8utting and gru<<ing road land including u=rooting !ild >egetation7 grass7 <ushes7 shru<s7sa=lings and trees of girth u=to ,''mm7 remo>al of stum=s of such trees cut earlier anddis=osal of unser>icea<le materials and stac"ing of ser>icea<le materials to <e used orauctioned7 including remo>al and dis=osal of to= organic soil not e?ceeding 10' mm inthic"ness as =er Technical S=ecification 8lause ('1 <& manual means in area of non-thron& @ungle etc.7 com=lete as directed <& the Engineer in charge of the !or".
NAME 23 42R) :META##N5 AND ASP6A#TN5 23 R2AD 3R2M )E#AD T2 T-' R2AD N SA5ARAT#AU)7 S6M25A DSTR8T. 3R2M '.'' T2 9./0' )M PA8)A5E N2. (/-(;
Tender Sl.No.
Scarif&ing e?isting granular surface to a de=th of 0' mm and dis=osal of scarified material!ith a lift u=to , m and leads u=to 1''' m as =er Technical S=ecification 8lause ,'1./ !ith
all leads and lifts7 loading and unloading charges including cost of la<our7 hire charges ofmachiner& and eui=ments and all other incidental charges necessar& for the successfulcom=letion of !or"s including trans=ortation etc.7 com=lete as =er detailed standards=ecification and as directed <& the Engineer in charge of the !or"s etc.7 com=lete.
NAME 23 42R) :META##N5 AND ASP6A#TN5 23 R2AD 3R2M )E#AD T2 T-' R2AD N SA5ARAT#AU)7 S6M25A DSTR8T. 3R2M '.'' T2 9./0' )M PA8)A5E N2. (/-(;
Tender Sl.No.
4ater <ound macadam su< <ase * <ase 4$M 5rading ( Pro>iding7 la&ing s=reading andcom=acting stone aggregates of s=ecific sies to !ater <ound macadam s=ecificationincluding s=reading in uniform thic"ness7 hand =ac"ing7 rolling !ith three !heel roller '-1'' )N static roller in stages to =ro=er grade and cam<er7 a==l&ing and <rooming7 stonescreening * <inding materials to fill u= the intersectices of coarse aggregate7 !atering andcom=acting to the reuired densit& grading ( !ith all lead and lifts7 loading and unloadingcharges7 cost and con>e&ance of all materials7 la<our eui=ment and other incidentalcharges etc.7 com=lete as =er Technical s=ecification 8lauses /'0 as directed <& theEngineer in charge of the !or".
8utting and gru<<ing road land including u=rooting !ild >egetation7 grass7 <ushes7 shru<s7sa=lings and trees of girth u=to ,''mm7 remo>al of stum=s of such trees cut earlier anddis=osal of unser>icea<le materials and stac"ing of ser>icea<le materials to <e used orauctioned7 including remo>al and dis=osal of to= organic soil not e?ceeding 10' mm inthic"ness as =er Technical S=ecification 8lause ('1 <& manual means in area of non-thron& @ungle etc.7 com=lete as directed <& the Engineer in charge of the !or".
NAME 23 42R) :META##N5 AND ASP6A#TN5 23 R2AD 3R2M )E#AD T2 T-' R2AD N SA5ARAT#AU)7 S6M25A DSTR8T. 3R2M '.'' T2 9./0' )M PA8)A5E N2. (/-(;
Tender Sl.No.
Scarif&ing e?isting granular surface to a de=th of 0' mm and dis=osal of scarified material!ith a lift u=to , m and leads u=to 1''' m as =er Technical S=ecification 8lause ,'1./ !ith
all leads and lifts7 loading and unloading charges including cost of la<our7 hire charges ofmachiner& and eui=ments and all other incidental charges necessar& for the successfulcom=letion of !or"s including trans=ortation etc.7 com=lete as =er detailed standards=ecification and as directed <& the Engineer in charge of the !or"s etc.7 com=lete.
