Kennewick School District Daily Report: Eastgate Elementary Specializing in Projects that Make a Difference® PROJECT TEAM Kennewick School District 1000 4th Ave. Kennewick, WA 99336 (509) 222-7667 www.ksd.org Doug Carl Director of Capital Projects Madsen Mitchell Evenson and Conrad, PLLC 8905 West Gage, Ste 200 Kennewick, WA 99336 (509) 396-7278 www.madmitch.com Doug Mitchell, AIA, LEED AP Project Architect Joe Hampton Project Manager Leone & Kebble Contractor 108 West Boone Spokane, WA 99201 (509) 327-4451 www.leone-keeble.com Tom Mercer Project Manager Carl Clausen Superintendent Strategic Construcon Management, Inc. 3601 North 20th Pasco, WA 99301 (509) 737-0072 www.strategic-cm.com David L. Robison, CCM, LEED AP Owner’s Representave CONSTRUCTION ACTIVITY OBSERVED Report No.: 040114-01 SEPTEMBER 11, 2014 VOL. 1 n ISSUE 77 Kennewick Elementary Improvement Program Prepared By: V. Guzman Weather: 73° Sunny Wind Speed: 10 mph Humidity: 19% Precipitaon: 0.00 in. Interior demolion of all the walls and spaces within the exisng school connues; the demolion of the exterior walls will soon begin. Only the exterior walls remain at the old principle’s office Grinding of the exisng organics is part of the process required for ongoing site development. Electrical conduits are neatly placed and encased in the new concrete floor. The placement of masonry block connues at all available locaons.