ON IT 1 Kent Avenue Generating Station Ash Pit Interim Remedial Measure (IRM) September 21, 2011
10

Kent Avenue Generating Station Ash Pit Interim Remedial Measure (IRM)

Feb 15, 2016

Download

Documents

dympna

Kent Avenue Generating Station Ash Pit Interim Remedial Measure (IRM) . September 21, 2011. 1. 1. 2. 2. 4. 4. Kent Avenue Generating Station Site History . Operated 1905-1989 as power generating station (coal ash/water mixture pumped to ash pit); electric distribution until 1998 - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Kent Avenue Generating Station  Ash Pit Interim Remedial Measure (IRM)

ON IT

111

Kent Avenue Generating Station Ash Pit Interim Remedial Measure (IRM)

September 21, 2011

Page 2: Kent Avenue Generating Station  Ash Pit Interim Remedial Measure (IRM)

ON IT

222

Page 3: Kent Avenue Generating Station  Ash Pit Interim Remedial Measure (IRM)

ON IT

3

Page 4: Kent Avenue Generating Station  Ash Pit Interim Remedial Measure (IRM)

ON IT

444

Page 5: Kent Avenue Generating Station  Ash Pit Interim Remedial Measure (IRM)

ON IT

Kent Avenue Generating StationSite History

• Operated 1905-1989 as power generating station (coal ash/water mixture pumped to ash pit); electric distribution until 1998

• Original Williamsburg power plant demolished in 1950s

• Remaining power plant was abated for asbestos/lead paint and demolished in 2007-2009

• July 2010 Voluntary Cleanup Agreement (VCA) with NYSDEC for the entire Site

• Former National Grid Manufactured Gas Plant (MGP) located adjacent to south property line

5

Page 6: Kent Avenue Generating Station  Ash Pit Interim Remedial Measure (IRM)

ON IT

6

Page 7: Kent Avenue Generating Station  Ash Pit Interim Remedial Measure (IRM)

ON IT

GeoTube Process

7

Page 8: Kent Avenue Generating Station  Ash Pit Interim Remedial Measure (IRM)

ON IT

Kent Avenue Generating StationAsh Pit IRM – EH&S Features

• Dust/Odor Control

• Community Air Monitoring Program

• Noise Mitigation

• Site Security

• Traffic Management

• Surface Water Runoff Control

• Spill Prevention/Containment

8

Page 9: Kent Avenue Generating Station  Ash Pit Interim Remedial Measure (IRM)

ON IT

Kent Avenue Generating StationAsh Pit IRM Tentative Schedule (2011-2012)

• Site Preparation: Sept. 19 – Oct. 7

• Removal of Surface/Subsurface Structures: Oct. 4 – Nov. 25

• Removal/Processing of Contents: Oct. 7 – Dec. 13

• Closure: Dec. 5 – 21

• Removal of Temporary Facilities: Dec. 14 – Jan. 6

• Work Hours: 7:00 AM to 6:00 PM

9

Page 10: Kent Avenue Generating Station  Ash Pit Interim Remedial Measure (IRM)

ON IT

Kent Avenue Generating StationAsh Pit IRM

QUESTIONS AND ANSWERS

10