North Sea Baltic Connector of Regions Interreg Baltic Sea Region programme 2014–2020 Key findings from NSB CoRe regional workshop “Accessibility needs along and beyond the North Sea-Baltic corridor” Kaunas, Lithuania, February 8, 2018 The Workshop on Accessibility needs along and beyond the North Sea-Baltic corridor was organised in Kaunas, Lithuania, on 08.02.2018. 24 stakeholders from Poland and Lithuania participated. In the workshop discussions were held regarding the following topics: • Accessibility as a driver for regional development; • Stakeholders to involve in NSB CoRe Network Development; • Identification of 2nd level connections; • Needs and Bottlenecks of the NSB CoRe Corridor. During the first part of discussion three questions were rised: participants were asked to give an opinion how do they see accessibility along / beyond / on the NSB corridor in 2050, how do they see Lithuania and Poland on the global transport map in 2050 and how improved accessibility would be beneficial for the regional development? The following word cloud illustrates the keywords mentioned in this discussion. Afterwards participants were asked to assess the stakeholders’ maps for Poland and Lithuania that have been elaborated as part of the spatial vision elaboration. It was mentioned, that the Lithuanian National Road Carriers’ Association LINAVA should be added to the list of stakeholders, and exclude the bus stations from
5
Embed
Key findings from NSB CoRe regional workshop ...€¦ · North Sea Baltic Connector of Regions Interreg Baltic Sea Region programme 2014–2020 Key findings from NSB CoRe regional
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
North Sea Baltic Connector of Regions
Interreg Baltic Sea Region programme 2014–2020
Key findings from NSB CoRe regional workshop “Accessibility needs along and
beyond the North Sea-Baltic corridor”
Kaunas, Lithuania, February 8, 2018
The Workshop on Accessibility needs along and beyond the North Sea-Baltic corridor was organised in Kaunas,
Lithuania, on 08.02.2018. 24 stakeholders from Poland and Lithuania participated. In the workshop
discussions were held regarding the following topics:
• Accessibility as a driver for regional development;
• Stakeholders to involve in NSB CoRe Network Development;
• Identification of 2nd level connections;
• Needs and Bottlenecks of the NSB CoRe Corridor.
During the first part of discussion three questions were rised: participants were asked to give an opinion how
do they see accessibility along / beyond / on the NSB corridor in 2050, how do they see Lithuania and Poland
on the global transport map in 2050 and how improved accessibility would be beneficial for the regional
development?
The following word cloud illustrates the keywords mentioned in this discussion.
Afterwards participants were asked to assess the stakeholders’ maps for Poland and Lithuania that have been
elaborated as part of the spatial vision elaboration. It was mentioned, that the Lithuanian National Road
Carriers’ Association LINAVA should be added to the list of stakeholders, and exclude the bus stations from
North Sea Baltic Connector of Regions
Interreg Baltic Sea Region programme 2014–2020
the Stakeholders list, since they are already in LINAVA. Potentially, Kaunas and Palanga airports should be
included. The importance of media was highlighted, suggesting these should be added to the stakeholders.
For Poland the TEN-T coordinators Catherine Trautmann (North Sea-Baltic) and Kurt Bodewig (Baltic Adriatic)
should be added to the list of stakeholders. The name of the Ministry of Infrastructure and Construction has
changed at the beginning of 2018 into Ministry of Infrastructure. The City of Suwałki should be added,
Warsaw Modlin airport, although it is not a node of TEN-T network, should be added to the list of
stakeholders (only 35 km to the NSB corridor, about 3 mln passengers every year). Also, the railway
companies and intermodal operators should be added to the list of stakeholders:
Local, regional and national level needs and bottlenecks
As part of the spatial vision elaboration process multiple needs and bottlenecks along the NSB CoRe corridor
were identified. Workshop participants were asked to evaluate and prioritize these needs.
