Client Project Key Plan $$$SYTIME$$$ $$$DGNSPEC$$$ Project No. Date Number Revision 1858 Title Scale @ Arch E1 Apple Campus 2 Apple Inc. Perimeter Bicycle Strategy 04/12/2013 N www.altaplanning.com 2560 9th Street, Suite 212 Berkeley, CA 94710 p:510.540.5008 f:510.540.5039 04/12/13 NTS Perimeter Bicycle Strategy 04/12/13 Planning Revision 06
6

KIER & WRIGHT - Amazon Simple Storage Service · Project Key Plan Rev. $$$SYTIME$$$ $$$DGNSPEC$$$ Project No. Date ... Perimeter Bicycle Strategy 04/12/2013 6 04/12/13 Planning Revision

Jul 09, 2018

Download

Documents

vumien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: KIER & WRIGHT - Amazon Simple Storage Service · Project Key Plan Rev. $$$SYTIME$$$ $$$DGNSPEC$$$ Project No. Date ... Perimeter Bicycle Strategy 04/12/2013 6 04/12/13 Planning Revision

© Foster Partners

www.arup.comTel (415) 957 9445 Fax (415) 957 9096San Francisco, CA 94105 USA560 Mission Street, Suite 700

Arup North America Ltd.

Santa Clara, California 950543350 Scott Boulevard, Building 22KIER & WRIGHTPhone: (408) 727 6665www.kierwright.com

Fax: (408) 727 5641© Kier & Wright, 2011

Client

Project

Key Plan

Rev.

$$$S

YTI

ME

$$$

$$$D

GN

SP

EC

$$$

Project No. Date

Number Revision

All dimensions shall be verified on site before proceedingwith the work.Foster + Partners shall be notified in writing of anydiscrepancies.

Do not scale drawings. Dimensions govern.1.2.3.

4.

General Notes

5. Any areas indicated on this sheet are approximate andindicative only.

All dimensions are in feet and inches unless noted otherwis

1858

Title

Scale @ Arch E1

Reason For IssueDate

Apple Campus 2

Apple Inc.

Perimeter Bicycle Strategy

04/12/2013

6 04/12/13 Planning Revision #6

N

www.altaplanning.com

2560 9th Street, Suite 21Berkeley, CA 94710

p:510.540.5008 f:510.540.5

www.altaplanning.com

2560 9th Street, Suite 212Berkeley, CA 94710

p:510.540.5008 f:510.540.5039

04/12/13 NTS

Perimeter Bicycle Strategy

04/12/13 Planning Revision 06

Page 2: KIER & WRIGHT - Amazon Simple Storage Service · Project Key Plan Rev. $$$SYTIME$$$ $$$DGNSPEC$$$ Project No. Date ... Perimeter Bicycle Strategy 04/12/2013 6 04/12/13 Planning Revision

© Foster Partners

www.arup.comTel (415) 957 9445 Fax (415) 957 9096San Francisco, CA 94105 USA560 Mission Street, Suite 700

Arup North America Ltd.

Santa Clara, California 950543350 Scott Boulevard, Building 22KIER & WRIGHTPhone: (408) 727 6665www.kierwright.com

Fax: (408) 727 5641© Kier & Wright, 2011

Client

Project

Key Plan

Rev.

$$$S

YTI

ME

$$$

$$$D

GN

SP

EC

$$$

Project No. Date

Number Revision

All dimensions shall be verified on site before proceedingwith the work.Foster + Partners shall be notified in writing of anydiscrepancies.

Do not scale drawings. Dimensions govern.1.2.3.

4.

General Notes

5. Any areas indicated on this sheet are approximate andindicative only.

All dimensions are in feet and inches unless noted otherwis

1858

Title

Scale @ Arch E1

Reason For IssueDate

Apple Campus 2

Apple Inc.

Perimeter Bicycle Strategy

04/12/2013

6 04/12/13 Planning Revision #6

N

www.altaplanning.com

2560 9th Street, Suite 21Berkeley, CA 94710

p:510.540.5008 f:510.540.5

www.altaplanning.com

2560 9th Street, Suite 212Berkeley, CA 94710

p:510.540.5008 f:510.540.5039

04/12/13 NTS

Perimeter Bicycle Strategy

04/12/13 Planning Revision 06

Page 3: KIER & WRIGHT - Amazon Simple Storage Service · Project Key Plan Rev. $$$SYTIME$$$ $$$DGNSPEC$$$ Project No. Date ... Perimeter Bicycle Strategy 04/12/2013 6 04/12/13 Planning Revision

© Foster Partners

www.arup.comTel (415) 957 9445 Fax (415) 957 9096San Francisco, CA 94105 USA560 Mission Street, Suite 700

Arup North America Ltd.

Santa Clara, California 950543350 Scott Boulevard, Building 22KIER & WRIGHTPhone: (408) 727 6665www.kierwright.com

Fax: (408) 727 5641© Kier & Wright, 2011

Client

Project

Key Plan

Rev.

$$$S

YTI

ME

$$$

$$$D

GN

SP

EC

$$$

Project No. Date

Number Revision

All dimensions shall be verified on site before proceedingwith the work.Foster + Partners shall be notified in writing of anydiscrepancies.

