Installation d’empilage Setting installation Produits cuits sur wagon de four tunnel Fired products on tunnel kiln car Hourdis (brique pour plancher) Hourdis (ceiling bricks) KHAYYAT, ARABIE-SAOUDITE KHAYYAT, SAUDI ARABIA www.lingl.com VOTRE PARTENAIRE DANS L’INDUSTRIE DES PRODUITS EN CÉRAMIQUE PARTNER OF THE CERAMIC INDUSTRY
2
Embed
Khayyat, arabie-Saoudite Khayyat, Saudi arabia · Khayyat, Saudi arabia VOTRE PARTEIRE D AN S ’ INDU STRI E DE S PRODUIT S CÉRAMIQUE PARTNER F TH CERAIC INDU STRY . Installation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Installation d’empilageSetting installation
Produits cuits sur wagon de four tunnelFired products on tunnel kiln car
Hourdis (brique pour plancher)Hourdis (ceiling bricks)
Khayyat, arabie-Saoudite Khayyat, Saudi arabia
www.lingl.com
Votre partenaire danS L’induStrie deS produitS en céramique
partner of the ceramic induStry
Installation de conditionnementPackaging installation
projets réalisés:
� Usines 3/5 Four tunnel 2003
� Usine 7 Usine complète 2001
� Usine 8 Installation de déchargement 2002
� Usines 12, 13, 14 3 usines complètes 2005
� Usine 15 Usine complète 2011
� Usines 16, 17, 18 3 usines complètes 2014
� Usine 19 Usine complète 2015
Scope of projects:
� Plant 3/5 Tunnel kiln 2003
� Plant 7 Complete plant 2001
� Plant 8 Unloading installation 2002
� Plant 12, 13, 14 3 complete plants 2005
� Plant 15 Complete plant 2011
� Plant 16, 17, 18 3 complete plants 2014
� Plant 19 Complete plant 2015
Production totale: environ 1.100.000 produits/jour = environ 11.000 t/jour
Total output: approx. 1.100.000 products/day = approx. 11.000 t/day