NAME 23 42R) :META##N5 AND ASP6A#TN5 23 R2AD 3R2M )E#AD T2 T-' R2AD N SA5ARAT#AU)7 S6M25A DSTR8T. 3R2M '.'' T2 9./0' )M PA8)A5E N2. (/-(;
Tender Sl.No.
4ater <ound macadam su< <ase * <ase 4$M 5rading ( Pro>iding7 la&ing s=reading andcom=acting stone aggregates of s=ecific sies to !ater <ound macadam s=ecification
including s=reading in uniform thic"ness7 hand =ac"ing7 rolling !ith three !heel roller '-1'' )N static roller in stages to =ro=er grade and cam<er7 a==l&ing and <rooming7 stonescreening * <inding materials to fill u= the intersectices of coarse aggregate7 !atering andcom=acting to the reuired densit& grading ( !ith all lead and lifts7 loading and unloadingcharges7 cost and con>e&ance of all materials7 la<our eui=ment and other incidentalcharges etc.7 com=lete as =er Technical s=ecification 8lauses /'0 as directed <& theEngineer in charge of the !or".
F PRAD6ANA MANTR 5RAMA SADA) G2CANAF P6ASE H (''+-'9
Date of Recording :
Item of work Nos. L in M D in M Qty nit !mo"nt
1
Pre measurement t&. >ide this M.$.No.'1 at =age No.1 to , of tem No. ,.,0''
,.,0'' 6ectare 19/.'' +,0+,.''
,
'.'' to '.(' )M
#eft side 0 ,'.'' 10'.'' Rmtr
1 .'' .''
Right side + ,'.'' 1'.''
'.(' to './' )m
#eft side , ,'.'' '.''
1 ('.'' ('.''
Right side / ,'.'' 1('.''
1 0.'' 0.''
'./' to '.+' )m
#eft side + ,'.'' 1'.''
1 ('.'' ('.''
Right side + ,'.'' 1'.''
1 ('.'' ('.''
'.' to 1.'' )m
#eft side 1 1'.'' 1'.''
NAME 23 42R) : META##N5 AND ASP6A#TN5 23 R2AD 3R2M )E#AD T2 T-' R2AD N SA5ARA T#AU)7
S6M25A DSTR8T. 3R2M '.'' T2 9./0' )M PA8)A5E N2. (/-(;Name of 8ontractor : Mr. Sharath C Shet
Estimate 8ost : Rs. ('0.+ #a"hs
Technical a==ro>al No. : T86*'+(,1*DH*P6 - H $I *'9-'
6ead of Account : ,'0/-'+-,,9-Rural roads - '1
Agreement No. :
Starting Period : 1(-1(-(''
Sti=ulated Period : 11-'-(''
#$.No.
% in M&ender
rate
8utting and gru<<ing road land including u=rooting !ild >egetation7 grass7 <ushes7shru<s7 sa=lings and trees of girth u=to ,''mm7 remo>al of stum=s of such treescut earlier and dis=osal of unser>icea<le materials and stac"ing of ser>icea<lematerials to <e used or auctioned7 including remo>al and dis=osal of to= organicsoil not e?ceeding 10' mm in thic"ness as =er Technical S=ecification 8lause ('1<& manual means in area of non-thron& @ungle etc.7 com=lete as directed <& theEngineer in charge of the !or".
Surface drains in soil construction of unlined surface drains of a>erage crosssectional area './' sm in soil to s=ecified lines7 grades le>els and dimensions.E?ca>ated material to <e used in em<an"ment !ith all lead and lifts7 loading andunloading charges cost and con>e&ance of all materials7 la<our7 eui=ment andother incidental charges etc.7 com=lete as =er Technical s=ecification 8lause ,'9.Mechanical means as directed <& the Engineer in charge of the !or".
