“KNOWLEDGE TRANSFER PROGRAMME” – (KTP) JABATAN PENGAJIAN TINGGI, KEMENTERIAN PENDIDIKAN MALAYSIA LAPORAN KEMAJUAN BERKALA / PERIODIC PROGRESS REPORT NOTA :Jikaterdapatsebarangperubahansepertidalamborangasal, silapohonkelulusandaripihakUrusetia. NOTE: If there any changes in the original form, kindly get approval from Secretariat. 3 bulan / 3 months 6 bulan / 6 months 9 bulan/ 9 months 12 bulan/ 12 months 15 bulan / 15 months 18 bulan / 18 months 21 bulan/ 21 months 24 bulan/ 24 months *Silatanda (√) di ruang yang berkenaan / Please tick (√) in the appropriate space. A : MAKLUMAT GERAN / Information of Grant KOD RUJUKAN GERAN: I-GT/15(UPM-13) Reference Code of Grant: B : MAKLUMAT KETUA PROJEK / Details of Project Leader NAMA KETUA PROJEK : Nor AzahYusof Name of Project Leader: 731024085280 NO.KAD PENGENALAN : ID no.: FAKULTI/JABATAN/: InstitutTeknologiMaju (ITMA), Universiti Putra Malaysia, 43400 Serdang, Selangor. Faculty/School/Centre: (AlamatPenuh/Full Address): NO. TELEFON NO. FAKSIMILI : NO. TELEFON BIMBIT: ALAMAT EMEL: DIREKTORI : PEJABAT : Fax No.: Mobile No.: E-mail Address: Directory : Office Phone No.: 03-89466782 03-89435380 019-2421472 [email protected]
19
Embed
“KNOWLEDGE TRANSFER PROGRAMME” – (KTP)ktpmonitoring.usm.my/ktp/uploads/3/319/3_319_18_i.pdf“knowledge transfer programme” – (ktp) jabatan pengajian tinggi, kementerian
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
“KNOWLEDGE TRANSFER PROGRAMME” – (KTP)
JABATAN PENGAJIAN TINGGI, KEMENTERIAN PENDIDIKAN MALAYSIA
NOTA :Jikaterdapatsebarangperubahansepertidalamborangasal, silapohonkelulusandaripihakUrusetia. NOTE: If there any changes in the original form, kindly get approval from Secretariat.
3 bulan / 3 months 6 bulan / 6 months 9 bulan/ 9 months 12 bulan/ 12 months
15 bulan / 15 months 18 bulan / 18 months 21 bulan/ 21 months 24 bulan/ 24 months
*Silatanda (√) di ruang yang berkenaan / Please tick (√) in the appropriate space.
A : MAKLUMAT GERAN / Information of Grant
KOD RUJUKAN GERAN: I-GT/15(UPM-13) Reference Code of Grant:
B : MAKLUMAT KETUA PROJEK / Details of Project Leader
NAMA KETUA PROJEK : Nor AzahYusof Name of Project Leader:
731024085280
NO.KAD PENGENALAN :
ID no.:
FAKULTI/JABATAN/: InstitutTeknologiMaju (ITMA), Universiti Putra Malaysia, 43400 Serdang, Selangor. Faculty/School/Centre:
(AlamatPenuh/Full Address):
NO. TELEFON NO. FAKSIMILI : NO. TELEFON BIMBIT: ALAMAT EMEL: DIREKTORI : PEJABAT : Fax No.: Mobile No.: E-mail Address: Directory : Office Phone No.:
untukujikeupayaandalamskala perlu di merekabentuk ‘pilot plant’ dalamskala yang kecil
besarpenjerap yang Buatsendiri dah
dihasilkan Ulu kerana
university dan
industry
Tiada kemudah
an tersebut
Silagunakanlampirantambahanjikaperlu/ Kindly use additional sheet if necessary
I : HASIL DAN IMPAK BERDASARKAN ‘MILESTONE’ / Outcome and Impact based on Milestone
PENCAPAIAN MENGIKUT ‘MILESTONE’ / HASIL/ IMPAK/
‘MILESTONE’ BERDASARKAN Milestone Outcome Impact
PROGRES BESERTA PERATUS: 1. To apply the developed sorbent(100)% 1. Sorbent has been proved to be 1. Possible sorbent can
Achievement(s) based on (Poly (ethyl hydrazide) grafted Oil able to adsorpt mercury be commercialized
Milestone According to Progress Palm Empty Fruit Bunch Fiber however the physical form is
(peh-g-opefb) and iminodiacetic
and Percentage :
not suitable
acid chelating functional group
2.
