Revision AR03A.133.24.08 Drawn Drawing Number RM MELBOURNE Project Number Project 00010409 KEW STAGE 3A HOUSING VIC, 3184 Scale Walker Corporation Client Details Stage 3A Town Planning Drawing Project Status TOWN PLANNING ゥ dKO Architecture Pty Ltd Except as allowed under copyright act, no part of this drawing may be reproduced or otherwise dealt with without written permission of dKO Architecture. NOTES Builder/Contractor shall verify job dimensions before any job commences. Figured dimensions take precedence over drawings and job dimensions. All shop drawings shall be submited to the Architect/Consultant, and manufacture shall not commence prior to return of inspected shop drawings by the Architect/Consultant. Architect dKO architecture (Victoria) pty ltd Level 2, 358 Lonsdale Street Melbourne, Victoria, 3000, AUS T +61 3 9670 3088 / F+61 3 9670 3054 www.dko.com.au / [email protected]ABN: 61 413 783 636 KEW Lot 133 (Type GK) Checked ML ISSUED FOR TOWN PLANNING Rev Description By Date @ A1 LEGEND CL Ceiling Level DP Downpipe FG Fixed Glass FL Floor Level FP Fire Place FR Freezer GFL Garage Floor Level HWS Hot Water Service MB Meter Box OG Obscure Glazing REF Refrigerator SD Sliding Door SPR Spreader WM Washing Machine 3 Town Planning Issue NR 10/02/2010 3 Ground Floor A: 133.2 m2 Garage A: 39.7 m2 entry timber lightcourt MB pantry timber laundry tiles AC UNITS 1,000 4,600 5,500 1,630 2,630 letter box watertank under deck Lot Area A: 351.0 m2 Outdoor Living 1 A: 86.8 m2 A C B D outdoor living 9.8m x 4.0m timber decking garage 6.0m x 6.0m steel trowelled concrete kitchen 5.7m x 2.7m timber dining 5.2m x 4.7m timber living 2 5.0m x 4.8m timber bath 1.8m x 3.9m timber decking living 1 4.4m x 3.8m timber 1500mm high painted timber gate and fence retractable clothesline 2100mm high brick fence line of level over line of level over line of level over line of level over DP DP A C B D shr First Floor A: 175.4 m2 bed 3 3.9m x 4.1m carpet ensuite 1 tiles bathroom tiles master suite 5.1m x 4.8m carpet wir carpet bed 2 3.9m x 3.3m carpet bed 4 4.1m x 3.9m carpet ensuite 2 tiles rumpus 3.9m x 4.0m carpet klipュlok colorbond roofing @ 2.0ー pitch parapet parapet parapet parapet sl parapet parapet klipュlok colorbond roofing @ 2.0ー pitch BOX GUTTER DP DP klipュlok colorbond roofing @ 2.0ー pitch 2.0ー fall sl 2,730 431 2,730 2,902 rendered finish to masonry external walls. powdercoat aluminium window & door joinery. render finish to light weight external cladding. rendered infill FL CL CL FL GFL Proposed ground line Existing natural ground line Lot Boundary Lot Boundary FG A FG A A FG A FG A FG A A FG 2,730 431 2,730 rendered finish to masonry external walls. render finish to light weight external cladding. powdercoat aluminium window & door joinery. FL CL CL FL 2,902 GFL Proposed ground line Existing natural ground line FG MB Lot Boundary Lot Boundary A FG FG SD SD FG FG A FG A FG A 2,730 431 2,730 2,902 rendered finish to masonry external walls. powdercoat aluminium window & door joinery. render finish to light weight external cladding. panel lift colorbond garage door FL CL CL FL GFL Proposed ground line Existing natural ground line FG Lot Boundary Lot Boundary D A FG FG A FG FG FG A rendered finish to masonry external walls powdercoat aluminium window & door joinery. render finish to light weight external cladding. FL CL CL FL 2,730 431 2,730 rendered finish to masonry fence rendered finish to masonry fence adjacent retaining wall adjacent retaining wall/ fence Proposed ground line Existing natural ground line DP DP DP Lot Boundary Lot Boundary DP FG FG FG OG OG A A FG LOT 133 LOWER FLOOR PLAN 1:100 LOT 133 UPPER FLOOR PLAN 1:100 LOT 133 ROOF PLAN 1:100 LOT 133 ELEVATION A 1:100 LOT 133 ELEVATION B 1:100 LOT 133 ELEVATION C 1:100 LOT 133 ELEVATION D 1:100 1:100
4
Embed
KEW STAGE 3A HOUSING - kew.org.au · PDF fileLOT 133 ELEVATION A 1:100 LOT 133 ELEVATION B 1:100 LOT 133 ELEVATION C 1:100 ... watertank under deck Lot Area A: 390.0 m2
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
NOTESBuilder/Contractor shall verify job dimensions before any job commences.Figured dimensions take precedence over drawings and job dimensions. Allshop drawings shall be submited to the Architect/Consultant, andmanufacture shall not commence prior to return of inspected shop drawingsby the Architect/Consultant.
NOTESBuilder/Contractor shall verify job dimensions before any job commences.Figured dimensions take precedence over drawings and job dimensions. Allshop drawings shall be submited to the Architect/Consultant, andmanufacture shall not commence prior to return of inspected shop drawingsby the Architect/Consultant.
NOTESBuilder/Contractor shall verify job dimensions before any job commences.Figured dimensions take precedence over drawings and job dimensions. Allshop drawings shall be submited to the Architect/Consultant, andmanufacture shall not commence prior to return of inspected shop drawingsby the Architect/Consultant.
NOTESBuilder/Contractor shall verify job dimensions before any job commences.Figured dimensions take precedence over drawings and job dimensions. Allshop drawings shall be submited to the Architect/Consultant, andmanufacture shall not commence prior to return of inspected shop drawingsby the Architect/Consultant.