KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC
21

KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Dec 14, 2015

Download

Documents

Homer Banks
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

KISTI-GSDC SITE REPORTAsia Tier Center Forum

@ KISTI, Daejeon, South Korea

22 Sep – 24 Sep 2015

Sang-Un Ahn

on the behalf of KISTI-GSDC

Page 2: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 2

CONTENTS• KISTI GSDC Overview

• Tier-1 operations

• Network

• Plan

2015-09-22

Page 3: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 3

KISTI GSDC OVERVIEW

2015-09-22

Page 4: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 4

KISTI LocationSouth Korea

Busan

Daejeon

2h by car

Gwangju

Jeju Island

Daegu

KISTI

30 Government Research Institutes11 Public Research Institutes29 Non-profit Organizations 7 Universities

Daedeok R&D Innopolis

2015-09-22

Rare Isotope Accelerator(To be constructed)

SeoulIncheonAirport

Page 5: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 5

KISTI GSDC• Government funding research institute for IT founded in 1962

• 600 people working for National Information Service(distribution & analysis), Super-computing and Networking

• Operating Supercomputing and NREN Infrastructure• Supercomputer: 307.4 TFlops at peak(14th ranked at Top500 in 2009; 201st now)

• NREN Infrastructure: KREONet2 • Domestic: Seoul ←(100G)→ Daejeon• International: HK ←(10G)→ Chicago/Seattle(Member of GLORIAD)

KISTI (Korea Institute of Science and Technology Information)

History of GSDC• 7 years of the experience running grid computing centre

with the collaboration with the ALICE experiment and WLCG

GSDC (Global Science experiment Data hub Center)• Government funding project to promote research experiment pro-

viding computing power and storage• HEP: ALICE, CMS, Belle, RENO• Others: LIGO, Bioinformatics

• Running Data-Intensive Computing Facility• 13 staffs: sysadmin, experiment support, external-relation, administration• Total 6,000 cores, 6,500 TB disk and 1,500 TB tape storage

GSDC Facility

2007 2009 2013201220112010 2014

ALICE T2 operation startFormation of GSDCALICE T2 Test-bed

ALICE T1 Test-bed KISTI Analysis Facility ALICE T1 candidate Full T1 for ALICE CMS T3

2015-09-22

Page 6: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 6

GSDC System Overview

2015-09-22

1.5 PB

Torque/MAUI 3,500 slots ALICE T1, Belle, RENO

HTCondor 2,500 slots CMS T3, LIGO, KIAF

Public Private

1.5 PB

4.0 PB

IBM TSM/GPFS

HITACHI USP/VSPEMC Clariion/VNX

HITACHI HNASEMC ICILON

4 Spine switches 74 Leaf switches500+ Servers in 22 racks 14 Storage racks 4 tape frames

40 RACKS!!!!

Page 7: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 7

System Management

• Services are defined at Puppet (manifests, profiles)• Stash is used for Puppet code management

• Nodes are created/provisioned via Foreman with Puppet classes• Any VMs are managed by the Red Hat solution

• Centralized authN/authZ are provided via IPA (SSO to be imple-mented)

• JIRA helps to track issues and to manage project • Confluence is a useful tool for documentation and sharing

2015-09-22

ProjectIssue tracking

Puppet codemanagement(via Git)

Documentation & Space

Node definitionProvisioning

ManifestsProfiles

v3.7.4

Page 8: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 8

TIER-1 OPERATIONS

2015-09-22

Page 9: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 9

Pledges

2014 2015 2016

CPU(HS06)(Installed)

25,000(28,800)

28,000(28,800)

31,000(31,000)

Disk(TB)(Installed)

1,000(1,000)

1,000(1,000)

1,500(1,500)

Tape(TB)(Installed)

1,500(1,000)

1,500(1,500)

1,500(1,500)

2015-09-22

2015 pledges was fully fulfilled at the end of last year

ALICE ONLY

Page 10: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 10

KISTI, 4.06%Jobs

Mar 2015 Sep 2015

~ 2500

~ 100 (Queued Agents)

2015-09-22

• 2,688 concurrent jobs = 28 kHS06• 84 nodes, 32 (logical) cores per node, 10.5 HS06/core• 2015 pledges

