Kingston Station Installation. Situation:. A pumping station, with no solution available, had for a number of years released trash and debris into a creek which dumped into Lake Ontario. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Kingston Station Installation

Kingston Station Installation

Page 2: Kingston Station Installation

A pumping station, with no solution available, had for a number of years released trash and debris into a creek which dumped into Lake Ontario.

With the increased commitment by the Canadian Government and the Canadian cities that boarder the Great Lakes to find solutions to the growing problem of trash and debris being dumped into the lakes, the engineers upgrading the Kingston Station, located on Lake Ontario, turned to Fresh Creek.

Situation:

Page 3: Kingston Station Installation

An underground installation was proposed at a pumping station on the Bay of Kingston located on Lake Ontario, and engineered with a bypass vent to an outflow containing a TRASHMASTER™ Net Capture System unit.

Situation:

Page 4: Kingston Station Installation

Working together a solution was found in the TRASHMASTER™ Net Capture System. This unit was selected because of the low flow of water passing through the bypass vent.

The Solution:

Page 5: Kingston Station Installation

Preparing the TRASHMASTER blank fresh from the Rotomold process.

TM

Kingston Station Project

Page 6: Kingston Station Installation

Drilling holes for the base flange and seal to mate to the connecting flange for the main pipe.

Page 7: Kingston Station Installation

Holes for the base flange and seal are drilled and an opening started.

Page 8: Kingston Station Installation

Both ends are completed and net guide channels installed.

Page 9: Kingston Station Installation

base flange and seal to mate to the to the connecting flange for the main pipe is completed at both ends.

Page 10: Kingston Station Installation

Internal Stainless Steel frames and overflow grid being installed and balanced.

Page 11: Kingston Station Installation

Looking into the unit . . .Overflow Screen

Netting frame

Drain dry grids

Frame channels

Page 12: Kingston Station Installation

Unit completed with main pipe mating flanges attached.

Page 13: Kingston Station Installation

Unit being prepared for shipment. Note hold-down straps.

Page 14: Kingston Station Installation

Excavation site with section removed and ready for unit.

Page 15: Kingston Station Installation

TRASHMASTER unit installed. Note mating flanges attached to main pipe system.

TM

Page 16: Kingston Station Installation

Unit sits on a packed shale base.

Hold-down straps are attached to hold-down screws that reach deep into the base.

Page 17: Kingston Station Installation

10-foot long net channel sections are attached.

Channels allow top of unit to extend to ground level for easy net change-out.

Page 18: Kingston Station Installation

Neck extension being prepared to slip over channel extensions and the protect unit.

Page 19: Kingston Station Installation

Neck extension in place and bolted to unit.

Page 20: Kingston Station Installation

Overview of neck extension in place and bolted to unit.

Page 21: Kingston Station Installation

Overview of neck extension in place and bolted to unit.

Cutaway shows how net channels extend to top of neck.

Page 22: Kingston Station Installation

Finished installation being backfilled to ground level.

Page 23: Kingston Station Installation

Kingston Station Installation

For more information on TRASHMASTER and all of our Net Capture Systems visit our web site: freshcreek.com

or call us: 1.800.741.9486