmed 11/20/2006
China
Spain
Utd.Arab Emir.
India
India
Italy
Italy
India
United Kingdom
Spain
Italy CLASS 150 - 600: 26"-48"
Italy
RSA Mr. Akroosh's request, the limitation has been changed to "Size 2-24#; class 150 up to class 600; Material carbon & low alloy steel WCB, WCC, LCC and LCB." Please see the back up e-mail attached to Q-info. AOCT Inspection 1-8-09 The manufacturer is limited to class 150 and 300 up to size 12".
2-12 inch class 150 and 300, the only approved source for casting is ETC which belong to the same group.
AOCT Inspection Sep 30, 2008 From: Akroosh, Fahad A Sent: Monday, September 29, 2008 9:54 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: RE: Audco status Dear Miho This is to kindly request you to remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 <H><U>LIMITATION MODIFIED M. WARD 31st MARCH 2004</></> <H>1.0.</> <H>Audco are approved with limitations and the limitation is:-</> <H>Audco must only weld valves using welding procedures approved by Saudi Aramco CSD Materials/Welding Unit. Furthermore, Audco must not sub-contract welding of Saudi Aramco Valve Units without written approval from Saudi Aramco.SEE SERVICES TO OBJECTS ATTACHMENTS:-</> <H>RELIMITATION ON AUDCO INDIA LTD S</>
Italy
Japan
Japan
Canada
Czech Republic
India
India
Italy
Saudi Arabia
United Kingdom
Italy
Italy
Netherlands
Manual Linkage was completed with the request by RSA Mr. Fahad Akroosh based on the attached the e-mail dated on 8/20/2007. AOCT Inspection 9/3/2007
- Released the hold status as per the request by RSA Mr. Akroosh, changed back to QSAA. Please see the attached correspondence. AOCT Inspection Sep 30, 2008 From: Akroosh, Fahad A Sent: Monday, September 29, 2008 9:54 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: RE: Audco status Dear Miho This is to kindly request you to remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98
MAXIMUM SIZE 2 INCH Added from Plant assessment.Plant is currently approved for this 9COM.
Italy
Japan
Japan
United States Of America
Canada
Canada
United States Of America
South Korea Forged: 1/4 - 2 In., ,,150-4500 Ib. Casting:,,1 1/2 - 36 In.,,,150-2500 Ib
Saudi Arabia
Saudi Arabia
South Korea
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Denmark
Saudi Arabia
Spain
Japan
United States Of America
United States Of America
Germany
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
This Manufacturer used to supply this materials before SAP. Please refer to the attached email from the RSA. Shabib M. Al-Sudairi Dec. 05, 2003
<H><U>NOTE ADDED APRIL 24th 2007</></> Corrective actions closed during on site visit on 24th April 2007. Michael Eric Ward 24th April 2007 <H><U>NOTE ADDED APRIL 24th 2007</></> Corrective actions closed during on site visit on 24th April 2007. Michael Eric Ward 24th April 2007
Denmark
Saudi Arabia
United States Of America
United States Of America
Italy
Italy
Italy Limited to 8", forged material only.
Italy
Italy
Canada
Canada
United Kingdom United Kingdom
United Kingdom
Japan
United States Of America
United States Of America Italy Thailand United States Of America
Italy
Saudi Arabia
United Kingdom
Italy
Comments entered by Angela McFadden on 02/14/06: Recommended for continued approval with Corrective action. Revise all 9COMs to QSAL, Visual inspection required until implementation of satisfactory corrective action. The On site evaluation performed by has successfully identified the root cause of most significant events. Corrective Action has been issued against this plant. All orders are being visually inspected until Velan provides a satisfactory response. *******************END*********************************
MAX. SIZE 16", INCLUDING EXOTIC MATERIALS LIKE TITANIUM, HASTELLOY, ETC.
Remarks Entered 11/12/2002 by Y.F. Dawkins: This Q-Info record is marked for continued approval. The workflow for Inspection Lot 107000003101 was not routed to the MC34 RSA to allow his input to approve/disapprove. Since the material previously approved, that status will remain. END OF REMARKS Remarks entered 11/05/2001 by Y. Dawkins: CLA-VAL is approved for only 1 stock number in Class 04 (04-782-355). This vendor should not be used for general purchases to 040102 or 040137 as the valves are of non-standard design for use in automatic control applications. The valves are hydraulically operated, diaphragm actuated.(RRW-10/23/95).
MAXIMUM SIZE 2 INCH Added from Plant assessment.Plant is currently approved for this 9COM.
Italy
Netherlands
United Kingdom LIMITED UP TO 2" ONLY.
Japan
Japan
United States Of America
United States Of America
United States Of America
Canada
United States Of America
South Korea Forged: 1/4 - 2 In., ,,150-4500 Ib. Casting:,,1 1/2 - 24 In.,,,150-2500 Ib
India
Saudi Arabia
Saudi Arabia
South Korea
India
India
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
This linkage has been created to enable Traffic Department to process the traffic transaction. Shabib M. Al-Sudairi October 14, 2003
Approval limited to:- Valve; Globe; up to 4 Inch threaded S O M. E. Ward- 11th November 2002 Note the change was requested by Fahad Akroosh after the work flow was issued Viz:- From: Akroosh, Fahad A Sent: Monday, October 14, 2002 12:07 PM To: Ward, Michael E Subject: RE: I want this company to approved for the following 6000000273 VALVE; CHECK; 2 THRU 24 INCH; ANSI CL 15 for 2. up to 12. and Class 150 & 300 only 6000000293 VALVE; GATE; WEDGE; 1 THRU 24 INCH; ANSI for 2. up to 12. and Class 150 & 300 only 6000000301 VALVE; GLOBE; 2 INCH AND UP; ANSI 150 AN for 2. up to 12. and Class 150 only 6000000300 VALVE; GLOBE; UP TO 4 INCH; THREADED; SO Please reinitiate the workflow or do it from your office. This is a new company and we have to establish some limitations until we are fully satisfied with their products. Corrective Actions Closed out during site visit during April 2003. M. E. Ward.
<H>NOTE ADDED APRIL 24th 2007</> Corrective actions closed during on site visit on 24th April 2007. Michael Eric Ward 24th April 2007 <H>NOTE ADDED APRIL 24th 2007</> Corrective actions closed during on site visit on 24th April 2007. Michael Eric Ward 24th April 2007
Saudi Arabia
Saudi Arabia
Saudi Arabia
India
Utd.Arab Emir.
Italy
Italy
India
AOCT Inspection Sep 30, 2008 From: Akroosh, Fahad A Sent: Monday, September 29, 2008 9:54 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: RE: Audco status Dear Miho This is to kindly request you to remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 <H><U>LIMITATION MODIFIED M. WARD 31st MARCH 2004</></> <H>1.0.</> <H>Audco are approved with limitations and the limitation is given below :-</> <H>Audco must only weld valves using welding procedures approved by Saudi Aramco CSD Materials/Welding Unit. Furthermore, Audco must not sub-contract welding of Saudi Aramco Valve Units without written approval from Saudi Aramco.SEE SERVICES TO OBJECTS ATTACHMENTS:-</> <H>RELIMITATION ON AUDCO INDIA LTD S</>
India
Saudi Arabia
United Kingdom
United Kingdom
France
Netherlands
Spain
Italy
Italy
Italy
Japan
Japan
Japan
United States Of America
remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 This Q Info. record is created at the request of Valve RSA Fahad Akroosh to add material 6000000301 to this vendor. The VID Superintendent, AMK instructed to create the Q Info record and at the same time request CSD to process the RVL forms to obtain the required signatures. Also the QA Manual requirement and questionnaire requirements have been waived by AMK. See object for services for details. Afaq Ahmed 02/09/2003 <H><U>LIMITATION MODIFIED M. WARD 31st MARCH 2004</></> <H>1.0.</> <H>Audco are approved with limitations and the limitation is:-</> <H>Audco must only weld valves using welding procedures approved by Saudi Aramco CSD Materials/Welding
CLASS 150 - 2,500: 2"-16" ONLY PRESSURE SEAL BONNET ACCEPTABLE
United States Of America Limited to NPS 6 or lower. (JAV - confirmed on 4/9/2003)
Canada
United States Of America
Canada
Canada
Saudi Arabia
Czech Republic
India
South Korea
South Korea
Comments entered by Angela McFadden on 02/14/06: Recommended for continued approval with Corrective action. Revise all 9COMs to QSAL, Visual inspection required until implementation of satisfactory corrective action. The On site evaluation performed by has successfully identified the root cause of most significant events. Corrective Action has been issued against this plant. All orders are being visually inspected until Velan provides a satisfactory response. *******************END*********************************
RSA - Fahad AlAkroosh has noted the following limitation on all supplied valves by SMI: <H>Valve committee has agreed to evaluate SMI for the below 9COMs. The approval will be limited to class 150 and 300. It will be also limited to size 2-12" only. The limitation will be active for a period of six to one year depending on the success of SMI in supplying standard valves. </> <H>Fahad Ahmed Al-Akroosh</> <H>Valve Engineering Specialist </> <H>Consulting Services Department</> <H> </>
Approval Limited to: Valve; Globe; 2 Inch and up: ANSI 150 and for 2 Inch up to 12 Inch and class 150 only. M. E. Ward. 11th November 2002. Note the change was requested by Fahad Akroosh after the work flow was issued Viz:- From: Akroosh, Fahad A Sent: Monday, October 14, 2002 12:07 PM To: Ward, Michael E Subject: RE: I want this company to approved for the following 6000000273 VALVE; CHECK; 2 THRU 24 INCH; ANSI CL 15 for 2. up to 12. and Class 150 & 300 only 6000000293 VALVE; GATE; WEDGE; 1 THRU 24 INCH; ANSI for 2. up to 12. and Class 150 & 300 only 6000000301 VALVE; GLOBE; 2 INCH AND UP; ANSI 150 AN for 2. up to 12. and Class 150 only 6000000300 VALVE; GLOBE; UP TO 4 INCH; THREADED; SO Please reinitiate the workflow or do it from your office. This is a new company and we have to establish some limitations until we are fully satisfied with their products Corrective Actions Closed out during site visit during April 2003. M. E. Ward.
Following Limitations apply: 9COM #,,Type Rat. CS,,,, SS,, 6~273,, Gate, Wedge, 150,, 2-12 In,, ,,1/2-12 In ,,,,,,,,300 2-12 In ,,1/2-12 In ,, 600 2-12 In,, 2-12 In ,, 900 2-12 In 2-12 In ,, 1,500 2-12 In 2-12 In ,,,,,, 2,500,,2.8 In,,,, 2.8 In CS Materials: ASTM A216 WCB A217 WC1, WC6, WC9, C5, C12 A352 LCC, LCB, LC1, LC3 SS Mat.: ASTM A351 CF8, CF8M, CF3, CF3M, CF8C, CN7M, CG8M, CG3M A494 M35-1, M35-2, CW-12MW, N-12MV
India
India
Saudi Arabia
China
Japan
China
Spain
Utd.Arab Emir.
United States Of America
United States Of America
United Kingdom United States Of America United States Of America
- Released the hold status as per the request by RSA Mr. Akroosh, changed back to QSAA. Please see the attached correspondence. AOCT Inspection Sep 30, 2008 From: Akroosh, Fahad A Sent: Monday, September 29, 2008 9:54 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: RE: Audco status Dear Miho This is to kindly request you to remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98
Limited to Carbon steel 12 inches and classes 150 and 300. Afaq Ahmed 11/20/2006
RSA Mr. Akroosh's request, the limitation has been changed to "Size 2-24#; class 150 up to class 600; Material carbon & low alloy steel WCB, WCC, LCC and LCB." Please see the back up e-mail attached to Q-info. AOCT Inspection 1-8-09 The manufacturer is Limited to class 150 and 300 up to size 12".
2-12 inch class 150 and 300, the only approved source for casting is ETC which belong to the same group.
United States Of America
United States Of America ******************************
Italy
United Kingdom South Korea South Korea United Kingdom Germany
Netherlands
United States Of America
Netherlands
United Kingdom
Italy
Denmark
United States Of America
Italy
India
Germany
United States Of America
United States Of America
Germany
South Korea Limitation: size: up to and including 24 inch.
Spain
Comments entered by Angela McFadden on 02/14/06: Per discussions between the RSA, Rajan Hingoraney and Julio Valdespino of ASC Quality Systems Unit, this plant is approved to supply 6000000270, 6000000304, and 6000000343. **********END******************************
Remarks updated 2/12/2004 by Linda Stowell: Limitations/SIS Comments: 1. CCV Orbit must supply Certificate of compliance that all castings comply with MSS SP 55. 2. Expanding plug valves can only be purchased with carbon steel plugs which is non-standard for Orbit. All purchases require special approval from the RSA if alternative materials are proposed.(JAV - 05-09-2003).
Max. 24" , only for carbon steel or ductile iron bodies with stainless steel or carbon steel electroless nickel plated plugs.
Limitation: ("Steel" lubricated Plug valves; up to size: 24 inch & pressure class: ANSI Class 600). From RSA E-mail:April 08, 2009 3:43 PM
RSA Fahad Akroosh email dated 3/24/2008 (see services for objects for details) Econ is accepted to supply Aramco with plug valves as follows ½ up to 16 inch class 150 and 300 ½ up to 8 inch class 900 and below AOCT Inspection 3/24/2008 RSA Fahad Aroosh email dated 12/04/2005 (see services for objects for details) Plug valve limitation: ½ up to 16 class 150 and 300 ½ up to 6# class 600 Afaq Ahmed 12/04/2005
Remarks entered by Linda Stowell on 2/11/2004: All order require inspection until findings are closed.
Remarks entered 12/9/2003 by Linda Stowell Limitation: Smaller size lined valves ( ductile iron in ½ thru 4")are made in Chihuahua Mexico Xomox plant but are distributed from/ by the Cincinnati plant. Consult with ASC TSD PRIOR to placement for such orders. (J.Valdespino - 07/28/2003)
Germany United Kingdom Italy
Denmark
United States Of America
United States Of America
Italy
Netherlands
India
Singapore
Ireland
Singapore
United States Of America United States Of America India India
Singapore
France
Singapore
United Kingdom Italy
United Kingdom
United States Of America Canada
Malaysia
India
India
United Kingdom
Ireland
Netherlands
United Kingdom
United States Of America
United States Of America
Max. 24" , only for carbon steel or ductile iron bodies with stainless steel or carbon steel electroless nickel plated plugs.
Remarks entered by Linda Stowell on 2/11/2004: All order require inspection until findings are closed.
Note: Existing QM sys. was changed to “Quality system NOT-APPROVED” to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02) Changed back to “Quality system APPROVED” based on RSA (Akroosh, Fahad A) recommendation by E-mail dated 04/03/02. (By Humoaa0b on 04/03/02)
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 02/27/02)
Note: Existing QM sys. was changed to “Quality system NOT-APPROVED” to synchronize SAP with RVL SAES. (By Humoaa0b on 02/27/02)
Note: Existing QM sys. was changed to “Quality system NOT-APPROVED” to synchronize SAP with RVL SAES. (By Humoaa0b on 03/01/02) Changed back to “Quality system APPROVED” based on RSA (Akroosh, Fahad A) recommendation by E-mail dated 04/03/02. (By Humoaa0b on 04/03/02)
India
Germany
United States Of America
United States Of America
Italy
Italy
Germany LIMITED TO MAX. 7-1/16" TO API 6A.
Italy
Italy MAX. 5000 PSI
United States Of America
Italy
United Kingdom LIMITATION FOR CCC 040132: MAX SIZE 16 INCHES.
United Kingdom INCLUDING EXOTIC MATERIALS LIKE TITANIUM, HASTELLOY, ETC.
United States Of America
United States Of America Italy
United States Of America
Thailand United States Of America United Kingdom Japan ANSI 1500 & 300:1/2"-8", ANSI 600:1/2"-4".
United States Of America
United States Of America United States Of America United States Of America South Korea United Kingdom
Saudi Arabia
Saudi Arabia
United States Of America
Limitation: Size shall be 1 thru 8 inch; ANSI CL shall be CL 150 and CL 300.
Remarks entered by Linda Stowell on 2/11/2004: All order require inspection until findings are closed.
Remarks entered by Angela McFadden on 02/10/2005: Conbraco has responded favorably to all of ASC's Corrective action requests . These responses are on file and considered adequate. The effectiveness of Conbraco's corrective actions will need to be verified during inspection of initial orders. Limitations: Although Conbraco now has the capabilities , Conbraco does not perform mechanical testing on their standard bronze valve product. Even though this is specified by ASTM; special order, special part number or PED certified valves will need to be ordered to meet this requirement. Inspection of initial orders will verify implementation. ********************END********************************
Remarks entered by Linda Stowell on 2/11/2004: All order require inspection until findings are closed.
Canada
United States Of America
Saudi Arabia
Italy
United Kingdom
Italy
Italy MAX. 5000 PSI
Canada
United States Of America
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
Italy
United States Of America
Thailand
United Kingdom
Spain
Limited to Carbon steel 12 inches and classes 150 and 300. Afaq Ahmed 11/20/2006
Remarks Entered 11/12/2002 by Y.F. Dawkins: This Q-Info record is marked for continued approval. The workflow for Inspection Lot 107000003101 was not routed to the MC34 RSA to allow his input to approve/disapprove. Since the material previously approved, that status will remain. END OF REMARKS Remarks entered 11/05/2001 by Y. Dawkins: CLA-VAL is approved for only 1 stock number in Class 04 (04-782-355). This vendor should not be used for general purchases to 040102 or 040137 as the valves are of non-standard design for use in automatic control applications. The valves are hydraulically operated, diaphragm actuated.(RRW-10/23/95).
Remarks entered by Angela McFadden on 02/10/2005: Conbraco has responded favorably to all of ASC's Corrective action requests . These responses are on file and considered adequate. The effectiveness of Conbraco's corrective actions will need to be verified during inspection of initial orders. Limitations: Although Conbraco now has the capabilities , Conbraco does not perform mechanical testing on their standard bronze valve product. Even though this is specified by ASTM; special order, special part number or PED certified valves will need to be ordered to meet this requirement. Inspection of initial orders will verify implementation. ********************END********************************
Italy
United States Of America
Canada
Saudi Arabia
Saudi Arabia
India
Utd.Arab Emir.
Italy Limited to 8", forged material only.
France
Italy
United States Of America
Saudi Arabia
India
Spain
Utd.Arab Emir.
United Kingdom
United Kingdom
United States Of America
India
Germany
Canada
RSA - Fahad AlAkroosh has noted the following limitation on all supplied valves by SMI: <H>Valve committee has agreed to evaluate SMI for the below 9COMs. The approval will be limited to class 150 and 300. It will be also limited to size 2-12" only. The limitation will be active for a period of six to one year depending on the success of SMI in supplying standard valves. </> <H>Fahad Ahmed Al-Akroosh</> <H>Valve Engineering Specialist </> <H>Consulting Services Department </>
2-12 inch class 150 and 300, the only approved source for casting is ETC which belong to the same group.
As per RSA Mr. Akroosh's request, the QM status(QSOH) has been removed and changed it to QSAC. if October visit by AOCT RIE is not satisfactory then the status can be changed again to QSOH. (Pls refer to the attached the e-mail by RSA : Services for object) AOCT Inspection 9-8-08 As per the result of follow up assessment to Advance Valve in 2008 by AOCT, the corrective actions were requested to the vendor. As per the RSA Mr. Akroosh's request, the QM status has been ON HOLD until all the actions will be verified. AOCT Inspection May 2008 Limitation requires the welding procedures and NDE procedures to be approved by Saudi Aramco before starting Saudi Aramco contracts involving welding and NDE. <H>Michael Eric Ward</> <H>3rd October 2005</>
United Kingdom
Denmark
United States Of America
India
Singapore
France
Italy
United Kingdom
Italy
United Kingdom
Singapore
United States Of America
United States Of America
Canada
Malaysia
India
United Kingdom
United States Of America
United Kingdom
Canada
United Kingdom
United Kingdom
United States Of America
United States Of America
Canada
Comments entered by Angela McFadden on 01/09/09: A plant survey is required with the next placement. **************END********************************** Remarks entered on 02/24/2004 by Linda Stowell: A plant survey is required in conjunction with the next placement.
Comments entered by Angela McFadden on 01/16/2005: *6000000301-Valve;Ball;One Piece- This 9COM is being manually linked in order to reconcile the RVL listing vs J002. *END***********************************************
Canada
United States Of America
United States Of America
Netherlands
United States Of America
United States Of America
Saudi Arabia
Saudi Arabia Only for Low Pressure non metallic Utility Piping
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Saudi Arabia
United States Of America
Utd.Arab Emir. Utd.Arab Emir. Saudi Arabia
Saudi Arabia
Comments entered by Angela McFadden on 02/14/06: Recommended for continued approval with Corrective action. Revise all 9COMs to QSAL, Visual inspection required until implementation of satisfactory corrective action. *******************END*********************************
Remarks entered by Angela McFadden on 03/17/09: Recommended for permanent approval with on-site quality assessment to be performed in conjunction with inspection of placement. *END******************************************************** Remarks entered by Angela McFadden on 03/27/2008: Temporary Approval expired. *****************************END*****************************
Comments entered by Angela McFadden on 02/14/06: Per discussions between the RSA, Rajan Hingoraney and Julio Valdespino of ASC Quality Systems Unit, this plant is approved to supply 6000000270, 6000000304, and 6000000343. **********END******************************
SEE services to objects attachment GULF_GASKET_CLOSED for close out details. M. E. WARD.
Corrective actions closed and hold status removed to re-approve vendor. Michael Eric Ward 27th June 2005
SEE services to objects attachment GULF_GASKET_CLOSED for close out details. M. E. WARD.
Saudi Arabia Utd.Arab Emir. United Kingdom
United States Of America
United States Of America
Saudi Arabia
India
Saudi Arabia
Saudi Arabia
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Saudi Arabia
United States Of America
United States Of America
India
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom
United Kingdom
Remarks entered 03/28/2002 by Y. F. Dawkins: Q-Info record created per E-mail SPM to Nasri, Nadhir I; Aidarous, Mamdouh B; Atiq, Tawfiq H dated 03/28/02 as follows: Although the ring joint gasket (Ring Joint, ASME B16.20, 9Com 6000000371) was previoulsy linked to Lamons (NL0515-01) in the AMS Catalog at the Man. Ref. line, SAP has not included this vendor as a potential source. We have noted a contradiction in SAP between the Classification View and the QM View regarding 9Com 6000000371. The Classification View indicates this is an RVL product (although not included in SAES-L-101) but the QM View indicates this product as an IDCAT-C. Although the 'old AMS Catalog' indicates Lamons linked to this product, SAP does not include them. We intend to "link" Ring Joint, ASME B16.20 (6000000371) to Lamons.
SEE services to objects attachment GULF_GASKET_CLOSED for close out details. M. E. WARD.
SEE services to objects attachment GULF_GASKET_CLOSED for close out details. M. E. WARD.
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Saudi Arabia
United States Of America
United States Of America
Saudi Arabia
Bahrain
India
United Kingdom
Saudi Arabia
Saudi Arabia
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Saudi Arabia
United States Of America
United States Of America
Bahrain
India
United Kingdom
United Kingdom
United States Of America
United States Of America
SEE services to objects attachment GULF_GASKET_CLOSED for close out details. M. E. WARD.
United States Of America
United States Of America
United States Of America
Germany
United States Of America
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Germany
United States Of America
Bahrain
United Kingdom
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Bahrain
Saudi Arabia
Saudi Arabia United Kingdom United Kingdom United States Of America
SEE services to objects attachment GULF_GASKET_CLOSED for close out details. M. E. WARD.
United States Of America United States Of America United States Of America
Saudi Arabia
Saudi Arabia
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom United Kingdom United States Of America United States Of America United States Of America United States Of America United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
Saudi Arabia
United Kingdom
SEE services to objects attachment GULF_GASKET_CLOSED for close out details. M. E. WARD.
SEE services to objects attachment GULF_GASKET_CLOSED for close out details. M. E. WARD.
Corrective actions closed and hold status removed to re-approve vendor. Michael Eric Ward 27th June 2005
SEE services to objects attachment GULF_GASKET_CLOSED for close out details. M. E. WARD.
United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United Kingdom
United States Of America
Saudi Arabia
Saudi Arabia
Netherlands
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
France
Japan
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
Canada
United States Of America
Germany
United States Of America
United States Of America
United States Of America
SEE services to objects attachment GULF_GASKET_CLOSED for close out details. M. E. WARD.
SEE services to objects attachment GULF_GASKET_CLOSED for close out details. M. E. WARD.
Saudi Arabia
South Korea
Netherlands
Netherlands
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom United Kingdom United Kingdom Bahrain Bahrain Japan Canada Canada United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America China
Saudi Arabia
<U>LIMITATION:-</> <H>Saudi Steel Pipe Company Plant Number One ( SAP Number 30000954) should not fabricate ASTM A53 Grade (B) or other materials requiring on line heat treatment.</> <H>Michael Eric Ward</> <H>6th June 2006</>
Saudi Arabia
Saudi Arabia
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
Japan
United Kingdom
United States Of America
Japan
Brazil
Brazil
Germany
United States Of America
France
Germany
United States Of America
United States Of America Saudi Arabia
The routine assessment of the Arabian CBI Facility was brought forward following a request from Vendor Inspection Quality control Unit to assess the vendor. This work-flow was created by WARDME to record the assessment results. M. E. Ward. September 9th 2003 THE QUALITY SYSTEM WAS APPROVED WITH CORRECTIVE ACTIONS, INSPECTION LOT 107000016768. NOTE THE RSA FAILED TO CONCUR FOR MATERIAL 6000000680 ( TANK ROOF FLOATING STEEL).THIS WAS DUE TO UNCERTAIN OWNERSHIP CONCERNING THE TECHNICAL AUTHORITIES FOR THE MATERIAL AND FINALLY Mr. NAFFAA ACCEPTED OWNERSHIP OF MATERIAL 6000000680. MATERIAL 6000000680 (TANK ROOF FLOATING STEEL ) WAS RE-APPROVED SEE SERVICES TO OBJECTS ATTACHMENT NAFFA_CSD_APPROVAL_DEC2003. M. E. WARD 4th JANUARY 2004. NOTE ADDED BY M. E. WARD 20th JANUARY 2004. The corrective actions were closed out during the site visit by M. E. Ward on 18th January 2004. The approval was changed to approve ( see servces to objects attachment close out).
Please refer to RSA email attached. Shabib M. Al-Sudairi February 04, 2004
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America United States Of America France Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
United States Of America
Saudi Arabia
United Kingdom
VID and CSD decided to change QMS for ABAHSAIN COPE (30000242) for aluminum cable tray (6000000744) from QSAL to QSAA. See attached email. OTHMAN ALAMOUDI 8626176 October 30, 2006 ************************************************************************ ******************************************************** Manufacturer is already approved in the RVL list
LIMITATION: Under License from MP Husky. KAS 02/12/2006. ------------------------ Corrective actions to be closed out during inspection visit in March 2002. Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward. Corrective Actions Closed. M. E. Ward.
<H><U>LIMITATION</></> 10 MVA, no special transformers, no auto transformers and no reactors. <U>NOTE:-</> See services to objects e-mail from the RSA. Michael Eric Ward October 8th 2008
<H><U>LIMITATION</></> 10 MVA, no special transformers, no auto transformers and no reactors. <U>NOTE:-</> See services to objects e-mail from the RSA. Michael Eric Ward October 8th 2008
Comments entered by Angela McFadden on 10/09/08: Per the request of the RSA, the following limitation has been placed on the 9COM. Please see email request attached to the plant record via services for objects. LIMITATION 10 MVA, no special transformers, no auto transformers and no reactors. *END**********************************************************
Comments entered by Angela McFadden on 10/09/08: Per the request of the RSA, the following limitation has been placed on the 9COM. Please see email request attached to the plant record via services for objects. LIMITATION 10 MVA, no special transformers, no auto transformers and no reactors. *END**********************************************************
Comments entered by Angela McFadden on 10/09/08: Per the request of the RSA, the following limitation has been placed on the 9COM. Please see email request attached to the plant record via services for objects. LIMITATION 10 MVA, no special transformers, no auto transformers and no reactors. *END********************************************************** Record was changed by SAP system batch on 7/7/03 to QSOH (as the RSA did not give concurrence to the continued approval of the 9COM). After contact with the RSA, it was noted that he inadvertantly forgot to click the concur on the 9COM. The system was corrected manually by Linda Stowell on 10/21/03.