Scarif&ing e?isting granular surface to a de=th of 0' mm and dis=osal of scarifiedmaterial !ith a lift u=to , m and leads u=to 1''' m as =er Technical S=ecification8lause ,'1./ !ith all lead and lifts7 loading and unloading charges cost andcon>e&ance of all materials7 la<our7 eui=ment and other incidental charges etc.7com=lete as =er Technical s=ecification 8lause ,'9. Mechanical means asdirected <& the Engineer in charge of the !or".
Pre measurement t&. >ide this M.$.No.'1 at =ageNo./ to + of tem No. /
8om=acting 2riginal ground su==orting em<an"ment loosening7 le>elling andcom=acting original ground su==orting em<an"ment to fecilitate =lacement of firstla&er of em<an"ment7 scarified to a de=th of 10' mm7 mi?ed !ith !ater at 2M8and then com=acted <& rolling as to achie>e minium dr& densit& as gi>en in Ta<le,''.1 and ,''.( for em<an"ment construction as =er Technical s=ecificationclause ,'1./.1 as directed <& the Engineer in charge of the !or".
construction of em<an"ment !ith a==ro>ed material de=osited at site from road!a& cutting and e?ca>ation from drain and foundation other structures graded andcom=acted to need the reuirement of ta<les ,''.1 J ,''.( as =er technicals=ecification 8lause ,'1.0 !ith all lead and lift loading and unloading chargesincluding cost of la<our 6ire charges of machiner& and eui=ments and all otherincidental charges necessar& for the successful com=letion of the !or" includingtrans=orting etc.7 com=lete. as =er the detailed standard s=ecification and asdirected <& the Engineer in charge of the !or" etc. com=lete
8onstruction of Su<grade and earthen shoulders !ith a==ro>ed material o<tainedfrom <orro! =its !ith all lifts and leads7 trans=orting to site7 s=reading7 grading toreuried slo=e and com=acted to meet reuirement of ta<le ,''.( !ith lead u=to1''' m as =er Technical S=ecification 8lause ,',.1 !ith all lead and lifts7 loadingand unloading charges cost and con>e&ance of all materials7 la<our7 eui=ment
and other incidental charges etc.7 com=lete as =er Technical s=ecification 8lause,'9. Mechanical means as directed <& the Engineer in charge of the !or".
s=reading and com=acting stone aggregates of s=ecific sies to !ater <oundmacadam s=ecification including s=reading in uniform thic"ness7 hand =ac"ing7rolling !ith three !heel roller '-1'' )N static roller in stages to =ro=er grade andcam<er7 a==l&ing and <rooming7 stone screening * <inding materials to fill u= theintersectices of coarse aggregate7 !atering and com=acting to the reuireddensit& grading ( !ith all lead and lifts7 loading and unloading charges7 cost andcon>e&ance of all materials7 la<our eui=ment and other incidental charges etc.7com=lete as =er Technical s=ecification 8lauses /'0 as directed <& the Engineerin charge of the !or".
Part Rate =aid Rs. /'''.''Toatl $ill amount Rs. (5+2('*.**
Pro>iding and la&ing Reinforced cement concrete =i=e NP, as =er design inSingle ro!. Pro>iding and la&ing reinforced cement concrete =i=e NP, for cul>ertson first class <edding of granular material in single ro! including fi?ing collar !ithcement mortar 1:( <ut e?cluding e?ca>ation7 =rotection !or"s7 <ac"filling7
concrete and masonr& !or"s in head !alls and =ara=ets !ith all lead and lifts7loading and unloading charges7 cost and con>e&ance of all materials7 la<our7eui=ment and other incidental charges etc.7 com=lete. 8lause 11'+ as directed<& the Engineer in charge of the !or". 1''' mm dia single >ent.
