1 Kopeopeo Canal Remediation Project Community Liaison Group Meeting 24 April 2018
27

Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

Mar 04, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

1

Kopeopeo Canal Remediation ProjectCommunity Liaison Group Meeting

24 April 2018

Page 2: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

2

Meeting agenda topics• Welcome & introduction – John Pullar

• Approval of minutes from previous meeting

• Communications update – Abby Tozer

• Project update – Brendon Love/Ken Tarboton

• Independent Monitor – Matt James

• Cultural Monitor – Eula Toko

• Health, Safety and Monitoring – Des McCleary

• Other business

• Light lunch

Page 3: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

3

Communications• Website www.boprc.govt.nz/kopeopeo

• Project page updates

• Pedestrian accessway open

• CLG site tour

Page 4: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

4

Project page• Register to follow the project

• You’ll get email alerts when updates are published

• You can unfollow at any time

Page 5: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

5

Kopeopeo – Orini Public Access Path

Page 6: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

6

CLG Site Tour

Page 7: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

7

Project updateOverview

• Progress made over previous period

• Dredging (progress, monitoring, validation)

• CS3 Enabling works

• CS3 Works

• Public access

• Activities planned for upcoming period

Page 8: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

8

Overview of progress (5 March – 20 April) Main dredging completed to Paroa Road First section complete and validated Second lift over bridge completed CS3 enabling works mostly complete CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to Paroa Road Alternative pedestrian access to Whakatāne river

stopbank constructed

Page 9: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

9

Dredging progress

270m

660mS1. 270m

S2. 390m

1180m

S3. 520m

1850m

S4. 670m

Containment Site 1CS1

FCS West

Dredged to date 20-04-2018

Validated to date 20-04-2018

Lift over bridge 1Lift over bridge 2

Lift over Paroa RdBridge 3

Lift over SH30Bridge 4

Page 10: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

10

Geobags filled

Bags 2-7

full & closed

Bags 9-10actively being filled

Bag 8Unrolled ready to

fill Bag 1 initial bag partially

full

Page 11: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

11

Barge lift over second bridge

Page 12: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

12

Sand bug operations

Page 13: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

13

Weed removal

Page 14: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

14

Wood pellet processing

Page 15: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

15

CS3 preliminary works

Page 16: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

16

CS3 works

Page 17: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

17

Activities planned for upcoming period

• Progress dredging in Section 4

• CS3 construction based on final design

• Processing of eels

• Ongoing weed removal ahead of large objects

• Sand-bug dredging under bridges and Kope/Orini pump intake channel

Page 19: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

19

Independent Monitor update• Powerpole incident investigation ongoing

• CLG site visit

• Excavator removing weed ahead of dredging

• Complaints received – Dredging and dust

• Eel removal report reviewed

• MP8 turbidity monitor installed

• Bone finds at CS3

• FCS-East fixed

• Sand bug dredging

Page 20: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

20

ACM & Wood Waste at CS3

Page 21: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

21

Canal Sediment Validation

The canal sediment Total PCDD/F WHO-TEQUpperbound results ranged between 23 and 45 pg/g, which is below the remedial target of 60 pg/g.

Page 22: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

22

Dioxin Air & Groundwater Monitoring

– Tested – Awaiting results for review

Air Tested – Awaiting results for review

Groundwater Six groundwater samples (including two duplicates ) were collected from the four monitoring wells located at CS1. Total PCDD/F I-TEQ Upperbound results of between 6.67 and 9.53 pg/L were recorded in the water samples. All were below the adopted Tier 1 trigger level criteria outlined in the Environmental Monitoring and Validation Plan (EMVP) of 13.5 pg/L and the consented limit of 30 pg/g.

Geobags Tested – Awaiting results for review

Over-sized bulk bags

Tested – Awaiting results for review

Page 23: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

23

Cultural Monitor update

• Recent finds –determined by Archaeologist to be modern, not archaeological artefacts

• Modified protocol

Page 24: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

24

Health, Safety & Environment

• Safety incident regarding overhead powerlines investigated

• CS3 Site closed to public

• Asbestos find at CS3 and sampling

• Disposal of material from trial site

Page 25: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

25

Dust Monitoring – CS3

At Kope/Orini Pump station Mobile dust monitor at CS3

Example false alarm3:47am 27 March

No dust exceedances in period

Page 26: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

26

Traffic Management

• CS3 traffic management

• Road closures associated with each crane lift

Page 27: Kopeopeo Canal Remediation Project...2018/04/24  · CS3 final design approved by Consent Authority Pump station canal dredging started Weed removal carried out to ParoaRoad Alternative

27

Other Business

• Next meeting: Tuesday 29th May 2018

• Tech Talk at next meeting – Monitoring system by Karam de Lacey of Control Tech