United States Of America
Japan
Brazil
South Korea
Sweden
France
France 60 MVA AND LESS AND 132 KV MAX
Saudi Arabia
Saudi Arabia
United Kingdom 30MVA AND LESS AND 132 KV MAX
Germany
Germany LIMITED UP TO 100MVA.
With the RSA Mr. Ishwait, Basel A concurrence that the 9COM6000000764 to be approved for 30000099 HHI permanently, the Q-info was modified as QSAA from QSAT. Please see the attached confirmation and detailed e-mail. 1/17/2007 AOCT Inspection
Saudi Transformers Company is approved for power transformer up to 5 MVA only and 15 kV. Saudi Transformers Company is not approved for any special type transformer within this ranged (5MVA). ************************************************************************ ******************************************************** QSOH - 6000000764 October 2, 2006 had been set up to WESCOSA as target completion date for corrective action but neither Saudi Aramco receives corrective actions nor any message explain why WESCOSA not able to submit the required corrective actions. Moreover, agreed target completion date October 2, 2006 had been extended up to October 08, 2006 and also neither Saudi Aramco receives corrective actions nor any message explain why WESCOSA also not able to submit the required corrective actions!!! WESCOSA had been moved to hold effective October 08, 2006 till January 8, 2007 for material # 6~764 (Power Transformer). Hold will not be moved till all required corrective actions are submitted, reviewed, verified and found in excellent condition starting from effective communication. See attached fax (1) See attached email (2) OTHMAN ALAMOUDI 8626176 October 08, 2006 ************************************************************************ ******************************************************** LIMITATION: 7.5/9.375 MVA Oil-Filled Power Transformers is the limitation as a new maximum limit for WESCOSA for this 9COM 6000000764. This is as per RSA/CSD Mohammed Al-Ghamdi. Refer to attachment too. HDQ 6/4/2006 VID/QAU ______________________________________________________________ Corrective actions to be closed out during inspection visit in March 2002. Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward. Corrective action closed. M. E. Ward It is up to 5 MVA only UP TO 5 MVA ONLY. No special transformer, No auto-transformer, No reactor. ________________________________________________________________ WESCOSA placed On-Hold as per CSD request for the 9-COM: 6000000764. Due to lack of short circuit design type test for this range of size of transformers and the failure of 2 transformers rated 2.5 MVA, 13.8 /4.16 KV and 2.5/3.75 MVA, 13.8 /4.16 KV. Refer to attachment for more information. The hold status is intended to prevent placing any future Company or Contractor PO's and this status will continue until the design type test is acquired and root causes of the recent 2 failures are identified and their preventive measures are established. After completing the on going investigation on the 2 failures, corrective and preventive actions should be communicate up to inspector level to avoid failure re-occurrence of transformers presently under manufacturing. Husam H. Sendi 10:30 AM, 07/26/2006 ________________________________________________________________ <U><H>LIMITATION:</></> As per CSD, the power transformer commodity (6000000764) limitations for WESCOSA is to read <H>#Max. 2.5 MVA and 13.8 kV/0.48 kV and no specialty equipment
United States Of America
Japan Japan
Turkey Limitation: 5MVA up to 250 MVA, max. 400 KV.
Turkey Brazil Thailand Canada
Japan
United States Of America
Oman
Egypt
Japan
Italy
Norway 35KV ONLY
Saudi Arabia
Saudi Arabia
Saudi Arabia <H><U>NOTE:-</></> See inspection lot 107000050128
United States Of America
United States Of America
United States Of America
United States Of America
Japan
Japan
Oman
Remarks entered by Angela McFadden on 2/19/2007: Limitation: This facility should be limited to provide power transformers for Saudi Aramco up to 35KV and 25MVA. *********************END********************************** Remarks updated 04/14/2003 by Linda Stowell: The South Boston plant is limited to the following ratings/sizes: 6000000764 (CCC 140033) Power Transformers: Primary winding - 69 kV (350 kV BIL) max. Max. OA Rating - 10 MVA James L. Bryant (Quality Coordinator) 04/14/2003
As per the RSA Mr.Ishwait, Basel A's request, this approval(30004806) needs the limitation to 120MVA and 275KV. Please see the attached correspondence to this Q-info for your reference. AOCT Inspection 11-28-08
<H><U>NOTE:-</></> The findings identified by inspection lot 107000049351 were closed during the on-site close out visit completed at the Jeddah Cables site on 9th September 2008. Note that the Jeddah Cables Company SAP record was changed to quality system approved. Michael Eric Ward September 10th 2008
<H><U>NOTE.1.</></> Corrective actions closed and record updated. Michael Eric Ward <H><U>NOTE.2.</></> See inspection lot 107000049405. Michael Eric Ward 23rd April 2008
Egypt
China
China
Egypt
Japan
Norway 35KV THRU 69KV
Saudi Arabia
Saudi Arabia
Japan
Japan
Japan
Turkey
Japan
Egypt
China
Japan
Japan
Japan
Japan
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Quality system is to be approved prior processing the WF. QM status has been changed to QSAA from QSNA manually as per the agreement between RSA and auditor as attached the correspondence. AOCT Inspection 11-5-2008
<H><U>NOTE.1.</></> Corrective actions closed and record updated. Michael Eric Ward <H><U>NOTE.2.</></> See inspection lot 107000049405. Michael Eric Ward 23rd April 2008
<H><U>PREVIOUS NOTE:-</></> AEIC type test must be completed at the time of the first Saudi Aramco order. This materials has no approved SAMSS or A-175 Form, this a special specifications and A-175 Form shall be created for each P.O. until new SAMSS and A-175 From are officially established. The Design Type Test certificate shall still be provided by the vendor to 132 KV power cables in accordance with the Company approved standards.
Overall Status of QMS has been revised as QSAA as agreed with RSA (see the attached e-mail dated on Nov 6, 2007 to IL). IL 107000044228 should have been resulted as QSAA based on the quality evaluation results (periodical assessment). AOCT Inspection Nov 6, 2007 Manufacturer plant Quality system is to be approved prior to conducting technical evaluation review
United States Of America
United States Of America
United States Of America
Germany
Saudi Arabia
Saudi Arabia
Japan
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Canada
United States Of America
<H><U>LIMITATIONS:-</></> i)Instrumentation Cables that are procured from Saudi Cable Co and marked for direct burial shall have an average insulation thickness of 26 mils and a minimum thickness at any point of 20 mils. ii) Exceptions to the approval are as specified by SAES-J-002
Remarks entered by Angela McFadden on 8/08/2005: In efforts to reconcile the SAP listing vs J002, it is being recommended that this plant be approved to supply 9 COM 6000000805. *****************END*************************************** Remarks entered by Angela McFadden on 04/25/05: Plant temporary approval has expired. The plant is now QSNA> ******************END************************************* Remarks entered by Angela McFadden on 12/28/2004. Based on request from ASC Purchasing request for evaluation of TE Wire and Cable, and concurrence of Class 34 RSA's (Reink Tuin and Nabil Gawargy), TE Wire and Cable Company has been granted a one time approval as an approved source of supply for Low Voltage Electrical Cable. ASC QSU is processing this evaluation workflow as a one time approval to allow for order placement (RFQs 5002334030, 5002347184, 5002466642, and 5002330015). TE Wire and Cable will be assessed during the working of the purchase orders for permanent approval. The other manufacturers currently approved for this material have been found to not manufacturer this particular 9CAT. The one time approval, which had the usage decision recorded on December 12, 2004, will be valid for approximately one month (expires January 28, 2005). ***************************************************************
United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
Saudi Arabia
Saudi Arabia
United States Of America
Saudi Arabia
Remarks entered by Angela McFadden on 8/08/2005: In efforts to reconcile the SAP listing vs J002, it is being recommended that this plant be approved to supply 9 COM 6000000805. *****************END*************************************** Remarks entered by Angela McFadden on 04/25/05: Plant temporary approval has expired. The plant is now QSNA> ******************END************************************* Remarks entered by Angela McFadden on 12/28/2004. Based on request from ASC Purchasing request for evaluation of TE Wire and Cable, and concurrence of Class 34 RSA's (Reink Tuin and Nabil Gawargy), TE Wire and Cable Company has been granted a one time approval as an approved source of supply for Low Voltage Electrical Cable. ASC QSU is processing this evaluation workflow as a one time approval to allow for order placement (RFQs 5002334030, 5002347184, 5002466642, and 5002330015). TE Wire and Cable will be assessed during the working of the purchase orders for permanent approval. The other manufacturers currently approved for this material have been found to not manufacturer this particular 9CAT. The one time approval, which had the usage decision recorded on December 12, 2004, will be valid for approximately one month (expires January 28, 2005). ***************************************************************
Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward.
Comments entered by Angela McFadden on 01/30/06: In efforts to synchronize the RVL listing, Point Eight Power is approved to supply 9 COM 6000000845. Please view orginal email request to link material attached to the plant record via services for objects. *************END***********************************************
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
LIMITATION: Siemens Type 8Bk30(Under licensefrom Siemens) KAS 02/12/2006 107000000952. The assessment findings were:- 1.0. QUALITY MANUAL. i) The organization description section of the quality manual failed to link the ISO Co-coordinator to the head of quality located in the USA. ii) The Plant Manager was identified as the Quality Representative for the Saudi Arabia site and the quality responsibilities / link to the Head of Quality located in the USA was not stated in the quality manual. iii) The organization diagram detailed the ISO Q.A. Manager with the ISO Coordinator reporting to the ISO QA Manager. The diagram must detail the responsibility to the Head of Quality in the USA. iv) The quality manual failed to address the ISO9001 para 4.2.1 requirements and explain the quality system documentation hierarchy, i.e. quality manual, quality procedures, project manual and forms. 2.0. ISO 9001:1994 Para 4.1.3. The management review meeting records failed to indicate the effectiveness of the quality system and adequacy of the quality policy was reviewed at the management review meeting. 3.0. ISO 9001 SECTION 4.13 CONTROL OF NON-CONFORMING PRODUCTS The manuals require review to clarify the criteria for issuing a non-conformance or engineering change request , i.e. :- a) The actions required to assess whether the deviation will be identified as a non-conformance or engineering change request. b) The stages required to process the non-conformance or engineering change request. It was noted that the non-conformance forms contained information such that they were a procedure, which is acceptable, and other detail was provided by the manuals. However, the concise clarity to formulate the procedure required by ISO9001 section 4.13 was in some part missing from the Arabian Point Eight Power Company procedures for the control of non-conforming product. 4.0. ISO 9001:1994 Section 4.15 Storage Arabian Point Eight Power Company was unable to provide a manufacturers data sheet to detail the storage conditions for the paint SIP KYP Zinc Chrome 410. The absence of the paint data sheet would indicate that it was not possible to store the paint in accordance with the paint manufacturer.s instructions and provide records indicating that the paint was stored in accordance with shelf life, temperature and humidity requirement. 5.0. ISO 9001 SECTION 4.8 IDENTIFICATION AND TRACEABILITY A solid MIG/MAG welding wire reel was found without identification in the welding wire storage area. The Arabian Point Eight Power Company to review and improve their procedure for the storage and issue of welding wire. The danger of poor welding consumable control is that it would be possible to use the wrong welding consumable i.e. stainless steel in place of carbon steel with the potential manufacturing problems. 6.0.,,ISO 9001 :1994 SECTION 4.14. The preventive action report form should be reviewed to determine the person responsible for assessing the effectiveness of the preventive action. Consideration should be given to the redesign of the preventive action form to incorporate a follow up The approval is limited to Model "MotorPact" only. _____________________________________________________ LIMITATION: SquareD , Motorpact ( under lincense from SquareD ). See attachment too. HDQ: 05/06/2006.
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
recommendation to approve JEDAC for this material ( 6000000857) The Finding from inspection lot 107000009252 were:- 1.0.,,PROCEDURE CLARIFICATION. 1.1. Procedure GEJ-PR-PD-013 should identify the shortage procedure in more detail i.e. shortage reported to Group Leader and the method adopted by the Group Leader to report the shortage to the person responsible for noting the shortage on the expediting sheet. The job title of the person responsible for noting the shortage on the expediting sheet must be specified by the procedure. 1.2. Procedure GEJ-PR-SA-003 and work instruction GEJ-W1-CSE-001 to be aligned to indicate that the Customer Service Engineer or Customer Service Manager call the kick off meeting. 1.3. Procedure GEJ-PR-ST-004 and work instruction GEJ-W1-CSE-001 to be aligned to indicate that the Customer Service Engineer or Customer Service Manager obtain the job number. 1.4. The organization chart to be updated when the company reporting structure is finalized by Senior Management i.e. Technical Manager to Branch Manager etal. 2.0.,,FINDING Work instruction GEJ-WI-PD-004, welding must be revised to defines how welding is controlled in JEDAC. It was noted that the welding process was not completed for load bearing items and was used to join sheet sections to form cabinets. However, the control exercised over MIG and spot welding must be defined in terms of:- a)MIG welding parameters must be specified i.e., voltage, current, shielding gas type, shielding gas flow rate, wire diameter, AWS wire specification. Note a welding procedure is suggested for this purpose. The welding procedure should be qualified by a welding procedure qualification in accordance with a recognized code, i.e. ASME ix. b) The relevant spot welding parameters must be defined, i.e. welding current, welding time, weld pressure applied, electrode type- angle etc. The method adopted to test the strength of the spot welds and the frequency of testing must be specified. 3.0.,,FINDING a) A procedure must be defined for checking the effectiveness of crimp tools for making a secure joint between electrical cables and connecting attachments. Poor/ worn crimp tools will not provide secure joints, the wire will fall out of the connecting attachment and short leading to a possible fire hazard. The test method and frequency of checking wire crimp tools must be specified, the crimp tool identification method must be specified and the method of recording results must be specified. b) Items not subject to calibration must be clearly marked, excluded from calibration system for information only. 4.0.,,FINDING. JEDAC to detail other required methods for approval of sub-vendors within their procedures. Examples discussed during the assessment included:- a) suppliers to be given trial orders and successful completion of the trial order would allow the vendor to be approved as a JEDAC supplier b) JEDAC to complete the vendor questionnaire for vendors if the questionnaire LIMITATION: Based upon Allen-Bradley Bulletin 1500(stationary contactor)OEM kit KAS 02/12/2006 ------------------------------------------ Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward.
Comments entered by Angela MFAdden on 05/10/2006: RSA concurred to link material. Please see email attached via services for objects on the vendor classification screen. *END****************************************************** Comments entered by Angela McFadden on 02/16/2006: This plant is being disapproved due to the non concurrence of the RSA on the workflow request. An email will be sent to the RSA to confirm his rejection of the materials linked to this plant. *END********************************************** Remarks entered by Donna Claymore 02/15/2006 Vacuum Limitamp (stationary contactor) *****************************************
Remarks entered by Donna Claymore 02/15/2006 SafeCenter# Advance Center#
United States Of America
United States Of America
United States Of America
United States Of America
Canada Corrected on 10/30/03 by Linda Stowell
Saudi Arabia
Australia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
Saudi Arabia
Comments entered by Angela McFadden on 05/05/05 In efforts to reconcile SAES-P101 & SAP, it is being recommended that this plant be delinked from the following 9COMs: 6000000857 - MOTOR CONTROL CENTER; 16-SAMSS-506; HIGH 6000000885 - SWITCHGEAR, METAL-CLAD LV INDOOR 6000000900 - BUSDUCT, METAL ENCLOSED 16-SAMSS-511 **********************END*******************************
Remarks Entered by Donna Claymore 02/15/2006 General Electric Vacuum Limitamp (stationary contactor) ****************************************************************
REMARKED ENTERD BY DONNA CLAYMORE 02/15/2006 Series 81000, Type ST-98H series (stationary contactor) **********************************************
Comments entered by Angela McFadden on 05/17/06: Limitation: SquareD , Motorpact *END******************************** Remarks entered by Angela McFadden on 05/04/2005: In efforts to reconcile SAES-P101 RVL Synchronization efforts, it was requested that plant ID 30001942 be approved to manufacture 9COM 6000000857. ***********************END************************************** REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006: MotorPact ***********************END**************************************
<H><U>UPDATED BY MESHARI GHURYRI ON MAY 20 2009:</></> <H><U>Limitation is not applicable as per IL#</></>107000054180 ***************************************************** <H><U>LIMITATION</></> <H>TEMPORARY APPROVAL until l</>ast day of September 2009. Permanent approval will require completion of satisfactory Saudi Aramco CSD and VID assessment during component manufacture before the expiration of the temporary approval. <H>NOTE:-</> The Assessor cancelled inspection lot 107000052404, evaluation request 6649, and raised this work flow to complete desk review because Gulf Power Distribution Company was assessed during 2nd March 2008 by the Saudi Aramco Assessor. Michael Eric Ward September 123th 2008
LIMITATION: Siemens models (Under License from Siemens). KAS 02/12/2006
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Squre D Model. Under license from square D. _______________________________________________ LIMITATION: I-Line, NF, NQOD ( under License from SqaureD ). Also, refer to attachment. HDQ: 05/06/2006. ________________________________________________________________
LIMITATION: General Electric Models (Under License from G.E.) KAS 02/12/2006. ---------------------------------------------------------------- Approval aligned to Patis report 082/00 to remove hold status. M. E. Ward. 10th August 2002. The PATIS report referenced above 082/00 is an old report. A latter report (number 156/00) dated October 30, 2000 states that the follwoing CCC's were resinstated through a desk review. The DR was done by Robert Ryan: CCC 160024, 160052 & 160073. The limitation is GE Models only. As a result hold has been removed from all three CCC's. CCC's are approved with limitation as given above (GE Models only). Afaq Ahmed 09/11/02
LIMITATION: Cutler-Hammer models (Under License from Cutler-Hammer) KAS 02/12/2006 ______________________________________________________________ Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward.
Remarks entered by Angela McFadden on 01/19/2005" It was requested that this 9 com be linked to this plant for the synchronization Between (SAP/RVL & SAES/RVL) for SAES-E-101 and SAES-P-101. ****************************END**********************
LIMITATION: Siemens GM/GMI Type (Under License from Siemens) KAS 02/12/2006
ABB model type ZS 3.2 and ZS 1 indoor switchgears as per 16-SAMSS-504. Limitation added as per RSA, Mohammed Ahmad Al-Ghamdi email, see services for objects. Afaq 3/10/2008
Saudi Arabia
Saudi Arabia
Saudi Arabia
MANUAL. i) The organization description section of the quality manual failed to link the ISO Co-coordinator to the head of quality located in the USA. ii) The Plant Manager was identified as the Quality Representative for the Saudi Arabia site and the quality responsibilities / link to the Head of Quality located in the USA was not stated in the quality manual. iii) The organization diagram detailed the ISO Q.A. Manager with the ISO Coordinator reporting to the ISO QA Manager. The diagram must detail the responsibility to the Head of Quality in the USA. iv) The quality manual failed to address the ISO9001 para 4.2.1 requirements and explain the quality system documentation hierarchy, i.e. quality manual, quality procedures, project manual and forms. 2.0. ISO 9001:1994 Para 4.1.3. The management review meeting records failed to indicate the effectiveness of the quality system and adequacy of the quality policy was reviewed at the management review meeting. 3.0. ISO 9001 SECTION 4.13 CONTROL OF NON-CONFORMING PRODUCTS The manuals require review to clarify the criteria for issuing a non-conformance or engineering change request , i.e. :- a) The actions required to assess whether the deviation will be identified as a non-conformance or engineering change request. b) The stages required to process the non-conformance or engineering change request. It was noted that the non-conformance forms contained information such that they were a procedure, which is acceptable, and other detail was provided by the manuals. However, the concise clarity to formulate the procedure required by ISO9001 section 4.13 was in some part missing from the Arabian Point Eight Power Company procedures for the control of non-conforming product. 4.0. ISO 9001:1994 Section 4.15 Storage Arabian Point Eight Power Company was unable to provide a manufacturers data sheet to detail the storage conditions for the paint SIP KYP Zinc Chrome 410. The absence of the paint data sheet would indicate that it was not possible to store the paint in accordance with the paint manufacturer.s instructions and provide records indicating that the paint was stored in accordance with shelf life, temperature and humidity requirement. 5.0. ISO 9001 SECTION 4.8 IDENTIFICATION AND TRACEABILITY A solid MIG/MAG welding wire reel was found without identification in the welding wire storage area. The Arabian Point Eight Power Company to review and improve their procedure for the storage and issue of welding wire. The danger of poor welding consumable control is that it would be possible to use the wrong welding consumable i.e. stainless steel in place of carbon steel with the potential manufacturing problems. 6.0.,,ISO 9001 :1994 SECTION 4.14. The preventive action report form should be reviewed to determine the person responsible for assessing the effectiveness of the preventive action. Consideration should be given to the redesign of the preventive action form to incorporate a follow up section allowing close out comments concerning the effectiveness of
LIMITATION: SquareD, Class 6055/VR 5 Breaker (under License from SquareD). See attachment too. HDQ: 05/06/2006 KAS 02/12/2006 _______________________________________________________________
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
Group Leader to report the shortage to the person responsible for noting the shortage on the expediting sheet. The job title of the person responsible for noting the shortage on the expediting sheet must be specified by the procedure. 1.2. Procedure GEJ-PR-SA-003 and work instruction GEJ-W1-CSE-001 to be aligned to indicate that the Customer Service Engineer or Customer Service Manager call the kick off meeting. 1.3. Procedure GEJ-PR-ST-004 and work instruction GEJ-W1-CSE-001 to be aligned to indicate that the Customer Service Engineer or Customer Service Manager obtain the job number. 1.4. The organization chart to be updated when the company reporting structure is finalized by Senior Management i.e. Technical Manager to Branch Manager etal. 2.0.,,FINDING Work instruction GEJ-WI-PD-004, welding must be revised to defines how welding is controlled in JEDAC. It was noted that the welding process was not completed for load bearing items and was used to join sheet sections to form cabinets. However, the control exercised over MIG and spot welding must be defined in terms of:- a)MIG welding parameters must be specified i.e., voltage, current, shielding gas type, shielding gas flow rate, wire diameter, AWS wire specification. Note a welding procedure is suggested for this purpose. The welding procedure should be qualified by a welding procedure qualification in accordance with a recognized code, i.e. ASME ix. b) The relevant spot welding parameters must be defined, i.e. welding current, welding time, weld pressure applied, electrode type- angle etc. The method adopted to test the strength of the spot welds and the frequency of testing must be specified. 3.0.,,FINDING a) A procedure must be defined for checking the effectiveness of crimp tools for making a secure joint between electrical cables and connecting attachments. Poor/ worn crimp tools will not provide secure joints, the wire will fall out of the connecting attachment and short leading to a possible fire hazard. The test method and frequency of checking wire crimp tools must be specified, the crimp tool identification method must be specified and the method of recording results must be specified. b) Items not subject to calibration must be clearly marked, excluded from calibration system for information only. 4.0.,,FINDING. JEDAC to detail other required methods for approval of sub-vendors within their procedures. Examples discussed during the assessment included:- a) suppliers to be given trial orders and successful completion of the trial order would allow the vendor to be approved as a JEDAC supplier b) JEDAC to complete the vendor questionnaire for vendors if the questionnaire information is obtained by fax or e-mail. The information must be attached to the questionnaire for audit purposes. 5.0.,,RECOMMENDATION. JEDAC are recommended to improve in-process inspection and test status/tags . It is recommended that inspected work-in-progress instrument panels should be provided with a sticky passed inspection tag indicating the inspector.s initials, date
According to RSA (Ghamdi, Mohammad A (CSD)) requirement for 9com # 6000000878 for WESCOSA, the limitation will be the following: 1.,,Powel VAC (Vacuum) 36" 1200A, 2000A, 3000A. 2.,,POWEL. VAC-ND (Vacuum Narrow Design) 26" is for 1200A only. RSA email is attached. OTHMAN ALAMOUDI 00966 862 6176 02/25/2007 ************************************************************************ ******************************************************* <H><U>1.0. NOTE</></> Note the RSA forgot to tick the concur box and this record was up-dated based on the fax from Mr. Carlson located in the attachment. MICHAEL ERIC WARD <H><U>2.0. LIMITATION</></> POWEL. VAC-ND is for 1200 A only. Shabib M. Al-Sudairi 12/11/2004 <H><U>3.0. CHANGE BY M. E. WARD</></> Date corrected by M. Ward 19th June 2005.
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Vac-Clad W *************************END*********************************
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Type PowerVac **********************END**************************
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Advancegear HKII *************************END****************************
MEDIUM VOLTAGE METAL-CLAD SWITCHGEAR - MAXIMUM VOL TAGE LIMITED TO 15KVCLASS. ************************************************ REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Point Vac C Point Vac G *********************END************************
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 GM/GMI Type *********************END**************************
Comments entered by Angela McFadden on 05/17/06: SquareD , Class 6055/ VR 5 Breaker *END**********************************
UPDATED BY MESHARI GHURYRI ON MAY 20 2009: Limitation is not applicable as per IL#107000054180 ***************************************************** <H><U>LIMITATION</></> Temporary approval until last day February 2009. Note:- i) Permanent approval will require completion of successful Saudi Aramco VID and CSD assessment prior to the end of the temporary approval. ii) Status changed from temporary to limitations whilst keeping the one year temporary period to allow RVL registration. Note that this action was agreed with the RSA (SEE SERVICES TO OBJECTS ATTACHMENT). Michael Eric Ward
Remarks Entered 10/24/2002 by Y.F. Dawkins: Material approved under Insp. Lot. #107000000426 for plant 30002033 which was entered into SAP in error. END OF REMARKS
LIMITATION: Siemens models (Under License from Siemens) KAS 02/12/2006
Saudi Arabia
Saudi Arabia
Netherlands
United States Of America
United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
LIMITATION: General Electric Models. KAS 02/12/2006 _________________________________________________ Approval aligned to Patis report 082/00 to remove hold status. M. E. Ward. 10th August 2002 The PATIS report referenced above 082/00 is an old report. A latter report (number 156/00) dated October 30, 2000 states that the follwoing CCC's were resinstated through a desk review. The DR was done by Robert Ryan: CCC 160024, 160052 & 160073. The limitation is GE Models only. As a result hold has been removed from all three CCC's. CCC's are approved with limitation as given above (GE Models only). Afaq Ahmed 09/11/02.
LIMITATION: Pow-R-Line models under license from Cutler-Hammer. KAS 02/12/2006 ____________________________________________________________ Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward.