!ttin' and 'r!((in' road land incl!din' !)rootin' %ild*e'etation+ 'ra,,+ (!,-e,+ ,-r!(,+ ,a)lin', and tree, o$ 'irt-
!)to 300mm+ remo*al o$ ,t!m), o$ ,!c- tree, c!t earlier anddi,)o,al o$ !n,er*icea(le material, and ,tac&in' o$ ,er*icea(lematerial, to (e !,ed or a!ctioned+ incl!din' remo*al anddi,)o,al o$ to) or'anic ,oil not eceedin' 150 mm in t-ic&ne,,a, )er Tec-nical S)eci$ication la!,e 201 (y man!al mean, inarea o$ non/t-rony !n'le etc.+ com)lete a, directed (y t-en'ineer in c-ar'e o$ t-e %or&.
S!r$ace drain, in ,oil con,tr!ction o$ !nlined ,!r$ace drain, o$a*era'e cro,, ,ectional area 0.40 ,qm in ,oil to ,)eci$ied line,+'rade, le*el, and dimen,ion,. ca*ated material to (e !,ed inem(an&ment %it- all lead and li$t,+ loadin' and !nloadin'c-ar'e, co,t and con*eyance o$ all material,+ la(o!r+ eq!i)mentand ot-er incidental c-ar'e, etc.+ com)lete a, )er Tec-nical,)eci$ication la!,e 307. ec-anical mean, a, directed (y t-en'ineer in c-ar'e o$ t-e %or&.
Scari$yin' ei,tin' 'ran!lar ,!r$ace to a de)t- o$ 50 mm anddi,)o,al o$ ,cari$ied material %it- a li$t !)to 3 m and lead, !)to1000 m a, )er Tec-nical S)eci$ication la!,e 301.4 %it- all leadand li$t,+ loadin' and !nloadin' c-ar'e, co,t and con*eyance o$all material,+ la(o!r+ eq!i)ment and ot-er incidental c-ar'e,etc.+ com)lete a, )er Tec-nical ,)eci$ication la!,e 307.ec-anical mean, a, directed (y t-e n'ineer in c-ar'e o$ t-e%or&.
em(an&ment to $ecilitate )lacement o$ $ir,t layer o$em(an&ment+ ,cari$ied to a de)t- o$ 150 mm+ mied %it- %aterat and t-en com)acted (y rollin' a, to ac-ie*e mini!m dryden,ity a, 'i*en in Ta(le 300.1 and 300.2 $or em(an&mentcon,tr!ction a, )er Tec-nical ,)eci$ication cla!,e 301.4.1 a,directed (y t-e n'ineer in c-ar'e o$ t-e %or&.
con,tr!ction o$ em(an&ment %it- a))ro*ed material de)o,itedat ,ite $rom road %ay c!ttin' and eca*ation $rom drain and$o!ndation ot-er ,tr!ct!re, 'raded and com)acted to need t-ereq!irement o$ ta(le, 300.1 300.2 a, )er tec-nical,)eci$ication la!,e 301.5 %it- all lead and li$t loadin' and!nloadin' c-ar'e, incl!din' co,t o$ la(o!r Hire c-ar'e, o$mac-inery and eq!i)ment, and all ot-er incidental c-ar'e,nece,,ary $or t-e ,!cce,,$!l com)letion o$ t-e %or& incl!din'tran,)ortin' etc.+ com)lete. a, )er t-e detailed ,tandard,)eci$ication and a, directed (y t-e n'ineer in c-ar'e o$ t-e%or& etc. com)lete
on,tr!ction o$ S!('rade and eart-en ,-o!lder, %it- a))ro*edmaterial o(tained $rom (orro% )it, %it- all li$t, and lead,+tran,)ortin' to ,ite+ ,)readin'+ 'radin' to req!ried ,lo)e andcom)acted to meet req!irement o$ ta(le 300.2 %it- lead !)to1000 m a, )er Tec-nical S)eci$ication la!,e 303.1 %it- all leadand li$t,+ loadin' and !nloadin' c-ar'e, co,t and con*eyance o$all material,+ la(o!r+ eq!i)ment and ot-er incidental c-ar'e,etc.+ com)lete a, )er Tec-nical ,)eci$ication la!,e 307.ec-anical mean, a, directed (y t-e n'ineer in c-ar'e o$ t-e%or&.