Top Banner
Cross Laminated Timber Kim Collins
20

Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Jan 21, 2018

Download

Business

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Cross Laminated Timber Kim Collins

Page 2: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Cross Laminated Timber CLT

Page 3: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Hayesfield Girls’ School White Design

Page 4: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Embodied Carbon Hayesfield Girls’ School

-126

159

206 217

-150

-100

-50

0

50

100

150

200

250

Nucleus(with

sequestration)

Nucleus(without

sequestration)

Concrete Scheme Steel scheme

Embo

died

Car

bon,

kgC

O2e

/ m

2

Embodied carbon of structural components, compared to equivalent steel and concrete schemes

Page 5: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Holme Lacy Workshops Hewitt Studios

Page 6: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Kingswood LocalityHub Alec French Architects

Page 7: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Arts Space, Hereford College of Art Hewitt Studios

Page 8: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Christies Care Nicholas Hare Architects

Page 9: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Christies Care Nicholas Hare Architects

Page 10: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Procurement

Page 11: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Hayesfield Girls’ School White Design

Page 12: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

ROH Costume Centre Nicholas Hare Architects

Page 13: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

ROH Costume Centre Nicholas Hare Architects

Page 14: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Steiner Academy, Frome FCBS

Page 15: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Bearing details

Avoids internal bracket but more machining of CLT required

Simple connection but requires wide support

Plated connection can be used if hidden by finishes

CONSIDER CONSTRUCTION TOLERANCES

Page 16: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Standard details

Bearing connection Shear connection

Page 17: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Disproportionate collapse

Ideal for acoustics Ideal for robustness

Page 18: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Raymond Fenton Community Centre, South Cerney White Design

Page 19: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Raymond Fenton Community Centre, South Cerney White Design

Page 20: Kim collins integral engineering design clt and innovation in construction low carbon business breakfast tuesday 19th september 2017

Conclusions

• Flexible, sustainable engineered material

• Needs to be embraced from the outset with a coordinated team approach

• Reduced time on site

• Detailing is very important- driven by connections and interfaces

• Programme must consider procurement