KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

Jan 20, 2016

Download

Documents

Luke Young
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

KISTI-GSDC SITE REPORTSang-Un Ahn, Jin Kim

On the behalf of KISTI GSDC

24 March 2015

HEPiX Spring 2015 Workshop

Oxford University, Oxford, UK

Page 2: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

HEPiX Spring 2015 Workshop 2

CONTENTS• KISTI GSDC Overview

• Tier-1 operations

• Summary

2015-03-24

Page 3: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

HEPiX Spring 2015 Workshop 3

KISTI GSDC OVERVIEW

2015-03-24

Page 4: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

HEPiX Spring 2015 Workshop 4

KISTI LocationSouth Korea

Seoul

Busan

Daejeon

2h by car

Gwangju

Jeju Island

Daegu

KISTI

30 Government Research Institutes11 Public Research Institutes29 Non-profit Organizations 7 Universities

Daedeok R&D Innopolis

2015-03-24

Rare Isotope Accelerator(To be constructed)

Page 5: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

HEPiX Spring 2015 Workshop 5

KISTI GSDC• Government funding research institute for IT founded in 1962

• 600 people working for National Information Service(distribution & analysis), Super-computing and Networking

• Operating Supercomputing and NREN Infrastructure• Supercomputer: 307.4 TFlops at peak(14th ranked at Top500 in 2009; 201st now)

• NREN Infrastructure: KREONet2 • Domestic: Seoul ←(100G)→ Daejeon• International: HK ←(10G)→ Chicago/Seattle(Member of GLORIAD)

KISTI (Korea Institute of Science and Technology Information)

History of GSDC• 7 years of the experience running grid computing centre

with the collaboration with the ALICE experiment and WLCG

GSDC (Global Science experiment Data hub Center)• Government funding project to promote research experiment pro-

viding computing power and storage• HEP: ALICE, CMS, Belle, RENO• Others: LIGO, Bioinformatics

• Running Data-Intensive Computing Facility• 18 staffs: sysadmin, experiment support, external-relation, administration• Total 5,500 cores, 4,000 TB disk and 1,500 TB tape storage

GSDC Facility

2007 2009 2013201220112010 2014

ALICE T2 operation startFormation of GSDCALICE T2 Test-bed

ALICE T1 Test-bed KISTI Analysis Facility ALICE T1 candidate Full T1 for ALICE CMS T3

2015-03-24

Page 6: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

HEPiX Spring 2015 Workshop 6

GSDC System Overview

2015-03-24

1.5 PB

Torque/MAUI 3,000 slots ALICE T1, Belle, RENO

HTCondor 2,000 slots CMS T3, LIGO, KIAF

Public Private

1.5 PB

2.5 PB

IBM TSM/GPFS

HITACHI USP/VSPEMC

HITACHI HNASEMC ICILON

4 Spine switches 74 Leaf switches500+ Servers in 22 racks 14 Storage racks 4 tape frames

40 RACKS!!!!

Page 7: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

HEPiX Spring 2015 Workshop 7

System Management

• Services are defined at Puppet (manifests, profiles)• Stash is used for Puppet code management

• Nodes are created/provisioned via Foreman with Puppet classes• Any VMs are managed by the Red Hat solution

• Centralized authN/authZ are provided via IPA (SSO to be imple-mented)

• JIRA helps to track issues and to manage project • Confluence is a useful tool for documentation and sharing

2015-03-24

ProjectIssue tracking

Puppet codemanagement(via Git)

Documentation & Space

Node definitionProvisioning

ManifestsProfiles

v3.7.4

Page 8: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

8

TIER-1 OPERATIONS

2015-03-24 HEPiX Spring 2015 Workshop

Page 9: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

HEPiX Spring 2015 Workshop 9

KISTI, 4.88%Jobs

Aug 2014 Feb 2015

~ 2500

~ 100 (Queued Agents)

Proxy failure due to KISTI-CERN network downAutomatic backup routing established afterwards

Linux Kernel security patch

2015-03-24

• 2,688 concurrent jobs = 28 kHS06• 84 nodes, 32 (logical) cores per node, 10.5 HS06/core• 2015 pledges

• Stable and smooth running• Down of KISTI-CERN 2G link in September• Linux kernel security patch before Christmas in 2014

• Completed 2.3M jobs in the last 6 months

Page 10: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

HEPiX Spring 2015 Workshop 10

Storage• Disk: 1000TB

• Usage > 50%• Managed by XRootD

• Tape: 1500TB• 310 TB RAW data (p-Pb from ALICE)• Available tape buffer = 400 TB• Raw data on tape buffer for fast access• Managed by XRootD

99% Availability (Last 6 Months) for R/W

3 Years history (KISTI_GSDC::SE2)

←Apr 2012 Feb 2015→

2015-03-24

Page 11: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

HEPiX Spring 2015 Workshop 11

Site Availability/Reliability

Sep Oct Nov Dec Jan Feb

Reliability 100 100 100 100 100 100

Availability 100 100 100 99 100 100

< Monthly Availability/Reliability (%) >

2015-03-24

• 100% Reliable for the last 6 month (from Sep-2014 to Feb-2015 )• Monthly Target for Reliability of ALICE test: 97%

• On track for a stable and reliable site • Participating in weekly WLCG operations meetings(2 times (Mon/Thu) per week): reporting operation-related issues

Page 12: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

HEPiX Spring 2015 Workshop 12

Plan• Additional resources will be procured

• ~900 CPU cores (Ivy-bridge)• ~700 TB disks (NAS/SAN)

• 2016 pledges (31k HS06) for ALICE will be made by the end of this year

• Elasticsearch-Logstash-Kibana will be deployed to moni-tor the whole system

2015-03-24

Page 13: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

HEPiX Spring 2015 Workshop 13

KISTI-CERN Network

10Gbps Upgrade

As-Is:

To-Be:

2G KREONET2 + 2G SURFnet

Dedicated Circuit 10G + 10G SURFnet

Contracted provider will

allocate the dedicated cir-

cuit 10G.

31 April

2015-03-24

Page 14: KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.

HEPiX Spring 2015 Workshop 14

감사합니다

2015-03-24