• Stable and smooth running• No issues

• Completed 2.1M jobs in the last 6 months

ALICE ONLY

Page 11: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 11

Storage• Disk: 1000 TB

• Usage > 75% • Managed by XRootD

• Tape: 1500 TB• 1,019 TB RAW data Pb-Pb & p-Pb (from ALICE)• Tape system: IBM TS3500

• Managed by TSM/GPFS

• Available tape buffer = 400 TB• Keeps replication to complement tape’s low R/W performance• Managed by XRootD

99 % Availability (Last 6 months) for R/W

3 Years Usage History (KISTI_GSDC::[SE2|TAPE])

← Oct 2012Run2 Data Taking

2015-09-22

1,019 TB Used (Tape)

725.3 TB Used (Disk)

ALICE ONLY

Page 12: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 12

• 100% Reliable for the last 6 month (from Mar-2015 to Aug-2015 )• Monthly Target for Reliability of ALICE test: 97%• Less than 10 days of yearly downtime

• On track for a stable and reliable site • Participating in weekly WLCG operations meetings(2 times (Mon/Thu) per week): reporting operation-related issues• 24/7 monitoring & maintenance contract • 2 persons responsible for on-call

Site Availability/Reliability

Mar Apr May Jun Jul AugAverage(6M

)

Reliability 100 100 100 100 100 100 100

Availability 95 100 99 100 98 100 99

< Monthly Availability/Reliability (%) >

2015-09-22

ALICE ONLY

Page 13: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 13

NETWORK

2015-09-22

Page 14: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 14

KISTI Domain Network for T1

2015-09-22

2 Core Switches

Physical Firewall

Backbone Router

Page 15: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 15

KISTI-CERN Network (LHCOPN)

10Gbps Upgrade done by 31st April 2015

Dedicated Circuit 10G + 10G SURFnet (backup link included) Operated by Kreonet, KISTI GLORIAD provides 3rd backup

2015-09-22

Page 16: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 16

Performance

2015-09-22

CERN IT GatewayMulti-stream: 500Max peak: 1GB/s

10G enabled

KISTI-GSDC

CERN→KISTI (5 min)CERN→KISTI

Average: 65 MB/s

• > 9Gbps peak (~ 1GB/s) observed• CERN IT provided a gateway, 500 parallel transfers

• xrd3cp crashed with Xrootd v3.3.4 (fixed @ v4 or later)

• Max 1GB/s peak @ alimonitor.cern.ch • Confirmed full capacity

MRTG @ MX960

alimonitor.cern.ch

Page 17: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 17

KISTI-ASIA

2015-09-22

• Connected to JP, US, CN, TW(ASGC) and HK• via Kreonet2• JP connected through APAN

• Not connected to TEIN @ HK • Detailed talks tomorrow

Tsukuba

Wuhan

Page 18: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 18

PLAN

2015-09-22

Page 19: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 19

T1 Operations

2014 2015 2016

CPU(HS06)(Installed)

25,000(28,800)

28,000(28,800)

31,000(31,000)

Disk(TB)(Installed)

1,000(1,000)

1,000(1,000)

1,500(1,500)

Tape(TB)(Installed)

1,500(1,000)

1,500(1,500)

1,500(1,500)

2015-09-22

• (CPU) Worker nodes were already allocated but not in production• (Disk) New disk storage installed last week & data migration soon to be scheduled

• EMC Clariion (1PB, 2011) -> EMC VNX (1.5PB, 2015)

• (Tape) Unchanged• More 500 TB will be procured next year for 2017 pledges

• (System)• Xrootd upgrade v3.3.4 -> v4.1.3 or later

2016 pledges will be fulfilled at the end of this year

ALICE ONLY

Page 20: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 20

Network• Concern about KISTI-ASIA network was informed to Kreonet & TEIN

• Detailed talk at TEIN-GLORIAD-KR joint session

• Current 10Gbps dedicated link between Daejeon-Chicago could be replaced by Kreonet once its upgrade done

2015-09-22

Page 21: KISTI-GSDC SITE REPORT Asia Tier Center Forum @ KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.

Asia Tier Center Forum 212015-09-22

감사합니다 .شکریہ کا آپ .

धन्यवा�द।ขอบคุ�ณ谢谢。

ありがとうございます。Terima kasih .Благодаря.

Dank u.Grazie.

Thank you.