Pre-identified Local, Regional and National level Needs and Bottlenecks - Lithuania
Inst
itu
tio
nal
asp
ects
1. Need to develop passenger rail connection Riga – Siauliai, Vilnius-Daugavpils, Tartu-Riga 2. Need to develop passenger train connection Warsaw – Vilnius 3. Need for interoperability with ports having different gauge widths 4. Need to ensure interoperability with 2nd level networks 5. Reduce urban sprawl negative effects around main urban nodes as larger population will concentrate around agglomeration 6. Need to serve local interests and create value of NSB CoRe for territories and small settlements in between main nodal points e.g. regional stations, frequent intersections, good accessibility also to depopulated areas
Infr
astr
uct
ure
7. Bottleneck – road between Panevėžys-Riga (150 km) 8. Bottleneck on railway line between Kaunas-PL border, need to reconstruct (straighten) 9. Need to develop Šiauliai- Panevėžys as dual metropolitan centre to benefit more from the Rail Baltica 10. Develop intermodal passenger transport nodes in Kaunas and Vilnius and ensure easy way to change mode of transportation 11. Need to develop connections from urban nodes to 2nd level cities 12. Development of new logistic centres and multimodal service points for cargo
During the workshop it was noted that need to “connect Šiauliai and Panevėžys as dual metropolitan center”
should be changed to “connect Šiauliai and Panevėžys as functional area”, since it would not be possible to
create metropolitan center from two cities which are facing decrease in population. Need to “Develop
intermodal passenger transport from Kaunas and Vilnius to ensure easy way to change mode of
transportation” – should include Klaipėda. “Development of new logistic centers and multimodal service
points of cargo” – it was noted to focus first on development of existing centers, their automation. It was
stated, that the most important bottleneck is connection Vilnius – Warsaw. In addition, it was noted, that
there was need to develop intermodal passenger transport Klaipėda-Kaunas-Vilnius; Road Panevėžys – Riga.
Pre-identified Local, Regional and National level Needs and Bottlenecks - Poland
Inst
itu
tio
nal
asp
ects
1. Need to develop passenger train connection Warsaw – Vilnius 2. Need to ensure interoperability with 2nd level networks 3. Reduce urban sprawl negative effects around main urban nodes as larger population will concentrate around agglomeration 4. Need to serve local interests and create value of NSB CoRe for territories and small settlements in between main nodal points e.g. regional stations, frequent intersections, good accessibility also to depopulated areas
North Sea Baltic Connector of Regions
Interreg Baltic Sea Region programme 2014–2020
Infr
astr
uct
ure
5. Need to develop DK8 Augustow-Bialystok (controversial, Natura 2000) 6. Need to develop Bialystok as intermodal hub if RB is built and Belarus opens for more trade with the west 7. Need to reconstruct Eastern Main Line railway Bialystok-Lublin-Rzeszow as a complementary corridor to NSB CoRe 8. Elk – Tricity through Masuria link is a bottleneck (rail?) 9. Need to develop Warsaw bypass dedicated to heavy goods vehicles 10. Need to develop S10 expressway linking Wloclawek and Plock with Warsaw 11. Need to strengthen Lodz as a hub for the New Silk Road 12. Need to build high-speed rail line Poznan-Kalisz-Lodz-Warsaw 13. Bottlenecks – Lodz, Lodz-Wroclaw, Warsaw node, Poznan (rail?) 14. Rail bottlenecks: Berlin – Wroclaw, Berlin – Szczecin 15. Need to develop connections from urban nodes to 2nd level cities 16. Development of new logistic centres and multimodal service points for cargo 17. Develop intermodal passenger transport nodes and ensure easy way to change mode of transportation
Regarding Poland, the most important needs were pointed out:
- Need to develop Warsaw bypass dedicated to heavy good vehicles (today a lot of HGV, in particular
at night, go very close to the city of Warsaw and additional bypass is needed dedicated to freight
traffic);
- Need to develop passenger train connection Warsaw-Vilnius;
- Rail-road terminals and connections to 2nd level cities.
It was agreed, that it is important to improve the public transport within the agglomeration areas.
Information was prepared by Liene Stikane, Spatial planner for NSB CoRe at VASAB Secretariat