-
KO-MAG
( / / )
User s Book
Global Cell Phone Repair Parts & Machines Wholesale Online
Store - Xicart.com
-
1. ---------------------------------------
Safety Regulations
2. ---------------------------------------
Parameters and Specification
3. ---------------------------------------
Features
4. -------------------------------------
Inspection and Alignment
5. ----------------------------------------
Operation Process
6. ----------------------------------------
Debubbling process
7. ----------------------------------------
Maintenance
8. -------------------------------
Relation between Vacuum Degree and Altitude
Global Cell Phone Repair Parts & Machines Wholesale Online
Store - Xicart.com
-
1.
Safety Regulations
For your safety, please read this handbook carefully to be more
familiar
with the application and limitations of the machines and the
related
potential risks.
A.
Read the instructions before using the equipment B.
Do not boot the equipment before closing the bin gate
C.
This machine adopts the third grounding method. It is important
to
keep the grounding normal. Poor grounding will cause the
dangers
towards the machine and user
D.
Electricity Box should not be opened without professional staffs
are
present
Global Cell Phone Repair Parts & Machines Wholesale Online
Store - Xicart.com
-
2.
Parameters AC220V 1500W
Power:
AC110V AC220V
Selective:
20-30
Work Environment: 20-30 , clean and dust-free
Laminating: Flat Type Lamination
40S/2pcs
Production Efficiency:
Heating Method: Constant temperature
7
Applicable Size: Below 7
510*480*380mm
Size of Equipment: 510*480*380mm
66kg
Height of Equipment: About 66kg
Global Cell Phone Repair Parts & Machines Wholesale Online
Store - Xicart.com
-
3.
Features *
No Modules Needed, No Debubbling Process Needed
*
Press to Boot, Easy Operation
*
Smart Constant Pressure; Automatic Shift to the Lamination
and
Debubbling Mode
*
Connect the power supply can be used; built-in vacuum pump and
air
compressor;
Global Cell Phone Repair Parts & Machines Wholesale Online
Store - Xicart.com
-
4.
Inspection and Alignment
1 2
Check that whether the tray is smooth Check that whether there
are
some foreign matters on the silicone pad
3 4
IC
Global Cell Phone Repair Parts & Machines Wholesale Online
Store - Xicart.com
-
Module Alignment Alignment on the silicone (LCD
screen is on the silicone
while IC is beyond the
silicone
5 6
Put into the laminator If the scree is with long flat
cable, put the product on the
external part of the anvil cell
and close the door
7 2
mode2 Open the door in
addition to the bubble machine,
the product put to
Global Cell Phone Repair Parts & Machines Wholesale Online
Store - Xicart.com
-
5.
Operation Process 1
Screen-Pressing Process Mode 1 No Need Remove Bubble
1.
Check whether the connected power
2.
Switch on the power and press the button to boot the
equipment
to check that whether the equipment can operate normally or
not.
3. OCA IC
;
Put the LCD with the OCA glue on the cut silicone (please
stagger
the silicone away from the IC position of the flat cable)
4. ;
Open the gate and put the tray on the cabinet
5. ;
Close the cabinet gate
6. 1
Switch to the "mode 1" in the control system
7. ;
Press button to boot the equipment
8. 2~6 ;
Wait patiently for 2 to 6 minutes
9. ;
Wait until the two indicator lights off or the vacuum table
turns to
the minimal value. Open the cabinet gate and take out the
product
10.
The process completed, check whether the product is normal
or
not.
Global Cell Phone Repair Parts & Machines Wholesale Online
Store - Xicart.com
-
2
Screen-Pressing Process Mode 2 In addition to the bubble
machine
usee
1. 1-5
Repeat the above steps 1-5
2. 2
Switch to the "mode 2" in the control system
3. ;
Press button to boot the equipment
4. 40
Wait 40 seconds
5. ;
Wait until the two indicator lights off or the vacuum table
turns to
the minimal value. Open the cabinet gate and take out the
product
6.
In addition to the bubble machine by pressing the "open"
button
7. 0
Wait for the pressure display table is displayed as zero and
the
"open" indicator light;
8.
Open the door in addition to the bubble machine, the product
put
to
9.
Close and fasten the handle in addition to the bubble
machine,
release the "open" button
10. 4-10 6-9
Patiently waiting for 4-10 minutes, then repeat steps 6-9 above,
the
product is taken out
Global Cell Phone Repair Parts & Machines Wholesale Online
Store - Xicart.com
-
7.
Maintenance
Projects
Items
Formwork
Check that whether there are some
foreign matters. If positive, please
clean them
Lamination Guide Pillar and Work
Platform Sideway
Add some lubricating oil to the
guide pillar and sideway regularly
to make sure the movement is
smooth
Global Cell Phone Repair Parts & Machines Wholesale Online
Store - Xicart.com
-
8.
Relation between Vacuum Degree and Altitude
1
Generally, the design and tested parameters of the vacuum pump
are
conducted under the standardized air pressure environment. If
the
altitude is changing, the exact performance will also change.
The exact
parameters are displayed in Table 1.
Altitude
(m)
Vacuum Degree
(-Mpa) mmHg
0 0.1013 760
200 0.0990 742.7
400 0.0968 726.2
500 0.0957 717.9
1000 0.0902 676.7
1500 0.0846 634.7
2000 0.0790 593.3
505.9 93~95
1057.5 88~90
Examples: Chengdu of Sichuan Altitude 505.9 Vacuum Degree
ranges
from 93 to 95, normal
Yulin of Shanxi Altitude 1057.5 Vacuum Degree ranges from 88 to
90,
normal
Global Cell Phone Repair Parts & Machines Wholesale Online
Store - Xicart.com
-
Debugging of Vacuum Pressure Gage 1 Panasonic
Panasonic Vacuum Pressure Gage Debugging
2 1
DP-100
Only need to press the
value shown in Table 1
Main
displayed in Main
Sub
displayed in Sub
0 /
0 action is needed (no need for operation) to display the
present and
reference values.
Global Cell Phone Repair Parts & Machines Wholesale Online
Store - Xicart.com