A SEMINAR PRESENTATIONON
2013-2014ELECTRICAL ENGINEERING
UNIVERSITY COLLEGE OF ENGINEERING ,KOTA
RAGHAV CHITTORAVII th semester
Electrical Engg.
Mr. S.K. Sharama Mrs. Seema Agrawal(Asst. professor)
Guided By :-
Presented By :-
Kota thermal power station
KOTA SUPER THERMAL POWER STATION
RAJASTHAN VIDHYUT UTPADAN NIGAM
LIMITED
INTRODUCTION
KSTPS is first coal based power plant in Rajasthan.
It is located ideally on the left bank of CHAMBAL
River at the upstream of KOTA BARRAGE.
Its first unit of capacity 110 MW is commisioned on 17
jan 1983 and last one on 2009.
It is one of highest power generating plant with
installed capacity of 1240 MW.
STAGES
Unit 6 – 195 MW
Unit 1 – 110 MW
Unit 2 – 110 MW
Unit 3 – 210 MW
Unit 4 – 210 MW
Unit 5 – 210 MW
Unit 7 – 195 MW
Stage I
Stage II Stage III Stage IV
Stage V
DESIGN
110 + 110 + 210 + 210 + 210 + 195 +195 = 1240 MW
CONTENTS OF THE PRESENTATION
• GENERAL LAYOUT
• COAL HANDLING PLANT
• PROCESS OF STEAM GENERATION
• TURBINE
• GENERATOR
• WATER TREWATMENT PLANT
• SWITCHYARD
• CONTROL PANNEL
PLANT OVERVIEW
COAL HANDLING PLANT
• 20000 tons coal requirment per day.• The main coal sources are:
1. Coal India Ltd. (CIL)
2. South Estern Coalfield Ltd. (SECL)
3. Northern Coalfield Ltd. (NCL)
(coal comes from 1000 km distance)
• Everyday 3- 4 trains of coal are unloaded, each train consists 58 wagons.(approx 3500-3800 tons)
• Coal is unloaded from wagons by means of WAGON TRIPPLER