KITCHEN PLAN Wall Oven Cooktop & Hood DW Refrig Eating Rear Exit BEFORE KITCHEN - AFTER Kitchen Remodel, LaGrange Pk, IL (2003) Susan GRANT Post Office Box 5097 Chicago, Illinois 773.548-3322 60680-5097 www.susangrant.net ARCHITECT GREEN DESIGN Part of a larger general remodeling, this Kitchen Remodel for a Family originally from a more dense & active Chicago neighborhood, provided some much needed respite from the bustle of urban living. Improvements to the home included: - Installation of Insulated, High- Efficiency Alum clad windows - Installing new Heavier-duty Roofing Shingles - Installation & Upgrade of the Roof Insulation system - Installation of Heavier-Duty Exterior doors (which added some security and insulation value) - Installation of ADA friendly bathroom fixtures & Door Hardware; - Remodeling of the Family’s outdated Kitchen (pictured) Project completion, 2003-2005 Kitchen Remodel Private Residence LaGrange Park, Illinois Completed 2003
3
Embed
Kitchen Remodel - Susan Grantsusangrant.net/sgd_Interiors.pdf · Kitchen Remodel, LaGrange Pk, IL (2003) KITCHEN - AFTER Susan GRANT Post Office Box 5097 Chicago, Illinois 773.548-3322
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
KITCHEN PLAN
Wall Oven
Cooktop &Hood
DW
Refrig
Eating
RearExit
BEFORE
KITCHEN - AFTERKitchen Remodel, LaGrange Pk, IL (2003)
S u s a nGRANT
Post Office Box 5097
C h i c a g o , I l l i n o i s
7 7 3 . 5 4 8 - 3 3 2 2
6 0 6 8 0 - 5 0 9 7
w w w . s u s a n g r a n t . n e t
A R C H I T E C TG R E E N D E S I G N
Part of a larger general remodeling,this Kitchen Remodel for a Familyoriginally from a more dense & activeChicago neighborhood, providedsome much needed respite from thebustle of urban living.
Improvements to the homeincluded:
- Installation of Insulated, High-Efficiency Alum clad windows
- Installing new Heavier-dutyRoofing Shingles
- Installation & Upgrade of the RoofInsulation system
- Installation of Heavier-Duty Exteriordoors (which added some securityand insulation value)
- Installation of ADA friendlybathroom fixtures & Door Hardware;
- Remodeling of the Family’soutdated Kitchen (pictured)
Project completion, 2003-2005
Kitchen Remodel
Private ResidenceLaGrange Park, IllinoisCompleted 2003
This Existing Split-Level Single familyHouse is undergoing a GeneralRenovation. New systems, windows,roofing, electrical, interior finishes are apart of project.
Improvements to the home included:
- Installation of a EnvironmentallyFriendly sprayed-in insulation. NewLow-E Insulated Windows throughout.
- Installation of a low-maintenance,water / flood resistant environmentallyfriendly Porcelain Floor Tile.
- Installation of Locally SourcedProducts, including a new GraniteCounter.
- Dimmable Lighting that can utilizecompact Fluorescent Lights.
Project Cost to HomeOwner(including Appliances & GraniteCounters) was about $12,750, foreverything you see in the photo(including demolition, new sub-floor,new drywall & insulation.)
This new Single-Family Home wasoriginally designed and completed forthis Chicago family 18 months earlier.After settling into the home, the Ownersdecided to complete the (thenunfinished) Basement level.
Improvements to the homeincluded:
- Installation of a EnvironmentallyFriendly Soy-Based Sprayed-in-PlaceExterior wall Insulation System.
- Custom Millwork / Cabinet systemsand Furniture.
- Installation of a Home Theatre Systemw/ Acoustical Ceiling Tile (which alsoserves to baffle sound from the Livingareas above.)
- Installation of a low-maintenance,water / flood resistant “Wood-look” FloorTile that has the beauty of real woodwithout the maintenance requirements.
- Installation of ADA friendly BathroomFixtures & Door Hardware;
- For Entertaining Purposes: Installationof a Bar/ Eating area, 2nd Kitchen &Laundry areas (pictured)