LIMITATION: Siemens Type R/RL (Under License from Siemens) KAS 02/12/2006
LIMITATION: ABB K-Line (Under License from ABB). KAS 02/12/2006 ________________________________________________________________ <H><U>LIMITATION:</></> As per RSA, Mohammad Ghamdi (CSD), the following limitation was added to 9COM <H>60000000885</>. Max SG was reviewed found meeting our specifications as such it is an acceptable system and would be adding value to Saudi Aramco. Reflect in the limitation section this <H>1- ABB K-Line (Under License from ABB).</> <H>2- ABB Max SG# (Under License from ABB).</> Refer to attachment too. Hussain D. Al-Qahtani VID/QAU 09/11/2006 ________________________________________________________________
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
metal enclosed LV indoor CCC 160054 <H><U>Based on GE Low Voltage Switchgear Type AKD</></> using wavepro air circuit breakers. Under 9COM <H>6000000885</>. See attachment from RSA. HDQ 09/11/2006 ---------------------------------------------------------- Record updated by M. Ward 24th August 2002 based on inspection lot 107000000952. The assessment findings were:- 1.0. QUALITY MANUAL. i) The organization description section of the quality manual failed to link the ISO Co-coordinator to the head of quality located in the USA. ii) The Plant Manager was identified as the Quality Representative for the Saudi Arabia site and the quality responsibilities / link to the Head of Quality located in the USA was not stated in the quality manual. iii) The organization diagram detailed the ISO Q.A. Manager with the ISO Coordinator reporting to the ISO QA Manager. The diagram must detail the responsibility to the Head of Quality in the USA. iv) The quality manual failed to address the ISO9001 para 4.2.1 requirements and explain the quality system documentation hierarchy, i.e. quality manual, quality procedures, project manual and forms. 2.0. ISO 9001:1994 Para 4.1.3. The management review meeting records failed to indicate the effectiveness of the quality system and adequacy of the quality policy was reviewed at the management review meeting. 3.0. ISO 9001 SECTION 4.13 CONTROL OF NON-CONFORMING PRODUCTS The manuals require review to clarify the criteria for issuing a non-conformance or engineering change request , i.e. :- a) The actions required to assess whether the deviation will be identified as a non-conformance or engineering change request. b) The stages required to process the non-conformance or engineering change request. It was noted that the non-conformance forms contained information such that they were a procedure, which is acceptable, and other detail was provided by the manuals. However, the concise clarity to formulate the procedure required by ISO9001 section 4.13 was in some part missing from the Arabian Point Eight Power Company procedures for the control of non-conforming product. 4.0. ISO 9001:1994 Section 4.15 Storage Arabian Point Eight Power Company was unable to provide a manufacturers data sheet to detail the storage conditions for the paint SIP KYP Zinc Chrome 410. The absence of the paint data sheet would indicate that it was not possible to store the paint in accordance with the paint manufacturer.s instructions and provide records indicating that the paint was stored in accordance with shelf life, temperature and humidity requirement. 5.0. ISO 9001 SECTION 4.8 IDENTIFICATION AND TRACEABILITY A solid MIG/MAG welding wire reel was found without identification in the welding wire storage area. The Arabian Point Eight Power Company to review and improve their procedure for the storage and issue of welding wire. The danger of poor welding consumable control is that it would be possible to use the wrong welding consumable i.e. stainless steel in place of carbon steel with the potential manufacturing problems. 6.0.,,ISO LIMITATION: Square D Class 6035(Under License from Square D). KAS 02/12/2006. ____________________________________________________ LIMITATION: SquareD, PZ4- Class 6037 (Under License from SquareD).Also, refer to attachment. HDQ: 05/06/2006.
LIMITATION: General Electric Type AKD (Under License from General Electric). KAS 02/12/2006 -------------------------------------------------------------- Approval aligned to Patis report 082/00 to remove hold status. M. E. Ward. 10th August 2002. NOTE ADDED MAY 11th 2003 Corrective actions were closed out during site close out assessment completed on 10th May 2003. The record was changed from approved with corrective actions to approved. M. E. Ward. 11th May 2003
LIMITATION: Cutler-Hammer Type DSII (Under License to Cutler-Hammer). KAS 02/12/2006 ------------------------------------------------------------- Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward. MAGNUM DS. 480 v type switchgear, by cutler-hammer. Shabib M. Al-Sudairi 12/11/2004
REMARKED ENTERED BY DONNA CLAYMORE 02/15/2006 Type DSII *************************END*************************
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Puerto Rico
Saudi Arabia
Saudi Arabia
Saudi Arabia
Remarks entered by Angela McFadden on 01/08/2007: Limitation: GE Entelsys 480v Switchgear, metal enclosed LV indoor CCC 160054 and Type AKD *END*********************************************** REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Type AKD *************************END***************************
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 K-Line ABB Max SG (Under License from ABB). **************************END******************************
Comments entered by Angela McFadden on 05/05/05 In efforts to reconcile SAES-P101 & SAP, it is being recommended that this plant be delinked from the following 9COMs: 6000000857 - MOTOR CONTROL CENTER; 16-SAMSS-506; HIGH 6000000885 - SWITCHGEAR, METAL-CLAD LV INDOOR 6000000900 - BUSDUCT, METAL ENCLOSED 16-SAMSS-511 **********************END*******************************
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Based upon Cutler-Hammer DSII breaker assembly *************************END**************************
Remarks entered by Angela McFadden on 01/08/2007: Limitation: Siemens WL 480v Switchgear, metal enclosed LV indoor CCC 160054 and typ R/RL *END*************************************************** REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Type R/RL ******************END***********************
Comments entered by Angela McFadden on 05/17/06: SquareD, PZ4- class 6037 *END********************************************
UPDATED BY MESHARI GHURYRI ON MAY 20 2009: Limitation is not applicable as per IL#107000054180 ***************************************************** <H><U>LIMITATION</></> Temporary approval until last day February 2009. <H>Note:-</> <H>i)</> Permanent approval will require completion of successful Saudi Aramco VID and CSD assessment prior to the end of the temporary approval. ii) Status changed from temporary to limitations whilst keeping the one year temporary period to allow RVL registration. Note that this action was agreed with the RSA (SEE SERVICES TO OBJECTS ATTACHMENT). Michael Eric Ward
Saudi Arabia
MANUAL. i) The organization description section of the quality manual failed to link the ISO Co-coordinator to the head of quality located in the USA. ii) The Plant Manager was identified as the Quality Representative for the Saudi Arabia site and the quality responsibilities / link to the Head of Quality located in the USA was not stated in the quality manual. iii) The organization diagram detailed the ISO Q.A. Manager with the ISO Coordinator reporting to the ISO QA Manager. The diagram must detail the responsibility to the Head of Quality in the USA. iv) The quality manual failed to address the ISO9001 para 4.2.1 requirements and explain the quality system documentation hierarchy, i.e. quality manual, quality procedures, project manual and forms. 2.0. ISO 9001:1994 Para 4.1.3. The management review meeting records failed to indicate the effectiveness of the quality system and adequacy of the quality policy was reviewed at the management review meeting. 3.0. ISO 9001 SECTION 4.13 CONTROL OF NON-CONFORMING PRODUCTS The manuals require review to clarify the criteria for issuing a non-conformance or engineering change request , i.e. :- a) The actions required to assess whether the deviation will be identified as a non-conformance or engineering change request. b) The stages required to process the non-conformance or engineering change request. It was noted that the non-conformance forms contained information such that they were a procedure, which is acceptable, and other detail was provided by the manuals. However, the concise clarity to formulate the procedure required by ISO9001 section 4.13 was in some part missing from the Arabian Point Eight Power Company procedures for the control of non-conforming product. 4.0. ISO 9001:1994 Section 4.15 Storage Arabian Point Eight Power Company was unable to provide a manufacturers data sheet to detail the storage conditions for the paint SIP KYP Zinc Chrome 410. The absence of the paint data sheet would indicate that it was not possible to store the paint in accordance with the paint manufacturer.s instructions and provide records indicating that the paint was stored in accordance with shelf life, temperature and humidity requirement. 5.0. ISO 9001 SECTION 4.8 IDENTIFICATION AND TRACEABILITY A solid MIG/MAG welding wire reel was found without identification in the welding wire storage area. The Arabian Point Eight Power Company to review and improve their procedure for the storage and issue of welding wire. The danger of poor welding consumable control is that it would be possible to use the wrong welding consumable i.e. stainless steel in place of carbon steel with the potential manufacturing problems. 6.0.,,ISO 9001 :1994 SECTION 4.14. The preventive action report form should be reviewed to determine the person responsible for assessing the effectiveness of the preventive action. Consideration should be given to the redesign of the preventive action form to incorporate a follow up section allowing close out comments concerning the effectiveness of
Saudi Arabia
Saudi Arabia
Netherlands
United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
Spain Limitation to 36KV maximum
Saudi Arabia
were:- 1.0.,,PROCEDURE CLARIFICATION. 1.1. Procedure GEJ-PR-PD-013 should identify the shortage procedure in more detail i.e. shortage reported to Group Leader and the method adopted by the Group Leader to report the shortage to the person responsible for noting the shortage on the expediting sheet. The job title of the person responsible for noting the shortage on the expediting sheet must be specified by the procedure. 1.2. Procedure GEJ-PR-SA-003 and work instruction GEJ-W1-CSE-001 to be aligned to indicate that the Customer Service Engineer or Customer Service Manager call the kick off meeting. 1.3. Procedure GEJ-PR-ST-004 and work instruction GEJ-W1-CSE-001 to be aligned to indicate that the Customer Service Engineer or Customer Service Manager obtain the job number. 1.4. The organization chart to be updated when the company reporting structure is finalized by Senior Management i.e. Technical Manager to Branch Manager etal. 2.0.,,FINDING Work instruction GEJ-WI-PD-004, welding must be revised to defines how welding is controlled in JEDAC. It was noted that the welding process was not completed for load bearing items and was used to join sheet sections to form cabinets. However, the control exercised over MIG and spot welding must be defined in terms of:- a)MIG welding parameters must be specified i.e., voltage, current, shielding gas type, shielding gas flow rate, wire diameter, AWS wire specification. Note a welding procedure is suggested for this purpose. The welding procedure should be qualified by a welding procedure qualification in accordance with a recognized code, i.e.ASME ix. b) The relevant spot welding parameters must be defined, i.e. welding current, welding time, weld pressure applied, electrode type- angle etc. The method adopted to test the strength of the spot welds and the frequency of testing must be specified. 3.0.,,FINDING a) A procedure must be defined for checking the effectiveness of crimp tools for making a secure joint between electrical cables and connecting attachments. Poor/ worn crimp tools will not provide secure joints, the wire will fall out of the connecting attachment and short leading to a possible fire hazard. The test method and frequency of checking wire crimp tools must be specified, the crimp tool identification method must be specified and the method of recording results must be specified. b) Items not subject to calibration must be clearly marked, excluded from calibration system for information only. 4.0.,,FINDING. JEDAC to detail other required methods for approval of sub-vendors within their procedures. Examples discussed during the assessment included:- a) suppliers to be given trial orders and successful completion of the trial order would allow the vendor to be approved as a JEDAC supplier b) JEDAC to complete the vendor questionnaire for vendors if the questionnaire information is obtained by fax or e-mail. The information must be attached to the questionnaire for audit purposes. Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward.
LIMITATION: Merlin-Gerin Ringmaster & Genie ( Under License from Merlin Gerin ). CBGS0 Switchgear. Also, refer to attachment. HDQ: 05/06/2006. ______________________________________________________________
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 SF-6 Load Break Switches only ***************************END****************************
South Korea
United States Of America
United States Of America
United States Of America
Germany
Switzerland
Saudi Arabia
United States Of America
United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
As attached RSA's concurrence, the QM status for 6000000895( CIRCUIT BREAKER; INERT GAS; 3; 34.5 - 23) has been changed manually to QSAA from QSNA. AOCT Inspection 1-6-09
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Type SPS2 245 kV circuit breakers not approved ***********************END****************************
Comments entered by Angela McFadden on 03/11/09: Type DT1-72.5 F1 (72.5 KV) circuit breakers not approved". See justification for limitation attached to the plant record (MK03) via services for objects. *END******************************************************
Limitation: The rated voltage to be registered is between 72.5 kV and 145 kV
LIMITATION: TIASTAR models(Under License from Siemens) KAS 02/12/2006
The limitation is Low Voltage Motor Control Center MNS 3.0 model only. OTHMAN ALAMOUDI 00966 3 862 6176 02/17/2007 ABB model type "MNS iS" low voltage motor control center as per 16-SAMSS-503. Limitation added as per RSA Mohammad Ahmad Al-Ghamdi, email, see services for objects. Afaq 03/10/2008
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
RVL. -Control gear, indoor/LV CCC 160071 Arabian Point Eight Power based on <H><U>GE-E-9000 evolution series design</></>. Under 9COM <H>6000000898 </>. See attachment from RSA. HDQ 09/11/2006 -------------------------------------------------------------- Record updated by M. Ward 24th August 2002 based on inspection lot 107000000952. The assessment findings were:- 1.0. QUALITY MANUAL. i) The organization description section of the quality manual failed to link the ISO Co-coordinator to the head of quality located in the USA. ii) The Plant Manager was identified as the Quality Representative for the Saudi Arabia site and the quality responsibilities / link to the Head of Quality located in the USA was not stated in the quality manual. iii) The organization diagram detailed the ISO Q.A. Manager with the ISO Coordinator reporting to the ISO QA Manager. The diagram must detail the responsibility to the Head of Quality in the USA. iv) The quality manual failed to address the ISO9001 para 4.2.1 requirements and explain the quality system documentation hierarchy, i.e. quality manual, quality procedures, project manual and forms. 2.0. ISO 9001:1994 Para 4.1.3. The management review meeting records failed to indicate the effectiveness of the quality system and adequacy of the quality policy was reviewed at the management review meeting. 3.0. ISO 9001 SECTION 4.13 CONTROL OF NON-CONFORMING PRODUCTS The manuals require review to clarify the criteria for issuing a non-conformance or engineering change request , i.e. :- a) The actions required to assess whether the deviation will be identified as a non-conformance or engineering change request. b) The stages required to process the non-conformance or engineering change request. It was noted that the non-conformance forms contained information such that they were a procedure, which is acceptable, and other detail was provided by the manuals. However, the concise clarity to formulate the procedure required by ISO9001 section 4.13 was in some part missing from the Arabian Point Eight Power Company procedures for the control of non-conforming product. 4.0. ISO 9001:1994 Section 4.15 Storage Arabian Point Eight Power Company was unable to provide a manufacturers data sheet to detail the storage conditions for the paint SIP KYP Zinc Chrome 410. The absence of the paint data sheet would indicate that it was not possible to store the paint in accordance with the paint manufacturer.s instructions and provide records indicating that the paint was stored in accordance with shelf life, temperature and humidity requirement. 5.0. ISO 9001 SECTION 4.8 IDENTIFICATION AND TRACEABILITY A solid MIG/MAG welding wire reel was found without identification in the welding wire storage area. The Arabian Point Eight Power Company to review and improve their procedure for the storage and issue of welding wire. The danger of poor welding consumable control is that it would be possible to use the wrong welding consumable i.e. stainless steel in place of carbon steel with the potential manufacturing problems. 6.0.,,ISO
LIMITATION: Square D Model 6 (Under License from Square D) KAS 02/12/2006. _________________________________________________ LIMITATION: SquareD, Model 6 MCC (under License from SquareD). HDQ: 05/06/2006. _________________________________________________
LIMITATION: CSD recommends removing JEDAC their old Spectra/8000 product line and replace it with new product #Evolution series E-9000#. This in under 16-SAMSS- 503 under SAP code 6000000898. This is as per Mohammad Al-Ghamdi RSA from CSD. Refer to attachment too. HDQ 6/4/2006 VID/QAU ________________________________________________________________ LIMITATION: General Electric 8000-Line and Spectra Series (Under License from General Electric) KAS 02/12/2006 ------------------------------------------------- Approval aligned to Patis report 082/00 to remove hold status. M. E. Ward. 10th August 2002. NOTE ADDED 11 th MAY 2003 The corrective actions were closed during the close out assessment completed on May 10th 2003. The record was changed from approved with corrective actions to approved. M. E. Ward. 11th May 2003.
Saudi Arabia
Netherlands
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Saudi Arabia
United States Of America
Saudi Arabia
The following limitation was adviced by RSA-Mohammed Al Ghamdi [GHAMMA07] as per attached email. "see services for object" Please add the below line in the limitation section for WESCOSA factory in Dammam. <H>"F2100 series including intelligent "IT MCC "under Eaton agreement " </> <H> </> <H>This is under 9com 6000000898 based on 16-SAMSS-503, they have submitted acceptable technical data for this addition.</> <H>07/13/2008</> **************************************************************** Approval changed to Approved with limitations based on details received from the RSA Mr. R. W. Carlson ( see attachment). LIMITATIONS ARE AS FOLLOWS:- THE LIMITATIONS AGAINST WESCOSA FOR MATERIAL 6000000898 ARE CUTLER-HAMMER ADVANTAGE OR FREEDOM 2100 MODELS MANUFACTURED UNDER LICENSE FROM CUTLER-HAMMER M. E. Ward. 6th November 2002 Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward.
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Advantage Freedom 2100 **********************END*************************
Comments entered on 05/10/2006 by Angela McFadden: Per the RSA's request, a limitation of "Evolution series E-9000" is to be placed on this 9COM. Email request from the RSA is attached via services for objects on the vendor classification screen (MK03). *END*************************** Comments entered by Angela MFAdden on 05/10/2006: RSA concurred to link material. Please see email attached via services for objects on the vendor classification screen. *END****************************************************** Comments entered by Angela McFadden on 02/16/2006: This plant is being disapproved due to the non concurrence of the RSA on the workflow request. An email will be sent to the RSA to confirm his rejection of the materials linked to this plant. *******************END***********************************
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Based upon Cutler-Hammer Advantage or Freedom 2100 design ****************************END*******************************
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 TIASTAR *******************END***************************
Comments entered by Angela McFadden on 05/17/06: SquareD, Model 6 MCC **END*********************************************
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Saudi Arabia
UPDATED BY MESHARI GHURYRI ON MAY 20 2009: Limitation is not applicable as per IL#107000054180 ***************************************************** <H><U>LIMITATION</></> Temporary approval until last day February 2009. <H>Note:-</> <H>i)</> Permanent approval will require completion of successful Saudi Aramco VID and CSD assessment prior to the end of the temporary approval. ii) Status changed from temporary to limitations whilst keeping the one year temporary period to allow RVL registration. Note that this action was agreed with the RSA (SEE SERVICES TO OBJECTS ATTACHMENT). Michael Eric Ward
Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward.
LIMITATION: (Under License from Technibus). KAS 02/12/2006. _______________________________________________________ Approval aligned to Patis report 082/00 to remove hold status. M. E. Ward. 10th August 2002. The PATIS report referenced above 082/00 is an old report. A latter report (number 156/00) dated October 30, 2000 states that the follwoing CCC's were resinstated through a desk review. The DR was done by Robert Ryan: CCC 160024, 160052 & 160073. The limitation is GE Models only. As a result hold has been removed from all three CCC's. CCC's are approved with limitation as given above (GE Models only). Afaq Ahmed 09/11/02
Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward.
Comments entered by Angela McFadden on 05/05/05 In efforts to reconcile SAES-P101 & SAP, it is being recommended that this plant be delinked from the following 9COMs: 6000000857 - MOTOR CONTROL CENTER; 16-SAMSS-506; HIGH 6000000885 - SWITCHGEAR, METAL-CLAD LV INDOOR 6000000900 - BUSDUCT, METAL ENCLOSED 16-SAMSS-511 **********************END*******************************
Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward.
United States Of America
Italy
United States Of America
United States Of America
United States Of America
United States Of America
Saudi Arabia
United States Of America United States Of America United States Of America
Switzerland
United States Of America
Canada
United States Of America
Japan
Germany
United States Of America
Canada
United States Of America
Brazil
United States Of America
South Korea
Germany
Finland
India
Switzerland
United States Of America
United States Of America
LIMITATION: MP Husky models (Under License from MP Husky) KAS 02/12/2006 _______________________________________________________ Note 01-01-2003. See attachment for problem solving visit relating to bushing leak on transformers. Michael Eric Ward.
QM status has been changed to QSAA from QSNA manually with RSA concurrence, because the RSA missed to concur the UD as QSAA through IL 107000050813 LS IND SYSTEMS 30004712 as attached in the correspondence. AOCT Inspection 12-18-08
United States Of America
Italy
Switzerland
France
India
France
United Kingdom
United Kingdom
United Kingdom
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
South Korea
Singapore
Singapore
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom
United Kingdom
United Kingdom
Germany
Germany
Comments entered by Angela McFadden on 09/19/05: Per the request of RSA Khalid H. Masoud, it is being requested that La Marche be approved to supply 9 COM 6000000947. *********END************************************************* Comments entered by Angela McFadden on 05/05/2005: In efforts to synchronize the SAES-P101 & SAP listing, it is being recommended that 9COM 6000000947 be delinked from this plant.
As attached the RSA concurrence, WF 5974 (IL107000051166)( which was completed wrongly as QSNA )'s QM status has been changed to QSAA manually. AOCT Inspection 1-6-09
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom
United Kingdom
United States Of America
United States Of America
Canada
Canada
United States Of America
United States Of America
United States Of America
United States Of America
South Korea
Singapore
Singapore
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
United States Of America United Kingdom United Kingdom United States Of America
Italy
Saudi Arabia Saudi Arabia Saudi Arabia United Kingdom MAX 150 MVA. United Kingdom Brazil
************************************************************ REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Caterpillar engine and generator ******************END****************************************
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Cummins engine *******************END**********************
Maximum power limit during Diesel-Gen package load testing is approx. 2.5 MW
Austria
Japan
Germany
Canada
Canada
United States Of America
United States Of America
Taiwan
United States Of America
United States Of America
Mexico
United States Of America
Germany
Sweden
Finland
Mexico
Germany
Poland
Brazil
Taiwan
QM status ON HOLD has been removed manually to QSAA as per AOCT Insp Rep(AA) & AOCL Inspection Supervisor's request. (See the attached) AOCT Inspection Oct 23, 2008 QM status has been changed to QSOH manually with the concurrence by AOCT Insp Rep Al-Megren, please see all the correspondence attached to this Q-info. AOCT Inspection Sep 30, 2008
Limitation: This recommendation is applicable to Cast Iron Motors which are designed , manufactured and tested at this plant only. Notes: 1. ABB Automation Technologies AB may not submit an explosion proof certificate of cast Iron frame motors (frame size; 160 - 250) at the moment. 2. ABB has worldwide central stock system and therefore, purchase orders shall be described that all motors ordered shall be manufactured and tested at this plant. Since motors may be distributed from other plants of ABB group including ABB China, India, Italia and Spain.
Limitation: This recommendation is applicable to cast iron motors which are designed , manufactured and tested at this plant only. Note: ABB has worldwide central stock system and therefore, purchase orders shall be described that all motors ordered shall be manufactured and tested at this plant. Since motors may be distributed from other plants of ABB group including ABB China, India, Italia and Spain.
QM status ON HOLD has been removed manually to QSAA as per AOCT Insp Rep(AA) & AOCL Inspection Supervisor's request. (See the attached) AOCT Inspection Oct 23, 2008 QM status has been changed to QSOH manually with the concurrence by AOCT Insp Rep Al-Megren, please see all the correspondence attached to this Q-info. AOCT Inspection Sep 30, 2008
United States Of America
United States Of America
Mexico
United States Of America
Germany
Sweden
Finland
Germany
Poland
Brazil
United States Of America
Japan LIMIATIONS UP TO 12000HP, 13.2 KV RATING.
South Korea LIMITATIONS UP TO 8000P, 13.2 KV RATING.
Sweden AMB & AMC only
France LIMITED TO 10,000 HP
Netherlands Maximum capacity : 815 HP and 6.6 KV ( 60 Hz)
Germany see attached e-mail 11/06/07
Taiwan
Japan
Brazil
Limitation: This recommendation is applicable to Cast Iron Motors which are designed , manufactured and tested at this plant only. Notes: 1. ABB Automation Technologies AB may not submit an explosion proof certificate of cast Iron frame motors (frame size; 160 - 250) at the moment. 2. ABB has worldwide central stock system and therefore, purchase orders shall be described that all motors ordered shall be manufactured and tested at this plant. Since motors may be distributed from other plants of ABB group including ABB China, India, Italia and Spain.
Limitation: This recommendation is applicable to cast iron motors which are designed , manufactured and tested at this plant only. Note: ABB has worldwide central stock system and therefore, purchase orders shall be described that all motors ordered shall be manufactured and tested at this plant. Since motors may be distributed from other plants of ABB group including ABB China, India, Italia and Spain.
QM status ON HOLD has been removed manually to QSAA as per AOCT Insp Rep(AA) & AOCL Inspection Supervisor's request. (See the attached) AOCT Inspection Oct 23, 2008 QM status has been changed to QSOH manually with the concurrence by AOCT Insp Rep Al-Megren, please see all the correspondence attached to this Q-info. AOCT Inspection Sep 30, 2008
LIMITATION UP TO 12000HP, 13.2KV RATING. PERIODICAL ASSESSMENT
Remarks entered by Angela McFadden on 6/14/2005: GE Brazil has a limitation of manufacturing motors up to 5500 hp. ******************END*************************************
Canada
United States Of America
United States Of America
Italy 5500 HP Max
Finland
Italy
Germany
Germany
Germany see attached e-mail 11/06/07
Germany Limitations: UP to 10,000 kW
China
Brazil
Japan
United States Of America
Japan LIMIATION UP TO 12000HP, 13.2 KV RATING.
South Korea LIMITATIONS UP TO 8000P, 13.2 KV RATINGS.
Sweden AMB & AMC Only
France LIMITED TO 10,000 HP
Netherlands Maximum capacity : 815 HP and 6.6 KV ( 60 Hz)
Germany
Taiwan
Comments entered by Angela McFadden on 04/26/06: 6000000996 - MOTOR INDUCTION; ABOVE 250 HP POWER,ABOVE 4000 V, TEFC/TEAAC/CACA ENCLOSURE,HORIZONTAL MTG,17-SAMSS-502 6000000997 - MOTOR INDUCTION; ABOVE 250 HP POWER,ABOVE 1000 V,VERTICAL MTG,17-SAMSS-502 *END********************************************* SEE THE PLANT REMARKS SCREEN (MPBP9619) ************************************** ******************************************* REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Horizontal, 6.6 kV max., 5,000 HP maximum *******************************************
************************************************************* REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 10,000 HP maximum *************************************************************
QM status ON HOLD has been removed manually to QSAA as per AOCT Insp Rep(AA) & AOCL Inspection Supervisor's request. (See the attached) AOCT Inspection Oct 23, 2008 QM status has been changed to QSOH manually with the concurrence by AOCT Insp Rep Al-Megren, please see all the correspondence attached to this Q-info. AOCT Inspection Sep 30, 2008
Japan
Brazil
Canada
United States Of America
United States Of America
Italy 5500 HP max
Finland
Italy
Germany
Germany
Germany see attached e-mail 11/06/07
Germany Limitations: Up to 10,000 kW
China
Brazil
Sweden
France
Germany
Brazil
Canada
Canada
Germany
Germany
Brazil
Saudi Arabia
Saudi Arabia
LIMITATION UP TO 12000HP, 13.2KV RATING. PERIODICAL ASSESSMENT
Remarks entered by Angela McFadden on 6/14/2005: GE Brazil has a limitation of manufacturing motors up to 5500 hp. ******************END*************************************
Comments entered by Angela McFadden on 04/26/06: 6000000996 - MOTOR INDUCTION; ABOVE 250 HP POWER,ABOVE 4000 V, TEFC/TEAAC/CACA ENCLOSURE,HORIZONTAL MTG,17-SAMSS-502 6000000997 - MOTOR INDUCTION; ABOVE 250 HP POWER,ABOVE 1000 V,VERTICAL MTG,17-SAMSS-502 *END********************************************* REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 Horizontal, 6.6 kV max., 5,000 HP maximum *******************END************************
REMARKED ENTERED BY DONNA CLAYMORE 02/15/2006 10,000 HP maximum *************************************************************
Saudi Arabia
United States Of America
United States Of America
Saudi Arabia
Switzerland Limitations: Only up to 200 kVA
United States Of America
Italy Limitations: Only up to 200 kVA
Switzerland Limitations: Only up to 200 kVA
Germany
Germany
United Kingdom
United Kingdom
United Kingdom
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom
United Kingdom
South Korea
Singapore
<H><U>LIMITATION</></> <H><U>1.0.</></> The limitation is that Statron must provide AEC with the following support:- i) Statron must finalize the test procedure to instruct AEC how to test the UPS. ii) Statron must loan AEC the required test equipment to test the UPS until AEC obtain the required test equipment iii) Statron must conduct on the job training to instruct AEC Personnel how to test the UPS systems and issue competence certificates when the training period is completed, minimum first Saudi Aramco order( also see services to objects Statron Letter). <H><U>Note </></> The limitation will remain effective until the three points detailed above have been completed, for example. Statron Personnel complete the AEC test procedure, AEC obtain the required test equipment and Statron Management issue competence certificate to AEC Test Personnel for testing the UPS systems. Michael Eric Ward September 12th 2006 2.0. Corrective actions closed during the site assessment completed on 28th April 2007. Note that the limitation is still valid. Michael Eric Ward 6th May 2007
Singapore
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
South Korea
Singapore
Singapore
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
Italy
France
France
United States Of America
United States Of America
Saudi Arabia
India
Italy
United States Of America
Germany
France
India
Greece
Germany
Saudi Arabia
China
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
India
Sweden
United States Of America
United States Of America
India
Czech Republic
REMARKS ENTERED BY DONNA CLAYMORE 02/15/2006 -Absolyte IIP, Valve regulated (sealed) ********************END*********************** In Saudi Aramco, the brand of valve regulated lead acid battery (9COM # 6000001075) by the manufacturer Exide Technologies (ID # 30001675) is known as (GNB). So following this manufacturer name, please insert the word"(GNB)". Thanks. Best Regards, Khalid Hasan Masoud
As attached the RSA concurrence, WF 5974 (IL107000051166)( which was completed wrongly as QSNA )'s QM status has been changed to QSAA manually. AOCT Inspection 1-6-09
The RSA performed his technical survey and found that the supplier is approved with the following limitation " approval is limited to the following product series; GFM, GFMG, GFMU, FTA,FTB and GFMJ, FTJ, FMJ"
As attached the RSA concurrence, WF 5974 (IL107000051166)( which was completed wrongly as QSNA )'s QM status has been changed to QSAA manually. AOCT Inspection 1-6-09
Germany
Germany
Netherlands United States Of America United States Of America New Zealand Singapore Australia United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America Malaysia Australia
Bahrain
Saudi Arabia
Saudi Arabia
Saudi Arabia
Netherlands
United Kingdom
Germany
United States Of America
United Kingdom
Bahrain
United Kingdom Limitation: manufacturing / assembling by FKI-ET.
