N E R E T V A 0 25 50 75 100m. 5 PS 1 PS2 PS 3 PS4 PS 10 OT 11 OT 1 OT 2 OT 3 OT 12 OT 4 OT 5 OT 13 OT OT 6 7 OT OT OT OT 14 8 9 15 OT OT 16 17 OT 2 3 1 4 TP 5 TP 6 TP 90 50 45 200 40 60 125 125 90 90 250 600 100 350 600 400 40 200 350 600 200 90 125 90 125 90 300 90 90 125 600 32 350 350 200 350 60 600 125 600 350 P 150 P 60 P 60 P 600 P 600 P 600 P 600 P 150 P 100 P 80 P 80 P 300 P 80 P 300 P 80 P 200 P 60 P 300 P 80 P 300 P 50/60 P 300 P 80 P 100 P 200 P 60 P 300 P 40 P 60 P 60 P 250 P 250 P 150 P 60 P 100 P 60 P 60 P 150 P 80 P 80 P 125 P 100 P 60 P 125 P 60 P 250 P 250 P 60 P 80 P 150 P 60 P 100 P 60 P 60 P 60 P 100 P 80 60 80 P 150 P 100 C 600/400 C 500/500 P 80 P 60 P 80 P 250 C 600/600 C 500/400 C 500/500 C 600/400 C 600/400 P 200 C 600/400 P 60 C 400/500 P 250 C 400/500 P 40 C 400 90 350 90 350 25 175 90 400 30 200 80 20 30 30 30 100 100 80 150 40 40 TUNEL / TUNNEL L=302.10m PS8 PS4 KP4 O 1050/700 L=136.53m L=117.21 m L=291.05 m L=219.59m PS8 L=536.77m L=136.53m MASTER PLAN FOR THE HISTORICAL AREA OF MOSTAR FOR THE PERIOD BETWEEN 2007 AND 2017 REGULACIONI PLAN HISTORIJSKOG GRADSKOG PODRUČJA MOSTAR ZA PERIOD OD 2007. DO 2017. GODINE 1 : 1000 N PERSON IN CHARGE FOR THE PREPARATION OF THE MASTER PLAN (NOSILAC PRIPREME REGULACIONOG PLANA) : FEDERAL MINISTRY FOR SPATIAL PLANNING ( FEDERALNO MINISTARSTVO PROSTORNOG UREĐENJA) MASTER PLAN REALIZED BY ( NOSILAC IZRADE REGULACIONOG PLANA): BIMTAŞ, IMP ISTANBUL COORDINATOR ( KOORDINATOR IZRADE RP ): AHMET AGIRMAN ODGOVORNI PLANER (CHIEF PLANNER) : PROF. DR. IBRAHIM BAZ LEGEND (LEGENDA): MAP (KARTA) INFRASTRUCTURE IMPROVEMENTS (WATER AND SEWAGE SYSTEMS) UNAPREDENJE INFRASTRUKTURE (VODOVOD I KANALIZACIJA) 16 PHASE (FAZA) PROPOSAL (PRIJEDLOG) INFRASTRUCTURE IMPROVEMENTS (WATER AND SEWAGE SYSTEMS) UNAPREDENJE INFRASTRUKTURE (VODOVOD I KANALIZACIJA) SCALE (RAZMJERA) 0 25 50 75 100m. P6-A INFRASTRUCTURE IMPROVEMENTS (WATER AND SEWAGE SYSTEMS) UNAPREDENJE INFRASTRUKTURE (VODOVOD I KANALIZACIJA)