Do not scale drawings. Dimensions govern.1.2.3.

4.

General Notes

5. Any areas indicated on this sheet are approximate andindicative only.

All dimensions are in feet and inches unless noted otherwis

1858

Title

Scale @ Arch E1

Reason For IssueDate

Apple Campus 2

Apple Inc.

Perimeter Bicycle Strategy

04/12/2013

6 04/12/13 Planning Revision #6

N

www.altaplanning.com

2560 9th Street, Suite 21Berkeley, CA 94710

p:510.540.5008 f:510.540.5

www.altaplanning.com

2560 9th Street, Suite 212Berkeley, CA 94710

p:510.540.5008 f:510.540.5039

04/12/13 NTS

Perimeter Bicycle Strategy

04/12/13 Planning Revision 06

Page 4: KIER & WRIGHT - Amazon Simple Storage Service · Project Key Plan Rev. $$$SYTIME$$$ $$$DGNSPEC$$$ Project No. Date ... Perimeter Bicycle Strategy 04/12/2013 6 04/12/13 Planning Revision

© Foster Partners

www.arup.comTel (415) 957 9445 Fax (415) 957 9096San Francisco, CA 94105 USA560 Mission Street, Suite 700

Arup North America Ltd.

Santa Clara, California 950543350 Scott Boulevard, Building 22KIER & WRIGHTPhone: (408) 727 6665www.kierwright.com

Fax: (408) 727 5641© Kier & Wright, 2011

Client

Project

Key Plan

Rev.

$$$S

YTI

ME

$$$

$$$D

GN

SP

EC

$$$

Project No. Date

Number Revision

All dimensions shall be verified on site before proceedingwith the work.Foster + Partners shall be notified in writing of anydiscrepancies.

Do not scale drawings. Dimensions govern.1.2.3.

4.

General Notes

5. Any areas indicated on this sheet are approximate andindicative only.

All dimensions are in feet and inches unless noted otherwis

1858

Title

Scale @ Arch E1

Reason For IssueDate

Apple Campus 2

Apple Inc.

Perimeter Bicycle Strategy

04/12/2013

6 04/12/13 Planning Revision #6

N

www.altaplanning.com

2560 9th Street, Suite 21Berkeley, CA 94710

p:510.540.5008 f:510.540.5

www.altaplanning.com

2560 9th Street, Suite 212Berkeley, CA 94710

p:510.540.5008 f:510.540.5039

04/12/13 NTS

Perimeter Bicycle Strategy

04/12/13 Planning Revision 06

Page 5: KIER & WRIGHT - Amazon Simple Storage Service · Project Key Plan Rev. $$$SYTIME$$$ $$$DGNSPEC$$$ Project No. Date ... Perimeter Bicycle Strategy 04/12/2013 6 04/12/13 Planning Revision

$$$S

YTI

ME

$$$

$$$D

GN

SP

EC

$$$

www.altaplanning.com

2560 9th Street, Suite 212Berkeley, CA 94710

p:510.540.5008 f:510.540.5039

04/12/13 NTS

Perimeter Bicycle Strategy

04/12/13 Planning Revision 06

Page 6: KIER & WRIGHT - Amazon Simple Storage Service · Project Key Plan Rev. $$$SYTIME$$$ $$$DGNSPEC$$$ Project No. Date ... Perimeter Bicycle Strategy 04/12/2013 6 04/12/13 Planning Revision

© Foster Partners

www.arup.comTel (415) 957 9445 Fax (415) 957 9096San Francisco, CA 94105 USA560 Mission Street, Suite 700

Arup North America Ltd.

Santa Clara, California 950543350 Scott Boulevard, Building 22KIER & WRIGHTPhone: (408) 727 6665www.kierwright.com

Fax: (408) 727 5641© Kier & Wright, 2011

Client

Project

Key Plan

Rev.

$$$S

YTI

ME

$$$

$$$D

GN

SP

EC

$$$

Project No. Date

Number Revision

All dimensions shall be verified on site before proceedingwith the work.Foster + Partners shall be notified in writing of anydiscrepancies.

Do not scale drawings. Dimensions govern.1.2.3.

4.

General Notes

5. Any areas indicated on this sheet are approximate andindicative only.

All dimensions are in feet and inches unless noted otherwis

1858

Title

Scale @ Arch E1

Reason For IssueDate

Apple Campus 2

Apple Inc.

Perimeter Bicycle Strategy

04/12/2013

6 04/12/13 Planning Revision #6

N

www.altaplanning.com

2560 9th Street, Suite 21Berkeley, CA 94710

p:510.540.5008 f:510.540.5

www.altaplanning.com

2560 9th Street, Suite 212Berkeley, CA 94710

p:510.540.5008 f:510.540.5039

04/12/13 NTS

Perimeter Bicycle Strategy

04/12/13 Planning Revision 06