Utd.Arab Emir.
Germany
United States Of America
Saudi Arabia
United States Of America
Material manufactured and tested at Hoppecke Batterie Systeme GmbH in Brilon, Germany.
Comments entered by Angela Mcfadden on 05/27/08: 9COM is manufactured in China. ********END********************************************* Comments entered by Angela McFadden on 09/18/2006: Per the request of VID, Foxboro is being namually linked to 9COM 6000001547. Please see email request attached to plant record MK03. *END************************************************
Canada
Saudi Arabia
Saudi Arabia
Netherlands
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
India
Germany
United States Of America
Canada
India
Saudi Arabia
Norway
United States Of America
Japan
Germany
Japan
United States Of America
United States Of America
Remarks entered by Angela McFadden on 11/23/2004: In efforts to reconcile the J002 listing, it is recommended that the following 9COMS be approved for this plant: 6000001537 & 6000001584. *******************************
Remarks entered by Angela McFadden on 11/30/2005: Emerson was initially evaluated for work to be done for the Ain Dar & Shedgum project (BI-8274). In the beginning, their quality system was found to be outdated. However, since that time, they have performed very well. A full report on Emerson's performance will be prepared once the project is complete. As requested by the RSA, the following 9COMs will be linked to synchronize J002/SAP: 6000001537 & 6000001584.
This 9COM is put on hold because of entire quality management system is on hold # for more detail review IL # 107000050584#. Meshari Ghuryri 03/03/2009 ================================================================ This change is to re-instate the approval status to QSAA as this 9COM was missed from the WF to lift hold. Ali Al Maimoni 05/25/09
Japan
United States Of America
Netherlands Italy Japan Japan
Germany
France Germany Germany Switzerland
Japan
Japan
Japan United States Of America United States Of America United States Of America Netherlands Japan
Netherlands
United States Of America United States Of America
United Kingdom
Utd.Arab Emir. Netherlands
United Kingdom
Netherlands Germany
Germany
India
Switzerland
United Kingdom Italy
Japan
Germany Utd.Arab Emir.
United Kingdom
Utd.Arab Emir.
One time approval has been granted by the RSA. Please refer to the RSA email attached. Shabib M. Al-Sudairi October 10, 2003
Limitation : only project management, engineering, packaging and testing is performed at the Hengelo location.
1.,,Approved to supply reciprocating compressors up to a 2500 HP limit. 2.,,Approval of NDT procedures Note 1: Dresser Rand NDT procedures were submitted to the NDTU via VID letter # M-044/06 dated 11/04/2006. NDT procedures shall be approved by NDTU at the time of placement of order.
Netherlands
Italy
Japan
Japan
United States Of America
Netherlands
Germany
India
Switzerland
Austria
United Kingdom
Germany
Utd.Arab Emir.
Saudi Arabia
Saudi Arabia
Japan
Germany
United Kingdom
Germany
United Kingdom
Japan
Italy
Austria
United Kingdom
Italy
United Kingdom
Limitation : This 9COM can only be supplied by Nuovo Pignone thru their subcontractor GI&E. During this evaluation the scope of products assembled and tested at the GI&E shop were identified : -AVTN/BVTN series (vertical), including Cubogas type. -O-series (horizontal) -Frame type HA, HB, HD, HE, 2HF up and including 4HF (horizontal) -HM, SHM series -SHMB series
1.,,Approved to supply reciprocating compressors up to a 2500 HP limit. 2.,,Approval of NDT procedures Note 1: Dresser Rand NDT procedures were submitted to the NDTU via VID letter # M-044/06 dated 11/04/2006. NDT procedures shall be approved by NDTU at the time of placement of order.
Maximum power upper limit during compressor package load testing is 1.5 MW
Put On Hold. see document attached to the Vendor Master. Shabib M. Al-Sudairi 02/23/2005
Saudi Arabia
Netherlands
France
Japan
Japan
Japan
United States Of America
United States Of America
United States Of America
Italy
Canada
South Korea
France
Japan
Japan
South Korea
China
India
Mexico
Saudi Arabia
Saudi Arabia
Japan
Germany
United Kingdom
United Kingdom
Japan
Italy
Austria
<H><U>LIMITATION.</></> Approved with limitations packaging only and all major components , pumps motors, mechanical seals etc, to be procured from approved Saudi Aramco RVL Manufacturers ( see services to objects attachment) Michael Eric Ward 14th November 2007
Comments entered by Angela McFadden on 02/07/06: Based on an ASC Engineering & Quality Systems Unit evaluation of this facility, Flowserve is now an approved source. ***END********************************************
Put On Hold. see document attached to the Vendor Master. Shabib M. Al-Sudairi 02/23/2005
United Kingdom
Italy
Saudi Arabia
Netherlands
France
Netherlands
France
Japan
Japan
United States Of America
United States Of America
United States Of America
United States Of America
Italy
France
Japan
Japan
Germany
Brazil
Brazil
South Korea
China
India
Saudi Arabia
Saudi Arabia
Germany
United Kingdom
Germany
Japan
Casing sub-supplier should be approved by Saudi Aramco (Refer to inspection lot 107000020058).
<H><U>NOTE:-</></> Desk review completed 5th November 2007 to clarify approval position (see services to objects attachment). Michael Eric Ward 14th November 2007
Comments entered by Angela McFadden on 02/07/06: Based on an ASC Engineering & Quality Systems Unit evaluation of this facility, Flowserve is now an approved source. ***END********************************************
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 02/28/02)
United Kingdom
Italy
Saudi Arabia
Netherlands
Netherlands
Japan
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Italy
Japan
South Korea
China
Mexico
United Kingdom Canada
United States Of America
United States Of America United States Of America United States Of America Sweden
United Kingdom
Germany
Casing sub-supplier should be approved by Saudi Aramco (Refer to inspection lot 107000020058).
<H><U>NOTE:-</></> Desk review completed 5th November 2007 to clarify approval position (see services to objects attachment). Michael Eric Ward 14th November 2007
Comments entered by Angela McFadden on 02/07/06: Based on an ASC Engineering & Quality Systems Unit evaluation of this facility, Flowserve is now an approved source. ***END********************************************
omments entered by Angela McFadden on 10/20/05: ASC QSU will conduct a full on site evaluation either prior, or during the working of the next order. ******END******************************************
Updated Q-info record to correct conversion error. Eval report indicated approval and concurrence. Linda Stowell 4/21/03
Casing sub-supplier should be approved by Saudi Aramco (Refer to inspection lot 107000020058). All pumps in this commodity ( 6000002303) shall be manufactured/assembled/tested at this Glasgow plant. Pumps supplied thru IMO-Sweden (30000080) is NOT acceptable.
Germany
Canada United States Of America United States Of America United States Of America United Kingdom Germany
United Kingdom
United States Of America United Kingdom United Kingdom
Australia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Deviations from API 676 requiring technical waiver : 1) Pump ( pressure ) casings are designed to AD Merkblatter ( German pressure code) in stead of ASME VIII div.1 2) Gears are designed to meet DIN 3990 calculations in stead of AGMA 6010. 3) Materials selection. Materials for main components ( forgings, castings, pipe, etc) are selected on the basis of DIN standards in lieu of ASME section II. 4) Weld design including WPS/PQR and welders qualification are made to meet AD Merkblatter, EN 287 and EN 288 in lieu of ASME IX.
According to Insp. Rep Mr. Alaa, the temporary linkage will be made based on the one-time approval by RSA Mr. Hazza Hussain in 2004 and the below justification from PMT. The new WF 4747 will be followed by AOCT auditor's quality evaluation and RSA's techncial evaluation this year for the formal approval. 5-26-06 AOCT Insepction Quote) From: Zowayed, Abdullah J Sent: Monday, April 17, 2006 3:28 PM To: Odan, Nabeel M Cc: Hazza, Hussain A; Dossary, Khaled M (CSD); *CSD RED Pump Engineers; Ghunam, Zaid A; Ghamdi, Khaled D Subject: RE: REQ#1000200490 PUMP; ROTARY; VANE; Nabeel, Please see below single source Justification was provided by PMT, please review it and let us know if we can proceed with requesting quote from vendor. Justification:- The required pump is ordered to be a shop spare for two existing kerosene unloading pumps at NRBP-TLR. The pump is part of complete unloading skid and the original manufacturer will supply identical pump which technically compatible with companion equipment presently in place. The original pump#s manufacturer will supply a pump that identical to the existing ones and will fit in the off-loading skid without any modification neither electrical nor mechanical which will eliminate additional installation and modification cost Regards, Abdullah Jassem Al-Zowayed Projects & Strategic Purchasing Dept. CR/WR &PCS Unit Tel +966 3 874-0240 Fax +966 3 874-0251 mail to [email protected] (Unquote) As per the RSA email, one time approval is granted. See attached email. Shabib M. Al-Sudairi February 14, 2004 ================================================================Extended the approval date up to end of October 2004. Shabib M. Al-Sudairi June 04, 2004.
Utd.Arab Emir.
Germany
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom
France
Germany
United States Of America
United States Of America
Saudi Arabia
Belgium
<H>Note:-</> Approval to include manufacture of the associated tanks. Michael Eric Ward 20th October 2007
<H><U>Limitations:-</></> i),,Detailed design and drawings including the pipe isometrics shall be completed by a qualified designer. The designer shall be evaluated by the RSA on a purchase order basis. ii),,RVL-managed components of the skid shall be provided form approved RVL manufacturers. iii),,Electrical installation and testing must be completed by Saudi Aramco approved electrical contractor. iv),,MIS Arabia must provide suitable undercover assembly area for the skid manufacture, assembly and testing to avoid water contact and ingress of sand particles during dust storms. Furthermore, electrical components must be stored in accordance with the manufacturer's recommendations to prevent deterioration and malfunction.
<H><U>LIMITATION</></> 1.,,Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction code. 2.,,Metito is only approved for manufacturing. <H><U>NOTE:-</></> See services to objects attachment for the RSA letter. Michael Eric Ward 30th December 2008
Comments entered by G Wood 22-Nov-2004: per eval report dated 09-Feb-1994 Full inspection should be performed on all welds until such time as Bran & Luebbe can demonstrate implementation of an adequate weld inspection program; including training of a weld inspector. The implementation of corrective actions for the following items should be verified with inspection of subsequent orders at this facility: 1) Weld procedures are available to welders, and drawings contain sufficient weld details. 2) The procedure for the approved vendors list has been revised to require QA involvement in the approval of vendors and the control of the AVL. 3) The procedure for calibration of measurement equipment has been revised to either provide for recall of equipment checked with tools later found to be out of calibration, or to include verification of measurement equipment to known standards on a time interval short enough to minimize the potential risk of having product verified with tools out of calibration. PJK 1/29/97 JSW 10/23/2001 SEE THE PLANT REMARKS SCREEN (MPBP9619)
Utd.Arab Emir.
India India India
Saudi Arabia
Saudi Arabia
United Kingdom Saudi Arabia
Saudi Arabia
Netherlands Germany United States Of America United States Of America United States Of America United States Of America Japan Japan
Japan
India Brazil Brazil
India
India
United States Of America
Saudi Arabia
Belgium
Japan
United States Of America
Germany
Mechanical seal 6000002315 is limited to maximum diameter of 12 inches. ============================================================== Limitaition is removed. refer to IL#107000052778 and attachment in service for object. Meshari Ghuryri 09/08/08
The linkage was created based on the CSD email and concurance for when the mechanical seals are replacement in kind (spares) of existing mechanical seals, no mechanical seal inspection is required. However, for new mechanical seal installations (new pumps), the plant has to be approved first. Hussain A. Al-Hazza REU/RED/CSD 03) 874-7873 E-7510, Dhahran see the attached email Alaa July 14, 2005 Te above statement fulfilled by the survey conducted on August 2005 after the temporary linkage and passed to the RSA and accepted as per the work flow of Evaluation request # 3660. Unfortunately, the system did not change it automatically. the approval change form QSAT to QSAA manually Abdulaziz A. Al-Megren February 5, 2008
United States Of America
Germany
Japan
Japan
United States Of America
Japan
United States Of America
Japan
Denmark
Saudi Arabia
Saudi Arabia
India
United Kingdom
Germany
Japan
Italy
United Kingdom
United Kingdom
Saudi Arabia
France
France
Japan
United States Of America
United States Of America
United States Of America
Brazil
India
9COM delinked from 3000113 plant ( Man Berlin) and linked to MAN Oberhausen plant ( 30001196). Concurred by AOCIU and CSD. RAK 04/11/05
The manual linkage of 9COM-6000002340 Blower; Centrifugal ; 31-SAMSS-001, with 30001350 Hitachi has been completed as per RSA Mr. Abdulrahman Khowaiter's request (pls see the attached backup correspondece) AOCT Inspection 6/18/2009
Put On Hold. see document attached to the Vendor Master. Shabib M. Al-Sudairi 02/23/2005
<H><U>NOTE:-</></> Desk review completed 5th November 2007 to clarify approval position ( see services to objects attachment). Michael Eric Ward 14th November 2007
Comments created by Angela McFadden on 10/04/2005: By the RSA's request, Peerless Pump is approved to manufacture 9 COMs 6000002355 & 6000002344. 9 COMs 6000002350 & 6000002288 are to be delinked. *********************************END****************************
Netherlands
Netherlands
United Kingdom
United Kingdom
Germany
Germany
United Kingdom
United Kingdom
Austria
Japan
Japan
France
Japan
France
France
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Japan
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
United Kingdom
Saudi Arabia
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Saudi Arabia
Japan
France
United States Of America
China
Japan
<H><U>NOTE:-</></> Desk review completed 5th November 2007 to clarify approval position (see services to objects attachment). Michael Eric Ward 14th November 2007
As attached the correspondence, RSA concurred only one-time approval. As a result of AOCT quality evaluation, the result was QSAA. Based on teh RSA's concurrence as QSAT, it was manually updated to QSAT from QSAA. AOCY Inspection Feb 2008
United States Of America
Saudi Arabia
Saudi Arabia
India
Japan
Austria
United Kingdom
Saudi Arabia
United States Of America
United States Of America
South Korea
<H><U>NOTE:-</></> Desk review completed 5th November 2007 to clarify approval position (see services to objects attachment). Michael Eric Ward 14th November 2007
Removed the power limitation on 9COM 6000002350 Pump; Centrifugal; Horizontal; ASME/ISO as per the RSA's request (Abdullah A. Al-Ghamdi, Supervisor Rotating Equipment Unit/RED/CSD) The QM status for this material has been updated as QSAA (See the attached the e-mail to Q-info) FYI : However please note the power limitation exists as follows according to Mr. Ohno, AOCT inspector: (quoted) The rating of test motor is 750KW (1000 HP). The performance test shall be covered 120% of rating point. However, this vendor can#t perform 900KW (1200 HP) operation. From the motor capacity, 625KW is maximum rating of this vendor. (unquoted) AOCT Inspection 7-9-2008 Please note limitation indicated by RSA: "the limitation is 500 HP and 440 volts as reported. Normally we have 460 and 480 volts systems. This is due to the testing stand limitaitons. Since this is the first plant from Korea, I would recommend starting with ASME pumps first and may add API pumps (more critical) later after we see their capability of after sale support and field experience. Hussain A. Al-Hazza Mar-11-2004" Henk Kampinga for Khalid Suwaidan Mar-23-2004
South Korea
Brazil
South Korea
China
India
United States Of America
United States Of America
United Kingdom
United States Of America
United States Of America
China
France UP TO 27,000 RPM.
Germany
United Kingdom
Austria
Italy
Removed the power limitation on 9COM 6000002350 Pump; Centrifugal; Horizontal; ASME/ISO as per the RSA's request (Abdullah A. Al-Ghamdi, Supervisor Rotating Equipment Unit/RED/CSD) The QM status for this material has been updated as QSAA (See the attached the e-mail to Q-info) FYI : However please note the power limitation exists as follows according to Mr. Ohno, AOCT inspector: (quoted) The rating of test motor is 750KW (1000 HP). The performance test shall be covered 120% of rating point. However, this vendor can#t perform 900KW (1200 HP) operation. From the motor capacity, 625KW is maximum rating of this vendor. (unquoted) AOCT Inspection 7-9-2008 Please note limitation indicated by RSA: "the limitation is 500 HP and 440 volts as reported. Normally we have 460 and 480 volts systems. This is due to the testing stand limitaitons. Since this is the first plant from Korea, I would recommend starting with ASME pumps first and may add API pumps (more critical) later after we see their capability of after sale support and field experience. Hussain A. Al-Hazza Mar-11-2004" Henk Kampinga for Khalid Suwaidan Mar-23-2004
W/Deviation not full as per ASME B73 but as per ISO 2858 AOCT Inspection Yozo Okura
Japan
Japan
United States Of America
United States Of America
As per the CSD Mr. Odan, Nabeel M Request attached, 9COM 6000002352 PUMP; CENTRIFUGAL; HIGH HEAD, LOW FLOW has been linked to the plant ID 30003449 manually without WF. AOCT Inspection 2-3-09 From: Odan, Nabeel M Sent: Monday, February 02, 2009 11:16 AM To: Saihati, Husain M Cc: *CSD RE&CED Pump Engineers; Bash, Fahad M Subject: FW: Adding vendors to Low Flow - High Head Pumps 9COM 6000002352 Hussain, We request that the attached vendors be added to 9COM 6000002352. No survey or workflow requests are needed (refer to the background below) Background: We have changed the name of 9COM 6000002352 from integrally geared pumps to low flow-high head pumps. Due to this change we needed to add the already approved vendors to this 9COM. Please note that these manufacturers are already approved for the manufacturing of this pump application. This is only re-organizing of commodities to ensure better sourcing of these pumps and improve competitiveness.
Comments entered by Angela McFadden on 2/03/09: From: Odan, Nabeel M Sent: Monday, February 02, 2009 11:16 AM To: Saihati, Husain M Cc: *CSD RE&CED Pump Engineers; Bash, Fahad M Subject: FW: Adding vendors to Low Flow - High Head Pumps 9COM 6000002352 Hussain, We request that the attached vendors be added to 9COM 6000002352. No survey or workflow requests are needed (refer to the background below) Background: We have changed the name of 9COM 6000002352 from integrally geared pumps to low flow-high head pumps. Due to this change we needed to add the already approved vendors to this 9COM. Please note that these manufacturers are already approved for the manufacturing of this pump application. This is only re-organizing of commodities to ensure better sourcing of these pumps and improve competitiveness. Regards, Please see email attached via services for objects to the plant record (MK03). ********************************END*****************************
Comments entered by Angela McFadden on 2/03/09: From: Odan, Nabeel M Sent: Monday, February 02, 2009 11:16 AM To: Saihati, Husain M Cc: *CSD RE&CED Pump Engineers; Bash, Fahad M Subject: FW: Adding vendors to Low Flow - High Head Pumps 9COM 6000002352 Hussain, We request that the attached vendors be added to 9COM 6000002352. No survey or workflow requests are needed (refer to the background below) Background: We have changed the name of 9COM 6000002352 from integrally geared pumps to low flow-high head pumps. Due to this change we needed to add the already approved vendors to this 9COM. Please note that these manufacturers are already approved for the manufacturing of this pump application. This is only re-organizing of commodities to ensure better sourcing of these pumps and improve competitiveness. Regards, Please see email attached via services for objects to the plant record (MK03). ********************************END*****************************
United States Of America
South Korea
France
Japan
omments entered by Angela McFadden on 10/20/05: ASC QSU will conduct a full on site evaluation either prior, or during the working of the next order. ******END******************************************
As per the CSD Mr. Odan, Nabeel M Request attached, 9COM 6000002352 PUMP; CENTRIFUGAL; HIGH HEAD, LOW FLOW has been linked to the plant ID 30003177 manually without WF. AOCT Inspection 2-3-09 From: Odan, Nabeel M Sent: Monday, February 02, 2009 11:16 AM To: Saihati, Husain M Cc: *CSD RE&CED Pump Engineers; Bash, Fahad M Subject: FW: Adding vendors to Low Flow - High Head Pumps 9COM 6000002352 Hussain, We request that the attached vendors be added to 9COM 6000002352. No survey or workflow requests are needed (refer to the background below) Background: We have changed the name of 9COM 6000002352 from integrally geared pumps to low flow-high head pumps. Due to this change we needed to add the already approved vendors to this 9COM. Please note that these manufacturers are already approved for the manufacturing of this pump application. This is only re-organizing of commodities to ensure better sourcing of these pumps and improve competitiveness.
As per the CSD Mr. Odan, Nabeel M Request attached, 9COM 6000002352 PUMP; CENTRIFUGAL; HIGH HEAD, LOW FLOW has been linked to the plant ID 30003449 manually without WF. AOCT Inspection 2-3-09 From: Odan, Nabeel M Sent: Monday, February 02, 2009 11:16 AM To: Saihati, Husain M Cc: *CSD RE&CED Pump Engineers; Bash, Fahad M Subject: FW: Adding vendors to Low Flow - High Head Pumps 9COM 6000002352 Hussain, We request that the attached vendors be added to 9COM 6000002352. No survey or workflow requests are needed (refer to the background below) Background: We have changed the name of 9COM 6000002352 from integrally geared pumps to low flow-high head pumps. Due to this change we needed to add the already approved vendors to this 9COM. Please note that these manufacturers are already approved for the manufacturing of this pump application. This is only re-organizing of commodities to ensure better sourcing of these pumps and improve competitiveness.
Mexico
United States Of America
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
India
United Kingdom
Germany
Italy
United Kingdom
United Kingdom
Saudi Arabia
Netherlands
Norway
Japan
United States Of America
United States Of America
Comments entered by Angela McFadden on 2/03/09: From: Odan, Nabeel M Sent: Monday, February 02, 2009 11:16 AM To: Saihati, Husain M Cc: *CSD RE&CED Pump Engineers; Bash, Fahad M Subject: FW: Adding vendors to Low Flow - High Head Pumps 9COM 6000002352 Hussain, We request that the attached vendors be added to 9COM 6000002352. No survey or workflow requests are needed (refer to the background below) Background: We have changed the name of 9COM 6000002352 from integrally geared pumps to low flow-high head pumps. Due to this change we needed to add the already approved vendors to this 9COM. Please note that these manufacturers are already approved for the manufacturing of this pump application. This is only re-organizing of commodities to ensure better sourcing of these pumps and improve competitiveness. Regards, Please see email attached via services for objects to the plant record (MK03). ********************************END*****************************
Put On Hold. see document attached to the Vendor Master. Shabib M. Al-Sudairi 02/23/2005 Casing sub-supplier should be approved by Saudi Aramco (Refer to inspection lot 107000020058).
<H><U>NOTE:-</></> Desk review completed 5th November 2007 to clarify approval position (see services to objects attachment). Michael Eric Ward 14th November 2007
United States Of America
Brazil
Brazil
India
Japan
Germany
Germany
United Kingdom
Italy
United Kingdom
Italy
Saudi Arabia
Netherlands
Netherlands
Japan
Japan
United States Of America
United States Of America
United States Of America
United States Of America
Italy
South Korea
France
Japan
Japan
Comments created by Angela McFadden on 10/04/2005: By the RSA's request, Peerless Pump is approved to manufacture 9 COMs 6000002355 & 6000002344. 9 COMs 6000002350 & 6000002288 are to be delinked. *********************************END****************************
Put On Hold. see document attached to the Vendor Master. Shabib M. Al-Sudairi 02/23/2005
<H><U>NOTE:-</></> Desk review completed 5th November 2007 to clarify approval position (see services to objects attachment). Michael Eric Ward 14th November 2007
Comments entered by Angela McFadden on 02/07/06: Based on an ASC Engineering & Quality Systems Unit evaluation of this facility, Flowserve is now an approved source. ***END********************************************
omments entered by Angela McFadden on 10/20/05: ASC QSU will conduct a full on site evaluation either prior, or during the working of the next order. ******END******************************************
Germany
Brazil
Brazil
South Korea
China
India
Mexico
Italy
Germany
United Kingdom
Germany
United Kingdom
Japan
Italy
United Kingdom
Italy
Saudi Arabia
Netherlands
France
Japan
Japan
Japan
United States Of America
United States Of America
United States Of America
Italy
Canada
France
Japan
Put On Hold. see document attached to the Vendor Master. Shabib M. Al-Sudairi 02/23/2005
<H><U>NOTE:-</></> Desk review completed 5th November 2007 to clarify approval position (see services to objects attachment). Michael Eric Ward 14th November 2007
Comments entered by Angela McFadden on 02/07/06: Based on an ASC Engineering & Quality Systems Unit evaluation of this facility, Flowserve is now an approved source. ***END********************************************
Japan
Japan
Brazil
Brazil
China
Japan
Germany
United Kingdom
Germany
United Kingdom
Italy
United Kingdom
Italy
Saudi Arabia
Netherlands
Japan
Japan
United States Of America
Italy
Canada
This Q information record is created at the request of the RSA Hussain A.Al-Haza, REU/RED/CSD). See details in the attached emails. Afaq 12/3/2003. This Q information record is created at the request of the RSA (Hussain A.Al-Haza, REU/RED/CSD). See details in the attached emails. Afaq 12/3/2003. This Q information record is created at the request of the RSA (Hussain A.Al-Haza, REU/RED/CSD). See details in the attached emails. Afaq 12/3/2003. This Q information record is created at the request of the RSA (Hussain A.Al-Haza, REU/RED/CSD). See details in the attached emails. Afaq 12/3/2003. ______________________________________________________________ Put On Hold. see document attached to the Vendor Master. Shabib M. Al-Sudairi 02/23/2005
Casing sub-supplier should be approved by Saudi Aramco (Refer to inspection lot 107000020058). Tawfiq Al-Atiq 1/12/2004 This Q information record is created at the request of the RSA (Hussain A.Al-Haza, REU/RED/CSD). See details in the attached emails. Afaq 12/3/2003. This material was added in the request because the Q-I record was created manualy for it on March, 2003 Majed, 12/16/2003
<H><U>LIMITATION.</></> Approved with limitations packaging only and all major components , pumps motors, mechanical seals etc, to be procured from approved Saudi Aramco RVL (see services to objects attachment). Michael Eric Ward 14th November 2007
This Q information record is created at the request of the RSA (Hussain A.Al-Haza, REU/RED/CSD). See details in the attached emails. Afaq 12/3/2003. This Q information record is created at the request of the RSA (Hussain A.Al-Haza, REU/RED/CSD). See details in the attached emails. Afaq 12/3/2003.
