www.thamestunnelconsultation.co.uk Kirtling Street New Covent Garden Market Royal Mail Sorting Office Kirtli ng St reet Nine Elms Pier Battersea Power Station B a t t e r s e a P a r k R o a d C r i n g l e S t r e e t N i n e E l m s L a n e N CITY OF WESTMINSTER WANDSWORTH Local authority boundary Draft limit of land to be acquired or used Proposed tunnel route – centreline Heathwall Pumping Station site Location plan Jack up barge servicingpiling operations Cranes Piling rig Conveyor Shaft N Maximum extent of construction site for phases 1 and 2 Site hoarding Site support/welfa re Excavated material storage and processing Maintenance workshop and storage Constructionsupport Internal site road Site access Existing Thames Path ThamesPathdiversion Aerial view of the completed works Phases one and two construction plan Shaft Barges Gantry crane N Maximum extent of construction site for phase 3 Site hoarding Sitesupport/welfare Excavatedmaterial storage and processing Maintenance workshop and storage Constructionsupport Internal site road Site access Existing Thames Path Thames Path diversion Noise enclosure over shaft and gantry crane Crane Conveyor N Shaft Gantry crane Conveyor Maximum extent of construction site for phases 4 and 5 Site hoarding Site support/welfar e Excavatedmaterial storage and processing Maintenance workshop and storage Constructionsupport Internal site road Site access Existing Thames Path Thames Path diversion Noise enclosure over shaft and gantry crane Permanent access for maintenance Combined ventilation structure and equipmentkiosk Safeguarded Wharf jetty retained Temporary hoarding around site for development by others ‘Riverlight’ development Nine Elms pier Kirtling Street resurfaced Thames Path wayfinding signage Kirtling Street C r i n g l e S t r e e t N i n e E l m s L a n e N New fence to boundary of concrete batching works site Layout of the site once construction works complete Phase three construction plan Phases four and ve construction plan