grafted kenaffiber for mercury
clean up in petroleum industrial
waste water in PAKA Trengganu.
3.
2. To work together with the (100)%
2. We have carried out industrial
industrial partner in solving all
visit together with HgSolution 4.
related problems in mercury
Sdn Bhd to Petronas Carigali
clean up based on the actual
Sdn Bhd and Petronas
industrial set up
3. To supply the technology to the (50%)
industry together with the
developed sorbent in large scale
4. To consult the industry on problems related to the technology (70%)
Ammonium Sdn Bhd to gain 5. knowledge on actual industrial set up.
3. Block diagram has been designed for upscaling process, however more fund is needed to carry out this plan. Suggestion to work with HgSolution for Technofund
J : PENCAPAIAN PROJEK BERDASARKAN PROGRES / Project Achievement Based on Progress
HASIL KEPADA INDUSTRI / HASIL/ IMPAK/
KOMUNITI SASARAN Outcome Impact
BERDASARKAN PROGRES:
Outcome(s) to Targeted Industry / 1. As of now, we have been working side by 1.
Community According to Progress : side with the industry, and the strategy will
be to present together the outcome to fund
provider. First is to apply TechnoFund for 2.
precommercialization (to built pilot plant for
upscaling) and followed by presentation to
Petronas or other oil and gas company for 3.
licensing purposes
2. prototype for removal of mercury in condensate and produced water has been built and currently under testing. 3. Suitable form (sylinder like) of polymer has been obtained using mould 4. Upscaling study has been successfully carried out up to 200%
PULANGAN KEPADA IPTA: HASIL/ Outcome IMPAK/ Impact
Return(s) to IPTA :
1.
2.
3.
SUMBANGAN KEPADA HASIL/ Outcome IMPAK/ Impact
PEMBANGUNAN MODAL INSAN:
Contribution(s) to Human Capital
1. 2 pelajar (1 MSc dan 1 PhD) 1.
Development:
2. 2.
3. 3.
HASIL TIDAK LANGSUNG YANG DITERIMA OLEH INDUSTRI / KOMUNITI (SASARAN): Indirect Outcome received by recipient Industry / Community (Targeted):
1. New technology potential for commercialization
2. Working together for technofund
3.
*Silagunakanlampirantambahanjikaperlu/ Kindly use additional sheet if necessary.
HASIL TIDAK LANGSUNG YANG DITERIMA OLEH 1. PIHAK KETIGA(BUKAN SASARAN):
Indirect Outcome received by third party: 2.
3.
*Silagunakanlampirantambahanjikaperlu/ Kindly use additional sheet if necessary.
K : AKUAN KETUA PROJEK / Declaration by Project Leader
TANDATANGAN KETUA PROJEK : _______________ _____________ TARIKH : 24/4/2015 Project Leader’s Signature : (TandatanganElektronik)Tarikh:
(Electronic Signature)
L : AKUAN TIMBALAN NAIB CANSELOR/PENGARAH YANG BERTANGGUNGJAWAB / Declaration by responsible Deputy Vice Chancellor/Director
NAMA PUSAT BERTANGGUNGJAWAB: Name of Responsible Center :
NAMA TIMBALAN CANSELOR YANG BERTANGGUNGJAWAB: Name of Responsible Deputy Vice Chancellor :