Comments entered by Angela McFadden on 02/07/06: Based on an ASC Engineering & Quality Systems Unit evaluation of this facility, Flowserve is now an approved source. ***END********************************************
France
Japan
Germany
Japan
Brazil
Brazil
South Korea
India
Japan
Germany
United Kingdom
Germany
United Kingdom
Japan
Italy
United Kingdom
Italy
Saudi Arabia
Netherlands
Japan
Japan
Japan
United States Of America
United States Of America
United States Of America
United States Of America
Italy
Canada
Put On Hold. see document attached to the Vendor Master. Shabib M. Al-Sudairi 02/23/2005
<H><U>LIMITATION</></> Approved with limitations packaging only and all major components , pumps motors, mechanical seals etc, to be procured from approved Saudi Aramco RVL ( see services to objects attachment). Michael Eric Ward 14th November 2007
Comments entered by Angela McFadden on 02/07/06: Based on an ASC Engineering & Quality Systems Unit evaluation of this facility, Flowserve is now an approved source. ***END********************************************
France
Japan
Japan
Japan
Brazil
South Korea
China
India
Japan Germany United Kingdom Germany
United Kingdom
Japan
Italy
Austria
United Kingdom
Italy
Saudi Arabia
Netherlands Japan
Japan
Japan
United States Of America
United States Of America Italy
France
Japan Japan Japan
Brazil
South Korea China
India
Put On Hold. see document attached to the Vendor Master. Shabib M. Al-Sudairi 02/23/2005
Casing sub-supplier should be approved by Saudi Aramco (Refer to inspection lot 107000020058). Tawfiq Al-Atiq 1/12/2004
<H><U>LIMITATION</></> Approved with limitations packaging only and all major components , pumps motors, mechanical seals etc, to be procured from approved Saudi Aramco RVL ( see services to objects attachment). Michael Eric Ward 14th November 2007
Comments entered by Angela McFadden on 02/07/06: Based on an ASC Engineering & Quality Systems Unit evaluation of this facility, Flowserve is now an approved source. ***END********************************************
United States Of America
United States Of America
Germany
Germany
United Kingdom
France
Germany
Japan
United States Of America
United States Of America
United States Of America
Germany
United States Of America
Germany
Germany
Italy
Comments entered by G Wood 22-Nov-2004: per eval report dated 09-Feb-1994 Full inspection should be performed on all welds until such time as Bran & Luebbe can demonstrate implementation of an adequate weld inspection program; including training of a weld inspector. The implementation of corrective actions for the following items should be verified with inspection of subsequent orders at this facility: 1) Weld procedures are available to welders, and drawings contain sufficient weld details. 2) The procedure for the approved vendors list has been revised to require QA involvement in the approval of vendors and the control of the AVL. 3) The procedure for calibration of measurement equipment has been revised to either provide for recall of equipment checked with tools later found to be out of calibration, or to include verification of measurement equipment to known standards on a time interval short enough to minimize the potential risk of having product verified with tools out of calibration. PJK 1/29/97 JSW 10/23/2001 SEE THE PLANT REMARKS SCREEN (MPBP9619)
Remarks entered by Angela McFadden on 01/30/2006: The Corrective Action Request issued September, 2004 is now considered closed, and Pulsafeeder will be retained as an approved source for 6000002361. ***********************END*********************************
Deviations from API 676 requiring technical waiver : 1) Pump ( pressure ) casings are designed to AD Merkblatter ( German pressure code) in stead of ASME VIII div.1 2) Gears are designed to meet DIN 3990 calculations in stead of AGMA 6010. 3) Materials selection. Materials for main components ( forgings, castings, pipe, etc) are selected on the basis of DIN standards in lieu of ASME section II. 4) Weld design including WPS/PQR and welders qualification are made to meet AD Merkblatter, EN 287 and EN 288 in lieu of ASME IX.
ANY ORDER PLACEMENT MUST BE APPROVED IN ADVANCE BY THE RSA.
United States Of America
United States Of America
Japan
Sweden
Germany
United Kingdom
Italy
United Kingdom
Germany
United States Of America
United States Of America
United States Of America
Germany
China
Germany MAX. 280 KW
Japan
United States Of America
Japan
China
China
Germany
Saudi Arabia
Remarks entered by Angela McFadden on 02/28/2006: RSA (Tariq Al-Alshaikh) has concurred to link the material. *END********************************************************* Remarks entered by Angela McFadden on 11/15/2004: 9COM 6000002365 recommended by the assessor was not concurred to by the RSA. Therefore, the plant's status is QSAA with a QSNA on the 9COM that was rejected by the RSA> ****************************************************************
The AB Motala Plant is a manufacturing plant solely for Gardner Denver Nash. Any purchase order for vacuum pumps needs to be placed thru sales office Gardner Denver Nash Deutschland GmbH ( Vendor ID 10028374) located at Neurenberg in Germany.
omments entered by Angela McFadden on 10/20/05: ASC QSU will conduct a full on site evaluation either prior, or during the working of the next order. ******END******************************************
omments entered by Angela McFadden on 10/20/05: ASC QSU will conduct a full on site evaluation either prior, or during the working of the next order. ******END******************************************
<H><U>LIMITATION.</></> Approval restricted to packaging only and the pumps must be obtained from a Saudi Aramco approved vendor. ( see services to objects attachment for the RSA approval) Michael Eric Ward February 3rd 2008
Japan
United States Of America
Japan Italy United Kingdom Germany United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
Germany
Saudi Arabia
Netherlands
United Kingdom
Norway
Singapore
United States Of America
United States Of America
United States Of America
United States Of America
Denmark
Saudi Arabia
Denmark
Japan
United States Of America
United States Of America
Italy
Germany
United States Of America
<H><U>NOTE:-</></> Desk review completed 5th November 2007 to clarify approval position (see services to objects attachment). Michael Eric Ward 14th November 2007
The approval does not include pumps for fire water services. See RSA email in services for objects Afaq Ahmed 10/17/2005
United States Of America
India
Denmark 9COM added as part of RVL Enhancement effort.
United Kingdom
Spain
United Kingdom
Japan
United States Of America
United States Of America
South Korea
Japan
India
India Japan Saudi Arabia Denmark 9COM added as per RVL enhancement effort. United Kingdom
United Kingdom WATER TUBE BOILERS ONLY. 50 TONNES PER HOUR PLUS.
Germany Japan United States Of America Mexico
United States Of America
Spain
South Korea Japan Italy India
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
India
Saudi Arabia
Netherlands
Japan
United States Of America
United Kingdom
Thailand
Saudi Arabia
United Kingdom
India
Italy
Belgium
United States Of America
Taiwan
United States Of America
United States Of America
1.0. It is recommended that the hold status is removed from Metito (see attachments # letter from Managing Director). It is recommended that the following limitations are placed on Metito:- Order placement must take the painting process into account because Metito may have difficulty in controlling the painting process due to the fact that Metito surface blast clean and paint out of doors. <H>LIMITATIONS CLARIFIED</> Metito lack comprehensive welding technology knowledge and contracts should be confined to carbon steel less than 20 mm thick and austenitic stainless steel.See services to objects attachment Metito. M. Ward 15th June 2004
It is the limitation that PCC Sterling can manufacture / assemble the complete set of furnaces of 1 MW and below at PCC Sterling's plant at Aylesbury in UK.
No refractory lining by Hidada. Hidada is a fabrication shop only. They are not capable of doing design for fire heaters.
BIH should be limited to design, procurement and project management only. Fabrication of Saudi Aramco orders must be subcontracted to Aramco approved plants.
Saudi Arabia
Japan
United States Of America
Belgium
United States Of America
Taiwan
Utd.Arab Emir.
Utd.Arab Emir.
Qatar
Italy
Germany
Saudi Arabia
Saudi Arabia
France
Italy
France
South Korea
Japan
United States Of America
United States Of America
South Korea
Utd.Arab Emir.
South Korea
South Korea
Italy
<H><U>LIMITATIONS:-</></> a) <H>Restrict the Steel Casting Company supply scope to HANGER SUPPORT UNITS ONLY TO ASTM A 297 GRADE HK (cast 25 percent chromium 20 percent nickel steel).</> b) <H>Weld repair of Saudi Aramco castings is not permitted until the Steel Casting Company demonstrate satisfactory control of the welding process providing relevant welding procedures and qualification of welders.</> c) <H>NDE must be completed by approved Saudi Aramco NDE contractors until the Steel Casting Company set up NDE facility and gain approval for NDE from Saudi Aramco.</> Michael Eric Ward 1st December 2008
Based on the attached the correspondences between RSA & Insp Rep, AOCT updated the VM as QSAA as the resutls of AOC lead auditor Mr. Tamura in 2006. AOCT Inspection 4/9/2007
It was resulted that S&T is acceptable provided that effectiveness of the corrective actions and the follow-up actions are verified by AOCT assessor during the next survey to be conducted six (6) months after this survey. Inspection Engineer Name: Akira Tamura, Lead Assessor Certifications: JRCA A00532 Date: 21 June 2006
UPDATE BY MESHARI GHURYRI IN JUNE 7, 2009. "Hamon D'Hondt Middle East approval is limited to assembly (not manufacturing) of Air Cooled Heat Exchangers using the components supplied by Hamon D'Hondt France"
",,Jord Malaysia Fabrication shop is limited to Fabrication of Air cooled Heat Exchanger utilizing Jord International engineering and procurement for critical items. JORD MALAYSIA (30005221) AP Inspection June 2009
Remarks entered by ALM on 7/21/2004: Brown Fintube is approved for both double-pipe and multi-tube (or hairpin) heat exchangers only. Heaters approved are line and suction heaters and tank fintube heaters only. Finned tubes approved are longitudinal finned resistance welded tubes only. Brazed tubes are not approved, nor are tubes with circumferential fins, such as used for air-cooled heat exchangers.
Engineering Limits/Comments Entered 7/13/04 by ALM Engineering Comments: Maximum pressure is 400 psig, maximum temperature is 300 degrees F, maximum port (inlet) size is 16 in. diameter. Material of internal plates can be any alloy. **END Engineering Limits/Comments Entered 10/22/01 by Y. Dawkins Engineering Comments: Maximum pressure is 400 psig, maximum temperature is 300 degrees F, maximum port (inlet) size is 16 in. diameter. Material of internal plates can be any alloy.
United States Of America
Japan
Germany
United States Of America
United Kingdom
Italy
France
France
United Kingdom
United Kingdom
Germany
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United Kingdom
France
United Kingdom
France
United Kingdom
United Kingdom
Japan
Japan
United Kingdom
MHI Hiroshima informed AOCT that they are NO LONGER produceing this material and WF for de-linkage will be initiated after AOCT recives the RSA concurrence which was requested today (Sep26, 2006). Please refer to the attached the e-mail from vendor dated on Sep 26, 2006. AOCT Inspection
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Egypt
Kuwait
Japan
Netherlands
Saudi Arabia
Saudi Arabia
Saudi Arabia
MHI Hiroshima informed AOCT that they are NO LONGER produceing this material and WF for de-linkage will be initiated after AOCT recives the RSA concurrence which was requested today (Sep26, 2006). Please refer to the attached the e-mail from vendor dated on Sep 26, 2006. AOCT Inspection
The routine assessment of the Arabian CBI Facility was brought forward following a request from Vendor Inspection Quality control Unit to assess the vendor. This work-flow was created by WARDME to record the assessment results. M. E. Ward. September 9th 2003 ARABIAN CBI WAS APPROVED WITH CORRECTIVE ACTIONS. M. E. WARD. 4th JANUARY 2004. NOTE ADDED BY M. E. WARD 20th JANUARY 2004. The corrective actions were closed out during the site visit by M. E. Ward on 18th January 2004. The approval was changed to approve ( see servces to objects attachment close out).
<H><U>RECORD UP-DATED BY M. E. WARD 27th MARCH 2004</></> <H><U>ADDITIONAL NOTE ADDED 25th February 2003</></> MIS Arabia were not recommended for approval of SAP material 6000002479 because the Saudi Aramco Surveyor considered that MIS Arabia required time to develop a capability ( and team lacking experience) fabricating vessels to 19mm thick before being considered for a broader supply scope involving the addition of SAP material 6000002479. M. E. Ward 25th February 2003.
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Based on an audit conducted in April 2009, this is to endorse continuing approval of GEYAD FACTORY FOR PRESSURE VESSELS CO. (30000497) under 9COM 6000002479 with the following limitation: Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code.
SEE TEXT 1.0. Note that the Gulf Engineering Factory For Heat Exchangers Plant was assessed on 2nd and 3rd of November 2004 for the addition of material 6000002479. The Gulf Factory For Heat Exchangers Plant was Approved with corrective actions restricting the Vendor, Gulf Factory For Heat Exchangers, to the manufacture of shop built tanks to the nine com number 6000002479. 2.0. Note that the Vendors (Gulf Engineering Company For Heat Exchangers) request for approval to SAP material 6000002480 was deleted from the work flow because CSD Personnel and the Assessor considered that the Gulf Factory for Heat Exchangers Personnel were not ready to receive orders for site erected tanks. Michael Eric Ward 23 rd February 2005.
<H><U>LIMITATIONS</></> <H>1.0.</> <H>Al-Kodari Personnel must not perform NDE on Saudi Aramco jobs until their personnel, procedures and written practice are approved by Saudi Aramco. <U>Note Approved Saudi Aramco NDE sub-contractors must be used. </></> <H>2.0.</> <H>Al-Khodari is only approved to Manufacture carbon steel tanks In their factory.</> <H>3.0.</> <H>Al-Khodari must not undertake design work and must use qualified and experienced design sub-contractors.</>
<H><U>LIMITATIONS</></> <H>1.0.</> <H>Al-Kodari Personnel must not perform NDE on Saudi Aramco jobs until their personnel, procedures and written practice are approved by Saudi Aramco. <U>Note Approved Saudi Aramco NDE sub-contractors must be used. </></> <H>2.0.</> <H>Al-Khodari is only approved to Manufacture carbon steel tanks In their factory.</> <H>3.0.</> <H>Al-Khodari must not undertake design work and must use qualified and experienced design sub-contractors.</>
<H><U>DETAILS UP-DATED BY Meshari Ghuryri 17th MARCH 2009</></> Approval of local manufacturer METSCCO STEEL CONST. COMPANY (Plant #30000653) for 9COM item 6000002479 (TANK; CYLINDRICAL; STEEL; 32-SAMSS-030) is endorsed for only carbon steel storage tanks. Below limitation is not applicable. It is kept for record only. ************************************************************* <H><U>DETAILS UP-DATED BY M.E. WARD 27th MARCH 2004</></> <H><U>LIMITATIONS</></> 1.0. METSCCO are restricted to carbon steel tanks only with the following dimension restriction:- 4 metres maximum diameter for shop built tanks 40 metres maximum diameter for field erected tanks. 2.0. METSCCO must only process carbon steel in their plant until their material storage is improved and accepted by Saudi Aramco VID and CSD.
Saudi Arabia
Saudi Arabia
Saudi Arabia
IS LIMITED PER API 650 APPENDIX J; CARBON STEEL See attachment 076_00. M. Ward 4th JuLy 2002. Limited per API 650 Appendix J: Carbon Steel. Concurrence to 9COM item 6000002479 has been endorsed by Mahmoud Y. Naffa'a.
<H><U>updated on April 4, 2009 by Meshari Ghuryri:</></> <U><H>No limitation</></> <H><U>***************************************************************</> </> <H><U>NOTE ADDED 27th July 2006</></> The material limitation for the nine com 6000002479 was removed by the assessment reported by inspection lot 107000040079. Michael Eric Ward 27th July 2006 <H><U>1.0 LIMITATIONS FOR ONE TIME APPROVAL FOR STAINLESS STEEL TANKS FABRICATED DURING 2006</></> <H>1.1.</> This is a one-time approval of Gulf Steel Works limited to the fabricate stainless steel tanks (under the scope of 9COM 6000002479) for Saudi Aramco purchase order JHCI-M98-32-K296-DA, subcontractor purchase order number 2151-305: - B69-D-0113A/B,,,,FW/CW Calcium Hypochlorite tank - B69-D-0121A/B,,,,CW Corrosion Inhibitor Mixing Tank - B69-D-0122,,,, ,,Corrosion Inhibitor Dosing tank - B69-D-0133A/B,,,,Scale Inhibitor Mixing Tank - B69-D-0136A/B,,,,DW Calcium Hypochlorite Mixing tank - B69-D-0149,,,,,,Boiler Chemical Dosing tank - B69-D-0154A/B,,,,RO Sodium Bisulfite tank <H>1.2.</>,,This one-time approval is conditional with the following: - All welding procedure specifications (WPS) shall be prepared by a welding engineer and submitted to CSD/ID for review and approval before commencement of any fabrication activities. - Approval for stainless steel tank valid until 30th November 2006. -Design must be completed by a design office agreed with Saudi Aramco CSD Tank and Pressure Vessel Section. Not meeting the above approval conditions will revoke this one-time approval. Michael Eric Ward 12th April 2006.
Saudi Arabia
Japan
Saudi Arabia
Saudi Arabia
o,,Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction code. o,, Al-Zamil Heavy Industries Ltd is only approved for manufacturing. o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",, Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. Othman Alamoudi September 7, 2008 00966 3 8626176 ================================================================ Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code 07/26/2008 Meshari Al-Ghuryri o,,Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction code. o,, Al-Zamil Heavy Industries Ltd is only approved for manufacturing. o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",, Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. o,,Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction code. o,, Al-Zamil Heavy Industries Ltd is only approved for manufacturing. o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",, Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders.
Saudi Arabia
Egypt
Egypt
Singapore
Kuwait
Saudi Arabia
<H><U>IMITATIONS:-</></> 1.0 Design must be certified by a valid licensed ,,,, ,, Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code. <H>Note:-</> Design limitation was removed for pressure vessels but it must remain for tanks ( see services to objects attachment) 2.0. Additional inspection hold points shall be applied to the ITP for Saudi Aramco and Zamil Personnel: a) To ensure that only rolling machine operation is employed to a shell ring to correct fit-up offsets, exceeding the permitted Code tolerances, of edges of butt joint to be welded until the deviations are within the specified limits. b) To ensure that only pressing machine operation is employed to correct fit-up offsets, exceeding the permitted Code tolerances, between pre-formed sections of multi-piece vessel head, until the deviations are within the specified limits. c) To ensure that only rolling machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell rings until the deviations are within the specified limits. d) To ensure that only pressing machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell ring and head until the deviations are within the specified limits. NOTE:- SEE INSPECTION LOT 107000053371 Michael Eric Ward 21st October 2008
<H><U>LIMITATIONS</></> i) Carbon Steel tanks only ii) Either a resident Saudi Aramco inspector or third party inspector approved by Saudi Aramco VID and reporting to Saudi Aramco must be present throughout the manufacturing operation. MichaelEric Ward 30th January 2008
<H><U>LIMITATION</></> It was recommended that the PETROJET Kattamia Central Work Shop Site is approved for the Saudi Aramco nine com material 6000002479 (for stainless steel and carbon steel tanks)with the with the following limitations: 1. Exclusion of storage tanks with HIC testing requirements. 2. Either a resident Saudi Aramco inspector or a resident third party inspector, approved by Saudi Aramco VID, must be present during the entire manufacturing process.
Rotary Engineering Limited Singapore 30004371 was approved permanently through WF5564 on Dec 9, 2007. AOCT Inspection 12/26/2007 Rotary Engineering Limited Singapore is acceptable for "Temporary Approval" in limitation of three (3) months validity in condition that Inspection Level is to be changed for extra witness inspection (one level-up) and QMS implementation is to be monitored by AOC Tokyo during fabrication and inspection for ARAMCO Job. Akira Tamura AOCT Inspection 1/25/2007
Approval of BEMCO STEEL INDUSTRIES CO. LTD. for 9COM 6000002479 has the following limitations: 1.,,For only carbon steel storage tanks. 2.,,Design work must be done by qualified and experienced design contractors. Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code.
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Japan
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
The routine assessment of the Arabian CBI Facility was brought forward following a request from Vendor Inspection Quality control Unit to assess the vendor. This work-flow was created by WARDME to record the assessment results. M. E. Ward. September 9th 2003 ARABIAN CBI WAS APPROVED WITH CORRECTIVE ACTIONS. M. E. WARD. 4th JANUARY 2004. NOTE ADDED BY M. E. WARD 20th JANUARY 2004. The corrective actions were closed out during the site visit by M. E. Ward on 18th January 2004. The approval was changed to approve ( see servces to objects attachment close out).
Approval Limitations: 1. Maximum Diameter is 14 Meters. 2. Not approved for engineering and design. Shabib M. Al-Sudairi Approval Limitations: 1. Maximum Diameter is 14 Meters. 2. Not approved for engineering and design. Shabib M. Al-Sudairi November 09, 2004 Based on an audit conducted in April 2009, this is to endorse continuing approval of GEYAD FACTORY FOR PRESSURE VESSELS CO. (30000497) under 9COM 6000002480 with the following limitations: 1.,,Excluding storage tanks with dome roofs and tanks under scope of Appendix C of API STD 650. 2.,,Excluding storage tanks under scope of API STD 620. 3.,,Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code.
<H><U>LIMITATIONS</></> <H>1.0.</> <H>Al-Kodari Personnel must not perform NDE on Saudi Aramco jobs until their personnel, procedures and written practice are approved by Saudi Aramco.<U>Note Saudi Aramco approved NDE subcontractors must be used.</> </> <H>2.0.</> <H>Al-Khodari must not undertake design work and must use qualified and experienced design sub-contractors.</>
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
<H><U>LIMITATIONS</></> <H>1.0.</> <H>Al-Kodari Personnel must not perform NDE on Saudi Aramco jobs until their personnel, procedures and written practice are approved by Saudi Aramco.<U>Note Saudi Aramco approved NDE subcontractors must be used.</> </> <H>2.0.</> <H>Al-Khodari must not undertake design work and must use qualified and experienced design sub-contractors.</>
<H><U>INFORMATION UPDATED BY Meshari Ghuryri 17th MARCH 2009</></> Approval of local manufacturer METSCCO STEEL CONST. COMPANY (Plant #30000653) for 9COM item 6000002480 (TANK; ATMOSPHERIC PRESSURE; 32-SAMMS-005) is endorsed with the following exclusions: 1.,,Tanks under scope of Appendix S of API STD 650. 2.,,Tanks under scope of API STD 620. Below limitation is not applicable. It is kept for record only. ************************************************************** <H><U>INFORMATION UPDATED BY M. E. WARD 27th MARCH 2004</></> <H><U>LIMITATIONS</></> 1.0. METSCCO are restricted to carbon steel tanks only with the following dimension restriction:- 4 metres maximum diameter for shop built tanks 40 metres maximum diameter for field erected tanks. 2.0. METSCCO must only process carbon steel in their plant until their material storage is improved and accepted by Saudi Aramco VID and CSD.
<U>Update on April 4th, 2009 by Meshari ghuryri</> Approval is for storage tanks under scope of only API STD 650 with the following limitations: 1.0. DIAMETER RESTRICTED TO 100 FEET MAXIMUM. 2.0. NO FLOATING ROOF. 3.0. NO DOME ROOF. **************************************************************** <H><U>LIMITATIONS</></> 1.0. NO DESIGN AND NOTE DESIGN MUST BE COMPLETED BY DESIGN ESTABLISHMENT ACCEPTABLE TO SAUDI ARAMCO CSD TANK GROUP. 2.0. DIAMETER RESTRICTED TO 100 FEET MAXIMUM 3.0. NO FLOATING ROOF 4.0. NO DOME ROOF. Michael Eric Ward 29th January 2006 ________________________________________________________________
Saudi Arabia
Saudi Arabia
Saudi Arabia
Singapore
o,,Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction code. o,, Al-Zamil Heavy Industries Ltd is only approved for manufacturing. o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",,Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. OTHMAN ALAMOUDI September 7, 2008 00966 862 6176 ================================================================ Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code 07/26/2008 Meshari Al-Ghuryri o,,Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction code. o,, Al-Zamil Heavy Industries Ltd is only approved for manufacturing. o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",,Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. o,,Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction code. o,, Al-Zamil Heavy Industries Ltd is only approved for manufacturing. o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",,Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders.
Rotary Engineering Limited Singapore 30004371 was approved permanently through WF5564 on Dec 9, 2007. AOCT Inspection 12/26/2007 Approval of Rotary Engineering Limited (Plant #30003471) for 9COM item 6000002480 is endorsed with the following exclusions: 1.,,Tanks under scope of Appendix S of API STD 650. 2.,,Tanks under scope of Appendices R, S and Q of API STD 620. M. Y. Naffa'a, 11/17/2007 Approval of Rotary Engineering Limited (Plant #30003471) for 9COM item 6000002480 is endorsed with the following exclusions: 1.,,Tanks under scope of Appendix S of API STD 650. 2.,,Tanks under scope of Appendices R, S and Q of API STD 620. Rotary Engineering Limited Singapore is acceptable for "Temporary Approval" in limitation of three (3) months validity in condition that Inspection Level is to be changed for extra witness inspection (one level-up) and QMS implementation is to be monitored by AOC Tokyo during fabrication and inspection for ARAMCO Job. Akira Tamura AOCT Inspection 1/25/2007
Saudi Arabia
India Japan Saudi Arabia Saudi Arabia Saudi Arabia Saudi Arabia Saudi Arabia Spain Italy Italy United Kingdom Japan
South Korea
Japan Japan Japan South Korea
United States Of America
United States Of America
United States Of America United States Of America
United States Of America lIMITATION: for tubes about 2.5" diameter or larger.
Italy South Korea United States Of America Italy
Italy
India South Korea Spain
Approval of BEMCO STEEL INDUSTRIES CO. LTD. for 9COM 6000002480 has the following limitations: 1.,,Excluding storage tanks under scope of Appendix S of API STD 650. 2.,,Excluding storage tanks under API STD 620. 3.,,Design work must be done by qualified and experienced design contractors. Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code.
Remarks entered by ALM on 07/20/2004: ASC QSU is aware of Brown's expertise in this technology and recommend approval of 9COM 6000002487 without limitation. ASC Quality Coordinator Steve Rice. Remarks entered on 7/24/2003 by Linda Stowell: The Temporary approval has expired and the status is now QSNA. Remarks entered by Linda Stowell - 05/28/2003 Per request of the RSA and Majed B. Al Mutairi (QAU/VID), Brown Fintube has been temporarily approved for 9COM 6000002487 until 06/30/2003. The signed RVL form and requesting emails are attached to the plant record via Services for Objects. The quality coordinator is Steve Rice (713-432-4143 or [email protected])
Italy Germany South Korea Belgium Taiwan India Japan Saudi Arabia Saudi Arabia Saudi Arabia Saudi Arabia Spain Italy United Kingdom Japan
South Korea
Japan Japan Japan South Korea
United States Of America
United States Of America United States Of America Italy South Korea
Italy
India South Korea Spain Italy Germany South Korea Taiwan
Italy
Japan
United States Of America
Note: Existing QM sys. was changed to “Quality system NOT-APPROVED” to synchronize SAP with RVL SAES. (By Humoaa0b on 02/28/02) Changed back to “Quality system APPROVED” based on RSA (Naffaa, Mahmoud Y) recommendation by E-mail dated 04/02/02. (By Humoaa0b on 04/03/02)
Comments entered by Angela McFadden on 03/03/06: ASC Quality Systems Unit (Quality Coordinator Steve Rice) requires a re-qualification survey upon placement for any new orders for turbines. ****END****************************************** Comments entered by Angela McFadden on 10/04/2005: In efforts to expand the RVL listing, it is being requested that Solar Turbines be approved for 9 COM 6000002490. ********END**********************************************
United States Of America
United States Of America
Canada
Italy
United States Of America
Canada
United States Of America
Comments entered by Angela McFadden on 04/19/06: Recommend re-linking this plant to 9COM's 6000002490 - TURBINE;COMB. GAS;5000 HP UP TO 30000 HP 6000002491 - TURBINE; COMBUS. GAS; 30000 HP AND ABOVE. ***END******************************************
Comments entered by Angela McFadden on 01/30/06: Rolls Royce is retained as an approved source for RVL 9COM's 6000002490 with the limitation that a performance assessment is required during the handling of the next order for new turbine(s). Comments entered by Angela McFadden on 10/04/2005: In efforts to reconcile the RVL listing, it is being requested that Rolls Royce be approved to supply 9 COM 6000002490.
Comments entered by Angela McFadden on 06/26/06: Conclusion: Pratt & Whitney is retained as an approved source for RVL 9COM's 6000002493, and is also recommended for linkage to 6000002490 with the limitation that a re-qualification survey is required upon placement of an order for new turbine(s).
Comments entered by Angela McFadden on 04/19/06: Recommend re-linking this plant to 9COM's 6000002490 - TURBINE;COMB. GAS;5000 HP UP TO 30000 HP 6000002491 - TURBINE; COMBUS. GAS; 30000 HP AND ABOVE. ***END****************************************** Remarks entered by Angela McFadden on 11/27/05: Rolls Royce does not manufacture CGT's, it only assembles CGT packages. ******END**************************************************** Remarks entered by Angela McFadden on 11/21/2005: In efforts to update the gas turbine listing, Rolls Royce is now to be conisdered an approved source to supply 9 COM 6000002491. *********END****************************************************
Comments entered by Angela McFadden on 10/05/2005: In efforts to expand the RVL listing, it is being recommended that Rolls Royce is recommended to be approved for 9Com 6000002491. ******************END***************************
Remarks entered by Angela McFadden on 11/27/05: After a quality assessment (desk review), Pratt & Whitney is to remain an approved source to supply 9COM 6000002491 with a limitation (30,000 HP and above) and that a performance assessment is required during the handling of the next order. *******************END************************************** Comments entered by Angela McFadden on 10/05/05: In efforts to expand the RVL listing, it is being recommended that Pratt & Whitney is recommended to be approved for 9Coms 6000002491 & 6000002490. ***END********************************************
United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
Italy
Japan
United Kingdom
France
Saudi Arabia
United States Of America
Sweden
Japan
Saudi Arabia
Saudi Arabia
Saudi Arabia
Italy
Japan
Saudi Arabia
United States Of America
Canada
Switzerland
Sweden
Switzerland
Japan
Germany Only machining of the casings and assembly of the Gas turbines
Comments entered by Angela McFadden on 10/05/05: In efforts to expand the RVL listing, it is being recommended that GE Engine Services is recommended to be approved for 9Com 6000002491. ***END********************************************
Note: QI record was created to synchronize SAP with RVL SAES. (By Humoaa0b on 02/28/02)
Remarks entered by Angela McFadden on 11/22/05: In efforts to update the RVL listing, Solar Turbines is not approved to supply 9 COM 6000002493. *******END*********************************************** Remarks entered by Angela McFadden on 01/25/2005: limitation: 6000002493 - Turbine Combustion Gas 5,000 up to 30,000HP.
Comments entered by Angela McFadden on 10/24/05: In efforts to update the Gas Turbine listing, it is being requested that this plant be an approved source for 9COM 6000002494. *******************END**************************************
only manufacturing of "rotors ready-to-install for gas turbines including compressor blades"
Netherlands
Japan
France
Japan
Japan
United States Of America
United States Of America
United States Of America
Canada
Germany
Japan
Italy
Netherlands
Based on the attached comment by RSA, AOCT approved this vendor for this commodity with limitation up to 300HP. From: Alshaikh, Tariq H (CSD) Sent: Sunday, May 07, 2006 2:26 PM To: Tamura, Akira (Tokyo) Cc: Khateeb, Eyad M; Dossary, Khaled M (CSD); 'Tabei, Miho'; Abuemarah, Alaa M (AOCT IR); Khowaiter, Abdulrahman O; Odan, Nabeel M; Hazza, Hussain A; Sabri, Hasan A Subject: RE: Deviation List / Niigata Worthington #30001392 / Steam Turbine, General Purpose Akira-san, We have completed a value engineering session on Steam Turbine Standards last week. The session was attended by most of the major manufacturers of steam turbines (such Dresser-Rand, Siemens, Nuovo Pignone and MHI). One critical decision was to apply API-611 standards on General Purpose Steam Turbines up to 300 HP and apply Saudi Aramco Standards 32-SAMSS-009 on general purpose steam turbines over 300 HP. This means Niigata Worthington approval shall be limited to General Purpose Steam Turbines of 300 HP or less provided they comply with API-611. They are not approved for General Purpose Steam Turbines greater than 300 HP or Special Purpose Steam Turbines. Best regards Tariq H. Al-Alshaikh RSA Compressors, Expanders, Gears & Steam Turbines And Standards Committee Chairman / CSD Dhahran; (9663) 874-6135 e-mail: [email protected]
Remarks entered 10/30/2003 by Linda Stowell: Temporary approval has expired. The quality coordinator is to conduct an evaluation for permanent approval. Per request of the RSA, Hasan Sabri, the Rotating Equipment Committee Chair, Nabeel Odan, and Afaq Ahmed, this plant has been temporarily approved for 9COM 6000002496 until 11/01/2003. The completed and signed RVL forms and the requesting emails and letter are attached to plant record via Services for Objects. The Quality Coordinator plans on conducting an assessment of this facility for permanant approval in conjunction with the inspection of the purchase order. The ASC Quality Coordinator is Steven J. Rice (713-432-4143 or [email protected])
Italy
Japan
Japan
Japan
Japan
United States Of America
United States Of America
United States Of America
Japan
Italy
United Kingdom
Germany
France
Japan
France
United States Of America
United Kingdom
United Kingdom
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
In efforts to update the RVL & Surveyed Plants for Rotating Equipment, Mafi Trench is now an approved osurce to maufacture 9COM 6000002498. *END**************************************************
Germany
India Japan United States Of America Thailand India Italy United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
India
India
India
Utd.Arab Emir.
Utd.Arab Emir.
Saudi Arabia
India
Egypt
Kuwait
Spain
Italy
Japan
Italy
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Utd.Arab Emir.
The routine assessment of the Arabian CBI Facility was brought forward following a request from Vendor Inspection Quality control Unit to assess the vendor. This work-flow was created by WARDME to record the assessment results. M. E. Ward. September 9th 2003 ARABIAN CBI WAS APPROVED WITH CORRECTIVE ACTIONS. M. E. WARD. 4th JANUARY 2004. NOTE ADDED BY M. E. WARD 20th JANUARY 2004. The corrective actions were closed out during the site visit by M. E. Ward on 18th January 2004. The approval was changed to approve ( see servces to objects attachment close out).
employed to correct fit-up offsets, exceeding the permitted Code tolerances, between pre-formed sections of multi-piece vessel head, until the deviations are within the specified limits. 3) To ensure that only rolling machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell rings until the deviations are within the specified limits. 4) To ensure that only pressing machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell ring and head until the deviations are within the specified limits. This limitation is applicable to 9COM items 6000002521 and 6000002522. Meshari Ghuryri 10/06/2008 ============================================================== <H><U>LIMITATIONS:-</></> This is to support revoking the current ON-HOLD of INMA STEEL FABRICATORS COMPANY for 9COM item 6000002521 with the following limitations: 1) ,,Design authority for the pressure vessel of INMA in association with the post weld heat treatment organization must complete structural stability calculations addressing Post weld heat treatment (PWHT) during the design phase and consequently determine the need for support/design modifications. 2),,Prior to the start of any PWHT activity for Saudi Aramco pressure vessels, Inma Steel Management must submit the intended PWHT procedure to Saudi Aramco CSD Pressure Vessel Group, allowing sufficient time, for their review. PWHT procedure must contain full details of the intended method of supporting the pressure vessel whilst undergoing PWHT and the relevant structural stability analysis calculations. The review does not constitute in any way a basis for approving the procedure and Saudi Aramco shall bare no responsibility for ensuring correctness of analysis input. 3) ,,Resident Saudi Aramco VID Quality Control Personnel to be present during the entire manufacturing process of Saudi Aramco Pressure Vessels at the Inma Site. 4),,Inma Management shall notify Saudi Aramco CSD Pressure Vessel Group of any pressure vessels to be manufactured for other customers to allow Saudi Aramco Personnel the opportunity to witness key stages of construction to ensure that Inma Personnel maintain the manufacturing Standards promised. 5),,Party responsible for purchasing vessels from INMA shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: a. Implications of INMA's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. b. Continuous monitoring of INMA's performance during execution of Saudi Aramco's purchase orders. 6) Additional inspection hold points shall be applied during: 1) Plate rolling to ensure that only
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
<H>LIMITATION</> 1.0. Prior to order award Purchasing, CSD and VID must assess the capacity planning to ensure that the vendor has the capability to complete the order on time.
<H><U>LIMITATION</></> <H>Al-Saghyir Company are recommended for the one time approval for purchase order number AHC/PO/7123 for the supply of two mercury absorber vessels of tag number J64-D-0493 A/B and reference BI 10-0348 mercury removal vessels ( see attachment in services to objects section) with the following limitations:-</> (i) A qualified resident inspector representing Saudi Aramco shall be present throughout the manufacturing process of the vessels (all steps from plate preparation to completion of all fabrication activities including examination and testing). His resume and qualifications should be submitted to CSD/ID for review and approval before commencement of any fabrication activity. ii) The design is formally approved and stamped approved by the LSTK Contractors Professional Engineer. Design of the vessels must be certified by a valid licensed Professional Engineer of the responsible LSTK contractor to ensure compliance with all relevant requirements of the applicable construction Code. iii) All welding procedures/PQR documents to be used during fabrication are reviewed/ approved by Saudi Aramco CSD prior to manufacture. iv) VID Quality Control Unit shall apply additional hold points to ensure that the following are covered:- Plate rolling Plate identification Dished End Manufacture v) Reference the recent e-mail received from Al-Saghyir Management indicating that dished ends could not be procured within the required project timescale ( see services to objects attachment). Al-Saghyir Personnel may manufacture the dished ends in accordance with the applicable ASME code( ASME Section viii Division 1), under Saudi Aramco VID surveillance, on the understanding that if VID reject the dish end for unsatisfactory workmanship Al-Saghyir Management will replace the dished ends at their expense. <H><U>Note: </></> <U>Para (v) changed by M. E. Ward. 13th May 2007</> vi) NDE to be completed by Saudi Aramco approved NDE organization.
SAP CORRECTED TO APPROVE WITH LIMITATIONS AS FOLLOWS:- 1.0. No design manufacture of pressure vessels only ( see services to objects attachment) Michael Eric Ward 5th September 2007 <H><U>Note</></> SAP corrected and nine com changed to approve with limitations. Michael Eric Ward 5th September 2007
Corrective actions closed on 22nd June 2004. Michael Eric Ward 22nd June 2004.
Saudi Arabia
Germany
United Kingdom
Japan
South Korea
Japan
South Korea
Japan
o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",, Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. Othman Alamoudi September 07, 2008 00966 8626176 ************************************************************************ ********************************************************NOTE:- For the Yanbu temporary site the Jeddah Factory pressure vessel nine com approval is limited to purchase order 4501621841, DEETHANIZER COLUMN/YANBU GAS PLANT EXPANSION PROJECT. ================================================================ Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code 07/26/2008 Meshari Al-Ghuryri o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",, Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",, Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders.
Based on the attached e-mail dated on 3/12/2007, in order for AOCT to meet the urgent project order at 30001443 Sungjin, the temporary linkage was made and after the completion of the existing WF, the permenent linkage will be done. This temporary linkage is based on both technical/quality evaluation approval by RSA/AOCT Lead auditor. AOCT Inspection 3/12/2007 Concurrence to approval of item is not warranted since we have not initiated the relevant evaluation process of the subject manufacturer. A separate work flow needs to be initiated to address the action to link the manufacturer to 9COM item 6000002521 and the following 9COM items which are of interest to us and have not been proposed in the work flow: 6000002522, 6000002523 and 6000002524.
United States Of America
South Korea
Italy
India
South Korea
Saudi Arabia
Belgium
South Korea
India
The QM status has been changed to QSOH from QSAA as per the RSA's request below. The WF was completed as QSAA mistakenly and will be on HOLD till the technical evaluaiton is completed by RSA in 2008. (please see the attached e-mail for more details). Jan 7, 2008 AOCT Inspection. As we have already advised AOCT, technical assessment of Godrej & Boyce (Plant # 30003657) for 9COM item 6000002521 will not be performed at present. This is due to the fact that the 9COM item is not included of the part of the list of 117 9COM items identified by project management for immediate need of resources. This is in line with our agreement with the Strategic Sourcing Unit of the P&CSD on the approach of considering potential manufacturer(s) for addition in Saudi Aramco material data base. Accordingly, we will advise the manufacturer when are ready to conduct the plant visit. The following are required as parts of the evaluation process: 1) ,,Visit to the manufacturer's fabrication shop where manufacturing of pressure vessels under the subject 9COM item is underway. 2) ,,Engineering evaluation. IDESA (Plant # 30004604) in Spain has been approved for the following pressure vessels 9COM items, in conjunction with an effort to facilitate the current and future increasing business need for RVL-managed pressure vessels: 1.,,6000002521,,CS; MAX. WALL THK OF 19 MM 4.,,6000002522,,CS/ LOW ALLOY; WALL THK OF 38 MM 5.,,6000002523,,HIGH ALLOY; NON FERROUS 6.,,6000002524,,CS/ LOW ALLOY; WALL THK FROM 38 TO 76MM 7.,,6000002525,,CS/ LOW ALLOY; WALL THK MORE THAN 76 MM
Saudi Arabia
Spain
Japan
Turkey
India
Egypt
Spain
Italy
Spain
South Korea
Belgium
Spain
Italy
Kuwait
South Korea
Saudi Arabia
Saudi Arabia
Saudi Arabia
<H><U>LIMITATIONS.</></> i) Additional inspection hold points shall be applied to the ITP for Saudi Aramco and Zamil Personnel: a) To ensure that only rolling machine operation is employed to a shell ring to correct fit-up offsets, exceeding the permitted Code tolerances, of edges of butt joint to be welded until the deviations are within the specified limits. b) To ensure that only pressing machine operation is employed to correct fit-up offsets, exceeding the permitted Code tolerances, between pre-formed sections of multi-piece vessel head, until the deviations are within the specified limits. c) To ensure that only rolling machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell rings until the deviations are within the specified limits. d) To ensure that only pressing machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell ring and head until the deviations are within the specified limits. NOTE:- SEE INSPECTION LOT 107000053371 Michael Eric Ward 21st October 2008
LIMITATION. It was recommended that the PETROJET Kattamia Central Work Shop Site is approved for the Saudi Aramco nine com material 6000002522 (carbon steels and low alloy steels) with the following limitations: 1. Exclusion of carbon steel pressure vessels with HIC testing requirements. 2. Either a resident Saudi Aramco inspector or a resident third party inspector, approved by Saudi Aramco VID, must be present during the entire manufacturing process.
Saudi Arabia
Saudi Arabia
Saudi Arabia
India
India
India
Utd.Arab Emir.
Utd.Arab Emir.
Utd.Arab Emir.
Utd.Arab Emir.
Saudi Arabia
India
Egypt
Kuwait
Italy
Japan
Germany LIMITED TO A MAX. WALL THICKNESS OF 25 MM
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
The routine assessment of the Arabian CBI Facility was brought forward following a request from Vendor Inspection Quality control Unit to assess the vendor. This work-flow was created by WARDME to record the assessment results. M. E. Ward. September 9th 2003. ARABIAN CBI WAS APPROVED WITH CORRECTIVE ACTIONS. M. E. WARD. 4th JANUARY 2004. NOTE ADDED BY M. E. WARD 20th JANUARY 2004. The corrective actions were closed out during the site visit by M. E. Ward on 18th January 2004. The approval was changed to approve ( see servces to objects attachment close out).
Saudi Arabia
Utd.Arab Emir.
Saudi Arabia
Saudi Arabia
Saudi Arabia
specified limits. 2) To ensure that only pressing machine operation is employed to correct fit-up offsets, exceeding the permitted Code tolerances, between pre-formed sections of multi-piece vessel head, until the deviations are within the specified limits. 3) To ensure that only rolling machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell rings until the deviations are within the specified limits. 4) To ensure that only pressing machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell ring and head until the deviations are within the specified limits. This limitation is applicable to 9COM items 6000002521 and 6000002522. Meshari Ghuryri 10/06/2008 ============================================================== <H>LIMITATIONS:-</> This is to support revoking the current ON-HOLD of INMA STEEL FABRICATORS COMPANY for 9COM item 6000002522 with the following limitations: 1) ,,Design authority for the pressure vessel of INMA in association with the post weld heat treatment organization must complete structural stability calculations addressing Post weld heat treatment (PWHT) during the design phase and consequently determine the need for support/design modifications. 2),,Prior to the start of any PWHT activity for Saudi Aramco pressure vessels, Inma Steel Management must submit the intended PWHT procedure to Saudi Aramco CSD Pressure Vessel Group, allowing sufficient time, for their review. PWHT procedure must contain full details of the intended method of supporting the pressure vessel whilst undergoing PWHT and the relevant structural stability analysis calculations. The review does not constitute in any way a basis for approving the procedure and Saudi Aramco shall bare no responsibility for ensuring correctness of analysis input. 3) ,,Resident Saudi Aramco VID Quality Control Personnel to be present during the entire manufacturing process of Saudi Aramco Pressure Vessels at the Inma Site. 4),,Inma Management shall notify Saudi Aramco CSD Pressure Vessel Group of any pressure vessels to be manufactured for other customers to allow Saudi Aramco Personnel the opportunity to witness key stages of construction to ensure that Inma Personnel maintain the manufacturing Standards promised. 5),,Party responsible for purchasing vessels from INMA shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: a. Implications of INMA's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. b. Continuous monitoring of INMA's performance during execution of Saudi Aramco's purchase orders. 6) Additional inspection hold points shall be applied during: 1) Plate rolling to ensure that only re-rolling is employed to correct any
<H><U>LIMITATION</></> The following Limitation applies:- No design manufacture of pressure vessels only. Michael Eric Ward 5th September 2007 <H><U>Note</></> SAP corrected and nine com changed to approve with limitations actions ( see services to objects attachment) Michael Eric Ward 5th September 2007
Saudi Arabia
Denmark
United Kingdom
Germany
United Kingdom
Italy
United Kingdom
Japan
South Korea
Japan
Japan
Japan
Japan
o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",,Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. Othman Alamodui September 07, 2008 00966 3 8626176 ************************************************************************ ******************************************************** NOTE:- For the Yanbu temporary site the Jeddah Factory pressure vessel nine com approval is limited to purchase order 4501621841, DEETHANIZER COLUMN/YANBU GAS PLANT EXPANSION PROJECT. ================================================================ Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code 07/26/2008 Meshari Al-Ghuryri o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",,Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",,Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders.
South Korea
Japan
United States Of America
United States Of America
United States Of America
South Korea
Italy
Utd.Arab Emir.
India
South Korea
Italy
Belgium
South Korea
India
Based on the attached e-mail dated on 3/12/2007, in order for AOCT to meet the urgent project order at 30001443 Sungjin, the temporary linkage was made and after the completion of the existing WF, the permenent linkage will be done. This temporary linkage is based on both technical/quality evaluation approval by RSA/AOCT Lead auditor. AOCT Inspection 3/12/2007
Approval is limited to only manufacturing. Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction code and Saudi Aramco requirements. Refer to attached RSA e0mail for more details. Meshari Ghuryri 11/19/2008
The QM status has been changed to QSOH from QSAA as per the RSA's request below. The WF was completed as QSAA mistakenly and will be on HOLD till the technical evaluaiton is completed by RSA in 2008. (please see the attached e-mail for more details). Jan 7, 2008 AOCT Inspection. As we have already advised AOCT, technical assessment of Godrej & Boyce (Plant # 30003657) for 9COM item 6000002522 will not be performed at present. This is due to the fact that the 9COM item is not included of the part of the list of 117 9COM items identified by project management for immediate need of resources. This is in line with our agreement with the Strategic Sourcing Unit of the P&CSD on the approach of considering potential manufacturer(s) for addition in Saudi Aramco material data base. Accordingly, we will advise the manufacturer when are ready to conduct the plant visit. The following are required as parts of the evaluation process: 1) ,,Visit to the manufacturer's fabrication shop where manufacturing of pressure vessels under the subject 9COM item is underway. 2) ,,Engineering evaluation.
Saudi Arabia
Spain
Japan
Turkey
India
Egypt
Spain
Italy
Spain
South Korea
Belgium
Spain
Italy
Italy
Kuwait
South Korea
Saudi Arabia
Saudi Arabia
<H><U>LIMITATIONS.</></> i) Additional inspection hold points shall be applied to the ITP for Saudi Aramco and Zamil Personnel: a) To ensure that only rolling machine operation is employed to a shell ring to correct fit-up offsets, exceeding the permitted Code tolerances, of edges of butt joint to be welded until the deviations are within the specified limits. b) To ensure that only pressing machine operation is employed to correct fit-up offsets, exceeding the permitted Code tolerances, between pre-formed sections of multi-piece vessel head, until the deviations are within the specified limits. c) To ensure that only rolling machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell rings until the deviations are within the specified limits. d) To ensure that only pressing machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell ring and head until the deviations are within the specified limits. <H>NOTE:-</> SEE INSPECTION LOT 107000053371 Michael Eric Ward 21st October 2008
<H><U>LIMITATION.</></> It was recommended that the PETROJET Kattamia Central Work Shop Site is approved for the Saudi Aramco nine com material 6000002522 (carbon steels and low alloy steels) with the following limitations: 1. Exclusion of carbon steel pressure vessels with HIC testing requirements. 2. Either a resident Saudi Aramco inspector or a resident third party inspector, approved by Saudi Aramco VID, must be present during the entire manufacturing process.
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
India
India
India
Utd.Arab Emir.
Utd.Arab Emir.
Saudi Arabia
India
Kuwait
Italy
Japan
Japan
Germany LIMITED TO A MAX. WALL THICKNESS OF 25 MM
Italy
Italy
Germany
Saudi Arabia
Saudi Arabia
Saudi Arabia
India
MHI Hiroshima informed AOCT that they are NO LONGER produceing this material and WF for de-linkage will be initiated after AOCT recives the RSA concurrence which was requested today (Sep26, 2006). Please refer to the attached the e-mail from vendor dated on Sep 26, 2006. AOCT Inspection
<H>LIMITATION.</> <H>1.0.Thickness Limitation is up to 19MM.</>
<H><U>NOTE:-</></> Limitation removed reference telephone call to Mr. Naffaa. 15th October 2008 Mchael Eric Ward
<H><U>LIMITATION:-</></> i) Nine Com 6000002523 approval limited to 38mm thick. Michael Eric Ward 11th January 2009
Utd.Arab Emir.
Saudi Arabia
Germany
United Kingdom
Italy
United Kingdom
Japan
Japan
Japan
"SAW cladding and welding will not be acceptable outdoors unless welding is done using a covered portable structure and a SAW outdoor procedure approved by CSD." Approval is endorsed with the following limitations: 1),,Outdoors welding shall be done under a covered portable structure (scaffolding and transparent shrouding). 2),,Scaffolding and wind shielding procedures shall be approved by Saudi Aramco Inspector prior to commencement of any welding activities. 3),,Outdoors welding procedure shall be approved by CSD prior to commencement of any welding activities.
o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",,Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. Othman Alamoudi September 07, 2008 00966 8626176 ************************************************************************ ********************************************************Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code 07/26/2008 Meshari Al-Ghuryri o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",,Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",,Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders.
Japan
Japan
Japan
Japan
South Korea
Japan
United States Of America
United States Of America
United States Of America
South Korea
Italy
India
South Korea
Saudi Arabia
Italy
Belgium
South Korea
India
Based on the attached e-mail dated on 3/12/2007, in order for AOCT to meet the urgent project order at 30001443 Sungjin, the temporary linkage was made and after the completion of the existing WF, the permenent linkage will be done. This temporary linkage is based on both technical/quality evaluation approval by RSA/AOCT Lead auditor. AOCT Inspection 3/12/2007
Added 9COM as per Mahmoud Naffaa's request. Approval limitations up to 19 mm.
The QM status has been changed to QSOH from QSAA as per the RSA's request below. The WF was completed as QSAA mistakenly and will be on HOLD till the technical evaluaiton is completed by RSA in 2008. (please see the attached e-mail for more details). Jan 7, 2008 AOCT Inspection. As we have already advised AOCT, technical assessment of Godrej & Boyce (Plant # 30003657) for 9COM item 6000002523 will not be performed at present. This is due to the fact that the 9COM item is not included of the part of the list of 117 9COM items identified by project management for immediate need of resources. This is in line with our agreement with the Strategic Sourcing Unit of the P&CSD on the approach of considering potential manufacturer(s) for addition in Saudi Aramco material data base. Accordingly, we will advise the manufacturer when are ready to conduct the plant visit. The following are required as parts of the evaluation process: 1) ,,Visit to the manufacturer's fabrication shop where manufacturing of pressure vessels under the subject 9COM item is underway. 2) ,,Engineering evaluation.
Saudi Arabia
Spain
Japan
Turkey
India
Spain
Italy
Spain
South Korea
Belgium
Italy
Spain
Italy
Kuwait Approval limitation: thickness up to 19mm M. Y. Naffa'a
South Korea
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
<H><U>LIMITATIONS</></> i) Maximum approved thickness 100 mm. ii) Additional inspection hold points shall be applied to the ITP for Saudi Aramco and Zamil Personnel: a) To ensure that only rolling machine operation is employed to a shell ring to correct fit-up offsets, exceeding the permitted Code tolerances, of edges of butt joint to be welded until the deviations are within the specified limits. b) To ensure that only pressing machine operation is employed to correct fit-up offsets, exceeding the permitted Code tolerances, between pre-formed sections of multi-piece vessel head, until the deviations are within the specified limits. c) To ensure that only rolling machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell rings until the deviations are within the specified limits. d) To ensure that only pressing machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell ring and head until the deviations are within the specified limits. <H><U>NOTE:-</></> INSPECTION LOT 107000053371 FOR SAUDI ARAMCO ASSESSMENT TEAM 14th October 2008 Michael Eric Ward
Approval is limited to a thickness of 38 mm. Limitation was determined by RSA as follows: 9COM #6000002523: Up to 38 mm Hani S. Banaja Engineering Specialist PEU/M&CED/CSD Dhahran Heights Tel: +966-3-876-0184 e-mail: [email protected]
Approval of the manufacturer under 9COM 6000002523 is limited to thickness up to 38mm.
Saudi Arabia
Saudi Arabia
India
India
India
India
India
India
Utd.Arab Emir.
Utd.Arab Emir.
Saudi Arabia
India
Egypt
Kuwait
Italy
Japan
Japan
Italy
Italy
Saudi Arabia
Saudi Arabia
MHI Hiroshima informed AOCT that they are NO LONGER produceing this material and WF for de-linkage will be initiated after AOCT recives the RSA concurrence which was requested today (Sep26, 2006). Please refer to the attached the e-mail from vendor dated on Sep 26, 2006. AOCT Inspection
The routine assessment of the Arabian CBI Facility was brought forward following a request from Vendor Inspection Quality control Unit to assess the vendor. This work-flow was created by WARDME to record the assessment results. M. E. Ward. September 9th 2003 ARABIAN CBI WAS APPROVED WITH CORRECTIVE ACTIONS. M. E. WARD. 4th JANUARY 2004. NOTE ADDED BY M. E. WARD 20th JANUARY 2004. The corrective actions were closed out during the site visit by M. E. Ward on 18th January 2004. The approval was changed to approve ( see servces to objects attachment close out).
Saudi Arabia
Saudi Arabia
India
Utd.Arab Emir.
<H><U>NOTE</></> Inspection lot 107000052131 created to remove nine com 6000002524 until Bilfal complete satisfactory rolling demonstration. Inspection lot to be completed and issued for approval ( see services to objects attachment). Michael Eric Ward August 3rd 2008 ====================================================== As per RSA,Mahmoud Naffaa, Manufacture is now approved for 9COM items 6000002524. Salah Shafie Sept. 3, 2008
Remove limitation from Nine Con 6000002524 ( Reference inspection lot 107000054057) Michael Eric Ward 11th January 2009
Desk review based on the site visit completed on 03/08/2005 and reported by inspection lot 107000028700. <H>Michael Eric Ward.</> <H>3rd October 2005.</>
During the routine assessment of the MIS, UAE plant it was noted that SAW cladding and welding was done out doors. This is not acceptable to CSD (Adnan Awami). The Q info. record has been changed from QSAA to QSAL. The limitation is given below: "SAW cladding and welding will not be acceptable outdoors unless welding is done using a covered portable structure and a SAW outdoor procedure approved by CSD." As per discussion with Ron Duffy, Quality Director of MIS on 11/23/02, MIS will take following actions to comply with CSD requiremments: 1) Use scaffolding and tarpoline to cover the SAW area 2) Submit a SAW outdoor welding procedure to CSD for review and approval. Afaq 11/23/02 Approval is endorsed with the following limitations: 1),,Outdoors SAW welding (base metal and weld overlay) shall be done under a covered portable structure (scaffolding and transparent shrouding). 2),,Scaffolding and wind shielding procedures shall be approved by Saudi Aramco Inspector prior to commencement of any welding activities. 3),,Outdoors SAW procedure shall be approved by CSD prior to commencement of any welding activities.
Saudi Arabia
Denmark
Germany
United Kingdom
Italy
United Kingdom
Japan
South Korea
Japan
Japan
Japan
Japan
Japan
o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",, Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. Othman Alamoudi September 07, 2008 00966 8626176 + ************************************************************************ ********************************************************NOTE:- For the Yanbu temporary site the Jeddah Factory pressure vessel nine com approval is limited to purchase order 4501621841, DEETHANIZER COLUMN/YANBU GAS PLANT EXPANSION PROJECT. ================================================================ Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code 07/26/2008 Meshari Al-Ghuryri o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",, Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",, Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders.
South Korea
Japan
United States Of America
United States Of America
South Korea
Italy
India
Italy
Belgium
South Korea
India
Based on the attached e-mail dated on 3/12/2007, in order for AOCT to meet the urgent project order at 30001443 Sungjin, the temporary linkage was made and after the completion of the existing WF, the permenent linkage will be done. This temporary linkage is based on both technical/quality evaluation approval by RSA/AOCT Lead auditor. AOCT Inspection 3/12/2007
Manual linked as requested per e-mail Mr. Mahmoud Naffaa dated 03/31/2009.
The QM status has been changed to QSOH from QSAA as per the RSA's request below. The WF was completed as QSAA mistakenly and will be on HOLD till the technical evaluaiton is completed by RSA in 2008. (please see the attached e-mail for more details). Jan 7, 2008 AOCT Inspection. As we have already advised AOCT, technical assessment of Godrej & Boyce (Plant # 30003657) for 9COM item 6000002524 will not be performed at present. This is due to the fact that the 9COM item is not included of the part of the list of 117 9COM items identified by project management for immediate need of resources. This is in line with our agreement with the Strategic Sourcing Unit of the P&CSD on the approach of considering potential manufacturer(s) for addition in Saudi Aramco material data base. Accordingly, we will advise the manufacturer when are ready to conduct the plant visit. The following are required as parts of the evaluation process: 1) ,,Visit to the manufacturer's fabrication shop where manufacturing of pressure vessels under the subject 9COM item is underway. 2) ,,Engineering evaluation.
Saudi Arabia
Spain
Japan
Turkey
India
Egypt
Spain
Italy
Spain
South Korea
Italy
Spain
Italy
Kuwait
South Korea
Saudi Arabia
Saudi Arabia
<H><U>LIMITATIONS</></> i) Additional inspection hold points shall be applied to the ITP for Saudi Aramco and Zamil Personnel: a) To ensure that only rolling machine operation is employed to a shell ring to correct fit-up offsets, exceeding the permitted Code tolerances, of edges of butt joint to be welded until the deviations are within the specified limits. b) To ensure that only pressing machine operation is employed to correct fit-up offsets, exceeding the permitted Code tolerances, between pre-formed sections of multi-piece vessel head, until the deviations are within the specified limits. c) To ensure that only rolling machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell rings until the deviations are within the specified limits. d) To ensure that only pressing machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell ring and head until the deviations are within the specified limits. <H>NOTE:-</> SEE INSPECTION LOT 107000053371 FOR SAUDI ARAMCO AUDIT TEAM 14th October 2008 Michael Eric Ward
<H><U>LIMITATION.</></> It was recommended that the PETROJET Kattamia Central Work Shop Site is approved for the Saudi Aramco nine com material 6000002524 (carbon steels and low alloy steels) with the following limitations: 1. Exclusion of carbon steel pressure vessels with HIC testing requirements. 2. Either a resident Saudi Aramco inspector or a resident third party inspector, approved by Saudi Aramco VID, must be present during the entire manufacturing process.
Approval of the manufacturer under 9COM 6000002524 is limited to thickness up to 60mm.
Approval limitation: Thickness up to 50mm. Meshari Ghuryri 10/11/2008
Saudi Arabia
India
India
India
Utd.Arab Emir.
Utd.Arab Emir.
Saudi Arabia
India
Italy
Japan
Japan
Italy
Saudi Arabia
Saudi Arabia
Saudi Arabia
MHI Hiroshima informed AOCT that they are NO LONGER produceing this material and WF for de-linkage will be initiated after AOCT recives the RSA concurrence which was requested today (Sep26, 2006). Please refer to the attached the e-mail from vendor dated on Sep 26, 2006. AOCT Inspection
<H>The limitation restricts the thickness up to 100mm thick, which represents the limit of the Arabian CBI plate rolling capacity.</> <H>Michael Eric Ward</> <H>15th October 2005</> The limitation restricts the thickness up to 100mm thick, which represents the limit of the Arabian CBI plate rolling capacity. The limitation restricts the thickness up to 100mm thick, which represents the limit of the Arabian CBI plate rolling capacity.
<H><U>LIMITATION:-</></> Approval for MARITIME INDUSTRIAL SERVICES (Plant # 30000335) under 9COM 6000002525 (Carbon Steel/ Low Alloy steel; WALL THK. MORE THAN 76 MM) is limited to a thickness of 130mm. NOTE:- The relevant assessment report is given by inspection lot 107000050731. Michael Eric Ward June 8th 2008
<H><U>NOTE</></> Inspection lot 107000052131 created to remove nine com 6000002525 until Bilfal complete satisfactory rolling demonstration. Inspection lot to be completed and issued for approval ( see services to objects attachment). Michael Eric Ward 3rd August 2008 ======================================================== s per RSA,Mahmoud Naffaa, Manufacture is approved for 9COM items 6000002525 with limitation: thickness up to 150mm. Salah Shafie Sept. 3, 2008
Saudi Arabia
India
Utd.Arab Emir.
LIMITATIONS:- i)150mm Max ii) Manufacture must be completed at the site identified as 30000500, New Eid Prayer Yard P.O. Box 342 Jubail 31951 except that rolling of shells and longitudinal seam welding of shells must be completed at the Extension one site located in the Royal Commission Area. <H><U>Note:-</></> The Royal Commission Site will be formally approved by assessment under a different plant number at a later date. The agreement was to approve the new site ( rolling equipment located at new site),initially, as a support unit for the main site (Saudi Aramco Plant number 30000500) and under the main site approval number for rolling thick vessel shells . Michael Eric Ward 11th January 2009
During the routine assessment of the MIS, UAE plant it was noted that SAW cladding and welding was done out doors. This is not acceptable to CSD (Adnan Awami). The Q info. record has been changed from QSAA to QSAL. The limitation is given below: "SAW cladding and welding will not be acceptable outdoors unless welding is done using a covered portable structure and a SAW outdoor procedure approved by CSD." As per discussion with Ron Duffy, Quality Director of MIS on 11/23/02, MIS will take following actions to comply with CSD requiremments: 1) Use scaffolding and tarpoline to cover the SAW area 2) Submit a SAW outdoor welding procedure to CSD for review and approval. Afaq 11/23/02 This Q info record was created to update SAP based on the approval given by RDM on the attached RVL form 2. Afaq Approval is endorsed with the following limitations: 1),,Outdoors SAW welding (base metal and weld overlay) shall be done under a covered portable structure (scaffolding and transparent shrouding). 2),,Scaffolding and wind shielding procedures shall be approved by Saudi Aramco Inspector prior to commencement of any welding activities. 3),,Outdoors SAW procedure shall be approved by CSD prior to commencement of any welding activities.
Saudi Arabia
Germany
United Kingdom
Italy
United Kingdom
Italy
Japan
South Korea
Japan
Japan
Japan
Japan
Japan
Japan
according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",, Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. Othman Alamoudi September 07, 2008 00966 8626176 <H><U>****************************************************************** **************************************************************</></> <H><U>GENERAL NOTE ADDED 20th OCTOBER 2007.</></> The Assessor recommended approval for the nine com 6000002525 based on the quality system assessment and inspection lot 107000047859 was approved by all the approval Personnel. However, VID was requested by the Project Quality Manager of the Khursaniyah Program to suspend pressure vessel approvals because of the poor performance of Al-Zamil Company planning and completing NDE utilizing Saudi Aramco Approved Third Party NDE Contractors. For this reason the vendor master was updated to reflect quality system approved and and the Q-Info record was processed to reflect not approved for material 6000002525. Note that inspection lot 107000048053 was created for approval to reverse the initial approval recommendation for the nine com material 6000002525. <H>The decision to place Al-Zamil on Hold was changed on 20th October 2007 and work flow 107000048053 was deleted</> Michael Eric Ward <H><U>NOTE 23rd OCTOBER 2007 RELATING TO TEMPORARY YANBU SITE</></> For the Yanbu temporary site the Jeddah Factory pressure vessel nine com approval is limited to purchase order 4501621841, DEETHANIZER COLUMN/YANBU GAS PLANT EXPANSION PROJECT. ================================================================ Design must be certified by a valid licensed Professional Engineer of the responsible LSTK or design contractor to ensure compliance with all relevant requirements of the applicable construction Code 07/26/2008 Meshari Al-Ghuryri o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of other customers, during the execution of Saudi Aramco's purchase orders. ",, Continuous monitoring of ZHI's performance during execution of Saudi Aramco's purchase orders. o,,Party responsible for purchasing vessels from ZHI shall be responsible for ensuring the manufacturer's readiness in terms of having sufficient production capacity to deliver in due time vessels according to the relevant purchase order schedule. This shall take into consideration the following: ",,Implications of ZHI's commitment to purchase orders of
Italy 9COM additional linked as per request of Mr. Naffaa.
India
Italy
Belgium
South Korea
India
Saudi Arabia
Spain
Japan
The QM status has been changed to QSOH from QSAA as per the RSA's request below. The WF was completed as QSAA mistakenly and will be on HOLD till the technical evaluaiton is completed by RSA in 2008. (please see the attached e-mail for more details). Jan 7, 2008 AOCT Inspection. As we have already advised AOCT, technical assessment of Godrej & Boyce (Plant # 30003657) for 9COM item 6000002525 will not be performed at present. This is due to the fact that the 9COM item is not included of the part of the list of 117 9COM items identified by project management for immediate need of resources. This is in line with our agreement with the Strategic Sourcing Unit of the P&CSD on the approach of considering potential manufacturer(s) for addition in Saudi Aramco material data base. Accordingly, we will advise the manufacturer when are ready to conduct the plant visit. The following are required as parts of the evaluation process: 1) ,,Visit to the manufacturer's fabrication shop where manufacturing of pressure vessels under the subject 9COM item is underway. 2) ,,Engineering evaluation.
<H><U>LIMITATIONS</></> i) Maximum approved thickness 100 mm. ii) Additional inspection hold points shall be applied to the ITP for Saudi Aramco and Zamil Personnel: a) To ensure that only rolling machine operation is employed to a shell ring to correct fit-up offsets, exceeding the permitted Code tolerances, of edges of butt joint to be welded until the deviations are within the specified limits. b) To ensure that only pressing machine operation is employed to correct fit-up offsets, exceeding the permitted Code tolerances, between pre-formed sections of multi-piece vessel head, until the deviations are within the specified limits. c) To ensure that only rolling machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell rings until the deviations are within the specified limits. d) To ensure that only pressing machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell ring and head until the deviations are within the specified limits. <H><U>NOTE:-</></> SEE INSPECTION LOT 107000053371. FOR SAUDI ARAMCO ASSESSMENT TEAM 14th October 2008 Michael Eric Ward
Turkey
India
Italy
Spain
Spain Approval is limited to maximum wall thihkness of 150 mm.
Italy
South Korea
India
India
India
Utd.Arab Emir.
Utd.Arab Emir.
India
India
Japan
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
India
Saudi Arabia
Saudi Arabia
<H><U>LIMITATION.</></> MIS Engineering Department does not have the capability for thermal design of heat exchangers. <H>MIS Personnel must not undertake thermal design for any Saudi Aramco Projects and this service must be sub-contracted to Saudi Aramco CSD approved organizations.</> Note that the RSA has permitted mechanical design.( see services to objects attachment). Michael Eric Ward June 20th 2007
LIMITED TO 38mm WALL THICKNESS CARBON STEEL OR LOW ALLOY STEEL SEE PATIS REPORT 076/00 DATED 11TH JUNE 2000 M. WARD NOVEMBER 14th 2005
<H>LIMITATIONS:</> <H>a)Shell and tube heat exchangers to nine com 6000002528 with a maximum wall thickness of 38mm</> <H>b) Maximum in-house rolling limited to 19mm thicker sections must be rolled by Saudi Aramco approved vendor.</> <H>c) <U>Approval limited to July 30th 2007 and Gulf Steel Works must be assessed by Saudi Aramco during the fabrication of Saudi Aramco heat exchanger unit . Note that satisfactory assessment results will change the approval to permanent approval.</></> ******************************* Last updated by Meshari Ghuryri through IL#107000056757 NO limitation. ******************************
Gogrej was aprroved for Heat Exchanger (9COM 6000002528) as per IL # 107000042151. See services for object. Afaq Ahmed 03/19/2007
Saudi Arabia
Italy
South Korea
South Korea
Spain
Italy
Italy
Germany
South Korea
Germany
Belgium
United Kingdom
Italy
Taiwan
India
India
India
Utd.Arab Emir.
Utd.Arab Emir.
<H><U>LIMITATIONS:-</></> i) Maximum thickness 38mm. ii) No thermal design and if thermal design is required by Saudi Aramco Contracts it must be completed by thermal design sub-contractors approved by Saudi Aramco CSD Heat Exchanger Unit. iii) Limitation required for all pressure vessel by Saudi Aramco pressure vessel group:- Additional inspection hold points shall be applied to the ITP for Saudi Aramco and Zamil Personnel: a) To ensure that only rolling machine operation is employed to a shell ring to correct fit-up offsets, exceeding the permitted Code tolerances, of edges of butt joint to be welded until the deviations are within the specified limits. b) To ensure that only pressing machine operation is employed to correct fit-up offsets, exceeding the permitted Code tolerances, between pre-formed sections of multi-piece vessel head, until the deviations are within the specified limits. c) To ensure that only rolling machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell rings until the deviations are within the specified limits. d) To ensure that only pressing machine operation is employed to correct fit up offsets, exceeding the permitted Code tolerances, between completely fabricated shell ring and head until the deviations are within the specified limits. <H><U>NOTE:-</></> Limitations agreed with the RSA. Michael Eric Ward 5th January 2009
United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America Ireland
Germany
Switzerland
Germany
Japan
United States Of America
Japan
United States Of America
Germany
France
Japan
France
Italy
United States Of America
United Kingdom
Germany
Sweden
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
United States Of America
United States Of America
Comments entered by Angela McFadden on 01/16/2006: *6000002534-Condenser; Surface Steam System. This 9COM is being manually linked in order to reconcile the RVL listing vs J002. *****************END*****************************************
Per the MC34 RSA's request, plant has been approved and Q-Info record has been created with out quality evaluation. Y.F. Dawkins 04/11/2002
United States Of America
United States Of America
Italy
South Korea
Italy
Germany
Saudi Arabia
Saudi Arabia
Japan
United States Of America
United States Of America
United States Of America
Canada
United States Of America
Italy
United Kingdom
Italy
United States Of America
United States Of America
Germany
United Kingdom
It's confirmed that OKAZAKI produces the cable of this 9COM in limitation of Cables for Thermocouple only. Also the manual linkage as QSAL has been completed based on the request by SAES-J-002 Improvement/Synchronization request by Mr. Awami Luay. AOCT Inspection 3/29/2007
Comments entered by Angela McFadden on 03/21/07: Per the request of P & CSD, in order to synchronize SAP/SAES-J-002, this facility is being linked to 9COM 6000002686. Please see email attached to plant record. ****END************************************************
Comments entered by Angela McFadden on 03/21/07: Per the request of P & CSD, in order to synchronize SAP/SAES-J-002, this facility is being linked to 9COM 6000002686. Please see email attached to plant record. ****END************************************************
Comments entered by Angela McFadden on 03/21/07: Per the request of P & CSD, in order to synchronize SAP/SAES-J-002, this facility is being linked to 9COM 6000002686. Please see email attached to plant record. ****END************************************************
Comments entered by Angela McFadden on 07/22/05: Based on the request of the RSA (as part of the RVL Versus SAP Synchronization Effort for SAES-J-002), Honeywell, Inc. is being approved for 9COMs 6000002732 and 6000002926. ***********END***************************************
United Kingdom Ireland Denmark
Belgium
Germany Germany United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America
United Kingdom
Belgium
Germany Ireland
United States Of America
United States Of America Norway Germany Netherlands United Kingdom Netherlands United Kingdom Italy United States Of America United States Of America Denmark United States Of America United States Of America
United States Of America
Belgium
Germany
Germany
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United Kingdom
United States Of America
United States Of America
Belgium
Germany
United Kingdom
United Kingdom
United Kingdom United States Of America United States Of America United States Of America United States Of America Belgium
Germany
Germany
Germany
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Comments entered by Angela McFadden on 03/21/07: Per the request of P & CSD, in order to synchronize SAP/SAES-J-002, this facility is being linked to 9COM 6000002761. Please see email attached to plant record. ****END************************************************
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Japan Japan United Kingdom Netherlands
Italy
Japan
Germany Germany United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America
United States Of America
Indonesia United Kingdom
United Kingdom
United States Of America
United States Of America
Italy
Belgium
United Kingdom
United States Of America
United States Of America
Comments entered by Angela McFadden on 11/13/2006: Per the request of the RSA (see email attached to plant record via services for objects ML03), Thermo Electron is being approved to supply 9COMS 6000002720 & 6000002764. *********END***************************************************
Comments entered by Angela McFadden on 11/14/2006: Per the request of the RSA (see email attached to plant record), this facility is now an approved source to supply 9COM 6000002764. *END************************************************************
Comments entered by Angela McFadden on 06/16/08: Per the request of the RSA, this facility has been approved to supply 9COM 6-2765 in efforts to synchronize J002.
Comments entered by Angela McFadden on 07/10/07: Per the request of the RSA, K-Tek is now approved to supply 9COM 6000002765. Please see email request attached to the plant record (MK03) via services for objects. *END*************************************
Mexico
Netherlands
Netherlands
Japan Japan United Kingdom France Saudi Arabia Saudi Arabia
United States Of America
United States Of America
United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America Germany Indonesia South Korea Saudi Arabia
United States Of America
United States Of America
United States Of America
Italy
Mexico
Netherlands
United States Of America
Comments entered by Angela McFadden on 8/08/2005: In efforts to reconcile SAP/J002, this plant is being approved to supply 9 COMs 6000002810 & 6000002796. *********************end*************************************
United States Of America
United States Of America Netherlands
Denmark
United Kingdom
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America
United States Of America
United States Of America *END*******************************************************
United States Of America
United States Of America
United Kingdom
Norway
Norway
Italy
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Denmark
Netherlands
Comments entered by Angela McFadden on 03/21/07: Per the request of P & CSD, in order to synchronize SAP/SAES-J-002, this facility is being linked to 9COM 6000002875. Please see email attached to plant record. ****END************************************************
Comments entered by Angela McFadden on 03/21/07: Per the request of P & CSD, in order to synchronize SAP/SAES-J-002, this facility is being linked to 9COM 6000002875. Please see email attached to plant record. ****END************************************************
United States Of America
United States Of America
United States Of America
Japan Japan United Kingdom United Kingdom
Japan
Germany United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America
United States Of America
United States Of America
United States Of America
Indonesia United Kingdom Italy
United Kingdom
United Kingdom United States Of America United States Of America United States Of America
Italy
United States Of America
United States Of America
United States Of America
Switzerland
Germany
Netherlands
Utd.Arab Emir.
Utd.Arab Emir.
Utd.Arab Emir.
Utd.Arab Emir.
Utd.Arab Emir.
Utd.Arab Emir.
Saudi Arabia
Saudi Arabia
United Kingdom
United Kingdom
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
United States Of America SEE THE PLANT REMARKS SCREEN (MPBP9619)
United States Of America
United States Of America
Utd.Arab Emir.
Utd.Arab Emir.
Utd.Arab Emir.
Utd.Arab Emir.
Utd.Arab Emir.
Utd.Arab Emir.
Singapore
Comments entered by Angela McFadden on 7/22/2005 Based on the request of the RSA (as part of the RVL Versus SAP Synchronization Effort for SAES-J-002), Halliburton Energy Services is being approved for 9COMs 6000003611. *******************END*********************************************
Comments entered by Angela McFadden on 7/22/2005 Based on the request of the RSA (as part of the RVL Versus SAP Synchronization Effort for SAES-J-002), Halliburton Energy Services is being approved for 9COMs 6000003611. *******************END*********************************************
Approved with limitation had been changed to approved (QSAA) for 9COM-6000003611. It is according to RSA (Luay H. Al-Awami) requirement.RSA email is attached. Othman Alamoudi 03/03/2007 00966 3 862 6176 ************************************************************************ ******************************************************** Not approved for off-shore Wellhead ESD Systems as per Email from the RSA, Luay H. Al-Awami. See attached emails in services for objects. Afaq Ahmed 02/18/2007
Approved with limitation had been changed to approved (QSAA) for 9COM-6000003611. It is according to RSA (Luay H. Al-Awami) requirement.RSA email is attached. Othman Alamoudi 03/03/2007 00966 3 862 6176 ************************************************************************ ******************************************************** Not approved for off-shore Wellhead ESD Systems as per Email from the RSA, Luay H. Al-Awami. See attached emails in services for objects. Afaq Ahmed 02/18/2007
Singapore
Saudi Arabia
Saudi Arabia
Netherlands United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America Netherlands United States Of America United States Of America Canada United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America United States Of America Netherlands Belgium United States Of America United States Of America United States Of America United States Of America
Sweden
United States Of America
United States Of America Belgium
Germany
Germany
South Korea
Japan
Comments entered by Angela McFadden on 01/03/2006: In efforts to synchronize the SAP & SAES-J-002, Magnetrol is now an approved source to supply 9COM 6000007390. Please see RSA's request attached to plant record. *END************************************************
Germany
Japan
Japan
Japan
Japan
Japan
Italy
Germany
Utd.Arab Emir.
Utd.Arab Emir.
Utd.Arab Emir.
Utd.Arab Emir.
Japan
Germany
United Kingdom
United States Of America
United Kingdom
Utd.Arab Emir.
United States Of America
United States Of America
United States Of America
United States Of America
Mexico
France
United States Of America
United States Of America
United Kingdom
Temp approval granted, based on the AOCIU's assessment at EEW. Prelimenary assessment results are satisfactory. Once workflow 1765 is completed, this 9COM will be linked permanently to this plant. Added as per request 3661.
Remarks entered by Angela McFadden on 11/03/05: In efforts to enhance the RVL listing, Pima Valve is being added as an approved source to supply 9 COM 6000009454. ********END***************************************************
Comments entered by Angela McFadden on 03/19/07: In efforts to synchronize SAP & SAES-Y-100, Regulated Vendors List for Custody Measurement Equipment , CSD has requested that this facility be an approved supplier to manufacture 9COMs 6000009831, 600009906, and 6000009907.
Belgium
United States Of America
United States Of America
Germany
Germany
United States Of America
United States Of America
Italy
United Kingdom
United States Of America
United States Of America
United States Of America
Italy
United Kingdom
United States Of America
United States Of America United States Of America United States Of America United States Of America
United Kingdom
Utd.Arab Emir.
Utd.Arab Emir.
United States Of America
United States Of America
Utd.Arab Emir.
Singapore
United States Of America
Utd.Arab Emir. Utd.Arab Emir. United Kingdom
United States Of America
Utd.Arab Emir. Netherlands Singapore Utd.Arab Emir. Utd.Arab Emir. United States Of America
Utd.Arab Emir.
United States Of America
United Kingdom
United States Of America
Netherlands
United States Of America
United States Of America
Mexico
Netherlands
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
Mexico
United States Of America
Mexico
Utd.Arab Emir.
Utd.Arab Emir.
Comments entered by Angela McFadden on 03/19/2007: In efforts to synchronize SAP & SAES-Y-100, Regulated Vendors List for Custody Measurement Equipment , CSD has requested that this facility be an approved supplier to manufacture 9COMs 6000009898, 600009894.
Comments entered by Angela McFadden on 03/19/2007: In efforts to synchronize SAP & SAES-Y-100, Regulated Vendors List for Custody Measurement Equipment , CSD has requested that this facility be an approved supplier to manufacture 9COM 6000009902
Comments entered by Angela McFadden on 03/19/07: In efforts to synchronize SAP & SAES-Y-100, Regulated Vendors List for Custody Measurement Equipment , CSD has requested that this facility be an approved supplier to manufacture 9 COM 6000009902. *END********************************************************
Comments entered by Angela McFadden on 03/19/07: In efforts to synchronize SAP & SAES-Y-100, Regulated Vendors List for Custody Measurement Equipment , CSD has requested that this facility be an approved supplier to manufacture 9COMs 6000009831, 600009906, and 6000009907.
Comments entered by Angela McFadden on 03/19/07: In efforts to synchronize SAP & SAES-Y-100, Regulated Vendors List for Custody Measurement Equipment , CSD has requested that this facility be an approved supplier to manufacture 9COMs 6000009831, 600009906, and 6000009907.
Saudi Arabia
United Kingdom
United States Of America
United States Of America
Utd.Arab Emir.
Netherlands
Netherlands
Saudi Arabia
Utd.Arab Emir.
Utd.Arab Emir.
Saudi Arabia
United Kingdom
Belgium
United States Of America
United States Of America
Utd.Arab Emir.
Netherlands
Italy
Netherlands
<H><U>LIMITATIONS:-</></> i)Approval limited to 1st August 2009. ii) Custody Liquid metering skids not to exceed 100 MBOD iii) Custody Gas metering skids not to exceed 100 MMSCFD iv) Qualified Control System Software Engineer capable of resolving the control system bunch list in-house must be available during the factory acceptance testing. The Control System Software Control Engineer shall be permanent employee or hired contractor. <H>NOTE:-</> See services to objects attachment for RSA update for limitations Michael Eric Ward 30th August 2008 ******************************** UPDATED IN APRIL 19,2009 BY MOHAAMED REAFIQ VIA IL#107000056654. Custody Liquid metering skids not to exceed 120 MBOD *********************************** Last Update 06/13/2009 by Meshari Ghuryri: Alderley approval status reinstated to 100 MBOD after one time approval for 120 MBOD granted by the RSA forPO#4502712341. Please refer to the attached messages for more info. ***************************************
Saudi Arabia
Utd.Arab Emir.
Utd.Arab Emir.
United Kingdom
Belgium
United States Of America
United States Of America
Utd.Arab Emir.
Netherlands
Italy
Netherlands
Saudi Arabia
United Kingdom
France
Utd.Arab Emir.
Saudi Arabia
Utd.Arab Emir.
Utd.Arab Emir.
Saudi Arabia
<H><U>LIMITATIONS:-</></> i)Approval limited to 1st August 2009. ii) Custody Liquid metering skids not to exceed 100 MBOD iii0 Custody Gas metering skids not to exceed 100 MMSCFD iv) Qualified Control System Software Engineer capable of resolving the control system bunch list in-house must be available during the factory acceptance testing. The Control System Software Control Engineer shall be permanent employee or hired contractor. <H>NOTE:-</> See services to objects attachment for RSA update for limitations Michael Eric Ward 30th August 2008 ******************************** UPDATED IN APRIL 19,2009 BY MOHAAMED REAFIQ VIA IL#107000056654. Custody Gas metering skids not to exceed 100 MMSCFD ************************************
Comments entered by Angela McFadden: Per the request of the RSA, 9COM 6000009915 is being linked to to this facility. Please see email from the RSA attached to the plant record. *END************************************************************
<H><U>LIMITATION:-</></> Temporary approval until the First August 2009. <H><U>NOTE:-</></> Alderley Industries Dammam will be required to undergo successful P &CSD and VID assessment during skid manufacture for permanent approval ******************************* UPDATED IN APRIL 19,2009 BY MOHAMMED RAFIQ VIA IL#107000056654. ************************************
United Kingdom
France
Utd.Arab Emir.
Saudi Arabia
Saudi Arabia
United Kingdom
United States Of America
Netherlands
United Kingdom
United Kingdom
Singapore
Netherlands
Saudi Arabia
Saudi Arabia
United Kingdom
United States Of America
United States Of America
Netherlands
United Kingdom
United Kingdom
Singapore
Netherlands
<H><U>LIMITATION:-</></> Temporary approval until the First August 2009. <H><U>NOTE:-</></> Alderley Industries Dammam will be required to undergo successful P &CSD and VID assessment during skid manufacture for permanent approval ******************************* UPDATED IN APRIL 19,2009 BY MOHAMMED RAFIQ VIA IL#107000056654. ************************************
<H><U>LIMITATIONS:-</></> i)Approval limited to 1st August 2009. ii) Custody Liquid metering skids not to exceed 100 MBOD iii0 Custody Gas metering skids not to exceed 100 MMSCFD iv) Qualified Control System Software Engineer capable of resolving the control system bunch list in-house must be available during the factory acceptance testing. The Control System Software Control Engineer shall be permanent employee or hired contractor. <H>NOTE:-</> See services to objects attachment for RSA update for limitations. Michael Eric Ward 30th August 2008 ******************************* UPDATED IN APRIL 19,2009 BY MOHAMMED RAFIQ VIA IL#107000056654. ************************************
Saudi Arabia
Italy France Italy France
United Kingdom
Germany
Sweden
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
United States Of America
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Utd.Arab Emir.
Saudi Arabia
Saudi Arabia
Saudi Arabia
<H><U>LIMITATIONS:-</></> i)Approval limited to 1st August 2009. ii) Custody Liquid metering skids not to exceed 100 MBOD iii0 Custody Gas metering skids not to exceed 100 MMSCFD iv) Qualified Control System Software Engineer capable of resolving the control system bunch list in-house must be available during the factory acceptance testing. The Control System Software Control Engineer shall be permanent employee or hired contractor. <H>NOTE:-</> See services to objects attachment for RSA update for limitations Michael Eric Ward 30th August 2008 ******************************* UPDATED IN APRIL 19,2009 BY MOHAMMED RAFIQ VIA IL#107000056654. ************************************
RVL items, tanks and pressure vessels, forming part of the R.O. equipment packages must be purchased from approved Saudi Aramco RVL Managed suppliers. <H>NOTE:-</> SEE INSPECTION LOT 107000042377 Michael Eric Ward 6th January 2007
Utd.Arab Emir.
United States Of America
Germany
Utd.Arab Emir.
Saudi Arabia
Saudi Arabia
Utd.Arab Emir.
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Utd.Arab Emir.
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
Utd.Arab Emir.
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Utd.Arab Emir.
RVL items, tanks and pressure vessels, forming part of the R.O. equipment packages must be purchased from approved Saudi Aramco RVL Managed suppliers. <H>NOTE:-</> SEE INSPECTION LOT 107000042377 Michael Eric Ward 6th January 2007
RVL items, tanks and pressure vessels, forming part of the R.O. equipment packages must be purchased from approved Saudi Aramco RVL Managed suppliers. <H>NOTE:-</> SEE INSPECTION LOT 107000042377 Michael Eric Ward 6th January 2007
Kuwait
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
Utd.Arab Emir.
United States Of America
Kuwait
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Utd.Arab Emir.
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
Utd.Arab Emir.
United States Of America
China
United States Of America
RVL items, tanks and pressure vessels, forming part of the R.O. equipment packages must be purchased from approved Saudi Aramco RVL Managed suppliers. <H>NOTE:-</> SEE INSPECTION LOT 107000042377 Michael Eric Ward 6th January 2007
RSA has accepted approval of ABJ Engineering and Contracting for 9COM 6000010096 TANK, WASTEWATER ALL WASTEWATER, refer to (Service for Object) email attachment. <H>ABJ Engineering and Contracting is technically accepted for 9COM [6000010096] TANK, WASTEWATER ALL WASTEWATER.</> <H>Thanks</> <H>Abu Naiyan, Mohammed H</>
RVL items, tanks and pressure vessels, forming part of the R.O. equipment packages must be purchased from approved Saudi Aramco RVL Managed suppliers. <H>NOTE:-</> SEE INSPECTION LOT 107000042377 Michael Eric Ward 6th January 2007
United States Of America United States Of America United States Of America Saudi Arabia Saudi Arabia Saudi Arabia Saudi Arabia Saudi Arabia United States Of America United States Of America
United States Of America
United States Of America
Utd.Arab Emir.
United States Of America
Hungary
Utd.Arab Emir.
Germany
Germany
France Germany
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United States Of America
Spain
Saudi Arabia
Saudi Arabia
Saudi Arabia
RVL items, tanks and pressure vessels, forming part of the R.O. equipment packages must be purchased from approved Saudi Aramco RVL Managed suppliers.
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
United Kingdom
Denmark
India
Switzerland
United States Of America
United States Of America
United States Of America
Italy
Switzerland
France
India
France
Germany
United Kingdom
Netherlands
Germany
As attached the RSA concurrence, WF 5974 (IL107000051166)( which was completed wrongly as QSNA )'s QM status has been changed to QSAA manually. AOCT Inspection 1-6-09
United States Of America
United States Of America
Japan
Japan
United Kingdom
Norway
Germany
Germany
Japan United Kingdom
France
Japan
India
India
India
Saudi Arabia
Saudi Arabia
Germany
United Kingdom
Saudi Arabia
Saudi Arabia
Netherlands
Germany
United States Of America
United States Of America
United States Of America
This shall be manufactured and tested at the manufacturing plant of Frank Mohn Flatoy AS in Frekhaug, Norway.
Deviations from API 676 requiring technical waiver : 1) Pump ( pressure ) casings are designed to AD Merkblatter ( German pressure code) in stead of ASME VIII div.1 2) Gears are designed to meet DIN 3990 calculations in stead of AGMA 6010. 3) Materials selection. Materials for main components ( forgings, castings, pipe, etc) are selected on the basis of DIN standards in lieu of ASME section II. 4) Weld design including WPS/PQR and welders qualification are made to meet AD Merkblatter, EN 287 and EN 288 in lieu of ASME IX.
Added as per attached correspondance. ID-CAT C material RAK 01/17/05
Mechanical seal 6000010464 is limited to maximum diameter of 12 inches. Shabib M. Al-Sudairi 01/03/2004 ================================================================Limitait ion is removed. refer to IL#107000052778 and attachment in service for object. Meshari Ghuryri 09/08/08
United States Of America
Japan
Japan
Japan
India
Brazil
Brazil
India
India
Saudi Arabia
Saudi Arabia Saudi Arabia
United States Of America
United States Of America
Germany
United States Of America
United Kingdom
United States Of America
United States Of America
United States Of America
United States Of America
As per Purchasing urgent order request, with the RSA concurrence, the Q-info validity date was extended to 10/25/2006 as attached the request e-mail dated on 10-15-06. AOCT Inspection 10/16/2006
Comments entered by Angela McFadden on 9/6/05: In efforts to sychronize SAP & SAES-J-002, 9COM 6000010782 is being linked to Fisher Controls (30001650). *******************************END***************************
Comments entered by Angela McFadden on 03/21/07: Per the request of P & CSD, in order to synchronize SAP/SAES-J-002, this facility is being linked to 9COM 6000010784. Please see email attached to plant record. ****END************************************************
Comments entered by Angela McFadden on 03/21/07: Per the request of P & CSD, in order to synchronize SAP/SAES-J-002, this facility is being linked to 9COM 6000010784. Please see email attached to plant record. ****END************************************************
Comments entered by Angela McFadden on 8/23/2005 Based on the request of the RSA (as part of the RVL Versus SAP Synchronization Effort for SAES-J-002), Halliburton Energy Services is being approved for 9COMs 6000003729 and 6000010821. ********************END*************************************
Comments entered on 7/22/05 by Angela McFadden: Based on the request of the RSA (as part of the RVL Versus SAP Synchronization Effort for SAES-J-002), Rotork Controls is being approved for 9COM 6000002902 and 6000010821.
United States Of America
India
India
Egypt
Saudi Arabia
Germany Limitations: Production limitation from 24" and up
Turkey
Germany
Japan
United Kingdom From 42 inch up to 84 inch max pipe length 9.1 mtres
United Kingdom
India
Germany
Germany
Japan
Japan
Japan
Japan
Japan
United States Of America
Brazil
Comments entered by Angela McFadden on 7/22/05: Based on the request of the RSA (as part of the RVL Versus SAP Synchronization Effort for SAES-J-002), Cameron Willis is being approved for 9COM 6000003727 and 6000010821. *****END**************************************************
Nominal diameter is limited from 8 inch till 120 inch scope of supply is OD from 8 inch up till 120 inch
Following limitations need to be observed for scope of supply: Pipe outside diameter is limited from 24 inch to 100 inch.
limited OD of 16" till 42" material grade up to X70 pipe length 12.6 meter.
<H><U>NOTE ADDED BY MICHAEL ERIC WARD MAY 2nd 2005</></> <H>It is recommended that SAW Pipes of Kosi Kalan are approved with limitations for the nine com 6000010871. The limitation is for <U>straight seams only SAW 16 Inches to 48 Inches </>(See attachment 142_00. Page 3 for the size range manufactured)</> Note:- this vendor was assessed on 10th of December 2004 and is currently approved to produces Sour service pipe which requires more control, therefore, the vendor is capable of manufacturing the product defined by the Saudi Aramco nine com number 6000010871. <H>---------------</>
Saudi Arabia
France API 5L to X-80. OD 20-80"
India
India
South Korea
Japan
<H>NOTE:-</> National Pipe Company Personnel were recently found to have completed base metal repairs for API 5L PSL 2 material ( spiral mill ). Saudi Aramco were required to conduct a major investigation involving etching pipes with nital (dilute nitric acid and alcohol solution) to determine the frequency of base metal weldment build up repairs. Furthermore, Saudi Aramco VID Personnel arranged a problem solving meeting/audit to identify corrective actions. Poor communications between Production Department, Quality Assurance Department, Quality Control Department and Inspection Personnel was identified as the problem along with a poor NCR/corrective action practice. Note Saudi Aramco monitors the National Pipe Company during the execution of Saudi Aramco Contracts, because of the current lack of trust and confidence Saudi Aramco experience towards National Pipe Company Personnel. Whilst the problem was experienced in the spiral mill the same quality personnel/practices relate the longitudinal mill. The lack of confidence resulted in VID drafting a letter for Vendor Liaison Personnel to issue to the National Pipe Company Management requesting a paradigm shift towards proactive quality practices. National Pipe Company is currently approved ( 25th April 2005)for the SAP nine com materials identified below:- 6000000033 6000000012 6000000640 6000000009 The approval scope increase requested the addition of SAP nine com material 6000010871, designated non-sour water injection service, and the material 6000010871 represented a lower manufacturing/technical control requirement compared to current approval held by NPC. Note that NPC were previously qualified for the sour service materials and for this reason NPC will be recommended for the additional nine com material despite the current decline in the confidence Saudi Aramco VID experience with NPC Personnel. Michael Eric Ward 25th April 2005.
Welspun were approved by desk review for material 6000010871 on the basis that the Saudi Aramco Assessor visited Welspun during December 2004 with the RSA and Welspun were approved for Sour Service Material with the limitation that HIC testing must be completed by a Saudi Aramco Approved HIC Laboratory. Based on the Sour Service Assessment Welspun were approved by desk review for the less critical material 6000010871. Michael Eric Ward 11 th. May 2005
Egypt
India
Saudi Arabia
India
India
India
Saudi Arabia
Saudi Arabia
Brazil
Mexico
Saudi Arabia
Saudi Arabia
India
Saudi Arabia
India
India
China
France
United States Of America
United States Of America
<H><U>LIMITATIONS</></> i) IPIC must issue the welding procedure and qualification record for review by Saudi Aramco CSD for the first Saudi Aramco Order prior to the start of pipe manufacture. ii) IPIC Management must confirm to Saudi Aramco that they have the required pipe forming procedure prior to starting manufacture for the first Saudi Aramco order. iii) Either a Saudi Aramco Quality Control Unit Inspector, or approved third party inspector must be present in the IPIC manufacturing facility throughout the pipe manufacturing process for the first Saudi Aramco order. Note that CSD Pipe Unit must be informed of the start date for the first order to allow witness if required. Michael Eric Ward 21st July 2008
<H>Limitation:-</> i) Drop Weight testing, if required, must be completed at the SAW Pipes Mundra One Facility or Saudi Aramco approved facility.
<H><U>LIMITATION</></> <H>GROUP FIVE ARE NOT APPROVED FOR SOUR SERVICE PIPE.</> <H>MICHAEL ERIC WARD</> <H>7th FEBRUARY 2006</>
<H><U>LIMITATION</></> <H>GROUP FIVE ARE NOT APPROVED FOR SOUR SERVICE PIPE.</> <H>MICHAEL ERIC WARD</> <H>7th FEBRUARY 2006</>
As attached to this Q-info, the QM status has been changed to QSAA from QSNA manually with the concurrence by RSA Mr. Tony Dib. (See the e-mail attached) AOCT Inspection 10-20-08
These materials can be supplied with the limitation of water and non-sour applications only, not for sour application because they do not have enough experience of production for sour service materials and also they do not have corrosion laboratory in the plant. A. Narita, AOCT Dec 19, 2007
Saudi Arabia
Saudi Arabia APPROVED INSPECTION LOT 10700003688
Netherlands Netherlands
South Korea
Canada
Netherlands
Singapore
United States Of America
Italy
France
United States Of America
United Kingdom
United Kingdom United States Of America United States Of America
United States Of America
United States Of America
United States Of America United States Of America
United States Of America
1.,,6000011206 SKID; FILTRATION SYSTEM Approval Limitations: a.,,Only manufacturing and assembly. Relevant process design shall be provided by others (LSTK contractor, specialized process engineering consultancy firms or process licensors). b.,,Skid component (Pressure Vessels) shall not be more than 38 mm thickness 6-3-2009 As per RSA Mr. Naffaa, Mahmoud 's request as attached the correspondece to "Services for object", the above limitation was added. AOCT Inspection Limitation was determined by RSA as follows: Skid component (Pressure Vessels) shall not be more than 38 mm thickness Hani S. Banaja Engineering Specialist PEU/M&CED/CSD Dhahran Heights Tel: +966-3-876-0184 e-mail: [email protected]
Duiker Combustion Engineers BV should be limited to design, procurement and project management only. Fabrication of Saudi Aramco orders must be subcontracted to Aramco approved plants.
The quality system was temparary approved based on the RSA request see the attached email from Abouelnaaj, Khaled K Alaa Abuemarah, December 15, 2005
Comments entered by Angela McFadden on 10/03/2005: Per the request of RSA Salamah Anizi, it is being requested that Brown Fintube be an approved US source to supply 9COM 6000011344. Workflow is currently in RSA's SAP inbox. Once the workflow is approved, the link will be made. ***********************END***********************************
Comments entered by Angela McFadden on 04/12/06: Per request of the RSA, the following limitation applies until further notice: Enpro's approval for fabrication of cyclones is contingent upon all design work being performed by Van Tongeren. ***END*****************************************************
Van Tongeren is an Engineering Comp only. Actual manufacturing and testing of internals can only be sourced to Enpro systems / Houston/USA.
United States Of America
United States Of America Italy United States Of America
United States Of America
France
Germany
France
United States Of America
Netherlands
South Korea
United States Of America United States Of America United States Of America
Finland
France
India
South Korea
United States Of America
Spain
South Korea
India
Remarks entered by Angela McFadden on 02/01/06: Per the request of the RSA, Powerware Corp. is now an approved source to supply RVL 9 COM 6000011555. See email request attached to plant record via services for objects. *********************END***************************
Limitation: MGE UPS French plant manufacturers UPS systems with the following input/output ac voltages: 3 phase / 3 phase = 380 / 380 Vac 3 phase / 1 phase = 380 / 220 Vac
Comments entered by Angela McFadden on 07/31/07: UPS System above 200 KVA. MGE UPS US plant manufacturers UPS systems with the following input/output ac voltages: 3 phase / 3 phase = 480 / 480 Vac 3 phase / 1 phase = 480 / 277 Vac See email request from RSA attached to the vendor record (MK03).
2.,,6000011581 SKID; DEHYDRATOR; GAS HYDROCARBON Approval Limitations: a.,,Only manufacturing and assembly. Relevant process design shall be provided by others (LSTK contractor, specialized process engineering consultancy firms or process licensors). b.,,Skid component (Pressure Vessels) shall not be more than 38 mm thickness 6-3-2009 As per RSA Mr. Naffaa, Mahmoud 's request as attached the correspondece to "Services for object", the above limitation was added. AOCT Inspection Limitation was determined by RSA as follows: Skid component (Pressure Vessels) shall not be more than 38 mm thickness Hani S. Banaja Engineering Specialist PEU/M&CED/CSD Dhahran Heights Tel: +966-3-876-0184 e-mail: [email protected]
United States Of America
United States Of America
Germany
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
France United States Of America United States Of America United States Of America Saudi Arabia France United States Of America United States Of America United States Of America Saudi Arabia
Saudi Arabia
Saudi Arabia
Saudi Arabia
Remarks entered by Angela McFAdden on 04/10/2006: This desk review resulted in de-linking an obsolete 9Com (6000000680) and linking the newer, better descriptive 9Com (6000011664) to the Tomball, Texas facility. No other changes in technical status was done. ******END*****************************************************
<H><U>LIMITATIONS:-</></> APC is recommended for approval for the Saudi Aramco nine com number 6000011875 with the following limitations:- i) The approval is limited to 12-SAMSS-018 T4 pipe/applications only. ii) 01-SAMSS-332 shall apply. <H>Note 1:-</> Specific manufacturing procedure shall be qualified for each job in accordance with 01-SAMSS-332 requirements and the procedure must be qualified in accordance with 01-SAMSS-332 requirements and approved by Saudi Aramco CSD for each set of essential variables defined by 01-SAMSS-332. Previous qualified manufacturing procedures for products which fall into the range of essential variables must be re-submitted to Saudi Aramco CSD for approval. <H>Note 2:-</> Whilst the Saudi Aramco specification 12-SAMSS-018 specified T4 pipe to 38mm thick the maximum limit will be set by the APC ERW plant capability at approximately 16 mm.
Saudi Arabia
United States Of America
France
France
United States Of America
Germany Saudi Arabia
Japan
Saudi Arabia Saudi Arabia
Germany
Canada
Yes One time approval has been granted to ARABIAN PIPES COMPANY (APC)Plant # 30000318 based on the RSA - Nabeel AlBannai below statement of approval: **************************************************************** <H>Dear James</> <H>Please keep me informed with the date of the first production so I can arrange to witness the production and make any necessary action required to avoid production delay. APC is required to demonstrate that their welding processes are in control and capable of consistent production of ERW pipe in accordance to the applicable Saudi Aramco Standards before consideration is given to allow ERW pipe for T2 applications. APC should confirm that they are able to meet the listed below requirements;</> <H>Conditions that APC must meet;</> <H>· Impact test at -18 oC, as required by 12-SAMSS-018 (coils must be procured with impact testing as appropriate).</> <H>· The impact test notch shall be at a distance of ± 0.25 mm from the weld line. This requirement has been added to the latest revision of ERW pipe standard which is now under BOE review.</> <H>· Location of impact notch relative to the weld line should be identified by etching and witnessed by VID representative. </> <H>Thanks</> <H>Nabeel Bannai</> <H>Engineering Specialist, Class 12 RSA</> ****************************************************************Abdullah Al Guwaifli VID-QAU 04/19/2008
10/09/06 - D. CLAYMORE - PER THE REQUEST OF THE RSA THIS 9COM HAS BEEN APPROVED FOR PLANT 30001498
Limitation: MGE UPS French plant manufacturers UPS systems with the following input/output ac voltages: 3 phase / 3 phase = 380 / 380 Vac 3 phase / 1 phase = 380 / 220 Vac
Comments entered by Angela McFadden on 07/31/07: UPS System above 10 to 200 KVA for IT and Communications. MGE UPS US plant manufacturers UPS systems with the following input/output ac voltages: 3 phase / 3 phase = 480 / 480 Vac 3 phase / 1 phase = 480 / 277 Vac See email request from RSA attached to the vendor record (MK03).
SIZE OF LINE PIPE PRODUCED BY THE PLANT IS 4 1/2" - 16". Green pipe for expandable tube without heat treatment and hydrostatic test only AOCT Inspection Narita
Comments entered by Angela McFadden on 03/08/2007: Per the request of CSD, this facility has been linked as an approved manufacturer of newly created 9COM 6000012249. See email request attached to the plant record (MK03) via services for objects.
United States Of America
United States Of America
United States Of America
Switzerland
India
India
Germany
Italy
Italy
Italy
Italy
Japan
United States Of America
United States Of America
Czech Republic
Italy
India
Italy
Italy
Italy Valves size range form 26 up to 50 inch only
United States Of America
Comments entered by Angela McFadden on 03/08/2007: Per the request of CSD, this facility has been linked as an approved manufacturer of newly created 9COM 6000012249. See email request attached to the plant record (MK03) via services for objects.
Comments entered by Angela McFadden on 03/08/2007: Per the request of CSD, this facility has been linked as an approved manufacturer of newly created 9COM 6000012249. See email request attached to the plant record (MK03) via services for objects.
Comments entered by Angela McFadden on 03/08/2007: Per the request of CSD, this facility has been linked as an approved manufacturer of newly created 9COM 6000012249. See email request attached to the plant record (MK03) via services for objects.
The Manual Linkage was completed as per the RSA's request (Mr. Fahad Akroosh). See the detailed in the attached e-mail. April 12, 2007 AOCT Inspection
Comments entered by Angela McFadden on 04/11/07: Per the request of the RSA, this facility is being manually linked to 9COM 6000012420. Email request is attached to the plant record via services for objects. *END********************************************
Comments entered by Angela McFadden on 04/11/07: Per the request of the RSA, this facility is being manually linked to 9COM 6000012420. Email request is attached to the plant record via services for objects. *END********************************************
As attached the request e-mail from CSD, the QSM status was updated limited to 42 inch only. April 18, 2007 AOCT Inspection The Manual Linkage was completed as per the RSA's request (Mr. Fahad Akroosh). See the detailed in the attached e-mail. April 12, 2007 AOCT Inspection
United States Of America
Canada
Netherlands
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
United States Of America
South Korea
Japan
Saudi Arabia
Saudi Arabia
Saudi Arabia
omments entered by Angela McFadden on 10/20/08: Product limitation: Tarpon Energy Services is approved only for packaging micro-turbines manufactured by Capstone Micro-Turbines. ***************************END**********************************
With the concurrece of RSA Mr. Ishwait, Basel A as attached e-mail dated on March 17, 09, it was confirmed to linke manually the new 9COM 6000012716 SWITCHGEAR; GAS TYPE,115 KV,SEC 32-SMSS-3,GAS INSULATEDSWITCHGEAR to HHI 3000099 without WF. AOCT Inspection 3-17-09
<H>Limitations</> 1.0. No machining casting only 20. Machining of castings must be completed by Approved Saudi aramco Vendor 30. The Arabian Axle Mahawer Plant is not approved. Michael Eric Ward 17 th September 2008
****************************************************** UPDATED IN 04/14/2009 by MESHARI GHURYRI: This approval will be temporary for only RT REFINERY's order, see attachment; only one impeller to be approved. Q-info record will be manually modified to release only one impeller for RT REFINERY's order. This action will be done manually after completing the WF. ****************************************************** Updated in 06/13/2009 BY MESHARI GHURYRI: Two impeller wear rings have been added in above limitation *******************************************************
Saudi Arabia
Spain
Japan
Spain
Italy
<H><U>LIMITATIONS:-</></> i) NDE must be subcontracted to Saudi Aramco approved NDE subcontractors until the Steel Casting Company develop their NDE Facility and obtain Saudi Aramco approval to complete NDE during the execution of Saudi Aramco projects ii) Hydro testing when required must be completed by subcontractors approved by Saudi Aramco until the Metal Casting Company Develop their Facility and gain approval from Saudi Aramco iii) Metal Casting Company must not weld repair Saudi Aramco castings until they demonstrate to Saudi Aramco the capability of satisfactory welding procedures and qualified welding personnel. iv) Metal Casting Company do not have satisfactory measuring equipment or design experience to determine the size of components from damaged samples, therefore, Metal Casting Company is <H><U>limited to casting products from casting drawings provided to them.</></> v) Steel Casting Company do not have machining capability, therefore, machining must be completed by machine shop facilities approved by Saudi Aramco. Michael Eric Ward 1st December 2009
RSA Mr. Akroosh has requested to link the 9COMs 6000013010 & 6000013011 manually as attached the correspondence at Service/Objective NEW 9COMS 6000013010 for Cryogenic service 6000013011 for pressure seal AOCT Inspection 4-10-08
India
Japan
Spain
- Released the hold status as per the request by RSA Mr. Akroosh, changed back to QSAA. Please see the attached correspondence. AOCT Inspection Sep 30, 2008 From: Akroosh, Fahad A Sent: Monday, September 29, 2008 9:54 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: RE: Audco status Dear Miho This is to kindly request you to remove the hold on Audco for all three plant 30000337/30004096/30000336 This is to inform you that Aduco has already resolved their issues with CSD. The foundry list is clear now. They are also committed to identify the seat leakage issues of Ras Tanura valves but the time is limited due to Eid holiday. They also changed their design fro globe valves. Attached all needed details I just want to draw your attention that Audco shall NOT be approved for metal seated ball valve 6000000244. Make sure that they are not linked to this 9COM. Audco has little experience with metal seated ball valves. They produce only up to 3 inch class 600 Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98 -QM Status has been changed to ON HOLD as per RSA Mr. Akroosh's request as follow. AOCT Inspection Sep 4,2008 From: Akroosh, Fahad A Sent: Wednesday, September 03, 2008 6:44 PM To: Tabei, Miho Cc: Muhaisen, Abdullah A Subject: Audco status Salam to All This is to kindly request you to place all Audco plant ONHOLD for a period of time as decided by CSD. The purpose of this hold is not to reevaluate the technical and quality system of Audco. It is to just alert Audco that they can not secure business with Aramco unless they comply with Aramco requirements. Recently Audco has deviated several times from complying and sticking with approved sources of foundries. We discussed this matter with them several times and in deferent occasions but they failed to comply. Each time they got a new order they always coroner PMT by saying that delivery time can not be met unless PMT approved new foundries that are not in the list. Audco must clearly submit the list of approved foundries with during quotation We also have another issue regarding globe valve failure in which Audco is not cooperative in solving the matter Audco India status should be changed to ONHOLD effective immediately. CSD will send you an email once the issue is solved with them Best regards, Fahad Ahmed Al-Akroosh Valve Engineering Specialist Consulting Services Department Tel: +9663-876-0198 Fax: +9663-874-4444 ext. 103306 Mob: +966-505972270 Dhahran Building -9155 R-98
RSA Mr. Akroosh has requested to link the 9COMs 6000013010 & 6000013011 manually as attached the correspondence at Service/Objective NEW 9COMS 6000013010 for Cryogenic service 6000013011 for pressure seal AOCT Inspection 4-10-08